prbdb.gov.inprbdb.gov.in/files/tnm/mpr july 2016.pdf · 2016-12-06 · rep ort pr worl punj outpu...

102
Re eport pr WORL Punj Outpu Improve T repared MON G D BANK jab Ro ut and ement, Re Sang NM by TNM Monito Con S NTHLY GOVE K FUND oads Perfor ehabilita grur‐M TECHNO MANAG M ICR oring Con nstruction D.A. Sangrur, Y PROG Ju RNM ED PUN & Bri rmanc ation, Res ansa‐B OLOGY A GEMENT RA Mana nsultant - Division .C Block Punjab - GRESS uly 201 ENT NJAB ST dges ce Base surfacing Bathin AND LTD. agement Project O , PWD B& – 2 148001 S REPO 16 OF P TATE RO Deve ed Roa g and Ro da Roa t Consul Office &R ORT N UNJA OAD SEC lopme ad Cont utine Ma ad Net 33 lting Se o. 22 AB CTOR P ent B tract ( aintenan twork 33333333 ervices L ROJECT oard OPRC) ce works 3 Ltd T ) s

Upload: vuxuyen

Post on 30-Aug-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

 

Rep

 

 

 

 

 

eport pr

WORL

Punj

OutpuImprove

T

repared

MON

GD BANK

jab Ro

ut and ement, Re

Sang

NM

d by TNM

MonitoCon

S

NTHLY

GOVEK FUND

oads 

Perforehabilita

grur‐M

TECHNOMANAG

M – ICR

oring Connstruction

D.A.Sangrur,

Y PROGJu

RNMED PUN

& Bri

rmancation, Res

ansa‐B

 

 

 

OLOGY AGEMENT

RA Mana

nsultant - Division.C Block Punjab -

GRESSuly 201

ENT NJAB ST

dges 

ce Basesurfacing

Bathin

ANDLTD.

agement

Project O, PWD B&– 2 148001

S REPO16 

OF PTATE RO

Deve

ed Roag and Ro

da Roa

t Consul

Office &R

ORT N

UNJAOAD SEC

lopme

ad Contutine Ma

ad Net

33

lting Se

o. 22 

AB CTOR P

ent B

tract (aintenan

twork 

33333333

ervices L

ROJECT

oard

OPRC)ce works

 

Ltd

T  

) s  

TNM 

 

OPRC WorlMonthly Pro

ABREV

AASHTOAADT  AC  ASTM BANK  Base YeaBC  BDS  BM BoQ CBR CoI CQAMP DBM DCP DgMark

DRB  EHS  EIA  EMP  EIRR  ESA ESMF FIDIC  

FWD  FWP  GC or GCGDP GOI GOP IBRD  ICB  IDA INR  IRC IRI IRR ITB  JV  JVA  km   LOS MC MBCB MDR MEC MOEF 

M TECHNOMANAG

ld Bank Project fogress Report No 22

VIATION

O   AmeAnnuAsphAmeWorl

ar   Last BitumBid DBitumBill oCalifoCorri

  ContDensDyna

et  Interand  DispuEnvirEnvirEnvirEconEquivEnvirFedeConsFallinForw

CC  GeneGrosGoveGoveInterInterInterIndiaIndiaInterInterInstrJointJointKilomLeveMonMetaMajoMonMinis

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

S

rican Associaual Average Dhalt Concreterican Societyld Bank Completed Fminous ConcData Sheet minous Macaof Quantities ornia Bearingidor of Impacract Quality se Bituminouamic Cone Pernational por internationute Review Bronment Hearonmental  Imronmental Momic Internavalent Standronmental Soeration Internsulting Enginng Weight Deward Work Preral Conditios Domestic Pernment of Inernment of Prnational Banrnational Comrnational Devan Rupees an Roads Conrnational Rournal Rate of Ructions to Bit Venture t Venture Agmetre l of Service  itoring Consal Beam Crasor District Roitoring Consstry of Enviro

a Bathinda Netwo

ation of StatDaily Traffic e  y for Testing 

Financial Yeacrete 

adam 

g Ratio ct Assurance Mus Macadamenetrometerrtal for tendeal organisatiBoardalth and Safempact AssesManagement al Rate of Reard Axel ocial Managenational Des eers eflectometerrogramme ons of ContraProductndia Punjab nk for Rehabmpetitive Bidvelopment A

ngress ughness IndeReturn idders 

reement

ultant sh Barrier oad ultant, Emplonment and 

ork in Punjab (Ind

e Highway a

and Materia

ar at the time

Management

r ers and procons (www.d

ety sment Plan 

eturn

ement FramIngénieurs‐C

act 

ilitation andddingAssociation 

ex

oyer, ContraForests 

dia) 

nd Transpor

als 

e of receipt o

t Plan 

urement oppgmarket.com

ework Conseils ‐ Int

 Developme

actor 

tation Officia

of the Bids

portunities fm) 

ternational F

nt 

   

als 

from governm

Federation o

   

ments 

TNM 

 

OPRC WorlMonthly Pro

MORT&MPa   MPD  MPM MSA NH  NHAI  NPV  ODR  OPRC  PAP  PC  PCU PIRR PSPCB  PWD  PRBDB  PSRSP  QA  QC  RAP  RDPM  ROMDAROW RPM RUS&CPSDBC  SH  SIA  TMP TOR UNDB oWB  

M TECHNOMANAG

ld Bank Project fogress Report No 22

H   MinisMegaMeaManMillioNatioNatioNet POtheOutpProjePartiPasseProjePunjaPubliPunjaPunjaQualQualReseRoad

AS   RoadRightRaise

PM   RoadSemiStateSociaTraffTerm

nline   UniteWorl

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

stry of Road aPascal. Unitn Profile Depagement Peron (Equivaleonal Highwayonal HighwayPresent Valuer District Roput and Perfoect Affected cular Conditenger Car Unect Internal Rab State Pollic Works Depab Roads andab State Roaity Assurancity Control ttlement Actd Durability Pd Measuremet of Way ed Pavementd User Servici Dense Bitume Highway al Impact Assfic Managemms of Referened Nations Dld Bank 

a Bathinda Netwo

Transport at of Measurepth rformance Mnt) Standardy ys Authority e ad ormance BasPerson ions of Contnit Rate of Returlution Contropartment d Bridges Dead Sector Proe 

tion PlanPerformanceent Data Acq

t Markere and Comfominous Conc

sessment ment Plannce Development

ork in Punjab (Ind

nd Highwaysement 

Measures d Axels

of India 

sed Road Con

ract 

rn (PIRR)ol Board 

evelopment Boject

e Measurequisition Syst

ort Performacrete 

t Business on

dia) 

s

ntract

Board

tem 

ance Measur

nline (www.d

re

devbusiness.

   

.com) 

   

TNM 

 

OPRC WorlMonthly Pro

TABLE

1  PRO

1.1 

1.2 

1.3 

2  PRO

2.1 

2.2 

2.3 

2.4 

2.5 

2.6 

2.7 

2.7

3  WO

3.1 

3.1

3.1

3.1

3.1

3.1

3.1

3.2 

3.2

3.2

3.3 

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

M TECHNOMANAG

ld Bank Project fogress Report No 22

EOFCON

OJECT HIGHL

Significant

Crash Reco

Snapshots

OJECT OVER

Backgroun

Agencies I

Contract A

Organisati

Responsib

Project Or

Basic Cont

.1  Proje

ORK PROGRE

Improvem

.1  Work

.2  Work

.3  Work

.4  Work

.5  Work

.6  Chang

Road Dura

.1  Roug

.2  Struct

Network P

.1  Pavem

.2  Unsea

.3  Drain

.4  Routi

.5  Obstr

.6  Incide

.7  Veget

.8  Road 

.9  Raise

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

NTENTS

LIGHTS FOR 

t Events .......

ord Update .

s – Pictorial O

RVIEW .........

nd ................

nvolved in th

Administratio

on & Respon

ilities of the 

ganization ..

tract Feature

ct Brief .......

ESS ‐ SUMMA

ment, Rehabil

ks Done ‐ Firs

ks Done ‐ Sec

k Done ‐ Thir

ks Under ‐ Fo

k Progress ‐ F

ge in Propos

ability’s Over

hness ..........

tural Capacit

Performance

ment Mainte

aled Shoulde

nage Mainten

ne Maintena

ruction on th

ent Response

tation Contr

Signs Maint

d Reflective 

a Bathinda Netwo

THE MONTH

....................

....................

Overview ......

...................

....................

he OPRC Pro

on Chart .......

nsibilities – M

Monitoring 

....................

es .................

....................

ARY AND CO

itation and R

st Year .........

cond Year .....

d Year ..........

ourth Year Pr

Fourth Year P

sal: ...............

rview ............

....................

ty Data (Pave

 Works’ Ove

enance (RUS&

er Maintenan

nance (RUS&

ance of Bridg

he Pavement

e and Emerg

ol (RUS&CPM

enance (RUS

Pavement M

ork in Punjab (Ind

H OF JULY 20

....................

....................

....................

...................

....................

oject .............

....................

Monitoring C

Consultant .

....................

....................

....................

OMMENTS ..

Resurfacing W

....................

....................

....................

rogramme ...

Programme .

....................

....................

....................

ement Defle

rview ..........

&CPM‐1) ....

nce (RUS&CP

&CPM‐3) ......

ges and Othe

t Surface and

gency Works 

M‐7) ............

S&CPM‐8) ...

Markers (RUS

dia) 

016 .............

....................

....................

....................

...................

....................

....................

....................

Consultant ....

....................

....................

....................

....................

...................

Works ..........

....................

....................

....................

....................

....................

....................

....................

....................

ctions) .........

....................

....................

PM‐2) ..........

....................

er Structures

d Shoulders (

Response (R

....................

....................

S&CPM 9) ....

...................

....................

....................

....................

...................

....................

....................

....................

....................

....................

....................

....................

....................

...................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

s (RUS&CPM

(RUS&CPM‐5

RUS&CPM‐6)

....................

....................

....................

   

...................

....................

....................

....................

...................

....................

....................

....................

....................

....................

....................

....................

....................

...................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

 – 4) ............

5) .................

) ...................

....................

....................

....................

   

........... 9 

............ 9 

............ 9 

.......... 10 

.......... 13 

.......... 13 

.......... 14 

.......... 15 

.......... 15 

.......... 15 

.......... 16 

.......... 16 

.......... 17 

.......... 19 

.......... 19 

.......... 19 

.......... 20 

.......... 20 

.......... 20 

.......... 21 

.......... 21 

.......... 22 

.......... 22 

.......... 23 

.......... 24 

.......... 25 

.......... 26 

.......... 27 

.......... 28 

.......... 28 

.......... 28 

.......... 28 

.......... 29 

.......... 30 

TNM 

 

OPRC WorlMonthly Pro

3.3

3.3

3.3

3.3

3.4 

3.5 

4  CO

4.1 

4.2 

4.2

4.2

4.2

4.2

4.3 

4.4 

5  ENV

5.1 

5.2 

5.3 

5.4 

5.5 

5.6 

6  RO

6.1 

6.2 

6.3 

6.4 

6.5 

6.6 

6.7 

6.8 

6.9 

7  CO

7.1 

7.1

M TECHNOMANAG

ld Bank Project fogress Report No 22

.10  Pavem

.11  Traffi

.12  Crash

.13  Mark

Observatio

Recomme

NSOLIDATED

Contractor

Summary &

.1  Analy

.2  Mana

.3  Road 

.4  Road 

Verificatio

Audit Insp

VIRONMENT

Environme

Complianc

Status of G

Status of P

Status of S

Future key

OADSAFETY

Introductio

Crash Reco

Crash Ana

Trend in C

Road Safet

Road Safet

Road Safet

Way Forw

Distributio

NTRACTOR’S

Contract’s

.1  Key S

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

ment Markin

c Island and 

h Barrier Mai

er Post Main

ons on Audit

ndation for N

D AUDIT REP

r's Audit Rep

& Compariso

ysis and Com

agement Per

Durability P

User Service

on of Contrac

ection’s Pho

TAL &SOCIAL

ental Manag

ce as per Env

General facili

Physical Envi

Statuary Clea

y issues as re

YANDTRAF

on ...............

ords .............

lysis ............

rashes .........

ty Audit .......

ty Audit Find

ty Strategies

ard ..............

on of fatal cra

S STAFF AND

 Staff as per 

taff of Lead 

a Bathinda Netwo

ng (RUS&CPM

Roundabou

intenance (R

ntenance (RU

t Sections .....

Network Per

PORT ...........

port on July 2

on of Contra

mments of the

rformance M

erformance 

e and Comfo

ctor’s Audit R

otographic Re

LMANAGEM

ement .........

vironmental 

ities at Contr

ronmental A

arances Appl

eviewed from

FFICMANA

....................

....................

....................

....................

....................

dings ............

s ...................

....................

ashes in the 

D CONSTRUC

Contract Ag

Contractor P

ork in Punjab (Ind

M‐10) ..........

t Maintenan

RUS&CPM‐12

US&CPM‐14)

....................

rformance W

...................

2016 ............

ctor’s Audit 

e Performan

Measures (MP

Measures (R

ort Performa

Report .........

ecord of Non

MENT ...........

....................

Performance

ractor Camp

Aspects on Si

icable for pr

m the works 

AGEMENT ...

....................

....................

....................

....................

....................

....................

....................

....................

OPRC netwo

CTION EQUIP

greement .....

Present at Sit

dia) 

....................

nce (RUS&CP

2) ..................

) ...................

....................

Works ............

...................

....................

vs. Monitori

nce Audit Ins

PM’s) ...........

RDPM’S) .......

nce Measure

....................

n‐Conforman

...................

....................

e Indicators 

 Site .............

te ................

roject and Ca

programme 

...................

....................

....................

....................

....................

....................

....................

....................

....................

ork ...............

PMENTS .....

....................

te in the mo

....................

PM‐11) .........

....................

....................

....................

....................

...................

....................

ing Consulta

pection .......

....................

....................

es ‐ RUS&CP

....................

nces .............

...................

....................

as per World

....................

....................

amp site ......

and work m

...................

....................

....................

....................

....................

....................

....................

....................

....................

....................

...................

....................

nth of July 2

   

....................

....................

....................

....................

....................

....................

...................

....................

nt’s Audit ....

....................

....................

....................

M ................

....................

....................

...................

....................

d Bank guide

....................

....................

....................

ethod ..........

...................

....................

....................

....................

....................

....................

....................

....................

....................

....................

...................

....................

016 ..............

   

.......... 31 

.......... 32 

.......... 33 

.......... 33 

.......... 34 

.......... 39 

.......... 41 

.......... 41 

.......... 44 

.......... 44 

.......... 44 

.......... 45 

.......... 46 

.......... 48 

.......... 64 

.......... 69 

.......... 69 

elines . 69 

.......... 71 

.......... 71 

.......... 73 

.......... 76 

.......... 77 

.......... 77 

.......... 77 

.......... 79 

.......... 81 

.......... 83 

.......... 83 

.......... 84 

.......... 84 

.......... 85 

.......... 91 

.......... 91 

.......... 91 

TNM 

 

OPRC WorlMonthly Pro

7.1

7.2 

7.3 

7.4 

8  PAY

8.1 

8.1

8.2 

9  APP

9.1 

9.1

9.1

9.2 

9.3 

9.4 

M TECHNOMANAG

ld Bank Project fogress Report No 22

.2  Key S

Contractor

Contractor

Review of 

YMENTS & D

Disputes a

.1  Claim

Summary 

PENDIX .......

Minutes o

.1  Minu

.2  Minu

MEC Meet

Correspon

Correspon

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

taff Present 

r’s Construct

r’s Staff Pres

Contractor’s

DISPUTES ....

and Claims ...

m ..................

Man‐Hours o

..................

f Meeting ...

tes of Arbitr

tes of Disput

ting Agenda 

ndence by M

ndence Recei

a Bathinda Netwo

at Site in Jul

tion Equipme

sent – July 20

s Staff ..........

...................

....................

....................

of Monitorin

...................

....................

al Tribunal M

te Resolution

....................

onitoring Co

ived .............

ork in Punjab (Ind

ly 2016 ........

ent’s July 20

016 ..............

....................

...................

....................

....................

ng Consultan

...................

....................

Meeting .......

n Board (DRB

....................

onsultant .....

....................

dia) 

....................

16 ................

....................

....................

...................

....................

....................

t Team ........

...................

....................

....................

B) Meeting ..

....................

....................

....................

....................

....................

....................

....................

...................

....................

....................

....................

...................

....................

....................

....................

....................

....................

....................

   

....................

....................

....................

....................

...................

....................

....................

....................

...................

....................

....................

....................

....................

....................

....................

   

.......... 91 

.......... 92 

.......... 93 

.......... 93 

.......... 94 

.......... 94 

.......... 94 

.......... 94 

.......... 96 

.......... 96 

.......... 96 

.......... 96 

.......... 96 

.......... 97 

........ 101 

TNM 

 

OPRC WorlMonthly Pro

LISTO

Figure  2Figure  2Figure  2Figure  2Figure  2Figure  3Figure  3Figure  3Figure  3Figure  3Figure  3Figure  3Figure 6Figure 6Figure 6Figure 6Figure 6Figure 6Figure 6Figure 6Figure 6Figure 6Figure 6

M TECHNOMANAG

ld Bank Project fogress Report No 22

OFFIGUR

2‐1 : OPRC Or2‐2 : Contract2‐3 : Organiza2‐4 :  Major c2‐5 :  OPRC N3‐1 : Rutting 3‐2 : Reverse3‐3 : Vegetat3‐4 : Road Se3‐5: Faded/d3‐6: Poor ma3‐7: Km stone6‐1: OPRC Ne6‐2: OPRC Ne6‐3: OPRC Ne6‐4: OPRC Ne6‐5 : OPRC Ne6‐6 : Fatal Cra6‐7 : Fatal Cra6‐8 : Fatal Cra6‐9 : Fatal Cra6‐10 : Fatal C6‐11 : Fatal C

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

RES

rganization Ct Administraation Chart ocomponents Network Map& Shoves re slope, rain cion control oection B8 – Pamaged Pavintenance ae 3, improveetwork – Secetwork – Secetwork – Speetwork – OPRetwork – Craash Locationash Locationash Locationash Locationrash Locatiorash Locatio

a Bathinda Netwo

Chart ...........ation Chart ..of Monitorinof Civil Worp ..................ecorded on Scuts & low son shouldersPoor maintenvement Marknd painting ement in wriction Length ction Length eeding & AligRC Network ash Trend ....ns at Sectionns at Sectionns at Sectionns at Sectionons at Sectioons at Sectio

ork in Punjab (Ind

....................

....................ng Consultanrks under OP....................S2 & B8 Roadshoulder ......s with manunance of Roaking on S1, Sof median kiting is requiv Number ov Number ognment as F– Fatality Tr.................... S1 .............. S2 .............. S3 .............. S4 ..............n S5 ............n B8 ............

dia) 

....................

....................nt .................PRC project .....................d Sections ........................ual and mechad signs .......S5 & B8 Roadkerbs on B8 Rired ..............of Fatalities &of Crashes & actors in Crarend ........................................................................................................................................................

....................

....................

....................

....................

....................

....................

....................hanical mean....................d Sections ...Road Section....................& Fatality RaCrash Ratesashes ...........................................................................................................................................................................

   

....................

....................

....................

....................

....................

....................

....................ns.........................................................n.......................................ates ..............s .......................................................................................................................................................................................................

