pragati ¥ÀæuÀw mÉëaÉÌiÉ - iti limitedintra.itiltd-india.com/bgp/pragati-nov08-eng.pdf ·...

8
PRAGATI November. 2008 Page No.: 1 ¥ÀæUÀw ¥ÀæUÀw ¥ÀæUÀw ¥ÀæUÀw ¥ÀæUÀw PRAGATI A monthly News Bulletin of Bangalore Plant for the month of NOVEMBER 2008 mÉëaÉÌiÉ mÉëaÉÌiÉ mÉëaÉÌiÉ mÉëaÉÌiÉ mÉëaÉÌiÉ 1 OCB-CSN 10.00 15.00 0.96 1.10 0.81 1.06 1.77 2.16 2 C-DOT 5.00 0.78 0.24 0.28 0.24 0.28 3.1 SATCOM PRODUCTS 12.50 4.04 3.21 3.68 3.21 3.68 3.1.1 SATCOM REPAIRS/AMC 0.80 0.66 0.75 0.20 0.23 0.86 0.98 P. MUX - SUB RACKS, 12.50 11.54 7.36 8.42 1.42 1.62 8.78 10.04 3.2.1 64 KBPS DATA CARDS MICRO WAVE 48.94 63.59 2.82 3.22 2.82 3.22 3.2.2 T D P : MISC: SPARES/ 0.80 0.69 0.78 0.69 0.78 AMC/ REPAIRS Etc. 5.1 CDMA INFRA 220.00 421.71 56.10 56.10 13.75 13.75 69.85 69.85 5.1A CDMA-AMC-BILLING 0.00 0.00 5.2 W L L - I & C. 2.69 0.00 0.00 5.3 I F W T 150.00 161.62 12.44 0.00 12.44 6 ADSL-DSLAM+CPE 56.60 57.70 41.52 40.40 5.02 2.93 46.54 43.33 8 ASCON 0.00 0.00 10 DEFENCE 175.00 18.15 8.36 9.56 2.05 2.35 10.41 11.91 10.3 TELE SET 5C, ETS & Magneto 2.90 0.31 0.35 0.07 0.08 0.38 0.43 11 S A P : MISC/SPARES/ 0.80 0.69 0.73 0.69 0.73 AMC/REPAIRS Etc. 12 ANTENNA FOR GSM / CDMA 96.06 2.36 1.76 * * 1.76 * 12.1 Broad Band Cor-Dect 84.70 13.83 0.48 0.48 0.96 0.00 13 IT BUSINESS 0.52 0.50 0.47 0.03 0.03 0.53 0.50 14 S S U * 1.44 * * 1.44 * 15 Data Centre 100.00 16 Contract Mnfrng; 300.00 0.20 0.020 0.02 0.02 0.02 Non Telecom servs; GRAND TOTAL 1271.30 779.03 126.62 137.83 23.80 22.01 150.42 159.84 Sl. No. PRODUCTS Corp. Plan 2008-09 ver. 2.0 Order book Posn. on dt. (incl. APO) Prod. upto previous month Desp. upto previous month production in the month Despatch in the month Cumulative PRODN. W/O-ED Cumulative DESP. With-ED Remarks The performance of Bangalore Plant for the month of November 2008 Date: 01-12-2008 Rs. in Crores PRODUCTION OVERVIEW - Bangalore Plant SSU = 0.286, D N = 0.119 ASCON = 0.029 Spares value shifted to P-MUX as per AGM(TDP) on 19.07.2008 Produced in previous year TL. DESP. 2.72 Lacs From AGM-B’s Desk SSU DESPATCH ............. Ramesh K. Murthy We have reached the end of the year and it has been a roller coaster ride as far as out put is concerned. The value of Production output is still well below the required level and I find it imperative that we tighten our belts and work as a single unit to achieve whatever we have promised to achieve. In this endeavor I will give what- ever fillip is required and let us all strive to reach for the ultimate goal. I am sure that we will succeed in the task that we are about to undertake as I have the fullest confidence in the capabilities of all of you.

