Alexandro Rocha ScislewskiDistrict of Caetité - DICAE
Coordination of Nuclear Facilities - CODINBrazilian Nuclear Energy Commission - CNEN
Highlights of Uranium Production in Brazil
14-18 October 2019Prague and Dolni Rozinka, Czech Republic
Interregional Workshop on Case Study of Conventional Uranium Production from Exploration to ClosureIAEA Technical Cooperation Project INT2019International Atomic Energy Agency – IAEA
Paulo Renato Barbosa Marinho Coordination of Nuclear Facilities - CODIN
Brazilian Nuclear Energy Commission - CNEN
THE BRAZILIAN NUCLEAR POLICY
According to the Brazilian Constitution (1988):
The Union holds the monopoly of the survey, mining, milling, exploration and exploitation of nuclear minerals, as well as of the
activities related to industrialization and commerce of nuclear minerals and materials – state owned companies
![Page 2: Prague Oct 2019 final- Brazil - Nucleus...Microsoft PowerPoint - Prague Oct 2019 final- Brazil.pptx Author LAZYKINAA Created Date 10/23/2019 11:55:12 AM](https://reader035.vdocument.in/reader035/viewer/2022071217/604dab40510f42278455cce7/html5/thumbnails/2.jpg)
2019/10/23
2
Licensing of Nuclear Mining Facilities (Brazil)
By Law definition, all the uranium and thorium mining and milling facilities are considered nuclear installations.
Nuclear installations are subject to both:
1 – A Nuclear License, by CNEN; and(Ministry of Science, Technology, Innovation and Communication)
2 – An Environmental License, by the Brazilian Institute for the Environmentand Renewable Natural Resources – IBAMA), with the participation of stateand local environmental agencies.(Ministry of Environment)
PB
RR AP
AM
AC
PA
RO
MT
MS
MA
TO
GOMG
BA
SP
PR
SC
RS
ES
RJ
DF
SE
RN
PEAL
PICE
Sta. Quitéria
Caetité/Lagoa Real
Poços deCaldas
• First brazilian Uranium mine;• Operated from 1982 to 1995;• Status – finished operation and
evaluating process of remediation andclosure
• Actually, the only uranium mine in operation;
• Status – in operation since 2000
Uranium Mining and Milling Facilities in Brazil
• Status – in process of comissioning;• The largest discovered uranium
reserve in Brazil) and uranium is inter-mixed with phosphates
![Page 3: Prague Oct 2019 final- Brazil - Nucleus...Microsoft PowerPoint - Prague Oct 2019 final- Brazil.pptx Author LAZYKINAA Created Date 10/23/2019 11:55:12 AM](https://reader035.vdocument.in/reader035/viewer/2022071217/604dab40510f42278455cce7/html5/thumbnails/3.jpg)
2019/10/23
3
Caldas – Operation History
• The installation was operated by state-owned company: Nuclear Industries of Brazil (INB)
• 1982 to 1995: Operation phase
• Open pit mining / sulfuric acid leaching
Mine PitChemical Processing Plant
Caldas – Current situation
• Liquid effluent treatment plant still in operation
• Main sources of contamination:– Mine pit
– Waste rock piles
– Tailings dam
– Ore processing and storage facilities
WASTE ROCK PILES
FLOODED MINE PIT
![Page 4: Prague Oct 2019 final- Brazil - Nucleus...Microsoft PowerPoint - Prague Oct 2019 final- Brazil.pptx Author LAZYKINAA Created Date 10/23/2019 11:55:12 AM](https://reader035.vdocument.in/reader035/viewer/2022071217/604dab40510f42278455cce7/html5/thumbnails/4.jpg)
2019/10/23
4
Caldas – Technical challenges
• The mining site high precipitation rates
• Acid Mine Drainage + High precipitation rates great volumes of water need be treated (heavy metals and radionuclides) before release.
