pradhan mantri gram sadak yojana · kashmir and uttaranchal), the desert areas as identified in the...

28

Upload: buiphuc

Post on 20-Aug-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Pradhan Mantri Gram Sadak Yojana

S No. Name Page No.

1. Guidelines 1-5

2. Rural Roads Construction 6-19

3. List of States, Nodal Departments, Executing Agency,

Autonomous Body, State Quality Coordinators and

IT Nodal Officers 20-25

C O N T E N T S

Pradhan Mantri Gram Sadak Yojana

1

Principles and Objectives

• The Pradhan Mantri Gram SadakYojana is a special centralintervention as part of a povertyreduction strategy. Though ruralroads is a State subject, the CentralGovernment is providing financialassistance as a CentrallySponsored Programme.

• The primary objective of theProgramme is to provideconnectivity to unconnectedhabitations in rural areas by meansof all-weather roads. This is to bedone in a time frame thathabitations with a population of1000 and above shall be coveredin three years, and those with apopulation of 500-1000 shall becovered by the end of the TenthFive Year Plan period.

• In respect of the Hill States (theStates in the North East, Sikkim,Himachal Pradesh, Jammu &Kashmir and Uttaranchal), thedesert areas as identified in theDesert Development Programmeand the Tribal Areas (Schedule V),the objective is to connecthabitations with a population of250 and above.

• The programme can provide forthe upgradation of the existingroads to prescribed standards.However, it must be noted thatupgradation is not a keycomponent of the programme andcannot exceed 20 per cent of theallocation of the State. And, inupgradation works, priority shouldbe given to the work of conversionof fair-weather roads to all-weather roads.

• The programme envisages singleconnectivity. If a habitation isconnected to another habitationby an all-weather road, no furtherwork can be taken up under thePMGSY for that habitation.

Planning for Rural Roads

• In each district, the DistrictPanchayat / Zilla Panchayat hasapproved its District Rural RoadsPlan indicating the existing roadnetwork system and also the roadsproposed for connecting theunconnected habitations to theexisting road network, in aneconomical and efficient manner.

• Out of this Plan, the DistrictPanchayat has identified a CoreNetwork consisting of some of theexisting roads as well as all the

Guidelines

Pradhan Mantri Gram Sadak Yojana

roads proposed for newconnectivity under theprogramme, in order to provide atleast single access to allconnected / eligible habitations.The Core Network is the basis forall planning in the rural roadssector.

• The District Rural Roads Plan andCore Network have been finalisedby the District Panchayat inconsultation with the IntermediatePanchayat / Panchayat Samiti andelected representatives.

Annual Proposals

• Each year the list of road works tobe taken up under the PMGSY isfinalised by the District Panchayat,in accordance with the fundsallocated to the district by the StateGovernment. The DistrictPanchayat shall finalise the listthrough a consultative processinvolving the lower-levelpanchayati institutions and electedrepresentatives. It must be ensuredthat the road works are part of theCore Network and that newconnectivity is given primacy asper the order of priority.

• In drawing up the list of roadworks, the District Panchayat

ensures that unconnectedhabitations get primacy byfollowing the order of priority:-

a) Providing new connectivity tounconnected habitations with apopulation of 1000 and more(500 and more for hill States, NEStates, Desert and Tribal areas)

b) Providing new connectivity tounconnected habitations with apopulation of 500-999 (250-499in the case of hill States, NEStates, Desert and Tribal areas)

c) Upgradation of through roads(i.e., roads leading to importantplaces with branching roadsleading to habitations)

d) Upgradation of link roads (i.e.,roads ending in a habitation)

• In plain areas, the population of allhabitations within 500 metresradius shall be counted for purposeof determining population size. Inhill areas the radius shall be 1.5 kmof path distance.

• Exceptions to the scheme outlinedabove can be made for roads thatlink the village Panchayatheadquarters, market centres oreducational, medical or otheressential services or notified touristdestinations.

• Under the PMGSY, the proposalsof the MPs are to be given full2

Pradhan Mantri Gram Sadak Yojana

consideration. A list ofunconnected habitations (withpopulation) in each District,alongwith a list of roads identifiedto connect them as part of the CoreNetwork, should be sent to the MPsconcerned for suggestions. It isincumbent on the DistrictPanchayat to ensure that, whileframing the proposals, fullconsideration is given to theproposals given by the MPs withinthe framework of the Guidelines.

State Nodal Agencies

• Each State Government hasnominated a Nodal Department,which has overall responsibility forthe implementation of the PMGSYin the State. The State Governmenthas nominated a State level agencyto receive the funds from theMinistry of Rural Development.

• Each State Government has alsoidentified Executing Agencies forthe programme. The executingagencies have their ProgrammeImplementation Units (PIU) atDistrict level, each headed by anengineer of the rank of ExecutiveEngineer.