Upload: lekhuong

Post on 06-May-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

PRAGATI November. 2008 Page No.: 1

¥ÀæUÀw¥ÀæUÀw¥ÀæUÀw¥ÀæUÀw¥ÀæUÀwPRAGATI

A monthly News Bulletin of Bangalore Plantfor the month of NOVEMBER 2008 mÉëaÉÌiÉmÉëaÉÌiÉmÉëaÉÌiÉmÉëaÉÌiÉmÉëaÉÌiÉ

1 OCB-CSN 10.00 15.00 0.96 1.10 0.81 1.06 1.77 2.16

2 C-DOT 5.00 0.78 0.24 0.28 0.24 0.28

3.1 SATCOM PRODUCTS12.50

4.04 3.21 3.68 3.21 3.68

3.1.1 SATCOM REPAIRS/AMC 0.80 0.66 0.75 0.20 0.23 0.86 0.98

P. MUX - SUB RACKS,12.50 11.54 7.36 8.42 1.42 1.62 8.78 10.04

3.2.1 64 KBPS DATA CARDS

MICRO WAVE 48.94 63.59 2.82  3.22 2.82 3.22

3.2.2 T D P : MISC: SPARES/0.80 0.69 0.78 0.69 0.78

AMC/ REPAIRS Etc.

5.1 CDMA INFRA 220.00 421.71 56.10 56.10 13.75 13.75 69.85 69.85

5.1A CDMA-AMC-BILLING 0.00 0.00

5.2 W L L - I & C.  2.69 0.00  0.00

5.3 I F W T 150.00 161.62 12.44 0.00 12.44

6 ADSL-DSLAM+CPE 56.60 57.70 41.52 40.40 5.02 2.93 46.54 43.33

8 ASCON 0.00 0.00

10 DEFENCE175.00

18.15 8.36 9.56 2.05 2.35 10.41 11.91

10.3 TELE SET 5C,

ETS & Magneto2.90 0.31 0.35 0.07 0.08 0.38 0.43

11 S A P : MISC/SPARES/0.80 0.69 0.73 0.69 0.73

AMC/REPAIRS Etc.

12 ANTENNA FOR

GSM / CDMA96.06 2.36  1.76 * * 1.76 *

12.1 Broad Band Cor-Dect 84.70 13.83  0.48 0.48 0.96 0.00

13 IT BUSINESS 0.52 0.50 0.47  0.03 0.03 0.53 0.50

14 S S U * 1.44 *   * 1.44 *

15 Data Centre 100.00

16 Contract Mnfrng;300.00 0.20 0.020 0.02 0.02 0.02

Non Telecom servs;

GRAND TOTAL 1271.30 779.03 126.62 137.83 23.80 22.01 150.42 159.84

Sl.No. PRODUCTS

Corp. Plan

2008-09

ver. 2.0

Order book

Posn. on dt.

(incl. APO)

Prod. upto

previous

month

Desp. upto

previous

month

production

in the

month

Despatch

in the

month

Cumulative

PRODN.

W/O-ED

Cumulative

DESP.

With-EDRemarks

The performance of Bangalore Plant for the month of November 2008

Date: 01-12-2008 Rs. in Crores

PRODUCTION OVERVIEW - Bangalore Plant

SSU = 0.286, D N = 0.119

ASCON = 0.029

Spares value shifted to

P-MUX as per AGM(TDP)

on 19.07.2008

Produced inprevious year

TL. DESP. 2.72 Lacs

From AGM-B’s Desk ?

SSU DESPATCH

............. Ramesh K. Murthy

We have reached the end of the year and it has been a roller coaster ride as far as

out put is concerned. The value of Production output is still well below the required

level and I find it imperative that we tighten our belts and work as a single unit to

achieve whatever we have promised to achieve. In this endeavor I will give what-

ever fillip is required and let us all strive to reach for the ultimate goal. I am sure

that we will succeed in the task that we are about to undertake as I have the

fullest confidence in the capabilities of all of you.