   

.......... 13 

.......... 15 

.......... 16 

.......... 17 

.......... 18 

.......... 26 

.......... 27 

.......... 29 

.......... 30 

.......... 32 

.......... 33 

.......... 34 

.......... 79 

.......... 80 

.......... 81 

.......... 82 

.......... 82 

.......... 85 

.......... 86 

.......... 87 

.......... 88 

.......... 89 

.......... 90 

TNM 

 

OPRC WorlMonthly Pro

LISTO

Table  2‐Table  2‐Table  3‐Table  3‐Table  3‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  4‐Table  5‐Table  5‐Table  5‐Table  5‐Table  6‐Table  6‐Table  6‐Table  7‐Table  7‐Table  7‐Table  7‐Table  8‐Table  8‐Table  9‐Table  9‐

M TECHNOMANAG

ld Bank Project fogress Report No 22

OFTABLE

‐1 : Agencies‐2 : Network‐1 : Work Pro‐2 :Structura‐3 : Audit Sec‐1 : Accumul‐2 : Summary‐3: Managem‐4: Road Dur‐5 : Road Use‐6 : Summary‐7 : Managem‐8 : Road Du‐9 : Summary‐10 : Verifica‐11 : Verifica‐12 : Verifica‐13 : Verifica‐14 : Verifica‐15 : Verifica‐16 : Verifica‐17: Verificat‐18: Verificat‐19 : Verifica‐20 : Verifica‐21 : Verifica‐22 : Verifica‐23 : Verifica‐24 : Verifica‐25 : Verifica‐1: Complian‐2 : Status of‐3 : Status of‐4 : Status of‐1: OPRC Net‐2: OPRC Net‐3: OPRC Net‐1: Contracto‐2: Key Staff ‐3: Construct‐4 : Contact N‐1 : Man Hou‐2 : Man Hou‐1 : Correspo‐2 : Correspo

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

ES

s and Key Pek Road Sectioogram Approal Capacity Dctions for thated Scores y of Networment Performrability Perfoer Service any Non‐Confoment Perforrability Perfoy of Non–Coation of Audiation of Audiation of Audiation of Audiation of Audiation of Audiation of Audition of Audittion of Auditation of Audiation of Audiation of Audiation of Audiation of Audiation of Audiation of Audince as per Enf General facf Physical Enf Statuary Cletwork Crashtwork Fatalittwork – Sumor’s Key Stafof Professiotion EquipmNo. of Contrurs (for the murs (for the mondence Senondence Rec

a Bathinda Netwo

rsons involvons under OPoved vs. AchData (Pavemee Month of Submitted bk Performanmance Measormance Mend Comfort Pormances .....mance Measormance Meonformancesit – Section Sit – Section Sit –Section Sit – Section Sit – Section Sit – Section Sit – Section St – Section St – Section Sit – Section Sit – Section Sit – Section Sit – Section Sit – Section Bit – Section Bit – Section Bnvironmentacilities at Convironmentaearances Ap Details (Up ties Details (

mmary of Craff as per Cononal Engineeent as per Cractor’s Staffmonth of Julmonth of Julnt ..................ceived ..........

ork in Punjab (Ind

ved in the PrPRC projecthieved Progrent DeflectioJuly 2016 ....by Contractonce submittesures (MPM`easures (RDPPerformance....................sures (MPMeasures (RDPs of RUS&CPS1 – Km 0.00S2 – Km 2.24S2 – Km 15.0S2 – Km 45.0S2 – Km 60.0S2 – Km 65.0S2 – Km 75.0S4 – Km 0.00S4 – Km 5.00S4 – Km 15.0S5 – Km 5.00S5 – Km 15.0S5 – Km 20.0B8 – Km 9.20B8 – Km 15.0B8 – Km 20.0al Performanntractor Caml Aspects onpplicable for to July 2016(Up to July 2ash Statisticstract Agreem

ering Consultontract Agref Present at Sy 2016) – Key 2016) – No........................................

dia) 

oject ...............................ress ..............ons) .................................or for Non‐Coed by Contra`S) SubmittePM`S) – Subme Measures –....................’s) ................PM’s) ...........M Measures0 to Km 5.0040 to Km 10.0 to Km 20.000 to Km 50.00 to Km 65.00 to Km 70.00 to Km 80. to Km 5.00 . to Km 10.0000 to Km 20.0 to Km 10.000 to Km 20.00 to Km 25.00 to Km 15.00 to Km 20.00 to Km 25.nce Indicatormp Site .........n Site ............project and6)…………………2016)…………s …………………ment and Prtant ..............eement/ PreSite ..............ey Experts ....on Key Exper........................................

....................

....................

....................

....................

....................onformanceactor ............ed by Contramitted by Co– Submitted............................................................s ..................00 .................00 ...............00 ................00 ...............00 ...............00 ...............00 ...................................0 ..................00 ...............

00 .................00 ...............340 ..............00 ................00 ................00 ...............rs as per .............................................. Camp site ..……………..…………………..…………………………esent at Site....................esent at Site ........................................rts .......................................................

   

....................

....................

....................

....................

....................es ......................................ctor .............ontractor ......d by Contract................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................…………………………………………………………e ...............................................................................................................................................................

   

.......... 14 

.......... 17 

.......... 19 

.......... 23 

.......... 25 

.......... 41 

.......... 42 

.......... 42 

.......... 42 tor ..... 43 .......... 44 .......... 45 .......... 45 .......... 47 .......... 48 .......... 49 .......... 50 .......... 51 .......... 52 .......... 53 .......... 54 .......... 55 .......... 56 .......... 57 .......... 58 .......... 59 .......... 60 .......... 61 .......... 62 .......... 63 .......... 69 .......... 71 .......... 71 .......... 73 ……. …78 ……. …78 ……. …83 .......... 91 .......... 91 .......... 92 .......... 93 .......... 95 .......... 95 .......... 97 ........ 101 

SN

TNM 

 

OPRC WorlMonthly Pro

1 PR

1.1

1.2

Sr. No. 

RoadName

1  S1 

2  S2 

3  S3 

4  S4 

5  S5 

6  B8 

Total 

M TECHNOMANAG

ld Bank Project fogress Report No 22

ROJECTH

Significan

Monitoring

Consultant

Monitoring

Network o

The Enviro

July 2016. 

The Arbitra

the confer

between C

adjustmen

of the resp

MEC Meet

July 2016, 

project wh

The Monit

submitted 

Contract A

The Monit

of June 20

CrashRec

Total 8 cra

There were

Total num

The total n

crashes sa

While the 

Network h

measures. 

d e 

Mar. 2

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

HIGHLIGH

ntEvents

g Consultant

t team and v

g Consultant

on 5th July 20

onmental and

al Tribunal h

rence room o

Claimant (Ch

nt formula, co

pondent’s co

ting between

to ensure ef

hich is the re

oring Consu

the non‐con

Agreement. 

oring Consu

16 on 21 July

cordUpdat

shes were re

e two fatal c

ber of fatalit

number of cr

me time pre

total numbe

has risen shar

OP

013 to Nov. 2013 

59 

81 

a Bathinda Netwo

HTSFOR

t’s Environm

visited the OP

t’s Data Anal

16 and held 

d Social Expe

eld its 13th &

of the Institu

ief Engineer,

ontained in t

ounsel. 

n Monitoring

ffective comm

quirement fo

ltant conduc

nformance re

ltant submit

y 2016, in ac

e

eported on t

crashes resul

ties in the 4t

rashes this ye

evious year (7

er of crashes 

rply from 8 t

PRC Network

Dec. 20Nov.2

0

78

3

3

1

1

86

ork in Punjab (Ind

THEMON

ental Expert

PRC Network

yst & Statist

meetings wi

erts from Wo

& 14th Meetin

ution of engin

, PWD) and R

the contract

g Consultant,

munication a

or OPRC proj

cted the mon

eport on 10 J

ted Monthly

ccordance wi

the network 

ting in 2 fata

h Year stand

ear (64) is do

74). 

has come do

to 18, calling

k Crash Detai

013 to 2014 

dia) 

NTHOFJ

, Dr Asha Sh

k on 14th July

tician, Dr Vin

ith M/s PIPL 

orld Bank vis

ng on 15 & 1

neers, to del

Respondent 

. The Arbitra

, Employer a

and teamwo

ject (Please 

nthly audit o

July 2016 to 

y Progress Re

ith the Contr

for reporting

alities. 

ds at 18.  

own by 10, co

own, the num

 for some ur

ils (Up to Jul

Dec. 2014 toNov. 2015

71 

98 

JULY201

arma, joined

y 2016.  

ay Maitri, vis

Inventory M

ited the OPR

16th July, 201

iberate on m

(M/s PIPL), a

al Tribunal he

nd Contract

ork for the de

see Section 9

f the OPRC n

fulfil the req

eport (MPR) 

ract Agreeme

g month of J

ompared to 

mber of fata

rgent speed m

ly 2016) 

o  DecNo

   

16

d Monitoring

sited the OP

Management 

RC Network o

6 in Chandig

matter of Arb

arising out pr

eard the argu

or was held 

elivery of hig

9).  

network and 

quirement of

no 21 for th

ent. 

uly 2016.  

the number 

lities on OPR

managemen

c. 2015 to ov. 2016 

50 

64 

   

RC 

team. 

on 26th 

garh in 

bitration 

rice 

uments 

on 29 

gh quality 

f the 

e month 

of 

RC 

nt 

Total Crashes

19 

258 

17 

10 

10 

15 

329 

TNM 

 

OPRC WorlMonthly Pro

 

Crashes

Fatalitie

1.3

M TECHNOMANAG

ld Bank Project fogress Report No 22

Dec  Ja

s  5  6

es  0  0

Snapshot

MEC Mee

135

1

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

Cra

n  Feb  M

6  12  9

0  10  1

s–Pictoria

eting at MC 

23

39

11

23

2 3

Total C

a Bathinda Netwo

ashes 4th Yea

Mar  Apr M

9  8

1  2 

alOverview

Office 

5059

3240

4 5

Crashes

Third

ork in Punjab (Ind

ar (Dec. 2015

May June

9 7

3  0 

w

6368

4956

6 7

s This Ye

d Year

dia) 

5 to Nov. 20

July Aug

8

2   

Arbitratio

7481

64

8 9

ear v Las

Fourth Year

016) 

Sep O

 

on Meeting i

8793

10 11

st Year

   

Oct  Nov 

   

   

n Chandigar

98

12

   

10 

Total

64

18 

rh

TNM 

 

OPRC WorlMonthly Pro

M TECHNOMANAG

ld Bank Project fogress Report No 22

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

MC

a Bathinda Netwo

C Key Experts

Fatal 

Fatal 

ork in Punjab (Ind

s meeting Co

Crash on S2

Crash on S2

dia) 

ontractor's Te

2 Road

2 Road

eam 

   

   

11 

TNM 

 

OPRC WorlMonthly Pro

T

M TECHNOMANAG

ld Bank Project fogress Report No 22

Traffic Contr

Contr

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

World 

rol during Ro

ractor's shou

a Bathinda Netwo

Bank Enviro

oad Works

ulder rectific

ork in Punjab (Ind

nmental Exp

MC

ation and ve

dia) 

pert on S2 Ro

C inspecting c

egetation con

oad Site 

construction 

ntrol mainte

   

 of Culvert C

nance 

   

12 

Catch Pit

TNM 

 

OPRC WorlMonthly Pro

2 PR

2.1

 

M TECHNOMANAG

ld Bank Project fogress Report No 22

ROJECTO

Backgrou

The Goverhas allottePatel  InfraRajkot,  foBathinda cdate on co

This  contManagemMaintenanContractorroutine  mpavement emergency

TechnologConsultingof  the MoBoard,  a  sBoard  ActConsultanc

 The OrganFigure 2‐1

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

OVERVIEW

und

rnment of Pued the worksastructure  Por  203.68  kmcontract areaompletion is 4

ract  is  an ent  Contrance works  or  is responsiaintenance rehabilitatioy works. 

gy  and  Mang Services Ltonitoring Constatutory  bot,  1998  (Pucy services w

isation Chart. 

F

a Bathinda Netwo

W

unjab (GOP)s  for  ImprovPvt.  Ltd  Patcms  of  its  sta. The contr4th Decembe

Output  anact)  for  Imf  roads  andble for the owork,  desigon and  impr

nagement  Litd, India, wansultant  (MCody  establishnjab  Act  N

will be for a p

t of Output a

Figure  2‐1 : O

ork in Punjab (Ind

through Punvement, Rehacon  House, tate  road  nact has starter 2022. 

nd  Performaprovement,   allotted  unoverall manan  and  constrovement wo

imited,  Israes selected aC) on behalfhed  under  thNo.  22  of  1period of five

and Perform

OPRC Organ

dia) 

njab Public Wabilitation a2nd  Floor,  K

network  comted on 5th De

ance  basedRehabilitat

nder  Contracagement of ttruction  of  torks and  the

el,  in  assocs the preferf of Punjab Rhe  Punjab  R1998).  The e (5) years. 

ance based 

ization Char

Works Depand Routine MKotecha  Chomprising  ofecember 20

d  Road  Contion,  Resurfct  no.  PSRSPthe networkthe  requirede manageme

ciation  with red bidder tRoads  and BRoads  and  Binitial  term 

Road Contra

rt 

   

artment, PWMaintenanceowk,  Kalawathe  Sangrur12 and the e

ntract  (OPRfacing  and P/WB/OPRC/k,  including ad  surfacing ent of  any n

ICRA  Manao undertakeBridges DeveBridges  Deve

of  the  Mo

act is given in

   

13 

WD (B&R) e to M/s ad  Road, r‐Mansa‐expected 

RC)(Asset Routine 

/ICB.  The all of the renewal, necessary 

agement e the role elopment elopment onitoring 

n  

TNM 

 

OPRC WorlMonthly Pro

2.2

M TECHNOMANAG

ld Bank Project fogress Report No 22

Agencies

Agencies a

T

 EMPLOYER 

CLIENT 

EMPLOYERREPRESEN

FUNDING A

MONITORCONSULTA

CONTRACT

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

Involvedin

and key perso

Table  2‐1 : A

AGE

R’S TATIVE 

AGENCY 

ING ANT 

TOR 

a Bathinda Netwo

ntheOPRC

ons involved

Agencies and

ENCIES &KEY

 PUNJABPROJEC

PUNJABDEVELO

CONSTR(B&R)  ‐

INTERNDEVELO

TECHNOMANAGMANAGSERVICE

DATE M

DURATI

PATELINLTD 

DURATI

START D

DATE O

END DA

VALUE O

ork in Punjab (Ind

Project

d in OPRC pr

d Key Person

Y PERSONS IN

B STATE ROACT (PSRSP) 

B ROADS ANDOPMENT BOA

RUCTION DIV‐ SANGRUR 

ATIONAL BAOPMENT (IBR

OLOGYAND GEMENT LIMGEMENT CONES LIMITED 

MOBILIZED O

ION OF CONT

NFRAESTRUC

ION

DATE 

F SIGNING O

ATE 

OF CONTRAC

dia) 

roject are pre

ns involved i

NVOLVED IN

AD SECTOR 

D BRIDGES ARD (PRBDB)

VISION PWD 

ANK FOR RECRD) 

MITED ‐ ICRA NSULTING 

N

TRACT

CTURE PVT. 

OF CONTRAC

CT SIGNED

esented in Ta

n the Projec

N THE PROJEC

Mr. YogChief En

Mr. YogProject Mr. AniDeputy 

Mr. GurExecutivMr. PawSub Div

CONSTRUCTIO

Mr. HaiPresidenMr. YogTeam LeManage

Octobe

5 years 

Mr. ArvManagiMr. MuRoad M

10 Year

Decemb

T  Decemb

Decemb

INR 596

   

able 2‐1. 

ct 

CT 

gesh Gupta ngineer‐ PSRS

gesh Gupta Director l Kumar ShaProject Dire

rmukh Singhve Engineer wan Kumar Gvisional Engin

ON AND 

m Bonjack nt gendra Bhatneader/Projecer 

r 7, 2014 

vind Bhai V. Ping Director kesh Kumar 

Manager 

rs 

ber 5, 2012 

ber 10, 2012

ber 4, 2022 

6.36 Crores 

   

14 

SP 

rma ctor 

 

Garg neer 

nagar ct 

Patel 

TNM 

 

OPRC WorlMonthly Pro

2.3

2.4

2.5

M TECHNOMANAG

ld Bank Project fogress Report No 22

ContractA

Contract ad 

Organisat

The  appoRepresentOPRC proje

The  ConsuConditionsof the Conpotential runder the 

As a repreadministraperformedassessmen

Responsib

The Monito

Monitoring

Overall moachieving a

Evaluationconstructe

EvaluationThe Emplo

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

Administra

dministratio

tion&Resp

ointed  Monative in impect. 

ultant  will  rs of an Outpnsultant’s rorisk to the Emworks contr

sentative of ation  of  thed by the Contnt of the CE´s

bilitiesofth

oring Consul

g the perform

onitoring of tand maintain

n of the qualied and maint

n and recommoyer. 

a Bathinda Netwo

ationChart

n chart is giv

Figure  2‐2

ponsibilitie

itoring  Conlementing a

represent  thut and Perfole  is  to provmployer by vact within th

the Employe  Contract  atracting Entits technical pe

heMonitor

ltant is respo

mance of the

the road conning the requ

ty and residutained by the

mendation o

ork in Punjab (Ind

ven in Figure

: Contract A

es–Monitor

nsultant  isnd maintain

he  Client  asormance basvide timely averifying the he stipulated

er, the Monand  for  thety for the Civerformance.

ringConsul

onsible for:

e Contractor

nstruction beuired and de

ual life of roae Contractor

of designs pro

dia) 

e 2‐2 

Administratio

ringConsul

responsible ing an appro

s  the  Projeced Road Conand orderly achievemen

d time and bu

itoring Conse  verificationvil Works. Th 

tant

r, based on th

eing done by esigned level

ad pavemenr. 

oposed by th

on Chart 

ltant

for  assistiopriate regim

ct  Manager ntract. Accorrequired advnt of all contrudget. 

ultant will bn  of  works he above inc

he approved

the Contracs of service. 

t, presented

he Contracto

   

ing  the  Emme for mana

under  the rdingly, the ovice to minimractual requ

e responsibland  serviceludes the co

d Work Progr

ctor, based o

d, designed, 

or for accepta

   

15 

mployer’s aging the 

General objective mize any irements 

e for the es  to  be ntinuous 

ram. 

ance to 

TNM 

 

OPRC WorlMonthly Pro

2.6

2.7

M TECHNOMANAG

ld Bank Project fogress Report No 22

Evaluationand Resett

Managing control of 

Monitoringupdating s

The reviewapprovals 

Review anusing tech

ProjectOr

Figure  2‐3Consultant

BasicCon

The OPRC The  Contralevels  on managemehanding ov

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

n and monitotlement & Re

the Quality Athe Contract

g, overall supsubmitted by

w of all technof the mont

d monitor thnology accep

rganization

3  shows  the t and the rel

Figure  2‐3 

ntractFeatu

methodologactor  is  paidthe  roads  (ent of the faver the road 

a Bathinda Netwo

oring of the pehabilitation

Assurance oftor. 

pervision andy the Contrac

nical documehly billing pr

he process leptable to the

n

internal  distationship wi

: Organizati

ures

gy optimisesd  for  output(level  of  sercility and asin a certain 

ork in Punjab (Ind

performancen Plan by the 

f the roads a

d recommenctor. 

entation requesented by t

eading to thee Client. 

tribution  of th the Client

on Chart of 

use of resouts,  the  mainrvice)  underssociated righquality to th

dia) 

e of EnvironmContractor.

and bridges a

ndation for a

uired for paythe Contract

e creation an

all membert and Contra

Monitoring 

urces to provntenance  serr  contract  aht of way due Client at th

mental Impac

and monitori

cceptance o

yment and retor. 

d updating o

rs  of  the  stactor. 