• Each State Government has set upa State-level Standing Committee(headed by the Chief Secretary) to

vet the Core Network and theannual project proposals to ensurethat they have been formulated inaccordance with the guidelines.The Committee is responsible forclose and effective monitoring ofthe programme, and oversees thetimely and proper execution ofroad works.(Details of these agencies invarious States is given at page 20)

Procedure for Clearance ofProposals

• After approval by the DistrictPanchayat, the proposals areforwarded through the District PIUto the State Level Agency. Theagency vets the proposals inaccordance with the guidelinesand places them before the State-Level Standing Committee.

• The State-level StandingCommittee scrutinises theproposals to see whether they haveadhered to the Guidelines andwhether the recommendations ofMPs have been taken into account.

• After clearance of the State-levelCommittee, the detailed projectreports are prepared for eachproposed road work, and the designand estimates are got scrutinised

3

Pradhan Mantri Gram Sadak Yojana

by a State Technical Agency (STA)nominated by the Ministry of RuralDevelopment.

• The State-level agencyconsolidates the proposals fromeach PIU after verifying that theyhave been duly scrutinised by therespective STAs and forwards theState annual proposal to theNational Rural RoadsDevelopment Agency (NRRDA),the agency of the Ministry of RuralDevelopment for management ofthe PMGSY.

• The NRRDA examines theproposals from the State-levelagency to ensure that they are inline with the programme guidelinesand that they have been dulyverified by STAs. The proposalsfrom the State are considered byan Empowered Committee,chaired by Secretary, Ministry ofRural Development andrecommended to the Minister ofRural Development for clearance.The representatives of the StateGovernment are invited to attendthe meetings.

Tendering & Execution of Works

• After formal clearance by theMinister of Rural Development, the

District PIUs tender the clearedworks as per the Standard BiddingDocument of the StateGovernment approved by theNRRDA.

• Within 15 days of the issue of thework order or the laying of thefoundation stone, whichever isearlier, a board is to be put up atthe site of the project, with aPMGSY logo, with the details of theproject.

• The contracted work is to becompleted within 9 months fromissue of work order in plain areasand 18 months in case of Hill Statesand Northeast, etc.

Quality Assurance

• Every contractor has to maintain afield laboratory for testing as partof the contract. He is to follow theQuality Control Handbookprescribed by NRRDA for all testsand is to record the results in theQuality Control Registermaintained by him at the site. Atleast 50% of the tests are to bedone in the presence of the PIUengineers.

• Each State Government hasappointed a State QualityCoordinator generally of the rank4

Pradhan Mantri Gram Sadak Yojana

of Superintending Engineer. Hedeputes independent qualitymonitors every month to check andreport on the quality of theexecution. All defects pointed outare required to be removedimmediately by the contractor.

• NRRDA deputes National QualityMonitors (NQM), who are retiredChief/Superintending Engineers.NQMs inspect road works in orderto guide PIUs to improve thetechnical quality of the works.

• In case a road is found to be ‘poor’or ‘average’ the work has to berectified or redone by thecontractor.

• In case a road is found to be ‘poor’or ‘average’ on completion, actionis initiated against the contractor /person at fault.

Maintenance

• All PMGSY roads are guaranteeddefect free by the Contractor for aperiod of 5 years and maintainedby him under a contract. Funds forthe maintenance contract areprovided from the State Budget.After the period of 5 years theroads are transferred to the DistrictPanchayat for further maintenance.

Convergence

• Road connectivity is not the goal.It is the means to ensure thatessential public services likehealth, education, employment,access to markets etc., areavailable to all citizens. StateGovernment agencies andPanchayati Raj Institutions willensure that all related programmesfocus on providing these servicesto habitations connected underPMGSY.

Complaints

All complaints may be made to theState Quality Coordinator or the Stateconcerned.Please visit the PMGSY websites at:-www.pmgsy.nic.in (Ministry of RuralDevelopment)www.pmgsy.org (National Rural RoadsDevelopment Agency)

*This pamphlet gives only some of the importantprovisions of the Yojana. The PMGSY Guidelinesissued by the Ministry of Rural Developmentmay be consulted for further information.

5

Pradhan Mantri Gram Sadak Yojana

Stages in Construction of Rural Roads

Survey, Planning and Design

To construct a good road,adequate survey, proper planningand design are required. Thealignment of the road has to bedecided to ensure proper roadgeometrics, gradient and effectivedrainage. A rural road generallyconsists of basic formation(embankment or cut-formation)and pavement over which thetraffic moves. The top 30 cm layerof the formation is compactedmore rigorously and is called sub-grade. The pavement consists ofa number of layers; the type oflayer and their thickness isdetermined by the nature ofground, strength of soil and also

the traffic intensity. These layersare sub-base course (compactedgranular material like gravel andsand etc.), base - course(watered, rolled and compactedmetal and screening, generallycalled Water Bound Macadam orWBM) and surface course (thinbituminous layer). These layersare constructed to distributeloads and stresses caused bytraffic from the upper layers to awider area of the sub-basecourse and sub-grade. The roadssurface may be unsealed (gravelsurface) if the traffic and rainfall islow or sealed (bituminous surfaceetc.) if traffic and rainfall is high.