PRAGATI November. 2008 Page No.: 2

TIME SYNCHRONISATION/CLOCK IN TELECOMMUNICATION NETWORKS

Introduction

The challenges and demands facing the Telecommunications Network have never been as high as they are today. Much

has been written lately about the new “Digital Economy“ where information flow has changed from the physical realm of

paper transactions to the growing age of Networked Intelligence. Advances in Telecommunications Technology and Network

Design have made this new era possible. The growth in technically innovative services and applications will continue to

challenge the telecommunications network to keep pace. Merely keeping pace however, will not be adequate. One especially

challenging area is the growing demand for bandwidth.

The explosive growth in Data and Voice traffic and the need for VoIP application are fueling the insatiable requirement for

bandwidth. Network planners are looking forward and plan effectively for this challenge. In addition to growth, the critical

content of the data traffic is becoming increasingly important to the new Digital Economy. The success of the developing

use of e-commerce is tied directly to the reliability of the telecommunications network. When the network is down, commerce

ceases.

Interruptions in Network Services can result in lost revenues, unhappy customers, lost business and, in most cases,

punitive financial actions. Similar scenarios occur when the network is compromised by poor quality. In both instances, the

bottom line effect is revenue shrinkage. The ability of the Network to support these critical revenue services has underlined

the need for Telecommunications Networks planned and designed to minimize the risk of system outages.

Time Synchronization is a fundamental component of an optimally performing Network. Time Synchronization networks

provide timing signals to all Synchronization Network elements at each node in a digital network. These timing signals are

traceable to a highly accurate Primary Reference Source (PRS) clock of Stratum 1 quality with frequency accuracy of 1 x

10-11 or better. The aim is to ensure that all outgoing transmissions from a Digital Network node have the same average

frequency. Buffer elements are used at important transmission interfaces to absorb differences between the average local

frequency and the actual short-term frequency of incoming signals, which may be affected by phase wander and jitter

accumulated along the transmission paths.

1. Requirement of Timing Signal in Networks:

The very nature of Digital Communications is based on Clocking Signals. All Digital Signals require some form of Clocking.

Sampling, Multiplexing, Accessing and Transportation of Digital Data are all dependent on changes based on prescribed

Time intervals. Digital Switches, Digital Cross-connect, Multiplexers and Digital Transport Systems are all linked for the

sole purpose of Reliable Communications. All of these pieces must mesh with respect to time in order to get the right

information Sampled, Switched, Transported and Received. Time Synchronization is a method of achieving the Timing

Requirements through

i. A common Clock Rate for the Elements making up the Network.

ii. Ensuring that Transmission Impairments impacting Synchronization between Nodes be kept to a minimum.

In addition to Synchronizing the Clock rates at the Transmit and Receive ends, the links connecting both ends must be

designed to minimize Timing Impairments such as Jitter and Frequency Wander. The Quality of the Transmission facilities

for Transporting Traffic or Synchronization Data is dependent on the degree of alignment between the Transmit and Receive

clocks. The higher the degree of alignment the better the error performance.

As the degree of alignment degrades, the rates of operation at the transmit and receive nodes start to differ. The end result

of this difference in rates is a loss or repetition of bits or bytes of information. This event is defined as a slip. Digital

communications relies on the use of data buffers to account for differences in clock rates between the transmitted and

received data. As the difference increases, the amount of buffer capacity consumed grows. If the difference is too great for

the buffers, then an overflow occurs resulting in a slip condition.

The impact of slip degradation on different services are shown in the following table:

Impact of Slips

Service Observed Effect

Voice Occasional audible clicks

Voice band data Serious degradation with some modems needing up to

6 seconds to recover from a slip.

Group 3 Fax Each slip causes compression or blank lines.

Encrypted Voice Serious degradation requiring retransmission of the

encryption key.

Compressed video Serious degradation requiring in freeze frames or

missing lines.

Packet data Loss of packets resulting in degraded throughput and

retransmission delays.