Consultant

vide maximarvice  of  ensand  specific uring the conhe end of the

   

ct Managem

ing the quali

of data for inv

ecommendat

of the asset d

ff  of  the Mo

al “value for uring  certainimproveme

ntract periode contract pe

   

16 

ent Plan 

ty 

ventory 

tions for 

database 

onitoring 

money”.  n  quality ents,  the d and for eriod. 

TNM 

 

OPRC WorlMonthly Pro

2.7

RoaCod

S1

S2

S3

S4

S5

B8

Tota

M TECHNOMANAG

ld Bank Project fogress Report No 22

7.1 Projec

AccoWor

Figu

The inte

ad de 

N

1  Sangru

2  BhawanSH13 In(SH12A

3  Barnala

4  Mansa interse

5  Dhanau

8  BathindSabo (u(SH17) 

l Length of c

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

ctBrief

ording  to  thrk Contract a

ure  2‐4 :  Ma

roads  undrvention are

Table  2‐2

ame of Road

r ‐ Sunam (M

nigarh ‐ Sunantersection ‐A) 

a ‐ Mansa: (S

–Talwandi Sction with B8

ula ‐ Bhikhi: (

da ‐ Kotshamup to interse

contract area

a Bathinda Netwo

he  Contractoare illustrate

ajor compon

der  the  OPe given in Tab

 : Network R

d Section  

MDR 21) 

am ‐ Bhikhi ‐‐ Kotshamir: 

SH13) 

Sabo (up to 8): (ODR9) 

(MDR 14)

mir–Talwandiction with S4

a (kms) 

ork in Punjab (Ind

or’s  Bidding d in Figure 2

nents of Civil

RC  Contractble  2‐2 and i

Road Section

Classific

MD

‐  SH

SH

OD

MD

i4): 

SH

dia) 

Document,2‐4. 

l Works unde

t  and  theirllustrated in 

ns under OPR

cation Len(k

DR  1

H  10

H  7

DR  24

DR 25

H 28

203

  the  major 

er OPRC pro

r  main  featFigure 2‐5.

RC project 

ngth km) 

Ty

1.3  RehaResu

6.13  Impr(widResu

.29  RehaResu

4.97  Impr(widResu

5.34 RehaResu

8.65 RehaResu

3.68 

   

component

oject 

tures  and  t

ype of interv

abilitation anurfacing 

rovement Wening) and urfacing 

abilitation anurfacing 

rovement Wening) and urfacing 

abilitation anurfacing 

abilitation anurfacing 

   

17 

ts  of  the 

types  of 

vention 

nd 

Works 

nd 

Works 

nd 

nd 

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

 

 

 

 

 

 

 

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Bathinda Network in PPunjab (India) 

Figu

 

ure  2‐5 :  OPRC N

  18

Network Map

   

TNM 

 

OPRC WorlMonthly Pro

3 W

3.1

YEAR 

1 (2013) 

2 (2014) 

3 (2015) 

4 (2016) (Balance of 3

rd 

year) 

5 (2017) 

6 (2018) 

7 (2019) 

8 (2020) 

9 (2021) 

10 (2022) 

Contract Total (km) 

*ROB

3.1

M TECHNOMANAG

ld Bank Project fogress Report No 22

ORKPRO

Improvem

The detailsper the coachieved f

The achievthe table.  

It should bPIPL) from2014. 

The progrework  progeffect on tthe contra

IM

As per Contrac

AApW

Pro

27.20  27

47.60 24.935.8

54.10  40

0.00    5

0.00 

0.00 

0.00 

0.00 

0.00 

0.00 

128.90 

B length exclud

1.1 Works

In  tapp(i) Fi.e. imp

WitConBhi

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

OGRESS‐

ment,Rehab

s of the apprntract for thigures at the

ved progress

be noted that December 2

ess of work igramme)  wathe efficiencyct. 

Table  3‐1 : 

PROVEMENT  

As per pproved Work ogramme 

Ac

.20 (S2)  25

97(S4) & 84 (S2) 

24

0.87 (S2) 21.10.5

52.42 

6.7.5.95.5

  

  

  

  

  

  

 9

ded. 

sDone‐Fir

the  first  yeaproved workFrom km 2.2in village G

provement w

th  regard  tontractor  fulfkhi (S5)(leng

a Bathinda Netwo

SUMMAR

bilitationa

roved work phe remaininge end of the f

s during the 

t the summa2012, prior t

in the seconas  appreciaby and effect

Work Progra

chieved As Con

c

5.91(S2)  0.

.44 (S4)  7.

100 (S2) & 530 (S4)  

0.

00 (S2)85 (S2) 900 (S2) 510 (S2), LHS 

25

   5.

   2.

   34

   0.

   0.

   0.

97.24  74

stYear

ar  of  contrack program. It240 to km18.harachon (iiworks in the f

o  the  rehabifilled  the  regth of 25.340

ork in Punjab (Ind

RYANDC

andResurfa

program for g time (6 yeafirst year, se

fourth year

ary includes to the mobil

d year as webly  behind  sciveness of ro

am Approve 

REHAB

per ntract 

As per AWork Pro

00  25.34

29  11.30

00 7.29 (S3

(S

.34   3

05 

20 

4.90 

00 

00 

00 

4.78  49

ct,  the  Contt complied w.150 (except ) from km 6first year.  

litation  worhabilitation 0 km). 

dia) 

COMMEN

acingWork

the first fours) are summcond year an

r  (balance w

the works caization of M

ell as in the tchedule.    Thoad network

ed vs. Achiev

BILITATION 

Approved ogramme 

Ac

4 (S5)  25

0 (S1) 

3) & 2.20 S2) 

11.

3.6 

  

  

  

  

  

9.73  3

ractor  fulfillwith the imprthe road sec7.840 to km

rks  as  per  thpertaining  t

NTS

ks

r years and tmarised in Tand the third 

work of 3rd ye

arried out byMonitoring Co

third year (ehis  delay  mak operations 

ved Progress

chieved As pCont

.34 (S5)  34.

0.00  0.0

125 (S1)   0.0

3.41*  11.

   23.

   10.

   0.0

   56.

   68.

   0.0

39.875  203

ed  the  requrovement of ction from k

m 79.000. For

he  approvedto  the  road 

   

the work proable 3‐1. Furyear are also

ear)  is also s

y the contraconsultant in 

extension of ay  have  detover the du

 

RESUR

per tract 

As per AWork Pr

.20  0.

00  0.

00  28

.30 

.60 

.20 

00 

.00 

.30 

00 

3.60  28

uirements  asf road sectiokm 8.400 to kr a total of 2

d  work  progsection  Dha

   

19 

ogram as rther the o shown. 

shown  in 

ctor (M/s October, 

2nd year trimental ration of 

RFACING 

Approved ogramme 

Ac

.00 

.00  28.

8.65   0

  

  

  

 

 

 

  

8.65  2

s  per  the ns S2 i.e.  km 9.400 26.07 km 

ram,  the anaula  –

hieved 

0.00 

65 (B8) 

0.00  

  

  

  

  

  

  

  

28.65 

TNM 

 

OPRC WorlMonthly Pro

3.1

3.1

3.1

M TECHNOMANAG

ld Bank Project fogress Report No 22

1.2 Works

Imp201thethekmclea

Reh2nd thicDis

Res37.woconAftreh

Duesec

1.3 WorkD

Duesec(PSsubbalCon0.0Jun

TheyeaS1)

Thepav67.

1.4 Works

TheexeThewoEmare

As the

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

sDone‐Sec

provement  w14  as  per  the road lengthe work on the  79.000  andarance of for

habilitation wyear (2014)ckness  of  thpute Review

surfacing wo850).  Howerks  executensidered as rer  the  15thhabilitation o

e to the abovctions (S1 and

Done‐Thir

e  to  the  dection,  the  2nd

RSP)  approbmitted  the ance  works ntractor was0 to km 11.3ne, 2015 resp

e balance woar.  The Empl and up to05

e  works  forvement  of  S840 were co

sUnder‐Fo

e  Contractoecuted  in  theese works arrk programmployer for ape to be impro

per  the appe 4th year of 

a Bathinda Netwo

condYear

works  of  47he  approvedh of 24.44 kme other roadd  km  108.77rest land. 

work for the , however thhe  pavemenw Board (DRB

ork  in  the 2n

ver,  the  Cod  from  km rehabilitationh  DRB  meeof B8 road, th

ve reasons, td S2) in the s

rdYear

esign  disputedyear work pved  it  as revised worfor  accepta

s started the300) on 29thpectively.  

orks of S1 anloyer was gr5th Dec, 201

r  3rd  year S2  road  fromompleted. Th

ourthYear

r  had  subme 4th year oe to be execme has beenpproval. Undoved and 3.6

proved work the contract

ork in Punjab (Ind

7.60  km  werwork  progr

m correspondd sections i.e70  (total  29.7

road length he work did nt  overlay.  TB). d year was cntractor  had9.200  to  kn or resurfacting  the  dehe resurfacin

the Contractsecond year.

e  of  S1  roaprogramme extension  ork  programmance  of  the e rehabilitatih May, 2015

nd S2, schedranted  the  t5 (for S2) res

(2nd  year  bm  km  45.200he completio

Programm

mitted  the  rof  the  contrauted in the 4n accepted bder the 4th y km road len

programmet 

dia) 

re  planned  tramme.   Howding to Sectioe.  S2 betwee77  km on  ro

of 11.3 km fnot commeThe  Contrac

completed  ind  raised  them  15.000  scing. The casecision  was ng would be 

tor did not fu. 

d  and  non‐was  shiftedof  2nd  year me  in  June, Monitoringon and imprand S2 (from

uled in the 2ime extensiospectively. 

balance  wor0  to  km  54.0on of minor w

e

revised  3rd act)  for  the 4th year of ty the Projecyear work prngths are to b

e  the  followi

to  be  compwever,  the  Con S4 and wen km 32.000oad  section 

for S1 sectioence due toctor  forward

n the Sectioe  dispute  reection,  whese has been conveyed  tconsidered.

ulfil the work

clearance  o  to  3rd  yearwork  prog

2015  to  comg  Consultantrovement wm km 45.20 t

2nd year, weon up  to 15

rks),  the  im000  and  froworks is still i

year  work acceptancehe contract. t manager arogramme 52be rehabilita

ing works  ar

   

leted  by  NoContractor  im

was unable to0 and km 67S2)  due  to  t

n was plannthe dispute ded  the  case

n B8  (km 9.egarding  theether  this  shreferred to that  the  ins

k programme

f  forest  on r  and Chief gramme.  Complete  the  2t  and  the  Eorks on S1 (to km 67.84)

ere shifted inth August, 2

mprovement m  km  55.70in progress. 

programmeof Project MThe revised 

and forwarde2.42 km roadated. 

re  to be exe

   

20 

ovember, mproved o execute .840 and the  non‐ 

ed in the over the e  to  the 

200 –km e  type  of hould  be the DRB. stead  of 

e of road 

S2  road Engineer ontractor 2nd  year mployer. from km ) 0n 03rd 

n the 3rd 2015  (for 

of  road 00  to  km 

e  (to  be Manager. 3rd year ed to the d lengths 

ecuted  in 

TNM 

 

OPRC WorlMonthly Pro

3.1

3.1

M TECHNOMANAG

ld Bank Project fogress Report No 22

Improve

Km 8.40

Km 18.1

Km 28.5

Km 40.7

Km 79.1

Total Le

Rehabili

Km 24.6 

Km 26.4

Km 27.6

Total Le

 

1.5 WorkP

Durto pro

Dursec

Durfrocom

Dur28.

Dur95.

1.6 Change

Undhad  Brid Vari

Vari

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

ement of Bha

0 to km 9.40

50 to km 24

00 to km 39

00 to km 45

50 to km 108

ngth (kms) 

tation of Su

to km 26.40

00 to km 27

00 to km 28

ngth (kms) 

Progress‐F

ring the monkm  24.400 

ogress. 

ring  the  moction from km

ring the monm  km  79.00mpleted. 

ring  the mo600 to km 34

ring the mon010 (LHS) ha

einPropos

der Section Vapproved th

dge Widening

ation Order 

ation Order 

a Bathinda Netwo

awanigarh‐S

000 

.5,00 

.300 

.200

8.770 

nam portion

00 (less ROB 

.60 (initially 

.600 

FourthYea

nth of Marchhas  been  c

onth  of  Aprim 24.400 to k

nth of May 00  to  km  8

nth of  June 4.500. 

nth of July 20as been com

sal:

VII – General he variations

g: 

No.1:  WidcleaBhik

No.2:   WideachBha

ork in Punjab (Ind

Sunam‐Bhikh

n S2 road 

400m) 

included as i

rProgramm

h 2016, the completed. 

l,  2016,  bitukm 28.600 (l

2016, the bi83.570  and 

2016, 5.9 k

016, 5.510 kmpleted. 

Conditions, s for: 

dening of exisar span) overkhi‐Kotshamdening  of  exh c/c over Kowanigarh‐Su

dia) 

hi‐Kotshamir

improvemen

me

bituminous wThe      exec

uminous  woess the ROB

ituminous wfrom  km  8

m of S2  roa

m (LHS) of S2

Clause 63, C

sting bridge r Lisara Drainir road (S2) .xisting  bridgotla Branch Cunam‐Bhikhi‐

r Road (S2)

1.

6.

10

4.

29

52

1.

nt work) 1.

1.

3.

work of S2 rution  of  mi

ork  for  rehab) has been c

work for  impr86.200  to  km

d have been

2 road betwe

Change in Pro

at Ch 100+7n crossing Bh e  2  span  3.Canal at RD 5‐Kotshamir R

   

0 km 

35 km 

0.8 km 

5 km 

9.77km 

2.42 

4 km 

2 km 

0km 

6  

road from kminor  works 

bilitation  of ompleted.  

rovement ofm  89.500  h

n  improved 

een km 89.5

oposal, Empl

00 (5x9.5m ehawanigarh‐S

.50m  clear  &54+040 (SkewRoad (S2). 

   

21 

m 18.150 is  under 

S2  road 

f S2 road has  been 

from km 

00 to km 

oyer 

each Sunam‐

&  3.60m w in 250) 

TNM 

 

OPRC WorlMonthly Pro

3.2 Ro

3.2

RSeN

M TECHNOMANAG

ld Bank Project fogress Report No 22

Vari

Vari

 4‐L 

Vari

Vari

Vari

oadDurabi

2.1 Rough

Concolle

In ththe  

Road ction No. 

Road

S2  BhawBhikh

S1  Sang

S2  BhawBhikh

S4  Man

S5  Dhan 

B8  BathSabo

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

ation Order 

ation Order 

anning of Ro 

ation Order 

ation Order 

ation Order 

ility’sOverv

hness

tractor has ect the rough

he month of following ro

d Section Nam

wanigarh‐Sunhi‐Kotshamir

grur Sunam  

wanigarh‐Sunhi‐Kotshamir

sa Talwandi 

naula Bhikhi 

inda  Talo 

 

a Bathinda Netwo

No.3:  WideachTalw

no. 4:   WideachSun250)

oad sections

No.5: For Roa

No. 6:  For 4(S2)

No. 7:  For 4(S2)

view

procured thhness (IRI) d

f June and Juad sections:

me  Roa

Fro

nam‐r  

24.4

27.

79.0

86.

0.00

nam‐r

2.24

18.4

45.

55.7

68.0

Sabo 0.00

0.00

lwandi  9.20

ork in Punjab (Ind

dening  of  exh  clear)  ovewandi Sabo rdening  of  exh  c/c  over am‐Bhikhi‐K) 

s: 

4‐lanning rod (S2) in Bhi4‐lanning of  in Cheema T4‐lanning of  in Maur Tow

e Profilometata of the ne

uly 2016, Con

ad Section 

m (km) To

400  26

200  28

000 83

200  89

00  11to 

40  18

400 24

200  54

700  67

000  79

00 24

00  24km

00  37

dia) 

isting  bridgeer  Lisara  Draroad (B8) xisting  bridgKotla  Brancotshamir  ro

oad of Bhawakihi Town froBhawanigarTown from CBhawanigarwn from Ch 8

ter  in  the metwork roads

ntractor has 

o (km)

6.400 

8.530 

3.560

9.500 

1.300  (excepCh 3+085) 

8.150 

4.400

4.000 

7.800 

9.000 

4.970

4.800 (exceptm 24.800 to k

7.850 

e  at  RD  20+ain  crossing 

ge  3  span  3.ch  Canal  crooad  (S2)  at  R

anigarh‐Sunaom Ch 54+03rh‐Sunam‐BhCh 39+300 torh‐Sunam‐Bh84+030 to Ch

month of  Juns. 

collected th

pt  from  Ch 

t city portionkm 25.340) 

   

+600  (6  spanBathinda‐Ko

.00m  clear  &ossing  BhawRD  73+450 

am‐Bhikhi‐Ko30 to Ch 55+hikhi‐Kotshamo Ch 40+700.hikhi‐Kotshamh 86+060. 

e 2016 and 

e roughness

Rem

DatJun

2+940  DatJuly

DatJuly 

DatJuly

n from  DatJuly

DatJuly

   

22 

n  8.70 m otshamir‐

&  3.60m wanigarh‐(skew  in 

otshamir +700. mir Road . mir Road 

starts  to 

s data for 

marks 

ta  collected ne 2016 end

ta  collected y 2016 

ta  collected y 2016 end

ta  collected y 2016 end 

ta  collected y 2016 end 

ta  collected y 2016 end.

in 

in 

in 

in 

in 

in 

TNM 

 

OPRC WorlMonthly Pro

3.2

M TECHNOMANAG

ld Bank Project fogress Report No 22

 

Conprocof  tConConuseddo tMC.

2.2 Structu

The of Mi.e. IRC 

The and 68.0S5  (inte

The com95thcurv

The km MonAgrechar 

Pavement lo

Group  2 (S4,S5,B8) 

Group 3 RoaS2, S3) 

 

The this 

Duriroad

Duriroadkm 8

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

tractor has cess the collthe  requiredsultant  andsultant  (MCd to processthe same. So 

uralCapaci

pavement dMonitoring Co(S1&S2 for 1115: 2014 al

pavement dS4 (from km

000 to 79.00(from  km  0rmediate lan

pavement mplying with h  percentilevature confir

FWD data o54+000 andnitoring  Coeement.  Theracteristic cu

Table  3‐2 :S

oading categ

Roads  50 

ads 100 msa

FWD data  fmonth and t

ing the mond from km 18

ing  the mond sections of89.500. The 

a Bathinda Netwo

procured thected roughd  software, d  to  accept)  has  alread the collecteo the data is 

ityData(Pa

deflections wonsultant wi100 MSA, S4ong the inne

deflection dam 0.000 to km0) for inner 0.000  to  kmne road widt

deflections the requirem

e  value  of rmed as show

on the newly   from km 55nsultant  ane  95th  percurvature conf

Structural Ca

ory  MaxiCent

msa < 0.8

a (S1,  < 0.8

for  road  lengthe analysis 

nth of  June 28.400 to km 

nth of  June 2f S2 road i.eresults for th

ork in Punjab (Ind

e profilomethness data hathe  IRI  da  for  fulfildy  conveyeded roughnesonly submitt

avementDe

were recordeith FWD for t4 & S5 for 50er (LHS & RH

ata was  collm 25.340), Sand outer w

m  25.340)  foth.  

data  for  tments of Clapavement  cwn in the Tab

constructed5+700  to kmnd  analysedentile  valuefirmed as me

apacity Data  

imum  Cral Deflectio

80

80

gth  from kmof the data i

2016, the FW24.400. 