6

Pradhan Mantri Gram Sadak Yojana

A proper design essentially consists of determining the right type and thicknessof these layers, in the most economic way for design life of 10 years, based onthe soil, terrain, climate and traffic conditions along the road.

7

Pradhan Mantri Gram Sadak Yojana

Road Geometrics

Every Road in the Programmehas to conform to the prescribedGeometric Standards laid out inRural Roads Manual. The widthof the road is determined on thebasis of expected traffic. Curveson the road side should begentle enough to allow traffic tomove at prescribed speed limits,with adequate sight distance. Allthis requires careful surveys atplanning stage.

MS Road to Chaina Road,Length:1.62 Km. Cost: Rs.15.77 Lakhs,District Morena, Madhya Pradesh.

Stages in Construction of Rural Roads

8

Pradhan Mantri Gram Sadak Yojana

Baldian to Kayarkoti Road, Length: 4.28 Km., Cost- 28 Lakhs,District Shimla, Himachal Pradesh.

NH 5 to Kunarbasta Road Length:1.21 Km.Cost: Rs.23.45 Lakhs, District Khorda, Orissa.

9

Pradhan Mantri Gram Sadak Yojana

Stages in Construction of Rural Roads

Earthwork and Sub-grade

An embankment is generallyconstructed to raise road levelto avoid later damage to theroad by surface water andground water. Height ofEmbankment is decided on thebasis of the ground profile.Good soil for embankment islaid in layers and compactedusing Road Rollers. Fly ash

can also be used forembankment construction.The Sub-grade is the top 30 cmthickness of the earthwork whichis constructed by using betterselected soil and compactedwith higher effort. Complete andproper compaction is crucial tobuilding a long lasting road.

Compaction of the sub-grade soil of the road,Rampur Fakhruwal to Rampur Road, Length 2.47 Km., Cost Rs 40.55 Lakhs,Year 2001-02, District Jalandhar, Punjab.

10

Pradhan Mantri Gram Sadak Yojana

Hill side cutting for construction of formation of the road,Danughat to Kolka Road, Length:2.5 Km., Cost-62.83 Lakhs. District Solan,Himachal Pradesh.

While creating an embankment,in addition to the road width,shoulders are also provided and

compacted to protect the roadand provide additional width toallow vehicles to pass eachother.

11

Pradhan Mantri Gram Sadak Yojana

Construction of Granular Sub-baseand Base Layers

After the laying and compaction ofthe Embankment, a sub-baselayer of granular material (sand,gravel or stone, slag, concrete,etc. in crushed form) is laid andcompacted properly.Metalling of the Road by basecourse layers of Water BoundMacadam (WBM) is then carriedout systematically. WBM isconstructed by spreading andcompaction of coarse and fineaggregates. The coarseaggregate is generally metal(generally crushed rocks,possessing adequate strength,

hardness, toughness, durabilityand of the right shape) which isspread over the road surface andcompacted dry by repeatedpassing of a road roller. After thisdry rolling of metal, screeningmaterial (to fill the spaces betweenthe metal pieces) is added andagain the dry rolling is done. Aftersufficient compaction, water isadded and the wet rolling iscarried out with road roller toachieve the full compaction. Ifrequired, the binding material isalso added to avoid raveling of themetal. The strength of the layer tosustain the traffic load comes fromthe interlocking of the metalpieces achieved by thecompaction. A number of WBMlayers with progressively smallersized metal may be donedepending on the strength of thesub-grade soil and traffic intensity.Dry compaction of metal and

application of screening material:Narbari Road, Assam.

Stages in Construction of Rural Roads

12

Pradhan Mantri Gram Sadak Yojana

Preparation for construction ofgranular Sub-base: DabraJangipur Road to Gadi, Length4.00 Km. Cost 63.89 Lakhs.District Gwalior, Madhya Pradesh.

Wet rolling of Water BoundMacadam Road after screeningand binding material has beenspread: B.C.C. Road toSengalipallam, District Karur,Tamil Nadu.

Laying of metal with the help ofCamber Board: Length: 4.20 Km.

Cost 64.56 Lakhs. DistrictGwalior, Madhya Pradesh.

13

Pradhan Mantri Gram Sadak Yojana

Wearing Course

After the WBM layers havebeen constructed, the surfaceand wearing course, whichforms the surface of the roadis constructed. For ruralroads, this layer is generally atwo coat Surface Dressing(SD) or Premix Carpet (PMC)with Seal Coat. In SurfaceDressing, hot Bitumen issprayed on the brushed WBM

Application of binder after first coat of Surface Dressing:Pimpri Road, Orissa.