Shri M. Arun Kumar

DGMR(CA)

Shri G. Srihari

DGMR(SG)

Article by Contributed by

Article contd. in next issue

PRAGATI November. 2008 Page No.: 3

KANNADA RAJYOTSAVA PÀ£ÁðlPÀ gÁeÉÆåÃvÀìªÀ

53rd Karnataka Rajyotsava was celebrated on 29.11.2008 at Bangalore plant in a grand manner in the stage

named after “ Pandit Bhimasena Joshi ” recipient of Central Government’s “ Bharata Ratna “ award recently.

Shri S. K. Chatterjee, Chairman and Managing Director of our company was the Chief Guest. Shri K. Rehaman

Khan, Deputy Speaker, Rajya Sabha, Shri N.Y. Hanumanthappa, retired Chief Justice of Orissa and MP

(Chitradurga), Shri A. Krishnappa, Advisor to ITI Officers Association and Ex. Minister, Karnataka Government,

Shri S. G. Siddaramaiah, Ex. President of Kannada Pustaka Pradhikara and Shri Ramesh Keshavamurthy, Addi-

tional General Manager, Bangalore Plant were the Special invitees.

The Cultural Programs hosted by ITI Fine Arts and renowned artists on the nature, glory and history of Kannada

was the main attraction of the Rajyotsava. Recognizing Kannada as ‘Classical language’ this year was an added

feather. All the Senior Officers, Employees of Bangalore Plant, Corporate Office, N.S. Unit participated in the

program. ITI Employee’s Union and ITI Officers Association has organized this Program jointly.

PRAGATI November. 2008 Page No.: 4

FAREWELL TO Shri D. K. MALLIK, GM(R&d, QA)

Fare well function was arranged on the occasion of superannuation of Shri D. K. Mallik, General Manager- R & D / QA.

CMD, Directors, Senior Officers of R&D and Corporate Office graced the function.

KANNADA RAJYOTSAVA PÀ£ÁðlPÀ gÁeÉÆåÃvÀìªÀ

eÉÊ PÀ£ÁðlPÀ ªÀiÁvÉeÉÊ ̈ sÀĪÀ£ÉñÀéjà zÉëÃ

PÀ£ÀßqÀªÉAzÀgÉ PÀÄtÂzÁqÀĪÀŢà ªÀÄ£ÀPÀ£ÀßqÀªÉAzÀgÉ Q« ¤«ÄgÀĪÀÅzÀÄ

PRAGATI November. 2008 Page No.: 5

POOJA AT DATACENTRE BLOCK

1. Speak to people

2. Smile at people

3. Call people by name

4. Be friendly and helpful

5. Be cordial

6. Have a genuine interest in people

7. Be generous with praise

8. Be considerate of the feelings of others

9. Be thoughtful of the opinions of others

10. Be alert to give service

T. Krishnadas Rai, Manager-HR(ED)

Good eyesight is crucial, but are you doingall you can to protect your visions? here’show to take care of your eyes.

STARING AT THE SMALL SCREEN

All that time spent using computers can lead to eyestrain,

dry eyes, and blurred vision.  To combat these problems,

check your work station:

Ideally, your monitor should be 5 to 9 inches below eye

level. This brings your lid downward, maintaining the

healthiest blink rate, says Susan Resnick, an optom-

etrist in NY city. If you can’t move the monitor, measure

the distance between it and your eyes, then consult

your eye-care professional about the right pair of glasses

for that distance. Also make sure there’s no glare on

your screen. And obey the 20/20/20 rule: For every 20

minutes of screen time, look at something 20 feet away

for 20 seconds to maintain your eyes’ focusing system.

Kashi’s collection

The Collaboration Agreement between ITI and M\s Trimax Data Center Services Mumbai was signed for establishment of

The Next Generation Green Data Centre at ITI Bangalore and Back up centre at RO Lucknow. The building renovation Puja

was done on 05.11.2008 and was attended by our CMD, Director Production, Director HR, AGM-B and from M\s Trimax

their CMD Shri Surya Prakesh, Director Sudhanshu Tewari, Mrs. Saraswathi, Chief Finance officer and other diginatories.