2016,  the FW.  From km 7he above me

dia) 

ter at OPRC as not been ata  cannot the  contrac  to  the  Cons data at sitted by the C

eflections)

ed by Contacthe improve0 MSA) for eHS) and the o

ected  for  S12 (from km 2

wheel paths (or  outer  wh

the  above ause 8.2.3 ofcharacteristible 3‐2. 

d road sectiom 67+850     wd  as  per  t  of  pavemeentioned in t

(Pavement 

Characteristicon D0 (mm) 

m 18.400  to is under proc

WD data ana

WD data wa78.500 to kmentioned sec

project site arranged atbe  verified ctual  requirtractor  to  ae but till datContractor bu

ctor (PIPL) ud and rehabeach traffic  louter (LHS & 

1  (from km 02.240 to km (left and righheel  path  o

mentioned f the contracc  deflection

ns of S2 roadwas collectethe  requireent  charactethe Table 3‐2

Deflections)

c  MinimumCurvatur

< 0.1

<0.1

km 24.400 wcess. 

alysed  for  th

s collected am 83.560 andtions are sum

   

but the soft site. In the by  the  Moements.  Moarrange  the te Contractout not verifie

nder the supilitated roadloading grouRHS) wheel 

0.000  to km18.150 and ht side lanesonly  because

roads  sectct agreemenn  and  chara

d from km 4d  in  the preements  of ristic  deflec2. 

m  Charae D0‐D200 (m

was collecte

he road secti

and analysedd from km 8mmarized be

   

23 

ftware to absence onitoring onitoring software or fails to ed by the 

pervision  sections up as per paths. 

m 11.300) from km ) and for e  of  the 

ions  are nt i.e. the acteristic 

5+200 to esence of Contract tion  and 

acteristic mm) 

ed during 

ion of S2 

d  for  the 86.200 to elow: 

TNM 

 

OPRC WorlMonthly Pro

3.3

M TECHNOMANAG

ld Bank Project fogress Report No 22

  

NetworkP

To fulfil thfor the mo

The  audit Consultantsections. 

S

S

1

2

3

4

1

2

3

4

Sl No

Sl No

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

Performan

e requirementh of July, 2

details  ant  against  eac

From

1 78+9

2 79+0

3 80+0

4 81+0

5 82+0

6 83+0

From

1 78+9

2 79+0

3 80+0

4 81+0

5 82+0

6 83+0

l No.

l No.

From

86+200

87+020

88+020

89+020

From

86+200

87+020

88+020

89+020

o. Cha

o. Cha

a Bathinda Netwo

nceWorks’O

ent of the Co2016 are sum

nd  summarych  RUS&CPM

m To

900 79+000

020 80+000

020 81+000

020 82+000

020 83+000

020 83+560

m To

900 79+000

020 80+000

020 81+000

020 82+000

020 83+000

020 83+560

Chainage

Chainage

To

87+000

88+000

89+000

89+500

To

87+000

88+000

89+000

89+500

inage

inage

ork in Punjab (Ind

Overview

ontract Agremmarised be

y  of  non‐coM, MPM and

0 RHS 0

0 RHS 0

0 RHS 0

0 RHS 0

0 RHS 0

0 RHS 0

0 RHS 0

0 RHS 0

0 RHS 0

0 RHS 0

0 RHS 0

0 RHS 0

Oute

Side

Inne

9

Perc

Value

Side 9

Perc

Value

RHS

RHS

RHS

RHS

RHS

RHS

RHS

RHS

Oute

Side 9

Per

Valu

Inne

Side 9

Per

Valu

dia) 

eement, the elow in Table

onformancesd  RDPM are 

0.66 0

0.65 0

0.61 0

0.65 0

0.62 0

0.54 0

0.63 0

0.69 0

0.65 0

0.6 0

0.6 0

0.53 0

er Wheel Path

Ave

Defle

(m

er Wheel Path

5th 

centile 

e (mm)

5th 

centile 

e (mm)

Ave

Defle

(m

0.51 0

0.60 0

0.62 0

0.52 0

0.51 0

0.59 0

0.56 0

0.6 0

er Wheel Path

95th 

rcentile 

ue (mm)

Ave

Defl

(m

er Wheel Path

95th 

rcentile 

ue (mm)

Ave

Defl

(m

randomly see 3‐3: 

s  adjusted explained  i

.08 LHS

.07 LHS

.07 LHS

.07 LHS

.08 LHS

.07 LHS

.08 LHS

.06 LHS

.07 LHS

.07 LHS

.07 LHS

.07 LHS

erage 

ection 

mm)

Side

Sideerage 

ection 

mm)

0.07 LHS

0.07 LHS

0.07 LHS

0.07 LHS

0.07 LHS

0.06 LHS

0.07 LHS

0.06 LHS

h

erage 

ection 

mm)

Sid

erage 

ection 

mm)

Sid

   

elected audit

by  the  Mon  the  follow

0.54

0.65

0.59

0.65

0.6

0.62

0.44

0.65

0.64

0.69

0.63

0.61

95th 

Percentile 

Value (mm)

95th 

Percentile 

Value (mm)

S 0.63

S 0.61

S 0.57

S 0.58

S 0.56

S 0.59

S 0.57

S 0.56

e 95th

Percent

Value (m

e 95th

Percent

Value (m

   

24 

t  lengths 

onitoring wing  sub‐

0.08

0.07

0.07

0.07

0.07

0.07

0.07

0.08

0.07

0.06

0.07

0.08

Average 

Deflection 

(mm)

Average 

Deflection 

(mm)

3 0.07

1 0.07

7 0.07

8 0.07

6 0.07

9 0.06

7 0.06

6 0.06

tile 

mm)

Averag

Deflecti

(mm)

tile 

mm)

Averag

Deflecti

(mm)

 

ge 

on 

)

ge 

on 

)

TNM 

 

OPRC WorlMonthly Pro

Sl. No. 

1  S

2  B(S

3  MR

4  D

5  BIn

3.3

M TECHNOMANAG

ld Bank Project fogress Report No 22

angrur ‐ Sun

BhawanigarhS2) 

Mansa‐TalwaRamtirathjaga

Dhanaula‐Bhi

Bathinda‐Kotntersection w

3.1 Pavem

Durmai

Thesect

The

On 13.3

The

S2: (km

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

Table  3‐3

Name of

nam Road (S1

‐Sunam‐Bhik

andi  Saboa (S4) 

ikhi Road (S5

shamir‐Talwwith S4  

mentMainte

ring the audiintained as p

e28  to  30mmtion. 

e cracks were

B8 road the395 to km 13

e deficiencies

 m 2.240 to km

a Bathinda Netwo

3 : Audit Sec

f Road 

1) 

khi‐Kotsham

o  Road 

5) 

wandi  Sabo 

Total Audit

enance(RU

it  inspectionper the requi

m  rutting wa

e also found 

e slippage an3.400, LHS. 

s recorded u

m 3) 

ork in Punjab (Ind

ctions for the

ir  Road 

Up  to 

Road  upto 

t Length (km

US&CPM‐1)

  for the mored level of s

as  recorded 

between km

nd shoving w

nder RUS&C

 

dia) 

e Month of J

Section Code 

S111  

S211 S213 S219 S221 S223 S225 

S411 S412 S414 

 

S512S514 S515 

B811 B812 B813 

ms) 

nth of July 2service.  

between  km

m 17.000 to k

was observed

CPM‐1 are  pr

S2:

July 2016 

Cha(from km

0.000 t

2.240   t15.000 t45.000 t60.000 t65.000 t75.000 t

0.000   5.000 t15.000 t

5.000 t15.000 t20.000 t

9.200  t15.000 t20.000 t

2016, all the

m  2.420  to  k

km 18.000 of

d more than

resented in F

  (km 2.240 t

   

inage m ‐  to km) 

to 5.000  

to 10.000 to 20.000 to 50.000 to 65.000 to 70.000 to 80.000  

to  5.000 o 10.000 to 20.000  

o 10.000 to 20.000 to 25.340 

o  15.000 to 20.000 to 25.000 

e audit sectio

km  2.460  of

f S2 road. 

n 50mm betw

Figure 3.1 

o km 3) 

   

25 

Length (kms) 

5.000  

7.760 5.000 5.000 5.000 5.000 5.000 

 

5.000 5.000 5.000 

 

5.0005.000 5.340 

5.800 5.000 5.000 

83.90 

ons were 

f  S2  road 

ween km 

 

TNM 

 

OPRC WorlMonthly Pro

3.3

M TECHNOMANAG

ld Bank Project fogress Report No 22

B8: (

Fig

3.2 Unseal

Theon a

ThefromobsConexpreq

On 4.50

On The63.070.0

On 5.00

On shoshoEmpconthe 

 On 

On wer

Conmatsho

Thenoruns

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

 

 (km 9.2 to 15

 

gure  3‐1 : Ru

ledShoulde

e improvemeall road secti

e extra soil atm the edges erved  at  sontractor  has edite  the wuired ratio a

S2  road  sec00 to km 4.9

S2 road, lowe  rain  cuts  a000. Low sho000. 

S5 road sect00 to km 10.

S5  road  seulder was  opkeepers anployers  interducted withdrainage sys

S3 road, the

B8 road sectre observed 

ntactor  also terial in 80/2ulders. 

e road sectiomal  such  asealed should

a Bathinda Netwo

5) 

utting & Shov

erMainten

ent was obseions.  

t the edge oto facilitateme  of  the  astarted  to  rork and  finiss per the spe

ction,  the  re00 RHS and 

w shoulder wand  erosion oulder and r

tion, the low000. 

ction  betweobserved.  Asnd the villagervention  is rh the villagerstem of the r

e laying of se

tion betweebut the wate

maintaining20 ratio. This

ns where ths  the  locatiders should b

ork in Punjab (Ind

 

ves recorded 

ance(RUS&

erved to mai

of the shoulde the drainagaudit  sectionremove  the sh  the  slopeecifications.

everse  slopebetween km

was observedof  shoulderrain cuts we

w shoulder a

een  km  24.0  intimated  bers were oppequired. Thrrs and ‘Gramroad section

ewer was in p

n km 15.960er drained ou

  the  unseales shows the g

he wear and ons  near  dhbe maintaine

dia) 

B

d on S2 & B8

&CPM‐2)

ntain the se

ders was obsge. The erosns  but  rectifexcess  soil  fes of  the  sho

  and  rain  cum 4.900 to km

d at few locas  was  obserere also obse

nd reverse s

000  to  km by  the  Contrposed the shrough LRC, tm Panchyats’ s. 

progress whi

0 to km 15.99ut. 

ed  shouldergood results 

tear of the habas,  schoed on regula

 B8: (km 9.2 t

 

8 Road Sectio

rvice level o

served whichion of shoulfied  by  the from  the  shoulders  and 

uts  were  obm 5.000 LHS r

ations betwerved  betweeerved betwe

slope was ob

25.000  reveractor  in  hisoulder mainthe consultatto find out 

ich disturbed

90, the signs

s  by mixing for the main

unsealed shools  and  petar basis.  Now

   

o 15) 

ons 

f unsealed s

h should be ders due to Contractor oulders  but embankmen

bserved  betwrespectively.

een km 45 toen  km  62.00en km 69.00

bserved betw

erse  slopes s  own  audit tenance actition may nethe way to 

d the LHS sho

s of water st

the  soil  witntenance of u

oulders is mtrol  pumps w the Contra

   

26 

 

houlders 

removed rain was on  time. need  to nt  in  the 

ween  km . 

o km 50. 00  to  km 00 to km 

ween km 

and  low that  the ivity. The eed to be maintain 

oulder. 

agnation 

th milled unsealed 

ore than etc.  The actor has 

TNM 

 

OPRC WorlMonthly Pro

3.3

M TECHNOMANAG

ld Bank Project fogress Report No 22

staris a 

The

S2: (k

 

 

3.3 Draina

Mosfromlocaparamaithe 

The

At sConregu

On Theculv

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

rted to maintgood sign of

e deficiencies

 km 4  to km 

 

Figure  3

ageMainten

st of  the culm  debris.  Nations  the haapets  wereintain/restorquality of Ha

e scouring at 

some culvertntractor has sular basis. 

S4& S5  roade catchpits  shverts exist on

a Bathinda Netwo

tain the sensf maintenanc

s recorded u

5) 

S2: (

3‐2 : Reverse

nance(RUS

lvert drains Need  to  maazard markee  missing/dre the reflecazard marke

the inlet and

t  locations  tstarted to re

d,  at  some ohould be pron the other n

ork in Punjab (Ind

sitive locatioce which nee

nder RUS&C

 

 (km 45 to km

e slope, rain 

S&CPM‐3)

under  this mintain  the  ser were  founamaged.  Tting tapes oers. 

d the outlet 

he erosion aectify the ero

of  the culverovided not onetwork road

dia) 

ons as mentioeds to contin

CPM2 are  pre

S2

m 50) 

cuts & low s

month audit slopes  alongnd damagedhe  immedion the parap

of the culver

adjacent to tosion by putt

rt  locations only on  the d sections. 

oned above onue. 

esented in F

 2: (km 45 to k

 

 

shoulder  

sections weg  the  culverand  the  refate  attentiets, delineat

rts was also o

the parapetsting the sand

the catch piS4&S5 road

   

on regular b

igure 3.2 

km 50) 

ere cleaned rt  parapets.flective  tapeon  is  requtors and to 

observed.   

s was also od filled gunny

its are not ps but also o

   

27 

asis. This 

 

and  free .  At  few es on  the uired  to maintain 

observed. y bags on 

provided. on all  the 

TNM 

 

OPRC WorlMonthly Pro

3.3

3.3

3.3

3.3

M TECHNOMANAG

ld Bank Project fogress Report No 22

Conand

On wasConmai

On betw

On km 

In Bactithe maicooadjawith

Thebe ssolurecoConland

3.4 Routin

Theand

All locaobs

No 

Themonto m

3.5 Obstru

The of  tposs

No 

3.6 Incide

Conememajo

3.7 Vegeta

Conbut 

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

ntractor has d the work is 

S2 road, bets  observed ntractor menintain the dra

S2  road  seween km 76

S5 road sect9.400 which

Built‐up areavities,  the  CRoW  corri

intenance  wperatively  wacent  landowhin Built‐up z

e impact of  isevere and tutions  for  adognizes  the ntractor  anddowner issue

neMaintena

e bridges andd free from d

the  bridgesations  whererved. 

damage of t

e median manthly audit imaintain. 

uctiononth

unauthorizethe  road  secsible. 

obstruction 

ntRespons

tractor  has ergency toll for incident w

ationContr

ntractor was during the M

a Bathinda Netwo

started  to  jogoing on in f

tween km 8.along  the  cntioned in thainage.  

ection,  the .400 to km 7

tion, the wah was drained

s where othContractor  shdor  and  wi

work  that  exwith  the  Emwners  to  seezones. 

nadequate dthe Contractddressing  thdifficulties 

d  the  Empes that may b

anceofBrid

d the other sebris. 

s  and  otherre  the  una

he structure

rkers were it was observ

hePavemen

ed stockpilingctions.  Whe

was found o

seandEme

deputed  thfree contractwas recorded

ol(RUS&CP

recorded thMC audit no 

ork in Punjab (Ind

oin  the catcfull swing. 

.4000 to km carriageway eir own aud

water  stagn76.500 which

ater stagnatid out.  

hers may be hall  be  respoill  inform  thxtends  beyomployer,  otheek  the  best 

drainage on tor  is requirehese  deficieinvolved  inloyer  shall be an imped

dgesandO

structures in

r  structures uthorised  a

s was observ

installed on ved some of

ntSurfacea

g of materiaere  possible 

on the pavem

rgencyWor

he  highway t numbers od during the 

PM‐7)

he vegetationvegetation w

dia) 

hpits  to all  t

9.400 in budue  to  the

dit that the v

nation  was h was draine

on was also

responsible onsible  for  ahe  Project ond  the  correr  communsolutions  fo

the pavemeed to give pncies  as  a  pn  implemenwork  coopiment to ach

therStruct

n this month

were  cleanadvertisemen

ved and reco

the footpathf the marker

andShould

ls along the request  the

ment surface 

rksRespon

patrolling n each netwmonth. 

n on shouldewas found be

the culverts 

ilt up area, te  higher  levvillagers oppo

also  observd out. 

 observed b

for some drall  drainage Manager  ofridor.  The  City  organisator  addressing

ent within tharticular attpriority.  Hownting  these peratively  thieving these

tures(RUS&

h audit sectio

n  and  clear nts  and  wr

orded during

hs of the Mars were miss

ers(RUS&C

shoulders we  owner  to 

during audit

nse(RUS&C

vehicles  anwork road at s

ers in some eyond the sp

   

where  it  is 

the water stvel  of  surroosed the act

ved  in  built‐

between km 

rainage mainmaintenancf  the  need Contractor  wtions  (e.g.  Lg  drainage  p

he Built‐up zoention to  idwever  the  Eimproveme

to  resolve e improveme

&CPM–4)

ons were ma

except  froritten  mate

g the monthly

ansa ROB. Dusing which m

CPM‐5)

was observedremove  as 

t visit.  

CPM‐6)

d  also  dispsuitable inte

of the audit pecified limit

   

28 

required 

agnation oundings. tivities to 

‐up  area 

9.300 to 

ntenance ce within for  any 

will  work LRC)  and problems 

ones can entifying Employer nts.  The adjacent ents.  

aintained 

m  some rial  was 

y audit.  

uring the may need 

d in some soon  as 

plays  the rvals. No 

sections ts. 

TNM 

 

OPRC WorlMonthly Pro

3.3

M TECHNOMANAG

ld Bank Project fogress Report No 22

Conmai

On obsthe 

Thesign“veg

Conbranfrom

Thepres 

Figure  3‐3  

3.8 RoadS

Mosmucthe the 

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

ntractor  haintain/contro

B8, betweenerved on thesame. 

e road‐side tns.  Need  to getation free

ntractor mennches of them the forest 

e  vegetationsented in Fig

: Vegetation

SignsMaint

st of  the  roach required visibility. Ascushion at t

a Bathinda Netwo

s  arrangedol the vegeta

n km 15 to ke shoulders 

rees obstruccut  the  vege zone” as pe

ntioned that e trees.  Interdepartment

n  control  og. 3.3  

n control on 

tenance(RU

ad sides ganto paste the per the insthe gantry po

ork in Punjab (Ind

d  the  manation on the 

km 20 and bduring the a

ct the visibiligetation  ander contract a

the forest drvention of Et.  

n  shoulders

     

shoulders w

US&CPM‐8)

ntries exist  ine  reflective ttruction of Wost which is c

dia) 

nual  and shoulders. 

etween km audit and rec

ity of the ro  clear  up  toagreement.

epartment wEmployer  is 

s  with  man

with manual 

)

n the audit tape on  the 

World Bank tecomplied wit

mechanical 

20 to km 25corded the n

ad users, eso  6m  vertica

was not allowrequired to 

nual  and  m

 

and mechan

sections wepost of  the eam during tth. 

   

grass  cut

5, the vegetanon‐conform

specially for ally  from  gro

wing them toseek the pe

mechanical  m

nical means 

re painted. gantries  to their visits to

   

29 

tters  to 

ation was mance for 

the road ound  the 

o cut the ermission 

means  is 

 

It  is very improve 

o provide 

TNM 

 

OPRC WorlMonthly Pro

 

3.3

M TECHNOMANAG

ld Bank Project fogress Report No 22

Thecorr93–

Theroad

Theconholl

On km Figu 

B8: (km

B8: (km

Fi

3.9 Raised

As  pshoIRC:

On to  k17.0

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

e  Contractoresponding t–1985 and IR

e sectionsto bds are not co

e traffic signsfirming to ISow section c

B8 road sect9.200 to kmure 3.4. 

m 9.2 to km  

 m 9.2 to km 

igure  3‐4 : R

dReflective

per  the  Conuld be provi: 79. 

