pracownicze broszura en - perfectcube.plperfectcube.pl/en/files/pracownicze_broszura.pdf ·...

6
Employee cottages Employee cottages Brochure

Upload: others

Post on 19-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: pracownicze broszura EN - perfectcube.plperfectcube.pl/en/files/pracownicze_broszura.pdf · pracownicze_broszura_EN.cdr Author: Rafał Created Date: 12/27/2019 12:49:23 AM

Employee cottagesEmployee cottages

Brochure

Page 2: pracownicze broszura EN - perfectcube.plperfectcube.pl/en/files/pracownicze_broszura.pdf · pracownicze_broszura_EN.cdr Author: Rafał Created Date: 12/27/2019 12:49:23 AM

2

Modular employee cottages solve the problem of employee accommodation, by repeatedly reducing the company's costs. They affect tax optimization through quick depreciation and purchase in leasing.

What you gain?

Buildings are made in the technology for oversize thermal insulation, with the required regulations for the year 2021. Modules are delivered to the construction site by trucks. Thanks to the significant degree of prefabrication of modules, we can reduce to minimum time of the assembly, construction noise level and dust emissions, which is highly important in built-up areas. In addition, in the modular system it is possible to carry out prefabrication and assembly works in the winter, in conditions where traditional construction technologies require work to be suspended.

Technology

low prices

whole season

no fundings

lease available

short construction time

best materials

mobility solar panels

modern design eco house

Page 3: pracownicze broszura EN - perfectcube.plperfectcube.pl/en/files/pracownicze_broszura.pdf · pracownicze_broszura_EN.cdr Author: Rafał Created Date: 12/27/2019 12:49:23 AM

3

The outer walls of modular buildings are adapted to the installation of any type of facade system available on the market. Installation of a ventilated facade is done in a way that eliminates thermal bridges occurring on the fastening elements. Installation of partition walls based on a drywall system that meets the highest standards in terms of fire resistance, moisture resistance and impact resistance, allows you to easily change the arrangement of the building in use. All our structures meet the requirements for fire protection.

partitions with the following coefficient values U (W/m2ˇK)outer wall U = 0,2 (W/m2ˇK)floor U = 0,23 (W/m2ˇK)roof U = 0,15 (W/m2ˇK)

Construction of partitions

Thermal insulation

The supporting structure of the modules is made in the form of a skeleton of welded cold-formed and / or hot-rolled steel profiles of steel in structural material grades (e.g. S235JR, S355JR or appropriate according to PN EN 10025: 1993) and with cross-sections which will be result from static calculations performed each time.The steel structure is protected against corrosion and fire. Loads from modules can be transferred depending on the type of extension on:- prepared foundations (point foundations, foundation footings or foundation slab)- prepared for reinforced concrete, steel or combined construction

Supporting structure

Page 4: pracownicze broszura EN - perfectcube.plperfectcube.pl/en/files/pracownicze_broszura.pdf · pracownicze_broszura_EN.cdr Author: Rafał Created Date: 12/27/2019 12:49:23 AM

4

Room layout

Terrace Use area: 59,28m²

Construction area: 70,56m²area: 9,00 m²

area: 7,38 m²

area: 5,96 m²

area: 2,60 m²area: 25,58 m²

area: 2,72 m²

area: 5,96 m²

area: 7,38 m²

area: 1,70 m²

Page 5: pracownicze broszura EN - perfectcube.plperfectcube.pl/en/files/pracownicze_broszura.pdf · pracownicze_broszura_EN.cdr Author: Rafał Created Date: 12/27/2019 12:49:23 AM

5

Cross-section and materials

1. 10.

2. 11.

3. 12.

4. 13.

5. 14.

6. 15.

7. 16.

8. 17.

9. 18.

facade board (there is possibility to use any facade material) floor (floor panels, PVC floor covering, floorboard, etc.)

insulation (optional: grooved polystyrene, rockwool) board OSB 3

windinsulation joists

board OSB 3 steam insulation

steel element of the skeleton structure insulation (rockwool, polyurethane foam)

insulation (rockwool, polyurethane foam) steel element of the skeleton structure

steam insulation insulator (steel elements filled with polyurethane foam)

board OSB 3 board "steico universal black”

plasterboard insulation coating (protection and sealing mass)

1

12

14

15

13

16

17

18

75

4

6

10

11

3

2

8

9

Page 6: pracownicze broszura EN - perfectcube.plperfectcube.pl/en/files/pracownicze_broszura.pdf · pracownicze_broszura_EN.cdr Author: Rafał Created Date: 12/27/2019 12:49:23 AM

perfectcube.pl