10 Commandments of Human Relations

PRAGATI November. 2008 Page No.: 6

Observance of Vigilance Awareness week-2008

As per the Directives of Central Vigilance Commission, Govt. of India and in deference to the guidelines of by Corporate

Vigilance, the Bangalore Plant has observed Vigilance Awareness Week-2008 from 3rd to 7th November 2008 as follows:

During the entire week Message “ ITI LIMITED IS CELEBERATING VIGILANCE AWARENESS WEEK – 2008,DO NOT PAY OR ACCEPT ANY BRIBE” was played through PABX Exchange. Vigilance awareness pledge in English,

Kannada and Hindi was administered through public address system on the opening day. Banners were displayed about

Vigilance Awareness Week-2008 at the conspicuous locations of the Company’s premises.

Competitions on Quiz in English , Essay writing in Hindi, Kannada and English were held.

The Names of Prize winners are as follows.

a. Quiz

1. Anilkumar Rastogi 7109 Marketing

2. Bharadwaj 12399 BG Plant

3. Ratikant Nayak 60364 PRO(Corpo.)

4. Sulekha David 15447 Marketing

b. Essay writing :

English

1. Sulekha David 15447 Marketing

2. Jalaja Mohan 8846 BG Plant

3. Chinnamma Baradhi 0908 BG Plant

4. Bharadwaj 12399 BG Plant

Hindi :

1. Lalit Singh Raj 57072 NS-HR

2. Shrish Jain 26823 BG Plant

3. A. K. Rastogi 7109 Marketing

4. Prakash Dhakad 26822 I & C

Kannada :

1. Sanjay R 60345 Corporate

2. Gayatri S Murthy 45225 NSU-Fin.

3. K. S. Subramanyam 6119 BG Plant

4. C.G.Umashankar 16785 BG Plant

Workshop was conducted about “CDA Rules, Standing

Orders, Initiation of Disciplinary Action from Issuance of

Charge Sheet till awardal of punishment including conducting

Domestic/Departmental Enquiries and Redressal of

Grievances” by Shri C. GUNASEGARAN, CMR-HR(M & NS).

Our ITI Education Committee had organized Inter School

Competitions in following areas: “Elocution, Drawing, Collage,

Essay and Slogan Writings” related to vigilance for ITI

Schools and 6 other Institutions around ITI with a view to

create awareness on the evils of Corruption to the students

fraternity. In-house Workshop on “Purchase Management”

was conducted Shri K. Ranganathan, DGM-Tech.Details

on Public Interest Disclosure Resolution (PIDR) of GOI by

Shri K.ANILKUMAR, AGM-V (Corp).

Valedictory Function - next page

PRAGATI November. 2008 Page No.: 7

On the concluding day of the Vigilance Awareness Programme, the Valedictory function and Prize Distribution Ceremony

were organized jointly by Bangalore based Units and Corporate Office where our CMD Shri S. K. Chatterjee was the Chief

Guest. Our CVO gave the opening remarks on the occasion regarding preventive vigilance about Vigilance activities, CVC

guidelines and the role of each and every one in the organization. Our CMD addressed the gathering and distributed Cash

Awards and Certificates to the winners of the competitions.

DO NOT

PAY OR

ACCEPT

ANY BRIBE

As part of the Vigilance Awareness week 2008 Inter School competitions were conducted on 05/11/2008 at ITI Schools

Competitions were conducted in Essay Writing, Speech, Slogan writing, Drawing and Collage competitions.

The prize distribution function was held on 19/11/2008 at ITI Auditorium. Shri M. K. Das, IPS, Chief Vigilance Officer

ITI Limited was the Chief Guest. An exhibition of the Art work, Cartoons of the children participated in the Competition was

displayed at the venue.

Shri M. Arunkumar, DGM-R&D and Chairman ITI Education Committee welcomed the gathering. Few of the students

who won prizes shared their views on corruption in the Country and stressed the need to combat the corruption.