S1 road, betkm  4.000,  k000, km 68.0

a Bathinda Netwo

r  should  mto location dC 67–2001.

be used for ompatible to

s should be mS: 1239, rectconfirming to

tion, the signm 15. The non

15) 

15) 

oad Section 

ePavement

tract  agreemded on all h

tween km 0.km  6.000  to 000 to km 69

ork in Punjab (Ind

maintain  thedetails of eac

sign posts ino IRC: 67‐201

mounted onangular holloo IS: 3589. 

n boards wen‐conforman

 

B8 – Poor m

tMarkers(R

ment  delineaorizontal cu

.000 to km 1km  7.000, 

9.0 and betw

dia) 

e  sign  detch sign in ac

nstalled on t12 and MORT

 the supportow sections 

re damaged nce is record

B8

B8

maintenance

RUS&CPM9

ators,  bollarrves on eith

1.000, on S2 km  9.000  to

ween km 76+

ails  along cordance wi

he new impT&H specifica

t posts whicconfirming t

and not fouded for the s

 8: (km 9.2 to 

 8: (km 9.2 to 

e of Road sig

9)

rds  and  the er side of th

road sectioo  km  10.000+230 both sid

   

with  the  dith the stand

roved / rehaations. 

h may be of to IS: 4923 o

nd in order same as pres

km 15) 

km 15) 

ns 

other  safetye carriagewa

n between k0,  km  16.00des, the defic

   

30 

drawings dards IRC 

abilitated 

f GI pipes or square 

between sented in 

 

 

y  devises ay as per 

km 2.240 00  to  km ciency to 

TNM 

 

OPRC WorlMonthly Pro

3.3

M TECHNOMANAG

ld Bank Project fogress Report No 22

maiMC 

On the aud

Simsectrecorest

But mai

3.10 Pavem

During pavemeon the a

On fade

On pavMC 

On fade

On cenreco

 The

As cen

AlsoConto othe 

Themoris veThepart

Durpres

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

intain the RPaudit it was 

S4 road, betdeficiency  t

dit but during

ilarly  on  S5 tion betweeorded by thetored.   

on  B8  roadintained and

mentMarkin

this month ent marking audit section

 

S1  road  seced/ disturbe

S2 road sectement markaudit it was 

S5 road sected and missi

B8  road  sectreline was forded. 

e edge line m

per  the  Clautreline and e

o  as  per  thntractor musoffer an accetime for con

e roads may rnings, in wiery much reqerefore,  the ticularly at th

ring  this  mosented below

a Bathinda Netwo

PMs was recfound resto

tween km 2.to maintain g the MC aud

road  section km 15.000e Contractor

d  section  be the non‐con

ng(RUS&CP

audit  inspewas observens as below:

ction,  betwed. 

tion betweenking was recofound satisf

tion, betweeng for the sa

ction,  betwefound faded 

marking on S5

use  15.13  oedge lines on

he  Clause  1st ensure thaeptable levelnstruction to

be hazardounter seasonquired to maContractor he missing a

onth  audit,w in Figure3.

ork in Punjab (Ind

corded by thored.   

.800 to km 3the  RPMs  w

dit it was fou

on,  between0 to km 17.00r  in his own 

etween  km nformance w

PM‐10)

ction  the  deed. The pave

een  km  0.00

n km 75.000 orded by thefactory. 

en km 24.00ame the non

een  km  15.0and missing

5 road has b

f  the  Contran all state hig

15.3  (last  pat the centrel of safety foo commence 

us for the rowhen fog exaintain the sneeds  to  end faded sec

the  record.5. 

dia) 

e Contractor

3.000 and bewas  recordeund restored

n  km  16.00000, the deficaudit but d

20.000  to  kwas recorded

eficiency  to ement marki

00  to  km  0.1

to km 80.00e Contractor

00 to km 25.‐conformanc

000  to  km  1g and the non

een complet

act  Agreemeghways and m

paragraph)of e line and edor the road uor if it is und

oad‐users duxists and duervice level ensure  the ctions as IRC

ed  deficien

r in his own 

etween km 1ed  by  the  Co.   

0  to  km  17.0ciency to mauring the M

km  25.000, d.  

maintainingng was eithe

150  the  pav

00, the deficir in his own 

340, the pavce was recor

6.000  the  pn‐conforman

ted. 

ent  Contractmajor distric

the  Contradge lines meusers at all tderway’. 

e to low visiring the monof pavementnew  set  of‐35. 

cies  in  pav

   

audit but du

17.650 to kmontractor  in 

000  and  on aintain the RC audit  it w

the  RPMs  w

g  the  serviceer faded or d

vement  mark

ency to mainaudit but du

vement marrded. 

avement mance for the s

tor  has  to  mct roads.  

act  Agreemeet the specitimes ‘irresp

ibility in nighnsoon seasot marking atf  pavement 

vement  mar

   

31 

uring the 

m 17.700, his  own 

B8  road PMs was as  found 

were  not 

e  level  of damaged 

king  was 

ntain the uring the 

king was 

arking  of ame was 

mark  the 

ent,  the ifications ective of 

hts, early n also. It  all time. marking 

king  are 

TNM 

 

OPRC WorlMonthly Pro

3.3

M TECHNOMANAG

ld Bank Project fogress Report No 22

S1 –

S5 –(Km

Figur

3.11 Traffic

The

On centhe 

Thespe

The

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

–(Km 0 to km 

 m 24 to km25

re  3‐5: Faded

cIslandand

e improveme

B8  road, betral verge wsame.  

e  roundaboucifications. T

e poor mainte 

a Bathinda Netwo

m 1) 

5.340) 

d/damaged 

dRoundabo

ent in the ma

etween km 9was below th

ts  in  all  the The safety en

enance and 

ork in Punjab (Ind

 

 

 Pavement M

 outMainten

aintenance o

9.200  to km he service  lev

network  senhancement 

painting of c

dia) 

Marking on S

nance(RUS

f roundabou

14.00  the mvel. The non

ections  shouon the roun

central verge

S1 –(Km 0 

B8 –(Km 15 

S1, S5 & B8 R

S&CPM‐11)

uts was obse

maintenancen‐conforman

ld be maintadabouts nee

e is presented

   

to km 1) 

to km 20) 

Road Section

rved.  

e and paintinnce was reco

ained as  pereds to impro

d in Figure 3

   

32 

 

 

ns 

ng of  the orded for 

r  the  IRC ve. 

3.6.   

TNM 

 

OPRC WorlMonthly Pro

 

3.3

3.3

M TECHNOMANAG

ld Bank Project fogress Report No 22

B8: (

Figure

3.12 Crash

On (MBTheIRC:

On risedonthe 

3.13 Marke

Thepilladeli

Stillmai

Thesectsect

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

(km 9.2 to km

e  3‐6: Poor m

BarrierMa

S2 road, betBCB)  should e  ends  of  th:SP:73.  

S5 road sect.  In  the  5thNne by the CoFishtails as p

erPostMain

e  deficiency ars, edge maneators was

  the  boundaintain the se

e concrete pitions of netwtions which a

a Bathinda Netwo

m 15)  

B

maintenance

aintenance

tween km 1be  continuo

he  MBCB  sh

tion, betweeNight  Inspectontractor. Thper IRC: SP: 7

ntenance(R

to  maintainarkers,  culves observed al

ary  pillars  arvice level of

pe bollards (work. These aare sensitive

ork in Punjab (Ind

 

B8: (km 9.2 to 

e and paintin 

(RUS&CPM

17.200  to kmous.  The  dishould  be  fla

en km 18 to tion Report he ends of th73.  

RUS&CPM‐1

n  the  kilomert markers, long the diffe

re  not mainf the bounda

(roadway indare installede from the sa

dia) 

o km 15) 

ng of median

M‐12)

m 17.400, LHscontinuity  sayer  and  cov

km 19, the hit was  pointhe MBCB sh

14)

eter  stonesdistance maerent road se

ntained  alonary pillars als

dicators) are at the curveafety point o

B8: (km 9.2

 

n kerbs on B8

S,  the metashould  be  pvered  with 

height of theted out  but ould be  flay

,  hectometrarkers, hazarections of th

g  the  netwoso. 

e existed alone locations aof view. Thes

   

 to km 15) 

8 Road Secti

l beam crasatched  immthe  Fishtail

e MBCB maystill  it  has  n

yer and cove

re  stones,  brd markers ahe network. 

ork.  It  is  req

ng the differnd on the otse bollards a

   

33 

 

ion 

h barrier mediately. s  as  per 

y need to not  been ered with 

boundary and  road 

quired  to 

rent road ther road also carry 

TNM 

 

OPRC WorlMonthly Pro

3.4

M TECHNOMANAG

ld Bank Project fogress Report No 22

the sectmaimaiotheonebe m

It  isCondeta

 

 

Observati

The obsattentio1. S1 R

Km 

Betw

 Cleund

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

reflectors intions  and  dintain  these intain the exer  sections es and to ensmaintained a

s  very  mucntractor shouail design for

Figure  3

ionsonAud

ervations whon are summRoad: 0 – km 5 

ween km 0 to Nea

neeo Foo

sideo RHS

immo RHS

to do RHS

to to d

o LHSimp

o Saf

aning in theder the dust. 

a Bathinda Netwo

nstalled on temark  the pipe  bollard

xisting pipe balso.  The  dasure that theas per IRC: 79

h  required uld need to ir improveme

3‐7: Km ston

ditSections

hich were noarized below

to km 0.100, ar junction wed to attend otpath  kerbses of the carS,  the  electmediately. S, Water stado the fillingS, the soil exremove fromdrain out theS, small drainprove and clefety enhance

e built up are

ork in Punjab (Ind

the top whiccarriagewayds  and  painbollards in thamaged  pipee post shoul9. 

to  enhanceidentify the sent. 

S1: (km 0

ne 3, improve

s

ot the part ow:  

 with NH on Limmediatelys  need  to mrriageway. tric  pole  du

gnated on thg and maintaxcavated to m the shoulde rain watern along the fean. ement at the

ea required o

dia) 

h increase t  boundariest  them.  Nowhe audit secte  bollards  shd be vertica

e  the  safetysensitive loc

 0 to km 3) 

ement in wr

of the non‐co

LHS a manhoy. 

maintain  and 

umped  on 

he shoulder in the slope make the dider edges anstagnated ofootpath or t

 curve needs

on regular b

he visibility s.  It  is  very w  the  Contrtion but it nehould  be  repl. The roadw

y  on  the  encations at its 

riting is requ

onformance 

ole portion d

paint  in  bla

the  shoulde

along the caof the shoulitch to drainnd make then the shouldthe covered 

s to improve

asis. The pav

   

of the sensitmuch  nece

ractor  has  steed to expanplaced with way indicator

ntire  road own and su

uired 

but need im

depressed wh

ack & white 

er  need  to 

arriageway mder. n out the wa permanent der. slab of ‘nala’

e. 

vement mar

   

34 

tive road essary  to tarted  to nd to the the  new rs should 

network. ubmit the 

mmediate 

hich may 

on  both 

remove 

may need 

ter need solution 

’ need to 

rking was 

TNM 

 

OPRC WorlMonthly Pro

               

M TECHNOMANAG

ld Bank Project fogress Report No 22

Neethe 

At k

At k

At k

Delimai

At ksafe

Som

At k

Culv

The

2. S2 RKm 

Km 

Betwof t

5/1 

Km 

5/3,

Km 

Km 

Km 

Km 

Km 

Km 

7/2,

Betwbut 

Km 

Km 

Betwdeli

At  tthe mar

Bou

      Km 

BetwreqThe

               Km

At adja

At k

 RHSdan

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

ed to provideBus Stand. 

km 0.600, LH

km 0.780, RH

km 1.400, pip

ineators on tintain. 

km 1.900,  LHety walls in b

me of the saf

km 3.600, RH

vert, 5/1, no 

e reflective ta 

Road: 2.240 – km 

2.240, RHS, 

ween km 2.2he emulsion

culvert not c

4.368, 5/2 S

, catch pit re

4.870, RHS, 

5.155, 6/1 w

6.300, LHS, A

6.400, RHS, 

6.500, LHS, 

6.700, RHS, 

, water stagn

ween Km 7.0it was <50m

8.350, LHS, 

8.385, newly

ween  km  9neators nee

the  improveThermopla

rking should 

undary pillars

15 – km 20 

ween  km  1uired at bote MBCB shou

 45‐km 50 

km  46.900, acent to road

km 47.100 cu

S,  Village  wngerous to ro

a Bathinda Netwo

e the Zebra 

HS, the juncti

HS, culvert no

pe culvert pa

the safety w

HS,  gap betwbetween. 

fety parapets

HS, the pipe b

catch pit an

ape on the sa

10 

pavement m

240 to km 4 used to rep

completed r

Slab culvert, c

equired. 

Curve sign d

water stagna

Access road 

Minor junct

Minor juncti

Access road 

nated, catch 

000 to km 7mm 

narrow sign 

y constructe

9.700  to  kmd to maintai

d  road  sectistic  materiabe scarify pr

s need to ma

7.200  to  kmh ends. Damuld be flayer 

LHS,  villaged & RHS, was

ulvert 48/1, p

waste  wateroad crust. 

ork in Punjab (Ind

crossing and

on sign boar

o. ½, catch p

arapet requir

wall missing a

ween safety 

s are damage

bollard need

d poor main

afety parape

marking distu

4.000, the paair the crack

epair and pla

catch pit dam

damaged 

ted cleaning

sign should 

ion not impr

on not impr

sign damage

pit required

.300, RHS, s

post damage

ed culvert (sla

m  9.800,  LHn  

ions  the paval.  During  mroperly and t

aintain. 

m  17.400,  Lmage MBCB aat the ends a

e  Dhapai,  wste material 

parapet need

r  stagnated 

dia) 

d other safet

rd required.

it required.

red. 

and the refle

parapets  is 

ed or tilted n

d to paint bla

ntenance of h

ets missing o

urbed by NH.

avement marks. 

aster require

maged plaste

g required  

be as per IRC

roved 

oved 

ed and it sho

d. 

hoving and b

ed  

ab type) win

HS  retaining 

vement markmaintenancethen remark

LHS,  MBCB at start needas per IRC: S

water  stagnadumped by 

ds to plaster

in  ROW  a

ty features a

ctive tape al

more may 

need to main

ck & white.

hazard mark

r damaged.

rking disturb

ed. 

er and repair

C 67 

ould be as pe

bleeding on 

g or retainin

wall  paint

king may nee  the  old k. 

discontinue d to remove P: 73.  

ated  on  shothe locals at

r from backsi

along  the  c

   

as per IRC in

lso damaged

need  to  inst

ntain. 

er.  

bed due to o

r required. 

er IRC:67 

the repaired

ng wall dama

ing  faded/d

eed  to maintdamaged  p

at  centre, and fix the f

oulder  fromt shoulders. 

ide. 

arriageway 

   

35 

n front of 

d need to 

tall more 

over flow 

d surface 

aged 

damaged, 

tain with avement 

Fish  tail fish tails. 

m  houses 

may  be 

TNM 

 

OPRC WorlMonthly Pro

               

               

M TECHNOMANAG

ld Bank Project fogress Report No 22

At k

At k

Km bac

Km 

Culv

     Km 6

Betwtraf

Betwand

Slab

Culv

Betw

Culv

Culvpara

Km 

Km 

Betw

               Km

At k

Km 

Km 

Km 

Km mai

Km per 

Culvpara

Km 

Km 

LHS

LHS

Km 

Km 

70/4

               Km

Km 

Betw

Km (LHSpara

Betw

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

km 48.150 cu

km 48.400 cu

49.210 culvek. 

49.200, (200

vert 50/2, RH

60 – km 65 

ween  km  60ffic, near ‘dha

ween Km 63d Rain cuts on

b culvert 64/

vert 64/5 pa

ween km 64

vert 65/1, pi

vert  65/3,  Bapet. 

64.480, LHS 

64.800, RHS

ween km 64 

 65 – km 70 

km 65.200, th

65.580, BHS

65.585, RHS

65.500 to km

66.800,  Paintained.  

67.600, ManIRC‐35. 

vert  68/2,  capet to para

69.000, pain

69.170, Culv

S Hazard mar

S Minor junct

69.200, Aud

69.800 Bridg

4, no catch p

 75 – km 80  

stone 75 pa

ween km 75

75.312,  culvS=0.8m  fromapet painting

ween km 75

a Bathinda Netwo

ulvert 49/1, R

ulvert 49/2, p

ert 50/1, LHS

0m) hectome

HS parapet c

0.700  to  kmaba’ 

3.050 to km 6n embankme

/4, No deline

rapet height

.250 to 64.4

pe partially c

BHS,  parapet

junction not

S, Khiala pon

 to km 65, R

he sign posts

S, Minor junc

S, Parapet ne

m 65.600, LH

avement  m

nsa Kanchian

catch  pit  oldpet distance

nting require

vert 70/1, No

rker damage

tion need to 

dible lines no

ge on canal, 

pit. 

inting faded

.000 to km 7

vert  76/1,  pm  edge  of  Cg faded & pa

.800 to km 7

ork in Punjab (Ind

RHS catch pit

parapet pain

S parapet clo

eter stone da

lose to the c

m  60.800,  LH

63.200 culveents 

ators on par

t less (36 cm 

00, LHS, min

chocked, cat

ts  close  to 

t maintained

d over flowin

HS, the exca

s are old and

ctions need t

eed to mainta

HS, Edge line 

marking  mai

n round abo

d  and  damae is 11.88m. p

ed. 

o catchpit (Sl

d, edge line 

maintain. 

ot maintained

hazard mark

75.200, RHS, 

arapet  closeC/W  &  RHS arapet height

76.000, RHS, 

dia) 

t damaged, p

nting faded.

ose to carria

amaged. 

carriageway.

HS,  earthen 

erts 64/1 & 6

rapets. 

from FRL) 

nor junction n

tch pit damag

carriageway

d. 

ng. Immedia

vation for w

d not as per I

to maintain 

ain & LHS, Pa

under dust.

ntained  poo

ut pavemen

aged.  Parapparapet pain

lab), Erosion

faded/dama

d after the re

ker damaged

Edge line da

e  to  carriage=  10  cm), t is 43cm.  

water stagn

parapet not 

ageway, para

carriageway

64/2 Erosion 

not maintain

ged improve

y,  only  11.06

te attention

water pipe lin

RC standard

arapet dama

 

orly,  width 

t marking at

et  height  isnting require

 cuts adjace

aged. 

epair of crac

d on all sides

amaged <20m

eway, parapeback  of  par

ated in ROW

   

plastered fro

apet not plas

y,  dust  inter

adjacent to 

ned. 

ement requir

6m  from  pa

 required. 

e was in pro

d. 

aged. 

not  match

t Junction als

s  30‐33cm  od. 

nt to parape

ks. 

 (i.e. 4 in nos

m. 

et  to paraperapet  not  p

W. 

   

36 

om back. 

ster from 

rrupt  the 

parapets 

red. 

arapet  to 

ogress. 

hed  and 

so not as 

only  and 

et. 

s.) 

et  =  11m lastered, 

TNM 

 

OPRC WorlMonthly Pro

               

M TECHNOMANAG

ld Bank Project fogress Report No 22

Culvpavmar

CulvRHS

Km 

Betwcarr

3. S5 Km

At  kplasculv

At ktree

Culveart

At k

At kside

Som

Wasalso

8/2,

At req

At ktree

At k

10/

Betwregu

Km 

              Km 

16/clea

16/4

At k

17/mai

Betwneethe 

Som

At kIRC:

Bou

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

vert 77/2, Aement,  Pararker required

vert 77/3, LHS close to car

76.400, Hec

ween  km  76riageway, wa5 Road: m 5 – km 10

km  6.050,  oster and the vert slab, imm

km 6.300, the. 

vert  7/1,  8/th level and 

km 6.410, the

km 6.450,  thes, to contro

me of the spe

ste material o consult wit

, catch pit re

km  9.220, uired. 

km 9.560, the. 

km 9.550, mi

2, need to cl

ween km 9.9ular basis or 

10, km ston

1 5 – km 20 

3,  RHS  paraarance. 