Surface and small size metalaggregate (chips) are spread outevenly and rolled using roadroller. In PMC, the aggregateand Bitumen are hot mixed andlaid at a temperature of about1250 C and rolled using a roadroller.‘Cold Rolling’ may also be doneusing Bitumen emulsion whichcan be worked at atmospherictemperature.

Stages in Construction of Rural Roads

14

Pradhan Mantri Gram Sadak Yojana

Premix carpet after compaction:Alampadi to Ivanur Road, Length 5.20 Km., Cost: 53.36 Lakhs,District Cuddalore, Tamil Nadu.

Laying and compaction of 20 mm thick Pre Mix Carpet:Periyavadugapatti to Mangasolipalyam Road, Length 3 Km.,Cost: 33.54 Lakhs, District Karur, Tamil Nadu.

15

Pradhan Mantri Gram Sadak Yojana

Surface Drainage, Side Drainageand Cross Drainage and Protection Works

Proper Cross Drainage is animportant feature of these roads.Integration of side drains withcross drains is to be ensured.The drainage along and acrossthe road has to be proper, sothat water does not erode theroad structure. Drainage has tobe planned as part of roaddesign.

Hill side protection work and side drain: Shenal to Saunel Road,Length: 4.28 Km., Cost- 125 Lakhs, District Shimla, Himachal Pradesh.

Drainage of the road surfaceitself is extremely important. Thisis achieved by providing a gentleslope of 3% ( depending uponthe surface) on either side of thecentral line of the road. Thisslope is called Camber, and ithas to be uniform along thelength of the road except atcurves, where the outer surfaceis raised (super elevation) tobalance the centrifugal forces onthe vehicle.

Stages in Construction of Rural Roads

16

Pradhan Mantri Gram Sadak Yojana

Hume pipe vented causeway.The super elevation is visible at the curves at bottom right and top left. Theside drain well integrated with the cross drain is also visible.: Bhimanagar toBavarchiwadi Road, Length: 1.23Km, Cost- 14.66 Lakhs, District Satara,Maharashtra.

Slab culvert: Avulamanda toPathanancharapuram Road

Length:3.5 Km. Cost:Rs.19.5 lakhs, District

Prakasham, AndhraPradesh.

17

Pradhan Mantri Gram Sadak Yojana

Quality Control

Construction of Rural Roads underPradhan Mantri Gram Sadak Yojana

Contractor’s Field laboratory. Block:Jaura, District Morena, Madhya Pradesh.

Quality starts with proper surveyand design. Under PMGSY, thedesigns are scrutinized by StateTechnical Agencies (STAs) toensure scientific design cateringto local soil, terrain, climate andtraffic requirements in the mosteconomical manner.

Quality during construction beingequally important, a three tierquality control mechanism hasbeen devised – the first tierconsists of the contractor’s fieldlaboratory, where tests are to becarried out as per prescribedQuality Control Hand Book at

various stages of the work, undersupervision of the ProgrammeImplementation Unit (PIU). Thesecond and third levels consist ofrandom inspection by QualityMonitors employed by the StateNodal Agency and National RuralRoads Development Agencyrespectively.

The majority of the tests arecarried out to determine thecompaction of the various layers,and the nature, quality and size ofthe various granular and othermaterials used. Most equipmentlike Sieve Set, Moisture testingapparatus, Proctor compactiontesting apparatus, etc are inex-pensive and extremely easy touse.

Relentless testing and mercilessquality control is the only guaranteeof a well constructed road.

18

Pradhan Mantri Gram Sadak Yojana

Field laboratory. District South 24 Pargana, West Bengal.

Field Testing of N. H. 203 toNoagadi Road Length:1.5Km. Cost: Rs.33.00 Lakhs,District Bhubneshwar,Orissa.

19

Pradhan Mantri Gram Sadak YojanaPradhan Mantri Gram Sadak Yojana

20

List

of S

tate

s, N

odal

Dep

artm

ents

, Exe

cuti

ng A

genc

y, A

uton

omou

s B

ody,

Stat

e Q

ualit

y C

oord

inat

ors

and

IT N

odal

Off

icer

Sr.

Stat

eN

odal

Exec

uti

ng

Aut

onom

ous

Stat

e Q

uali

tyIT

Nod

al

No

Dep

artm

ent

Age

ncy

Bod

yC

oord

inat

ors

Off

icer

1A

nd

hra

Pan

chay

ati

Pan

chay

ati

AP

Stat

e R

ural

Shri

Gyn

eshw

ar,

Chi

efJ

Ani

l K

umar

, A

ssis

tant

Exe

cutiv

e

Pra

des

hR

aj &

Rur

alR

aj &

Rur

alD

evel

op

men

tEn

gine

er,

Dep

artm

ent

ofEn

gine

er,

Panc

haya

ti R

aj

Dev

elo

pm

ent

Dev

elo

pm

ent

Age

ncy

Panc

haya

t &

Rur

al

Dev

elop

men

t, S

RTG

N B

haw

an,

Erru

man

jil

Col

ony,

Hyd

erab

ad.