• Large amounts of sludge need to be disposed off (containing radionuclides and heavy metals)
• Radiological control of the site is maintained by the Operator, especially at effluent discharge points– Waste dam – Units of treatment of rainwater drainage from mining area and
waste rock piles
Caldas – Challenges for decommissioning
• Funding mechanism for decommissioning and remediation needs to be well defined
• Compliance endpoints are established on a case by case basis
• Political and psychosocial aspects involved– Although operation ceased in 1995, population is still concerned
– AMD and presumed watershed contamination are always on the local news, raising population concern
– Population believes in unconfirmed high levels of cancer occurrence
– The municipality created a multidisciplinary group to assess local water bodies in terms of radiological, chemical and biological contamination, which includes the regulators
– Need to establish a structured, systematic, long term communication and a stakeholder involvement programme
![Page 5: Prague Oct 2019 final- Brazil - Nucleus...Microsoft PowerPoint - Prague Oct 2019 final- Brazil.pptx Author LAZYKINAA Created Date 10/23/2019 11:55:12 AM](https://reader035.vdocument.in/reader035/viewer/2022071217/604dab40510f42278455cce7/html5/thumbnails/5.jpg)
2019/10/23
5
Caetité – uranium mining and milling facility
Open Pit Mine
Waste Rock Pile
Tailing Ponds and Recycling Effluent Tanks
Milling Facility
The site low precipitation rates: ~ 650 mm/year
• Operated by state-owned company: Brazilian Nuclear Industries (INB)
• The facility has been in operation in Caetité since 2000
• Has produced a total of approximately 4000 tons of U3O8
• Reserves of 100,000 t of U3O8
• Remediation activities and operation of the facility are performedsimultaneously, in order to prevent future legacy. Good practices
Caetité – general information
Source: https://www.unece.org/fileadmin/DAM/energy/se/pdfs/UNFC/ws_IAEA_CYTED_UNECE_Oct12_Lisbon/17_Gomerio.pdf, http://www.inb.gov.br/pt-br/Media-Center/Galeria-de-Imagens , International Workshop on Uranium Mine Safety-IAEA TC Project BRA/9/057-Rio de Janeiro 2014 - INB
![Page 6: Prague Oct 2019 final- Brazil - Nucleus...Microsoft PowerPoint - Prague Oct 2019 final- Brazil.pptx Author LAZYKINAA Created Date 10/23/2019 11:55:12 AM](https://reader035.vdocument.in/reader035/viewer/2022071217/604dab40510f42278455cce7/html5/thumbnails/6.jpg)
2019/10/23
6
Open pit mine
Milling Area
Tailing Ponds
Heap Leaching
Pile
Waste Rock Pile
Caetité – mining/milling waste management
Waste Rock
Photo source: INB
Caetité – remediation of waste rock pile
Measures to ensure long term stability:– The waste rock pile is being built on a natural slope of a dry valley in
order to ensure the geological and geotechnical stability
– The rain water infiltration is directed to a sump by an underlyingdrainage system. After monitoring, the collected effluents can either betreated or directly discharged to the environment
– The leached ore is emplaced into specific sectors of the waste rockpiles so that such material remains encapsulated, in order to reducethe transport of fine material due to infiltration
Leached Ore
Waste Rock
![Page 7: Prague Oct 2019 final- Brazil - Nucleus...Microsoft PowerPoint - Prague Oct 2019 final- Brazil.pptx Author LAZYKINAA Created Date 10/23/2019 11:55:12 AM](https://reader035.vdocument.in/reader035/viewer/2022071217/604dab40510f42278455cce7/html5/thumbnails/7.jpg)
2019/10/23
7
Caetité – remediation of waste rock pile
Installation biodegradable blanket
Topsoil cover
Revegetation
• The main steps of remediation of Waste Rock Pile are:– After waste rock and leached ore piles reach the final elevation, they
are covered with a semi-compacted layer of soil (clay)
– After sealing with the clay layer, the topsoil cover is emplaced andrevegetation is carried out. This procedure aims to prevent erosion ofthe surface layer.
Photos source: INB
Caetité – remediation of the tailing ponds
• Tailing ponds characteristics:– HDPE-lined ponds with a drainage
system which retains the solid phase and allows the recycling of the liquid
– When the ponds are full, they will be closed with compacted clay and topsoil covers, and revegetated
![Page 8: Prague Oct 2019 final- Brazil - Nucleus...Microsoft PowerPoint - Prague Oct 2019 final- Brazil.pptx Author LAZYKINAA Created Date 10/23/2019 11:55:12 AM](https://reader035.vdocument.in/reader035/viewer/2022071217/604dab40510f42278455cce7/html5/thumbnails/8.jpg)
2019/10/23
8
Caetité – remediation of the tailing ponds
• Remediation of the pond slopes:– During the operation of the facility the slopes of the ponds are
covered with topsoil and revegetated (simultaneous decommissioning and remediation)
2011 2013