4, parapets n

km 16.250, R

1, needs to rintain it. 

ween km 16ed to replacecurves. 

me of the spe

km 18.580, M:SP:73 guide

undary pillars 

 

a Bathinda Netwo

udible lines apet  close  td at all four s

HS, Catch pitrriageway, ha

tometre fad

6.400  to  kmaste water co

ld  slab  culve numbering mediate atte

he vegetation

1  needs  to maintain it.

e condition o

he 7/2, needl the emban

eed signs are

dumped onh them to st

equired. 

RHS,  water

he vegetation

inor junction

ear the wate

900 to km 10do some pe

e repair requ

apet  needs  t

need to shift

RHS, roads cr

raise the wa

6.500 to km 1. Sign post o

eed signs are

MBCB not relines. 

s need to ma

ork in Punjab (Ind

at bridge apto  carriagewsides. 

t damaged, pazard board 

ed. 

m  76.500,  RHontinuously 

ert,  need  toalso to be d

ention requir

n obstructs t

raise  the wa

of curve sign

d  to maintaikment erosio

e irrelevant a

 the shouldetop this type 

r  stagnation

n obstructs t

n improveme

er way. 

0.000, need rmanent sol

uired. 

to  shift  on 

t to clear the

rossing sign b

lls of the cat

16.600, chevof the chevro

e irrelevant a

ctified yet. N

aintain. 

dia) 

pproach not way,  Parape

parapet to padamaged. 

HS,  water  stcoming from

o  clean  and done. Cracksred. 

the visibility

alls  of  the  c

 poor, need 

n  the RPMs on. 

and need to r

er edges by tof activities 

  observed 

the visibility

ent required.

to remove tution of this

catch  pit  w

e roadway wi

board in poo

tch pit above

vron are old on also dama

and need to r

Need to incre

maintained et  to  parape

arapet = 11.

tagnated  onm houses. 

maintain.  Ths on paveme

 of the Gent

catch  pit  abo

to replace.

and also  to

replace with

the villagers in future. 

at  the  sho

 of the Gent

he dust from problem. 

wall  to  increa

idth. 

or condition. 

e the surroun

and not as paged. Delinea

replace with

ease the heig

   

after rectificet  =  10.8m,

15m, paintin

  shoulder  a

he  parapets ent develope

try, need to 

ove  the  surr

 project  the

 suitable sign

need to rem

ulder,  impro

try, need to 

m the carriag

ase  the  carr

nding earth l

per IRC speciators also req

 suitable sign

ght and insta

   

37 

cation of ,  Hazard 

ng faded, 

long  the 

need  to ed at the 

trim the 

rounding 

e parapet 

ns. 

move and 

ovement 

trim the 

geway on 

riageway 

level and 

ifications quired at 

ns. 

all as per 

TNM 

 

OPRC WorlMonthly Pro

               

M TECHNOMANAG

ld Bank Project fogress Report No 22

              Km 

At k

21/leve

Som

24/

25/

Betwthe 

Bou

4. S4Km

1/1,

At guid

Som

At k

3/1,

3/3,

At kalso

Km 

At spe

At spe

8/2,

8/4,

At k

10/

10/

Bou

Km 

At k

At k

16/

17/

17/4

18/

18/

18/

18/4

At k

20/

Bou5. B8

Km

Pain

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

20– km 25.3

km 20.000, R

1,  22/2,  neeel and mainta

me of the spe

3, catch pit r

3, parapet cr

ween km 24sharp edges

undary pillars 

4 Road m 0 – km 5 –

, needs to cle

km  0.000,  jdelines. 

me of the sign

km 2.000, sch

, catch pit re

, no number

km 3.820, RHo. 

stone 4.000

km  5.500, cifications. 

km  6.100,  Rcifications. 

, painting of 

, hazard mar

km 8.600, he

1, LHS catch 

3, painting re

undary pillars 

15 – km 20 

km 15.200, R

km 15.560, R

1, RHS catch

1, catch pit r

4, numberin

1, catch pit r

2 painting ne

3, canal brid

4, 18/5, 18/6

km 18.400, sc

3, the height

undary pillars8 Road m 9.200 – km

nting of rema

a Bathinda Netwo

340 

RHS, curve sig

eds  to  raise ain it. 

eed signs are

required. 

racked.  

4 and km 25,s. 

s need to ma

– km 10 

ear the wate

junction  wit

n post rusted

hool sign nee

equired. 

ring on LHS p

HS, village s

, painting re

LHS,  the  vil

RHS,  chevro

parapets is r

rker damage

ectometre pa

pit needs to

equired. 

s need to ma

RHS, sign of w

RHS minor ju

h pit damage

required, nee

g required.

required. 

eeds to main

ge, height of

6, 19/1, 19/2

chool sign bo

t of both side

s need to ma

m 15.000 

aining centra

ork in Punjab (Ind

gn in poor co

the walls  of

e irrelevant a

, the MBCB, 

aintain. 

er way. 

th  S3  road, 

d and paintin

ed to replace

parapet. 

ign post not

quired. 

llage  sign  p

on  sign  post

required. 

d. 

ainting needs

o improve an

aintain. 

water stagna

nction needs

d. 

eds to clear t

ntain. 

f parapets le

2, 19/3, 19/4

oard needs t

e parapets v

aintain 

al verge requ

dia) 

ondition. 

f  the  catch p

and need to r

needs to im

pavement 

ng damaged 

e. 

t vertical and

post  (Musa) 

t  height  is 

s to maintain

nd RHS catch 

tion observe

s to maintain

the water wa

ess than the r

4, 19/5, 20/1 

to replace. 

aries. 

uired. 

pit  above  th

replace with

mprove and p

marking  sh

need to rest

d needs to r

needs  to  m

less  need  t

n. 

pit required

ed. 

n. 

ay. 

required nee

&20/4 catch

   

he  surroundi

 suitable sign

place the fish

ould  be  as 

tore. 

replace the s

maintain  as 

o  check  as 

d. 

eds to check

h pits require

   

38 

ng  earth 

ns. 

h tails on 

per  IRC 

sign post 

per  IRC 

per  IRC 

ed. 

TNM 

 

OPRC WorlMonthly Pro

3.5

M TECHNOMANAG

ld Bank Project fogress Report No 22

Pav

Rem

11/

11/

Km 

Km sho

 12/

12/

At  kand

Bou

Km 

At k

16/

Betw

Junc

17/bac

At k

At k

Deli

19/

Km 

At  kmai

At k

22/

22/

Km 

Km 

Km IRC 

Recomme

Momaipainnee

Moeffeirre

Mopavan a

At  sreqheigIRC 

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

ement mark

move the Un

1, catch pit d

3, parapet m

11, stone ha

11.050,  LHSulder. Need 

/1, need to im

2, repair of c

km 12.300,  sd maintain th

undary pillars 

15 – km 20 –

km 15.300, R

2, hazard ma

ween km 15

ction signs s

1, needs to ck side of the

km 16.600, L

km 16.813, R

ineator and t

3 catch pit re

stone 19, ne

km  20.180, intain the slo

km 20.350, R

1, catch pit r

2, catch pit r

stone 23, 24

24.450, curv

stone 25 shstandard. Th

endationfo

nitoring  Conintain  the  pnting  and  cueds to mainta

nitoring  Conectively  and spective of t

nitoring Conement markacceptable le

some of  theuired  or  lesght of the sig: 67 guidelin

a Bathinda Netwo

king covered 

authorised s

damaged. 

maintenance 

as different d

S,  waste wato consult w

mprove the 

catch pit req

sign of watehe slopes. 

s need to ma

– km 25 

RHS, hazard m

arker damag

.600 to km 1

hould be as 

clear the wae parapets. 

HS, curve sig

RHS, curve sig

the pipe boll

equired. 

eeds to main

LHS,  on  shoope of the sh

RHS, curve sig

required. Par

required, num

4 needs to m

ve sign faded

hould be as phe sub‐stand

orNetwork

nsultant  haspavement  mulvert  parapeain. 

nsultant  recmaintain  t

the monthly 

nsultant alsokings meet tevel of safety

  road sectios  than  thatgn posts as pnes. 

ork in Punjab (Ind

under dust, 

sign boards.

required. 

dimension so

ter  drained with the Guru

parapets and

uired. Numb

er  stagnation

aintain 

marker dama

ged. 

15.800, chev

per IRC stand

ter way. Cat

gn suppleme

gn suppleme

lards need to

ntain as per I

oulder  the  sihoulders. 

gn post dam

rapets need 

mbering nee

maintain and 

d and post da

per  IRC. Km dard km and 

Performan

s  observed  tmarking,  roaets  painting 

commends  tthe  service audit section

 recommendhe IRC speciy and service

ons either  th.  Contractorper IRC guide

dia) 

cleaning req

on both sides

out  from  thudwara mana

d also the he

bering not as

n on  shoulde

aged. Curve s

rons require

dards. 

tch pit requir

entary plate d

entary plate 

o extend upt

RC standard

ign  of water

aged 

to plaster fro

eds to mainta

improve. Nu

amaged. 

stones and 5th km ston

nceWorks

that  there  iad  signs,  ais  required.

that  the  CMlevel  of  thens.  

ds that the Cifications ane for the road

he height of r  needs  to  celines and al

quired on reg

s, rectificatio

he  Gurudwaagement to 

eight of the c

s per IRC spe

ers  observed

sign post als

ed at curve.

red and also

damaged. 

damaged. 

to the bridge

s. 

r  stagnation 

om back. 

ain as per IRC

umbering not

5th km stones should be

is  a  scope  fnd  bridge  m.  This  is  a  co

MU  team  nee  entire  net

Contractor md contractuad users at all

the  sign pocheck  and  mso maintain 

   

gular basis. 

on required. 

ra  stagnatedstop this act

catch pit wal

cifications. 

d. Needs  to 

o damaged. 

 needs to pla

e. 

observed.  N

C standards.

t as per IRC. 

nes should be replaced. 

for  improvemaintenanceontinue  pro

eeds  to  wotwork  at  ea

must ensure al obligationl times. 

sts  is more maintain  thethe sign pos

   

39 

d  on  the tivity. 

ls. 

improve 

aster the 

Needs  to 

 

be as per 

ement  to e,  island cess  and 

ork  more ach  time 

that the n to offer 

than  the e  desired sts as per 

TNM 

 

OPRC WorlMonthly Pro

M TECHNOMANAG

ld Bank Project fogress Report No 22

Theentinew

Theavaeros

In tandon  texisenterem

Spemaispesafe

Convegthe 

Thepho

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

e  catchpits  sire  road  netw catch pits b

e  embankmeilable with  Psion cuts. 

he view of td put close wthe  road  anst  along  the ers  on  the 

moved to faci

ed  zoning  ointain the roed limit signety measures

ntractor  has etation on scontinuity. 

e  detailed  aotographs is p

a Bathinda Netwo

should  be  ptwork.  Contrbut at the sa

ent  slopes  shPWD.  Need 

the monsoonwatch on thed erosion ofnetwork nenetwork  roilitate the dr

of  the  entirad signs acc boards. In ts and prepar

arranged  thhoulders. Th

audit  reporpresented in

ork in Punjab (Ind

rovided  at  eractor  has  stme time nee

hould  be mato  ensure  t

n season thee sensitive  lof  high  embaeed  to  proteads.  The  exainage.  

re  road  netordingly. Cohe built‐up are the propo

he manual  ahis is a good 

rt  with  scon Chapter 4.

dia) 

each  culverttated  to  exeeds to impro

aintained  in that  the  emb

e CMU teamocations wheankments maect  so  that  thxtra  soil  on 

work  is  verntractor hasareas it is versal according

and mechansign of impr

ores,  un‐rep

t  location  onecute  the wve the old on

a  good manbankments  s

m needs to were the wateay  take plache water mathe  should

ry  much  req started the ry much reqgly. 

ical  grass  curovement an

ported  non‐

   

n  both  sidesork  to  constnes also. 

nner within should  be  fr

work more efer may be stce.  The wateay  not  overfer  edges  sh

quired  and activity to inuired to enh

utters  to  connd needs to 

‐conformanc 

   

40 

s  on  the truct  the 

the  land ree  from 

ffectively tagnated er  bodies flow and hould  be 

need  to nstall the ance the 

ntrol  the maintain 

ces  with 

TNM 

 

OPRC WorlMonthly Pro

4 CO

4.1

T

T

T

A

A

M TECHNOMANAG

ld Bank Project fogress Report No 22

ONSOLIDA

Contracto

Table  4‐1 :

Month

Mar‐13

Jul‐13

Aug‐13

Sep‐13

Oct‐13

Nov‐13

Dec‐13

Total – 2013

Jan‐14

Feb‐14

Mar‐14

Apr‐14

May‐14

Jun‐14

Jul‐14

Aug‐14

Sep‐14

Oct‐14

Nov‐14

Dec‐14

Total – 2014

Jan‐15

Feb‐15

Mar‐15

Apr‐15

May‐15

Jun‐15

Jul‐15

Aug‐15

Sep‐15

Oct‐15

Nov‐15

Dec‐15

Total – 2015

Jan – 2016

Feb – 2016

Mar – 2016

April  – 2016

May – 2016

Jun‐16

Jul‐16

Accumulated 

Total

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

ATEDAU

or'sAuditR

: Accumulate

S1 S2

2 12

2 12

2 11

1 14

2 16

1 12

2 13

12 90

0 9

1 9

1 17

1 11

1 10

1 7

0 5

0 3

1 9

1 13

7 20

14 42

28 15

2 13

2 7

40 31

4 44

24 16

0 36

0 35

0 13

2 87

2 65

0 32

0 26

76 52

0 8

2 43

2 2

0 43

1 16

14 29

4 43

135 90

a Bathinda Netwo

UDITREP

ReportonJu

ed Scores Su

2 S3

2 0

2 0

1 1

4 0

6 0

2 0

3 0

0 1

3

0

7 0

1 0

0 0

0

0

0

0

3 1

0 0

2 3

5 7

3 1

1

1 0

4 0

6 53

6 0

5 55

1 0

7 0

5 11

2 0

6 4

3 125

0

3 39

0

3 0

6 0

9 8

3 0

9 180

ork in Punjab (Ind

PORT

uly2016

ubmitted by  

S4 S5

10 6

6 1

2 3

10 2

4 0

5 1

4 2

41 15

3 3

2 2

2 2

1 3

3 2

0 0

0 0

0 0

6 4

1 3

13 1

11 24

42 44

0 3

4 4

20 40

22 20

11 10

2 28

3 0

6 0

6 18

15 2

23 4

2 8

114 137

8 0

2 10

53 0

0 20

0 46

19 0

4 4

279 272

dia) 

Contractor f

5 B8

4

4

5

6

5

5

5

5 34

6

6

4

4

5

1

0

3

3

2

17

4 35

4 86

4

4

0 39

0 69

0 31

8 44

17

0

8 21

19

5

5

7 258

26

0 20

44

0 14

6 2

36

10

2 520

for Non‐Con

MPM RDP

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

16 0

16 0

24 0

0 0

0 0

6 0

22 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

52 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

68 0

   

nformances 

MNon – 

Conforma

34

25

24

33

27

24

26

193

24

20

26

20

21

9

5

6

23

21

58

145

378

47

22

170

165

167

110

110

137

134

114

64

45

1285

42

116

101

77

65

106

65

2428

   

41 

nce

TNM 

 

OPRC WorlMonthly Pro

Ta

Sr.

1 Tota

2 Tota

3 Tota

Month:J

Month : JULY

MPM

MPM 1

MPM 2

MPM 3

MPM 4

MPM 5

MPM 6

Repeat MP

SL. 

No.Con

re

Total Road

Month : JU

M TECHNOMANAG

ld Bank Project fogress Report No 22

Table 

Table  4‐3: M

able  4‐4: Roa

alManagemen

alRoadDurab

alRoadUserS

JULY2016

Y 2016

Item Descrip

Quality Assurance

Contractor`s Prog

Contractor`s Repo

Traffic Manageme

Inventory DatabasManagement

Detailed Design &Constrcution Meth

PM Non-ConformancePrevious Month

Non‐

formance 

lating to

Sectio

d Durability Non‐

ULY 2016

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

4‐2 : Summ

Management

ad Durability

ntPerformanc

bilityNon‐Con

Safety&Comf

ptionPerforma

MeasuComplia

e System

grams

orts

ent

e

& hodology

e from

on Code

Numb

No

Conform

Reco

Contr

0

Conformance Sc

a Bathinda Netwo

ary of Netw

t Performan

y Performan

ItemDescrip

ceNon‐Confor

nformanceSco

fortNon‐Confo

Summaryof

ance ure ance

Number Non-Conform

Acontract

ber of 

on‐ 

mances 

orded

ractor

No

Conform

Weigh

B

0 5

ore

ork in Punjab (Ind

ork Perform

 

nce Measure

 

ce Measures

 

    

ption

rmanceScore

ore(RDPM'S)

ormanceScor

NetworkPerf

TotalScore

ofmances

or

Non-Conformanc

WeightingB

2

1

2

4

2

4

4

Total Ma

n‐ 

mance 

hting

B

Sub‐W

Months/

Record

Confo

5

dia) 

mance submit

s (MPM`S) S

s (RDPM`S) –

(MPM'S)

e(RUS&CPM

formanceSyst

eofNon‐Conf

ce g

Sub-WeiDays/Weeks/

Recorded Non C

Each Week of De

Each day of Delay

Each day of non rdeadline

Each day of non rdeadline

Each Week of De

Each Week of De

Number of Monthsconfoermance firs

anagement PerformaScore

eighting 

/Weeks of 

ded Non 

rmance

C

Tota

Confo

Sc

Ax

Cont

4

tted by Cont

Submitted by

– Submitted

Co

M'S)

tem

formance

ghting /Months ofConformance

N° Co

WeSu

elay

y

reciept after

reciept after

elay

elay

s since non-st identified.

ance Non-Conformae

al Non‐ 

ormance 

core

xBxC

tractor

0

0

   

tractor 

y Contractor

d by Contract

Scoresontractor

0

0

65

65

Non-on X

eigh x ubWC

Total Non-ConformancScore AxBx

Contractor

0

0

0

0

0

0

0

0ance

Comments

   

42 

tor 

Remarks

-ce xCr

Comments R

Pho

Refer

N

Photo Reference

No.

oto 

rence 

o.