2A

run

ach

alPu

blic

Wor

ksPu

blic

Wor

ksSh

ri T

omi

Ete,

Add

l. C

E, P

ublic

Bor

a Et

e, S

uper

inte

ndin

g

Pra

des

hD

epar

tmen

tD

epar

tmen

tW

ork

Dep

artm

ent

Gov

t. o

fEn

gine

er (

HQ

), O

/O C

E (E

Z),

Aru

nach

al P

rade

sh,

Itan

agar

.PW

D,

Mow

b-II

, It

anag

ar.

e-m

ail

: bo

raet

e@re

diff

mai

l.co

m

3A

ssam

Ru

ral

Publ

ic W

orks

Ass

am S

tate

Shri

.K.

Haz

arik

a, C

hief

Eng

inee

r,Sy

ed M

aiud

din

Has

san,

Dev

elo

pm

ent

Dep

artm

ent

Ro

adPu

blic

Wor

ks D

epar

tmen

t,Ex

ecut

ive

Engi

neer

, St

ate

Bri

dge

Mai

nte

nan

ceC

hand

mar

i, G

uwah

ati-

3B

ranc

h, O

/O C

hief

Eng

inee

r,

Bo

ard

PWD

(R

oads

), A

ssam

,

Cha

ndm

ari,

Guw

ahat

i-3.

4B

ihar

Ru

ral

Ru

ral

Bih

ar R

ural

Shri

M.P

. S

ingh

, C

hief

Eng

inee

r,K

N P

rasa

d, E

xecu

tive

Dev

elo

pm

ent

Engi

nee

rin

gR

oads

Rur

al E

ngin

eeri

ng O

rgan

izat

ion,

Engi

neer

(B

ridg

es),

Rur

al

Org

anis

atio

nD

evel

op

men

t5th

Flo

or,

Vis

hves

hvar

iya

Engi

neer

ing

Org

anis

atio

n

Age

ncy

Bh

awan

,Pat

na-

15

5C

hhat

tisg

arh

Panc

haya

tiR

ura

lC

hhat

tisg

arh

Shri

S.K

.Gup

ta,

Supe

rint

endi

ngM

L H

aldk

ar,

Supe

rint

endi

ng

Raj

& R

ural

Engi

nee

rin

gR

ural

Roa

dEn

gine

er,

Rur

al D

evel

opm

ent

Engi

neer

, R

ural

En

gine

erin

g

Dev

elo

pm

ent

Org

anis

atio

nD

evel

op

men

tD

epar

tmen

t, R

aipu

rSe

rvic

es

Age

ncy

Chh

atti

sgar

h

Pradhan Mantri Gram Sadak YojanaPradhan Mantri Gram Sadak YojanaSr

.St

ate

Nod

alEx

ecu

tin

gA

uton

omou

sSt

ate

Qua

lity

IT N

odal

No

Dep

artm

ent

Age

ncy

Bod

yC

oord

inat

ors

Off

icer

6G

oa

Ru

ral

Ru

ral

Dis

tric

t R

ural

Shri

P.K

. N

air

Seni

or T

echn

ical

Rav

indr

a A

. K

aran

dika

r ,S

tate

Dev

elo

pm

ent

Dev

elo

pm

ent

Dev

elo

pm

ent

Exam

iner

, D

te.

of V

igila

nce,

Nod

al C

o-or

dina

tor,

AE,

DR

DA

,

Dep

artm

ent

Age

ncy

Alth

vio,

Pan

aji-

403

001,

Goa

Nor

th P

anaj

i, G

oa 4

0300

1

(Nor

th G

oa)

Ph-

(083

2)22

2625

0

7G

uja

rat

Roa

ds &

Roa

ds &

Guj

arat

Sta

teSh

ri K

.M.

Pate

l, Su

peri

nten

ding

Ras

ik K

Cha

uhan

, U

nder

Bui

ldin

gsB

uild

ings

Rur

al R

oad

Engi

neer

, Q

ualit

y C

ontr

ol (

R&

B)

Secr

etar

y,PW

D (

Roa

ds a

nd

Dep

artm

ent

Dep

artm

ent

Dev

elo

pm

ent

Dep

artm

ent,

Gan

dhin

agar

,B

rid

ges)

Age

ncy

Gu

jara

t

8H

imac

hal

Publ

ic W

orks

Publ

ic W

orks

H.P

. G

ram

Shri

R.C

. G

upta

, C

hief

Eng

inee

rB

ikra

nt B

aner

jee,

Inc

harg

e

Pra

des

hD

epar

tmen

tD

epar

tmen

tSa

dak

Dev

lp.