Shri M. K. Das distributed the prizes and certificates and addressed the students of ITI Vidyamandir, ITI Central School

and prize winners from other schools. While sharing his experience he called on younger generation to develop a culture

of sincerity and honesty.

Shri Alphonse Kurian DGM-HR&V, Shri M. Venkatesh Chief Manager-Vigilance, ITI Netwok Systems Plant,

Shri D. Janakiraman Manager Vigilance ITI Bangalore Plant ,Teachers, Head Mistress ITI Vidyamandir, I/C Principal

ITI Central School, Members of ITI Education Committee were present on the occasion. Secretary ITI Education Committee

proposed vote of thanks.

Report on Vigilance Awareness Programmes conducted at ITI Schools

Observance of Vigilance Awareness week-2008 (Valedictory)

PRAGATI November. 2008 Page No.: 8

MANPOWER PROFILEThe manpower status of Bangalore Plant as of 1st November 2008 stood at 2136

Manpower Profile as on 1st December 2008

Divisions Officers Non - Officers Total

Bangalore Plant 714 1158 1872

R&D 134 28 162

ESD 50 0 50

Contract Technician - 45 45

Total 898 1231 2129

Prestigeous award to ITI Education Committee

“ITI Education Committee was selected for the prestigeous award “ Best Managed School” by the Karanataka aided

Primary School Teachers Association. The award ceremony was held on 27/11/2008 at Kuvempu Kalakshetra VV Puram

Bangalore. Shri. Vishweshwar Hegde Kageri, Hon’ble Primary and Secondary Education Minister , Government of Karnataka

was the Chief guest and presented the award.”

To the left Plaques. To the right Committee Group Photo. Sitting : Shri M. Arun kumar, DGMR-CA & Chairman ITI Education Committee,

Shri Ramesh K. Murthy - AGM-B and Patron-in Chief, Shri T. Krishnadas Rai-Secretary. Standing : Smt. Shakuntala Narendra - AO,

Shri K Srinivasa Murthy-Treasurer, Shri H A Haratheesh-Member, Shri Chandrashekara-Member, Dr. R Umashankar-Member.

------------ EDITORIAL BOARD ------------

Shri Ghosh A. K., DGM(I&C), Chairman. Shri Krishna Kumar, CMR-HR(SM & PR), Member

Shri Narasimha Prasad R., CMR(Intercom), Member(Editor & Co-ordinator). Shri Ponmalai, CMR-IT, Member

Shri Krishnadas Rai, M-HR(ED), Member. Shri Tasgaonkar R. R., Member

Art work / Layout Design by Shri Kashi Subramanyam, AM-IT., Photos by Shri Mallikarjuna M.,AE(PP).

SEPARATIONS - November 2008SUPERANNUATION

S.No St. No Name Mr. / Ms. Gr/Cat Divn. Dept. Discharge Date

OFFICERS1 00237P RAMAJOGA RAO C. H. Grade-7 TDP 712 30/11/2008

2 09021R NANJUNDASWAMY K Grade-3 CEN 808 30/11/2008

3 18511 VENKATESH G Grade-1 CEN 831 30/11/2008

4 19951 MALLIK D K GC R&D 940 30/11/2008

NON OFFICERS1 02675R SATHYANARAYANA Cat-PH CEN 061 30/11/2008

2 06539R MOHANAVELU M Cat-PH SAP 432 30/11/2008

3 09181R KONDAIAH Cat-PE TDP 732 30/11/2008

4 12648R ABDUL RASHEED Cat-PH CEN 061 30/11/2008

RESIGNATION1 11916-G GURUKUMAR S Grade - I R&D 199 18/09/2008

2 60236 SULABH MATELE Eng-R&D R&D 944 01/05/2007

3 60241 LAKSHMI TRIPATHI Eng-R&D R&D 942 18/11/2008

DEATH1 03222H HAGADURAPPA Cat-SD CEN 836 18/11/2008