TNM 

 

OPRC WorlMonthly Pro

Table

M TECHNOMANAG

ld Bank Project fogress Report No 22

e  4‐5 : Road 

S111

S112

S211

S212

S213

S214

S215

S216

S217

S218

S219

S220

S221

S222

S223

S224

S225

S226

S227

S228

S229

S230

S311

S411

S412

S413

S414

S415

S511

S512

S513

S514

S515

B811

B812

B813

B814

B815

Name of R

Name of R

Total Leng

Name of R

Total L

1

Name of R

Chowk) (S

Total Leng

Section

Total Leng

Total Co

Total Leng

Name of R

Total Leng

Name of R

(B8)

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

User Service

F

0

5

2

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

10

18

0

5

10

15

20

0

5

10

15

20

9

15

20

25

30

Road :‐ Man

Road :‐ Sang

gth of S1 Roa

kms

Road :‐  Bhaw

Length of S2

106.130 kms

Road :‐ Barn

3)

gth of S3 Ro

kms

n

gth of B8 Ro

kms

ontract Roa

gth of S4 Roa

kms

Road :‐ Dhan

gth of S5 Roa

kms

Road :‐ Bath

a Bathinda Netwo

e and Comfo

From

0.000

5.000

2.240

0.000

5.000

0.000

5.000

0.000

5.000

0.000

5.000

0.000

5.000

0.000

5.000

0.000

5.000

0.000

5.000

0.000

5.000

00.000

82.640

0.000

5.000

0.000

5.000

0.000

0.000

5.000

0.000

5.000

0.000

9.200

5.000

0.000

5.000

0.000

sa‐Talwand

Chaina

grur‐Sunam 

ad: 11.300 

wanigarh‐Su

2 Road: 

s

ala‐Mansa (

oad: 7.290 

ad: 28.650 

ad Length: 2

CONFORM

ad: 24.970 

nula‐Bhikhi 

ad: 25.340 

inda‐Kotsha

ork in Punjab (Ind

ort Performa 

To

5.000

11.300

10.000

15.000

20.000

25.000

30.000

35.000

40.000

45.000

50.000

55.000

60.000

65.000

70.000

75.000

80.000

85.000

90.000

95.000

100.000

108.770

189.930

5.000

10.000

15.000

20.000

24.970

5.000

10.000

15.000

20.000

25.340

15.000

20.000

25.000

30.000

37.850

di Sabo upto

age

(S1)

Total Non‐C

unam‐Bhikh

Total Non‐C

(Mansa Kain

Total Non‐C

Total Non‐C

03.680 kms 

ANCES

Total Non‐C

(S5)

Total Non‐C

amir‐Talwa

dia) 

ance Measur

5.0

6.3

7.7

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

8.7

7.2

5.0

5.0

5.0

5.0

4.9

5.0

5.0

5.0

5.0

5.3

5.8

5.0

5.0

5.0

7.8

o Ramtirath 

Conformanc

hi‐Kotsham

Conformanc

nchian to Ra

Conformanc

Audit L

in (K

Conformanc

‐ TOTAL NO

Conformanc

Conformanc

ndi Sabo up

es – Submitt

000

00

760

000

000

000

000

000

000

000

000

000

000

000

000

000

000

000

000

000

000

770

90

000

000

000

000

70

000

000

000

000

40

800

000

000

000

850

Jaga (S4)

ces S1

ir (S2)

ces S2

am Ditte W

ces S3

Length 

Kms)

Aud

J

Ass

ces B8

ON‐

ces S4

ces S5

pto Ramtirat

   

ted by Contr

4

0

4

10

0

4

0

0

0

0

0

1

0

0

1

3

0

24

0

0

0

0

0

43

0

0

2

0

0

2

0

4

0

2

0

2

0

4

2

5

3

0

0

10

65

ala 

dit Score of 

July ‐16 

sesment‐1

th Jaga 

   

43 

ractor 

TNM 

 

OPRC WorlMonthly Pro

4.2

4.2

Table  4‐contractadjusted

4.2

Sr.

1 TotalM

2 TotalR

3 TotalR

Month:JULY

M TECHNOMANAG

ld Bank Project fogress Report No 22

Summary

2.1 Analys

a) b) c)

AccMo

‐6  gives  the t and compad by the MC 

2.2 Manag

Acc(MPoutEmp

The

ManagementPerf

RoadDurabilityN

RoadUserSafety

Y2016

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

y&Compar

sisandCom

This  sectionsubmitted Consultant 

Network PeManagemenRoad DurabRoad User S

ording  to nitoring Con

  summary  oarison of thefor the mont

Ta

gementPer

ording  to  thPM‘s)  reflectputs,  includiployer. 

e non‐confor

ItemDe

formanceNon‐C

Non‐Conformanc

&ComfortNon‐

a Bathinda Netwo

risonofCon

mmentsofth

n  provides  aby  the  Co(MC) after in

erformance Innt Performanility PerformService and C

the  Contracsultant (MC)

of  the  audit e NON‐CONFth of July 20

able  4‐6 : Sum

rformanceM

he  Contract t  the  ability ing  the qual

mance recor

escription

ConformanceSco

ceScore(RDPM

‐ConformanceSc

SummaryofNe

TotalSc

ork in Punjab (Ind

ntractor’sA

hePerform

a  descriptionontractor  annspecting the

nspection innce Measuremance MeasuComfort Perf

ct  Specifica) perform th

for  each  typFORMANCES 016. 

mmary Non‐ 

Measures(M

Agreementof  the  Contity and effic

rded under t

ore(MPM'S)

M'S)

core(RUS&CPM

etworkPerforma

coreofNon‐Con

dia) 

Auditvs.Mo

manceAudit

n  and  analysnd  reviewede audit sectio

cludes  eaches (MPM’s) ures (RDPM’sormance Me

tions  (Appee Audit Inspe

pe  of  Perforsubmitted b

‐Conformanc

MPM’s)

t,  the  Manatractor  to  suciency of his 

his section is

SCon

M'S)

anceSystem

nformance

onitoringCo

tInspection

sis  of  the md/adjusted ons.   

 one of the b

s). easures (RUS

endix  8),  tections as pe

rmance Meaby the Contr

ces 

gement  Peruccessfully mreporting o

s presented 

Scoresntractor

Sc

0

0

65

65

   

onsultant’s

n

onthly  auditby  the  Mo

below items:

S&CPM’s) 

the  Contracer the forma

asures  set  ouractor with t

rformance  Mmanage  the of  informatio

below in Tab

coresMC

Rem

0

0

80

80

   

44 

sAudit

t  reports onitoring 

ctor  and t RM03.  

ut  in  the the score 

Measures contract 

on  to  the 

ble 4.7. 

marks

M

TNM 

 

OPRC WorlMonthly Pro

Month : JULY 2016

MPM Item

MPM 1 Quality As

MPM 2 Contracto

MPM 3 Contracto

MPM 4 Traffic Ma

MPM 5Inventory Managem

MPM 6Detailed DConstrcu

Repeat MPM Non-ConPrevious M

4.2

SL. 

No.

No

Conform

relatin

1 RDPM

Total Road Du

Month : JULY 

M TECHNOMANAG

ld Bank Project fogress Report No 22

m DescriptionPer

MCo

ssurance System

or`s Programs

or`s Reports

anagement

Database ment

Design & tion Methodology

nformance from onth

2.3 RoadD

As pthe futuCon

RDPEmpNonreco

Nowroug

Thekm the  

n‐

mance 

ng to

Section Code

M 4 S411

urability Non‐Conform

2016

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

rformance Measure ompliance

NumbNon-Confo

Acontra

Table  4‐7 : 

DurabilityP

per the ContContractor’

ure  generatintract. 

PM’s  are  theployer’s assen‐conformanorded until a

w  the  Contrghness (IRI) 

e rain cuts an0.000 to kmTable 4.8 be

Table  4‐8

Number of 

Non‐ 

Conformances 

Recorded

Contractor

Nu

Conf

Re

0

mance Score

a Bathinda Netwo

ber oformancesAactor

NumberNon-

ConformaA

MC

Manageme

Performanc

tract Agreems ability to sions  and  pr

e  contractuaessment. Failnce  for  thata program of

ractor  has  odata. The IR

nd erosion obm 5.000  for welow. 

8 : Road Dur

mber of 

Non‐ 

formances 

ecorded

MC

Non‐ 

Conforma

Weightin

B

1 5

ork in Punjab (Ind

r of-ances

Non-Conformance

WeightingB

2

1

2

4

2

4

4

Total Manag

nt Performa

 

ceMeasure

ment these asuccessful prrotect  it  fro

al  requiremelure to delivet  measure.  Tf rectification

owned  his  owI data presen

bserved on twhich  the no

rability Perfo 

nce 

ng

Sub‐Weighting

Months/Weeks 

Recorded Non

Conformance

C

4

dia) 

Sub-WeightingDays/Weeks/Month

Recorded Non Confo

Each Week of Delay

Each day of Delay

Each day of non recieptdeadline

Each day of non recieptdeadline

Each Week of Delay

Each Week of Delay

Number of Months sinceconfoermance first iden

gement Performance NScore

ance Measur

es(RDPM’S)

are a set of rotect the pom  consump

ents, which mer the specifThis  non‐con work has b

wn  Profilomnted in Chap

he embankmon‐conforma

ormance Me

of 

Total Non‐ 

Conformance 

Score

AxBxC

Contractor

To

Con

A

0

0

g hs of

ormance

N° Non-Con X

Weigh x SubW

C

CS

t after

t after

e non-ntified.

Non-Conformance

res (MPM’s) 

)

performanceavement anption  over  t

must  be meied RDPM crnformance een agreed w

meter  and  stpter 3. 

ment on S4 rance conside

easures (RDP

otal Non‐ 

nformance 

Score

AxBxC

MC

20Between

(Cuts on E

20

   

Total Non-Conformance Score AxBxC

Contractor

Total NConformScore A

MC

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

e criteria thad surfacing the  duration

et  at  the  timriteria will rewill  continuwith the Em

tarted  to  co

oad section ered as pres

PM’s) 

Comments

n Km 0 to Km 1 R.H.S

Embankment Slopes)

   

45 

Non-mance AxBxCC

Comments R

at reflect asset  for n  of  the 

me  of  the sults in a ue  to  be ployer. 

ollect  the 

between sented  in 

 

Photo 

Reference 

No.

1 & 2

Photo Reference

No.

TNM 

 

OPRC WorlMonthly Pro

4.2.

4.2.

4.2.

4.2.

4.2

M TECHNOMANAG

ld Bank Project fogress Report No 22

.3.1 Minim

As  eContyear

TherAsse

The Nove

The 3.6 k

.3.2 Pavem

The provcontanalemppavewhicClauright

In  acontcrite

As pusingmusE‐95time

Nowof  thanal

The 

.3.3 Pavem

AccodiffeClau

.3.4 Roadw Any 

Emb

2.4 RoadU

• AccoPerf

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

mumAnnua

explained  intractor's  wors and is bind

refore  so  faet Preservatio

4th year worember 2015

4th year workms for reha

mentRough

roughness  ivisions  of  Chtractor  has  tyse the dataployer,  who ements and ch is the IRI se 8.2.2.2. At to carry out

accordance  wtractor  shall eria througho

per the contrg  the methot be a Class 150.  The  Contes. 

w the Contrache  network ysed as per c

IRI data colle

mentDeflec

ording  to  therent road sese 8.2.3. The wayCutAn

non‐conformbankment Slo

UserServic

ording  to  tformance M

a Bathinda Netwo

alAssetPre

  Sub‐chapteork  annual  pding on the C

r  there  are on Quantitie

rk program (. 

rk programmbilitation. 

hness(RDP

is  a measurehapters  8  ato  conduct  ta as per the smust  measuevery 6 mon(InternationAlso  it  is vert roughness 

with  the  Clensure  that

out the durat

ract agreemeod  of  Intern1 precision Ptractor  shall

ctor has ownroads.  The clause 8.2.2.

ected by the

ction(RDPM

e  subsectioections was e detail is pre

dEmbankm

mance undeope.  

eandComf

the  Contraceasures  (RU

ork in Punjab (Ind

eservationQ

er  3.1,  this program  thatContractor. 

no  NON‐COes. 

(i.e. revised 3

me has been a

PM‐2)

e  of  comfortand  16  of  Pthe  roughnespecificationure  the  rounths thereafal Roughnesry  importantmeasureme

ause  8.2.2 t  the  roughtion of the c

ent Clause 2ational  RougProfile accordl  own  and  m

ned his ownIRI  will  be  c 

e Contractor 

M‐3)

n3.2.2  of  threcorded anescribed in s

mentSlope

er  the RDPM

fortPerform

ct  AgreemeUS&CPM)  ref

dia) 

Quantities

measure  pet  was  appro

ONFORMANC

3rd year) was

approved fo

t  of  road  usPart  2A  of ess  survey  ans mentionedghness  withfter. The valss Index) shat  to understants any time

of  the  specness  of  the ontract. 

2.6.2.4, the Rghness  Indeding to the smaintain  the

 Profilometecalculated  fo

is presented

his  report,  tnd found witub section 3

s(RDPM‐4)

M‐4 was not 

manceMea

nt,  the  Roflect  the  roa

–WorkPro

ertains  to  thoved  by  the 

CES  regardin

s submitted 

r52.42 kms f

sers  and  in  athe  contracand  measured in the conthin  the  first ues correspoall meet the and that  thee during the e

cifications  opaved  surfa

Roughness sx  (IRI).  The pecificationse  Roughness

er and starteor  the  entir

d the Chapter

he  pavementhin the perm3.2.2. 

)

recorded  fo

asures‐RUS

ad  User  Sead  user‘s  ex

   

ogram

he  fulfilmenemployer  f

ng  Minimum

by the Cont

for improvem

accordance ct  specificatie  the  roughntract agreem06  months onding to parequiremene employer’sentire contra

of  the  contrace  conform

hall be meaequipment s as defined s  Profilomet

ed to collect e  road  netw

r 3. 

nt  deflectionmissible limi

or Roadway C

S&CPM

ervice  and xpectation  ab

   

46 

nt  in  the for  three 

m  Annual 

tractor in 

ment and 

with  the ons,  the ness  and ment. The on  new 

arameter nts of the s has  the act. 

ract,  the ms  to  the 

sured by required by ASTM ter  at  all 

the data work  and 

n  on  the ts as per 

Cuts  and 

Comfort bout  the 

TNM 

 

OPRC WorlMonthly Pro

Month : 

Refere

 Bidd

Docum

Sectio

RUS&C

RUS&C

RUS&C

RUS&C

RUS&C

RUS&C

RUS&C

RUS&C

RUS&C

RUS&C

RUS&C

RUS&C

RUS&C

RUS&C

Any RUS

Any RUS

Any Roa

 Haza

M TECHNOMANAG

ld Bank Project fogress Report No 22

day com

• The ServexpeCon

• Anycorr

• TheNONConThe 

• The audMea 

JULY 2016

nce to

ding 

ment 

on VI

CPM1 Pavem

CPM2 Unsea

CPM3 Draina

CPM4Routin

other S

CPM5Obstru

and Sh

CPM6Incide

Respo

CPM7 Vegeta

CPM8 Roadsi

CPM9 Raised

CPM10Pavem

Symbo

CPM11Traffic

Mainte

CPM12 Crash 

CPM13Sight R

Barrier

CPM14Marke

Edge, C

S&CPMRepea

Consec

S&CPMAny un

identif

d Safety

ards

Any Im

Users I

OLOGY AND GEMENT LTD.

or Sangrur Mansa (July 2016) 

to  day  servmply with the

objectives vice  is  mainectations  actractor’s perway  the  firesponds to trefore, the fN‐CONFORMsultant are non‐conformcomparisonit  scores  byasures ‐ RUS&

Table  4‐9 : S

Item Desc

ment Maintenan

led Shoulder M

age Maintenanc

ne Maintenance

Structures

uctions on the P

houlders

nt and Emergen

nse 

ation Control

ide Signs Maint

d Reflective Pave

ment Markings ‐ 

ols etc)

 Island and Rou

enance

Barrier Mainten

Rails, Hand Rail 

r Maintenance 

er Posts (Guard S

Culvert, Distanc

ted Non‐Confor

cutive Months

n‐reported Non

fied by the Mon

mmediate Safety

Instructed for Re

Tota

RU

a Bathinda Netwo

viceability  oe Contract Stof  the  Contntained,  whicross  the  rarformance.nal  score  othat of the Mfinal monthl

MANCES  rela80 against tmance recorn of the audity  MC  regard&CPM, is sho

Summary of 

cription

nce

aintenence

ce

e of Bridge and 

Pavement Surfac

ncy Works 

enance 

ement Markers

(Lines, Text, 

undabout 

nance 

and Pedestrian 

Stones, Boundry

ce Markers, Haz

rmance in 

‐Conformance 

nitoring Consult

y Hazard to Roa

epair

al  Score

US FIELD

ork in Punjab (Ind

of  the  roadsandards spetract  Standaich  reflects nge  of  Cont

of  the  NONMonitoring Cly audit scorating  to  RUthe monthlyrded againstt scores submding  to  Roaown in the T

Non–Confor

Minimum 

for Each

Non ‐ Co

5km (1km

5km (1km

1

5km (1km

ce 1

N

5

5

5km

5km

5

5

5

y, 

ard)5

tant

dia) 

s  under  the cified for eacards  are  to the  road  utract  assets,

N‐CONFORMonsultant's Ares for the mUS&CPM  asy scores 65 at MPM is 20.mitted by thad  User  SerTable4.9. 

rmances of R

Audit Length

h Recorded

onformance

C

 for cracking)

 for cracking)

1km

 for cracking)

1km

N/A

5km 

5km

m/1km

m/1km

5km

5km

5km

5km

Contract.  Tch RUS&CPMensure  thatuser‘s  day  t  and  to  per

MANCES  incAudit Inspectmonth of Jus  adjusted as submitted. e Contractorrvice  and  Co

RUS&CPM M

Total Non‐

Conformance 

Score 

AxBxC

Contractor

C

6

4

0

0

0

0

3

0

28

10

0

0

0

2

53

12

0

0

65

   

The  ContractM. t  a  defined to  day  servrmit  auditin

luded  in  thtion. ly 2016 incluby  the  Mod by the Con

r versus the omfort  Perf

Measures 

Total Non‐

Conformance 

Score 

AxBxC

MC

C

6

5

0

0

0

0

2

2

2

6

1

0

0

2

26

24

30

0

80

   

47 

tor  must 

Level  of iceability g  of  the 

his  MPR 

udes the onitoring ntractor.  

adjusted formance 

Comments

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

4.3 Verific

Month : JULY 2016

Non‐Conformance 

Relating To

RUS&CPM1 Pavemen

RUS&CPM2 Unsealed

RUS&CPM3 Drainage

RUS&CPM4 Routine 

RUS&CPM5 Obstruct

RUS&CPM6 Incident 

RUS&CPM7 Vegetati

RUS&CPM8 Roadside

RUS&CPM9 Raised R

RUS&CPM10 Pavemen

RUS&CPM11 Traffic Is

RUS&CPM12 Crash Ba

RUS&CPM13 Sight Ra

RUS&CPM14Marker P

Distance

Any RUS&CPM Repeate

Any RUS&CPMAny un‐r

Monitor

Any Road Safety

 Hazards

Any Imm

for Repa

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

cationofContra

Item Description

nt Maintenance

d Shoulder Maintenence

e Maintenance

Maintenance of Bridge and o

tions on the Pavement Surfac

and Emergency Works Resp

ion Control

e Signs Maintenance 

Reflective Pavement Markers

nt Markings ‐ (Lines, Text, Sy

sland and Roundabout Maint

arrier Maintenance 

ils, Hand Rail and Pedestrian

Posts (Guard Stones, Boundr

e Markers, Hazard,Road Delin

d Non‐Conformance in Conse

reported Non‐Conformance i

ing Consultant

mediate Safety Hazard to Roa

air

Bathinda Network in P

actor’sAuditR

Table 5.0 km

n

Minim

for 

Non

5km (

o

e

5km 

other Structures

ce and Shoulders

onse 

ymbols etc)

tenance

 Barrier Maintenance 

ry, Edge, Culvert, 

neators)

ecutive Months

dentified by the 

ad Users Instructed 

T

Punjab (India) 

Report

4‐10 : Verificatiom Audit Length Start Location

mum Audit Length

Each Recorded

n ‐ Conformance

Number

Conform

Reco

Minimu

Leng

Contr

1km for ravelling 

or cracking or 

edgebreake)