(Des

ign)

, H

PPW

D,

US

Clu

b,C

ompu

ter

Cel

l, O

ffice

of

Age

ncy

Shim

la -

1En

gine

er-i

n-C

hief

, H

PPW

D

9H

arya

na

Publ

ic W

orks

Publ

ic W

orks

Har

yan

a St

ate

Shri

Dha

ram

Pal

,S

C J

inda

l /

G D

Goe

l,

Dep

artm

ent

Dep

artm

ent

Roa

ds &

Supe

rint

endi

ng E

ngin

eer

Exec

uti

ve E

ngi

nee

r,

(Bri

dges

and

Bri

dge

s(R

oads

), G

ovt.

of

Har

yana

,P

WD

(B&

R)

Ro

ads)

Dev

elo

pm

ent

S.C

.O N

o. 2

4, S

ecto

r -7

C,

Cor

pora

tion

Mad

hya

Mar

g, C

hand

igar

h

10Jh

arkh

and

Ru

ral

Ru

ral

Jhar

khan

dSh

ri P

.M.T

oppo

, C

hief

Eng

inee

rN

aren

dra

Pras

ad S

harm

a,

Dev

elo

pm

ent

Engi

nee

rin

gR

ajya

Gra

min

Dep

tt. o

f R

ural

Dev

elop

men

t,A

ssis

tant

Eng

inee

r, R

ural

Org

anis

atio

nPa

th V

ikas

Jhar

khan

d, P

roje

ct B

haw

an,

Engi

neer

ing

Org

anis

atio

n

Pra

dh

ikar

anR

anch

i

21

Pradhan Mantri Gram Sadak YojanaPradhan Mantri Gram Sadak Yojana

22

Sr.

Stat

eN

odal

Exec

uti

ng

Aut

onom

ous

Stat

e Q

uali

tyIT

Nod

al

No

Dep

artm

ent

Age

ncy

Bod

yC

oord

inat

ors

Off

icer

11Ja

mm

uPl

anni

ng &

Ru

ral

Jam

mu

&Sh

ri P

arve

z.M

.Faz

ili,

Nod

alA

amir

Ali,

Rur

al E

ngin

eeri

ng

& K

ashm

irD

evel

op

men

tD

evel

op

men

tK

ashm

ir R

ural

Off

icer

, PM

GSY

. Ex

. En

gine

erW

ing,

Rur

al D

evel

opm

ent

Engi

nee

rin

gD

epar

tmen

tR

oads

Gov

t. of

Jam

mu

& K

ashm

ir

Publ

ic W

orks

Win

g -

PWD

Dev

elo

pm

ent

O/o

CE,

( R

&B

) S

ilk F

acto

ry,

Dep

artm

ent

Age

ncy

Raj

bagh

Roa

d K

ashm

ir

12K

arn

atak

aR

ura

lR

ura

lK

arn

atak

aSh

ri N

agar

ajai

ah,

B R

avi,

Jun

ior

Engi

neer

,

Dev

elo

pm

ent

Dev

elo

pm

ent

Land

Arm

ySu

peri

nten

ding

Eng

inee

r,(S

peci

al G

rade

), R

ural

& P

anch

ayat

iEn

gin

eeri

ng

Cor

pora

tion

O/o

C

hief

Eng

inee

r, R

DED

,D

evel

opm

ent

and

Panc

haya

ti

Raj

Win

gA

nand

rao

Cir

cle,

Ban

galo

re.

Raj

13K

eral

aR

ura

lEn

gin

eeri

ng

Ker

ala

Stat

eSm

t P.

K.

Suja

ta,

Supe

rint

endi

ngSm

t K

Cha

ndra

sekh

aran

Nai

r,

Dev

elo

pm

ent

Win

g un

der

Rur

al R

oad

Engi

neer

, C

omm

issi

oner

ate

ofA

ssis

tant

Dev

elop

men

t

PR I

nstit

utio

nsA

gen

cyR

ural

Dev

elop

men

tC

omm

issi

oner

, R

ural

Thri

uvan

antp

uram

, K

eral

aD

evel

op

men

t

14M

egh

alay

aR

ura

lPu

blic

Wor

ksSt

ate

Rur

alSh

ri B

.K.B

atta

char

ya,

Chi

efB

K B

hatta

char

jee,

Add

ition

al

Dev

elo

pm

ent

Dep

artm

ent

Roa

dsEn

gine

er,

Dep

artm

ent

Rur

alC

hief

Eng

inee

r /

P K

Bha

iya,

Dev

elo

pm

ent

Dev

elop

men

t, L

ower

Lac

hum

eir,

Supe

rint

endi

ng E

ngin

eer,

Age

ncy

Shil

long

, M

egha

laya

PW

D

15M

ahar

ash

tra

Ru

ral

Zill

a Pa

rish

adM

ahar

ash

tra

Shri

D.M

.Mor

e, J

oint

Shri

M.M

. Sh

inde

, Se

ctio

n

Dev

elo

pm

ent,

Wor

ksR

ural

Roa

dSe

cret

ary

& C

hief

Eng

inee

rO

ffic

er

Publ

ic W

orks

Dep

artm

ent

Dev

elo

pm

ent

(EG

S),

Plan

ning

Dep

artm

ent,

Dep

artm

ent

Ass

ocia

tion

6th F

loor

, M

antr

alay

a, M

umba

i

Pradhan Mantri Gram Sadak YojanaPradhan Mantri Gram Sadak Yojana

23

Sr.

Stat

eN

odal

Exec

uti

ng

Aut

onom

ous

Stat

e Q

uali

tyIT

Nod

al

No

Dep

artm

ent

Age

ncy

Bod

yC

oord

inat

ors

Off

icer

16M

anip

ur

Ru

ral

Publ

ic W

orks

Sh P

. K

ipge

n, S

ecre

tary

(Wor

ks)

T R

abin

dra

Kum

ar,

Exec

utiv

e

Dev

elo

pm

ent

Dep

artm

ent

& C

E,R

D&

PR,G

over

nmen

t of

Engi

neer

/ L

P G

onm

ei,

Man

ipur

, Im

phal

Com

mis

sion

er,

Rur

al

Dev

elop

men

t an

d Pa

ncha

yati

Raj

17M

adh

yaR

ura

lM

P R

ural

Mad

hya

Shri

M.K

. G

upta

, G

ener

alG

ovin

d Pa

ncho

li, A

ssis

tant

Pra

des

hD

evel

op

men

tR

oads

Pra

des

hM

anag

ar(T

ech.

), M

PRR

DA

,M

anag

er,

MP

RR

DA

Dev

elo

pm

ent

Rur

al R

oads

Vin

dhya

chal

Bha

wan

, II

nd

Age

ncy

Dev

elo

pm

ent

Floo

r, B

hopa

l, M

adhy

a

Age

ncy

Prad

esh.

18M

izo

ram

Ru

ral

Publ

ic W

orks

Miz

ora

mSh

. R

. V.

Thu

anga

,V

L R

uata

Sai

lo,

Exec

utiv

e

Dev

elo

pm

ent

Dep

artm

ent

Rur

al R

oad

Supe

rint

endi

ng E

ngin

eer,

O/o

Engi

neer

/ V

anla

l D

uhsa

ka,

Dev

elo

pm

ent

CE,

PW

D,

Zon

e- I

I ,

Supe

rint

endi

ngEn

gine

er,

PWD

Age

ncy

Tuik

huah

tiang

, G

ovt.

of

Miz

oram

, A

izw

al

19N

agal

and

Ru

ral

Publ

ic W

orks

Nag

alan

dSh

ri H

ito V

isa,

Add

l. C

hief

,Er

. S.

Suhu

, JE

, PM

GSY

Cel

l,

Dev

elo

pm

ent

Dep

artm

ent

Rur

al R

oad

Engi

neer

, O

/o o

f C

hief

Eng

inee

r,C

.E.’s

Offi

ce,

PWD

(R&

B)

(Roa

ds &

Dev

elo

pm

ent

PWD

(R

&B

), K

ohim

a, N

agal

and

Ph#

(037

0) 2

2445

99 (

O),

Bri

dge

s)A

gen

cyFa

x (0

370)

222

2781

,em

ail

:

(NG

RR

DA

)st

eve2

kin

@ya

ho

o.c

om

20O

riss

aR

ura

lR

ura

lO

riss

a St

ate

Shri

Man

oran

jan

Mis

hra,

A C

Sah

u, A

ssis

tant

Dev

elo

pm

ent

Wor

ksR

ural

Roa

dEn

gine

er i

n C

hief

, R

ural

Exec

utiv

e En

gine

er,

Rur

al

Dep

artm

ent

Age

ncy

Dev

elop

men

t D

epar

tmen

t,W

orks

Bhu

bnes

hwar

, O

riss

a

Pradhan Mantri Gram Sadak YojanaPradhan Mantri Gram Sadak Yojana

24

Sr.

Stat

eN

odal

Exec

uti

ng

Aut

onom

ous

Stat

e Q

uali

tyIT

Nod

al

No

Dep

artm

ent

Age

ncy

Bod

yC

oord

inat

ors

Off

icer

21Pu

njab

Publ

ic W

orks

Publ

ic W

orks

Punj

ab R

oads

Shri

Am

rit

Inde

r Si

ngh,

Joi

ntK

ulw

inde

r Si

ngh

Rao

, C

/o

Dep

artm

ent

Dep

artm

ent

&

Bri

dges

Secr

etar

y,Pu

njab

Roa

d &

Join

t Se

cret

ary,

Pun

jab

(Roa

ds &

(Roa

ds &

Dev

elo

pm

ent

Bri

dges

Dev

elop

men

t B

oard

,R

oad

& B

ridg

e B

oard

Bri

dges

)B

rid

ges)

Bo

ard

Gov

t. of

Pun

jab,

106

-108

,

Sect

or 1

7D,

Bat

ra B

uild

ing,

Cha

ndig

arh-

1600

17,P

unja

b

22R

ajas

than

Publ

ic W

orks

Publ

ic W

orks

Raj

asth

anSh

ri P

.K.J

ain,

Exe

cuti

ve E

ngin

eer

S.K

. Si

nghv

i,

Dep

artm

ent

Dep

artm

ent

Rur

al R

oad

(R&

D I

I), R

oom

No

211,

Supe

rint

endi

ng E

ngin

eer

Dev

elo

pm

ent

IInd

Floo

r, A

-Blo

ck,

Cro

ss(T

raff

ic),

PW

D

Age

ncy

Dra

inag

e W

orks

Off

ice,

PW

D,

Jaip

ur,

Raj

asth

an

23Si

kkim

Ru

ral

Publ

ic W

orks

Sikk

im S

tate

Shri

G.P

Sha

rma,

Add

l C

hief

Raj

en S

harm

a,

Div

isio

nal

Dev

elo

pm

ent

Dep

artm

ent

Rur

al R

oads

Engi

neer

, D

epar

tmen

t O

f R

ural

Engi

neer

, R

ural

(Roa

ds &

Age

ncy

Dev

elop

men

t, T

ashi

ling

Dev

elo

pm

ent

Bri

dge

s)Se

cret

aria

t, G

angt

ok

24Ta

mil

nadu

Rur

alR

ura

lTa

mil

Nad

uSu

peri

nten

dent

Eng

inee

r,V

Rav

icha

ndra

n, A

EE,

Dev

elo

pm

ent

Dev

elo

pm

ent

Rur

al H

ousi

ngD

irec

tora

te o

f R

ural

Hou

sing

Dir

ecto

rate

of

Rur

al

Engi

nee

rin

g&

Inf

rast

ruct

ure

Che

nnai

Dev

elo

pm

ent

Win

gD

evel

op

men

t

Cor

pora

tion

25Tr

ipu

raPu

blic

Wor

ksPu

blic

Wor

ksTr

ipur

a R

ural

Shri

K.V

. Sa

tyan

aray

an,

S Sa

nkar

Ban

ik,

Exec

utiv

e

Dev

elo

pm

ent

Dep

artm

ent

Roa

d A

genc

yC

omm

isio

ner,

Cen

tral

Engi

nee

r/Su

per

inte

nd

ing

Secr

etar

iate

, G

ovt.

of

Engi

neer

(Pl

anni

ng)

Trip

ura,

Aga

rtal

a, T

ripu

ra

Pradhan Mantri Gram Sadak YojanaPradhan Mantri Gram Sadak Yojana

Sr.

Stat

eN

odal

Exec

uti

ng

Aut

onom

ous

Stat

e Q

uali

tyIT

Nod

al

No

Dep

artm

ent

Age

ncy

Bod

yC

oord

inat

ors

Off

icer

26U

ttar

Ru

ral

1.Pu

blic

Utt

ar P

rade

shSh

ri D

ebas

hish

Pan

da,

P R

Roy

, Ex

ecut

ive

Pra

des

hD

evel

op

men

t

Dep

artm

ent

Gra

mee

nC

omm

issi

oner

, D

epar

tmen

tEn

gine

er,

PWD

W

orks

Sada

k V

ikas

Rur

alD

evel

opm

ent,

10t

hFlo

or,

2.R

ura

l A

bhik

aran

Jaw

ahar

Bha

wan

, Lu

ckno

w

E

ngin

eeri

ng

S

ervi

ces

27U

ttar

anch

alR

ura

lR

ura

lU

ttar

anch

al S

hri

A.K

. K

hand

uri,

OSD

C L

Kap

oor,

TE(T

AC

),

Dev

elo

pm

ent

Dev

elo

pm

ent,

Rur

al R

oad

(PM

GSY

), 4,

Sub

hash

Roa

d,Fo

rest

& R

ural

Dev

elop

men

t

Publ

ic W

orks

Dev

elo

pm

ent

Secr

etar

iate

(FR

DC

),B

ran

ch

Dep

artm

ent

Age

ncy

Gov

ernm

ent

of U

ttar

anch

al,

Deh

radu

n, U

ttar

anch

al

28W

est

Pan

chay

atEn

gin

eeri

ng

Wes

t B

enga

lSh

.T.K

. M

ajum

dar,

Join

tD

r B

K G

hosh

, Ex

ecut

ive

Ben

gal

& R

ural

Win

g of

Zila

Stat

e R

ural

Secr

etar

y, R

ural

Dev

elop

men

tEn

gine

er,

Panc

haya

t

Dev

elo

pm

ent

Pari

shad

Dev

elo

pm

ent

Dep

artm

ent,

Kol

kata

,&

Rur

al D

evel

opm

ent

Age

ncy

Wes

t B

enga

l

(WB

SRD

A)

25