0

(1km for Shape) 0

1km 0

5km 0

1km 0

N/A 0

5km  0

5km 0

5km/1km 1

5km/1km 0

5km 0

5km 0

5km 0

5km 1

0

0

0

Total  Score

 

on of Audit – Secn    S1       km  0      to      km  5

r of Non‐

mances 

orded

m Audit 

gth A

ractor

Number of Non

Conformances

Recorded

Minimum Audi

Length A

MC

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

1 0

0 1

0 0

0 0

0 0

1 1

0 0

0 1

0 0

  48

ction S1 – Km 0.05

n‐

Non‐

Conformances 

Weighting 

B

Sub‐W

N

 Con

Week

2

1

2

2

1

2

1

2

2

2

1

1

1

2

6

6

6

00 to Km 5.000

Weighting 

No of

nsecutive 

ks/Months 

C

Total Non‐

Conformance 

Score 

A*B*C

Contractor

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 2

1 0

1 0

1 0

1 0

1 2

0 0

1 0

0 0

4

Total Non‐

Conformance 

Score 

A*B*C

MC

0

0

0

0

0

0

0

0

0During M

2Pavem

be

0

0

0

2 Km 3,

0

6

0

10

Comments

MC Audit the missing RPMs w

restored between km 0 to 

ment Edge marking faded/dis

etween km 0+000 to 0+150 R

, improvement in writing is r

RUS&CPM ‐ 10

   

Photo 

Reference No.

were found 

1

sturbed 

R.H.S3,4 & 5

equired 6

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : JULY 2016

Non‐Conformance 

Relating To

RUS&CPM1 Paveme

RUS&CPM2 Unsealed

RUS&CPM3 Drainage

RUS&CPM4 Routine 

RUS&CPM5 Obstruct

RUS&CPM6 Incident 

RUS&CPM7 Vegetati

RUS&CPM8 Roadside

RUS&CPM9 Raised R

RUS&CPM10 Paveme

RUS&CPM11 Traffic Is

RUS&CPM12 Crash Ba

RUS&CPM13 Sight Ra

RUS&CPM14Marker P

Distance

Any RUS&CPM Repeate

Any RUS&CPMAny un‐r

Monitor

Any Road Safety

 Hazards

Any Imm

for Repa

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Item Description

nt Maintenance

d Shoulder Maintenence

e Maintenance

Maintenance of Bridge and o

tions on the Pavement Surfa

and Emergency Works Resp

ion Control

e Signs Maintenance 

Reflective Pavement Markers

nt Markings ‐ (Lines, Text, Sy

sland and Roundabout Maint

arrier Maintenance 

ils, Hand Rail and Pedestrian

Posts (Guard Stones, Boundr

e Markers, Hazard,Road Delin

ed Non‐Conformance in Cons

reported Non‐Conformance i

ring Consultant

mediate Safety Hazard to Roa

air

Bathinda Network in P

Table  4

7.76 k

n

Minim

for 

Non

5km (

o

e

5km 

other Structures

ce and Shoulders

ponse 

s

ymbols etc)

tenance

n Barrier Maintenance 

ry, Edge, Culvert, 

neators)

ecutive Months

identified by the 

ad Users Instructed 

T

Punjab (India) 

4‐11 : Verificatio

km Audit Length Start Locatio

mum Audit Length

Each Recorded

n ‐ Conformance

Number

Confor

Reco

Minimu

Leng

Contr

(1km for ravelling 

or cracking or 

edgebreake)

1

(1km for Shape) 0

1km 0

5km 0

1km 0

N/A 0

5km  0

5km 0

5km/1km 4

5km/1km 0

5km 0

5km 0

5km 0

5km 0

0

0

0

Total  Score

 

on of Audit – Sec 

on       S2        km  2.240   to   

r of Non‐

mances 

orded

um Audit 

gth A

ractor

Number of Non

Conformances

Recorded

Minimum Aud

Length A

MC

1 1

0 1

0 0

0 0

0 0

0 0

0 0

0 0

4 0

0 0

0 0

0 0

0 0

0 0

0 0

0 1

0 0

  49

ction S2 – Km 2.2

km 10

n‐

it 

Non‐

Conformances 

Weighting 

B

Sub‐W

 Con

Week

2

1

2

2

1

2

1

2

2

2

1

1

1

2

6

6

6

240 to Km 10.00

Weighting 

No of

nsecutive 

ks/Months 

C

Total Non‐

Conformance 

Score 

A*B*C

Contractor

1 2

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 8

1 0

1 0

1 0

1 0

1 0

0 0

1 0

0 0

10

Total Non‐

Conformance 

Score 

A*B*C

MC

2Rutting 

1Rever

4+500

0

0

0

0

0

0

0

During

restored 

0

0

0

0

0

0

6

0

9

Comments

observed at km 2+420 to Km

(28 to 30mm)

rse slope & Raincuts found b

0 to 4+600 R.H.S & 4+900 to 

g MC Audit the missing RPMs

between km 2 to 4, Km 6 to

10

RUS&CPM ‐ 2

   

Photo 

Reference N

m 2+460 R.H.S 7 & 8

etween km 

5+000 L.H.S9 & 10

s were found 

 7 and km 9 to 

 

No.

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : JULY 2016

Non‐Conformance 

Relating To

RUS&CPM1 Pavemen

RUS&CPM2 Unsealed

RUS&CPM3 Drainage 

RUS&CPM4 Routine M

RUS&CPM5 Obstructi

RUS&CPM6 Incident a

RUS&CPM7 Vegetatio

RUS&CPM8 Roadside

RUS&CPM9 Raised Re

RUS&CPM10 Pavemen

RUS&CPM11 Traffic Isl

RUS&CPM12 Crash Bar

RUS&CPM13 Sight Rail

RUS&CPM14Marker P

Distance 

Any RUS&CPM Repeated

Any RUS&CPMAny un‐re

Monitorin

Any Road Safety

 Hazards

Any Imm

for Repai

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Item Description

nt Maintenance

d Shoulder Maintenence

Maintenance

Maintenance of Bridge and ot

ions on the Pavement Surface

and Emergency Works Respon

on Control

e Signs Maintenance 

eflective Pavement Markers

nt Markings ‐ (Lines, Text, Sym

and and Roundabout Mainten

rrier Maintenance 

s, Hand Rail and Pedestrian B

osts (Guard Stones, Boundry,

Markers, Hazard)

d Non‐Conformance in Consec

eported Non‐Conformance ide

ng Consultant

ediate Safety Hazard to Road

r

Bathinda Network in P

Table 

5 km Aud

Minimum

for Ea

Non ‐ C

5km (1k

or c

edg

5km (1k

her Structures

e and Shoulders

nse 

5k

mbols etc) 5k

nance

Barrier Maintenance 

, Edge, Culvert, 

cutive Months

entified by the 

 Users Instructed 

Tot

Punjab (India) 

4‐12 : Verificatio

dit Length Start Location       S

m Audit Length

ch Recorded

Conformance

Number of 

Conforman

Recorde

Minimum A

Length A

Contract

m for ravelling 

cracking or 

gebreake)

1

km for Shape) 0

1km 0

5km 0

1km 0

N/A 0

5km  0

5km 0

km/1km 1

km/1km 0

5km 0

5km 0

5km 0

5km 0

0

0

0

al  Score

 

on of Audit –Sect 

2        km 15   to   km 20

Non‐

nces 

ed

Audit 

A

or

Number of Non‐

Conformances 

Recorded

Minimum Audit 

Length A

MC

1

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

  50

tion S2 – Km 15.

Non‐

Conformances 

Weighting 

B

Sub‐Weigh

No of

Consecut

Weeks/Mo

C

2 1

1 1

2 1

2 1

1 1

2 1

1 1

2 1

2 1

2 1

1 1

1 1

1 1

2 1

6 0

6 1

6 0

00 to Km 20.00

ting 

ive 

nths 

Total Non‐

Conformance 

Score 

A*B*C

Contractor

To

Con

2

0

0

0

0

0

0

0

2

0

0

0

0

0

0

0

0

4

otal Non‐

nformance 

Score 

A*B*C

MC

2Km 17+000 to 18

0

0

0

0

0

0

0

0During MC Au

0

0

0

0

0

0

0

0

2

Comments

8+000 cracks found on pavem

udit the missing RPMs were fo

between km 16 to 17

   

Photo 

Reference 

ment surface

ound restored 

No.

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : JULY 2016

Non‐Conformance 

Relating To

RUS&CPM1 Paveme

RUS&CPM2 Unseale

RUS&CPM3 Drainage

RUS&CPM4 Routine 

RUS&CPM5 Obstruct

RUS&CPM6 Incident

RUS&CPM7 Vegetati

RUS&CPM8 Roadsid

RUS&CPM9 Raised R

RUS&CPM10 Paveme

RUS&CPM11 Traffic Is

RUS&CPM12 Crash Ba

RUS&CPM13 Sight Ra

RUS&CPM14Marker 

Distance

Any RUS&CPM Repeate

Any RUS&CPMAny un‐r

Monitor

Any Road Safety

 Hazards

Any Imm

for Repa

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Item Descriptio

nt Maintenance

d Shoulder Maintenence

e Maintenance

Maintenance of Bridge and 

tions on the Pavement Surfa

t and Emergency Works Resp

ion Control

e Signs Maintenance 

Reflective Pavement Markers

nt Markings ‐ (Lines, Text, Sy

sland and Roundabout Maint

arrier Maintenance 

ils, Hand Rail and Pedestrian

Posts (Guard Stones, Boundr

e Markers, Hazard)

ed Non‐Conformance in Cons

reported Non‐Conformance 

ring Consultant

mediate Safety Hazard to Roa

air

Bathinda Network in P

Table  4

5 km 

n

Minim

for

Non

5km 

o

5km

other Structures

ace and Shoulders

ponse 

s

ymbols etc)

tenance

n Barrier Maintenance 

ry, Edge, Culvert, 

secutive Months

identified by the 

ad Users Instructed 

T

Punjab (India) 

4‐13 : Verificatio

Audit Length Start Location  

mum Audit Length

r Each Recorded

n ‐ Conformance

Numbe

Confor

Reco

Minimu

Len

Cont

(1km for ravelling 

or cracking or 

edgebreake)

 (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

Total  Score

 

on of Audit – Sec 

     S2        km 45 to km 50

er of Non‐

rmances 

orded

um Audit 

gth A

tractor

Number of No

Conformance

Recorded

Minimum Aud

Length A

MC

0 0

1 1

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

  51

ction S2 – Km 45.

on‐

es 

dit 

Non‐

Conformances 

Weighting 

B

Sub‐W

 Con

Week

2

1

2

2

1

2

1

2

2

2

1

1

1

2

6

6

6

.00 to Km 50.00

Weighting 

No of

nsecutive 

ks/Months 

C

Total Non‐

Conformance 

Score 

A*B*C

Contractor

1 0

1 1

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

0 0

1 0

0 0

1

Total Non‐

Conformance 

Score 

A*B*C

MC

0

1Low sho

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

1

Comments

oulder found between Km 45

locations

   

Photo 

Reference N

5 to 50 at few 11 & 12

No.

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : JULY 2016

Non‐Conformance 

Relating To

RUS&CPM1 Paveme

RUS&CPM2 Unseale

RUS&CPM3 Drainag

RUS&CPM4 Routine

RUS&CPM5 Obstruc

RUS&CPM6 Inciden

RUS&CPM7 Vegetat

RUS&CPM8 Roadsid

RUS&CPM9 Raised 

RUS&CPM10 Paveme

RUS&CPM11 Traffic I

RUS&CPM12 Crash B

RUS&CPM13 Sight Ra

RUS&CPM14Marker

Distanc

Any RUS&CPM Repeat

Any RUS&CPMAny un‐

Monito

Any Road Safety

 Hazards

Any Im

for Rep

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Item Descripti

ent Maintenance

ed Shoulder Maintenence

ge Maintenance

e Maintenance of Bridge and

ctions on the Pavement Sur

t and Emergency Works Res

tion Control

de Signs Maintenance 

Reflective Pavement Marke

ent Markings ‐ (Lines, Text, 

Island and Roundabout Mai

Barrier Maintenance 

ails, Hand Rail and Pedestria

r Posts (Guard Stones, Boun

ce Markers, Hazard)

ed Non‐Conformance in Con

‐reported Non‐Conformance

oring Consultant

mediate Safety Hazard to R

pair

Bathinda Network in P

Table  4

5 k

ion

Min

f

N

5k

5k

d other Structures

rface and Shoulders

sponse 

ers

Symbols etc)

intenance

an Barrier Maintenance 

dry, Edge, Culvert, 

nsecutive Months

e identified by the 

oad Users Instructed 

Punjab (India) 

4‐14 : Verificatio

m Audit Length Start Locati

nimum Audit Length

for Each Recorded

Non ‐ Conformance

Num

Con

R

Mini

L

Co

m (1km for ravelling 

or cracking or 

edgebreake)

km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

Total  Score

 

on of Audit – Sec 

on       S2        km 60   to  km

mber of Non‐

nformances 

Recorded

imum Audit 

Length A

ontractor

Number of N

Conforman

Recorded

Minimum A

Length A

MC

0 0

1 1

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

  52

ction S2 – Km 60.

m 65

Non‐

nces 

d

Audit 

A

Non‐

Conformances 

Weighting 

B

Su

 C

W

2

1

2

2

1

2

1

2

2

2

1

1

1

2

6

6

6

.00 to Km 65.00

ub‐Weighting 

No of

Consecutive 

eeks/Months 

C

Total Non

Conforman

Score 

A*B*C

Contracto

1 0

1 1

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

0 0

1 0

0 0

1

n‐

nce 

or

Total Non‐

Conformance 

Score 

A*B*C

MC

0

1Sh

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

1

Comments

houlder eroded & rain cuts f

between Km 62 to 63

   

Photo 

Reference No

found 

o.

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : JULY 2016

Non‐Conformance 

Relating To

RUS&CPM1 Pavem

RUS&CPM2 Unsea

RUS&CPM3 Draina

RUS&CPM4 Routin

RUS&CPM5 Obstru

RUS&CPM6 Incide

RUS&CPM7 Vegeta

RUS&CPM8 Roads

RUS&CPM9 Raised

RUS&CPM10 Pavem

RUS&CPM11 Traffic

RUS&CPM12 Crash 

RUS&CPM13 Sight R

RUS&CPM14Marke

Distan

Any RUS&CPM Repea

Any RUS&CPMAny un

Monit

Any Road Safety

 Hazards

Any Im

for Re

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Item Descript

ment Maintenance

aled Shoulder Maintenence

age Maintenance

ne Maintenance of Bridge an

uctions on the Pavement Sur

nt and Emergency Works Re

ation Control

side Signs Maintenance 

d Reflective Pavement Marke

ment Markings ‐ (Lines, Text, 

c Island and Roundabout Ma

Barrier Maintenance 

Rails, Hand Rail and Pedestri

er Posts (Guard Stones, Boun

nce Markers, Hazard,Road De

ated Non‐Conformance in Co

n‐reported Non‐Conformanc

oring Consultant

mmediate Safety Hazard to R

pair

Bathinda Network in P

Table  4

ion

Min

f

N

5km

5k

d other Structures

rface and Shoulders

esponse 

ers

Symbols etc)

intenance

an Barrier Maintenance 

ndry, Edge, Culvert, 

elineators)

nsecutive Months

ce identified by the 

Road Users Instructed 

Roa

Punjab (India) 

4‐15 : Verificatio

nimum Audit Length

for Each Recorded

on ‐ Conformance

Numb

Conf

Re

Minim

Le

Co

m (1km for ravelling 

or cracking or 

edgebreake)

m (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

Total  Score

ad Section: S2; Length of Aud

 

on of Audit – Sec 

ber of Non‐

formances 

ecorded

mum Audit 

ength A

ntractor

Number of N

Conformanc

Recorded

Minimum Au

Length A

MC

0 0

1 1

0 0

0 0

0 0

0 0

0 0

0 0

1 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

dit Section: 5 km; Location f

  53

ction S2 – Km 65.

Non‐

ces 

d

udit 

Non‐

Conformances 

Weighting 

B

Su

 C

We

2

1

2

2

1

2

1

2

2

2

1

1

1

2

6

6

6

rom km 65 to km 70

.00 to Km 70.00

b‐Weighting 

No of

Consecutive 

eeks/Months 

C

Total Non‐

Conformanc

Score 

A*B*C

Contractor

1 0

1 1

1 0

1 0

1 0

1 0

1 0

1 0

1 2

1 0

1 0

1 0

1 0

1 0

0 0

1 0

0 0

3

ce 

Total Non‐

Conformance 

Score 

A*B*C

MC

0

1Low s

0

0

0

0

0

0

0Durin

0

0

0

0

0

0

0

0

1

Comments

shoulder and rain cuts obser

km 69 to 70 at few locai

ng MC Audit the missing RPM

restored between km 68 

   

Photo 

Reference N

rved between 

ions

Ms were found 

to 69

 

No.

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : JULY 2016

Non‐Conformance 

Relating To

RUS&CPM1 Pavem

RUS&CPM2 Unse

RUS&CPM3 Drain

RUS&CPM4 Routi

RUS&CPM5 Obstr

RUS&CPM6 Incide

RUS&CPM7 Veget

RUS&CPM8 Road

RUS&CPM9 Raise

RUS&CPM10 Pavem

RUS&CPM11 Traffi

RUS&CPM12 Crash

RUS&CPM13 Sight 

RUS&CPM14Mark

Dista

Any RUS&CPM Repe

Any RUS&CPMAny u

Moni

Any Road Safety

 Hazards

Any I

for Re

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Item Descrip

ment Maintenance

aled Shoulder Maintenence

nage Maintenance

ine Maintenance of Bridge a

ructions on the Pavement Su

ent and Emergency Works R

tation Control

side Signs Maintenance 

ed Reflective Pavement Mark

ment Markings ‐ (Lines, Text

c Island and Roundabout M

h Barrier Maintenance 

Rails, Hand Rail and Pedest

ker Posts (Guard Stones, Bou

nce Markers, Hazard)

ated Non‐Conformance in C

un‐reported Non‐Conforman

toring Consultant

mmediate Safety Hazard to 

epair

Bathinda Network in P

Table  4

ption

M

5

5

and other Structures

urface and Shoulders

Response 

kers

t, Symbols etc)

aintenance

trian Barrier Maintenance 

undry, Edge, Culvert, 

Consecutive Months

nce identified by the 

Road Users Instructed 

Punjab (India) 

4‐16 : Verificatio

km Audit Length Start Loca

Minimum Audit Length

 for Each Recorded

 Non ‐ Conformance

Num

Co

Min

C

5km (1km for ravelling 

or cracking or 

edgebreake)

5km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

Total  Score

 

on of Audit – Sec 

ation       S2        km 75   to   k

mber of Non‐

onformances 

Recorded

nimum Audit 

Length A

Contractor

Number of

Conforma

Record

Minimum 

Length

MC

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

1 0

5 0

0 0

0 0

0 0

0 0

1 0

0 0

0 0

  54

ction S2 – Km 75.

km 80

f Non‐

ances 

ed

Audit 

 A

Non‐

Conformances 

Weighting 

BW

2

1

2

2

1

2

1

2

2

2

1

1

1

2

6

6

6

.00 to Km 80.00

Sub‐Weighting 

No of

 Consecutive 

Weeks/Months 

C

Total No

Conforma

Score

A*B*C

Contract

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 2

1 10

1 0

1 0

1 0

1 0

2 12

1 0

0 0

24

on‐

ance 

C

tor

Total Non‐

Conformance 

Score 

A*B*C

MC

0

0

0

0

0

0

0

0

0D

fou

0Durin

0

0

0

0

0 Pav

0

0

0

Comments

uring MC Audit the missing 

und restored between km 7

ng MC Audit the Pavement m

ok between km 75 to

RUS&CPM ‐ 10 (During MC 

vement marking found ok be

to 80)

   

Photo 

Reference 

RPMs were 

6+230 B.H.S

marking found 

o 80

Audit the 

etween km 75 

 

No.

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : JULY 2016

Non‐Conformance 

Relating To

RUS&CPM1 Paveme

RUS&CPM2 Unseale

RUS&CPM3 Drainage

RUS&CPM4 Routine 

RUS&CPM5 Obstruct

RUS&CPM6 Incident

RUS&CPM7 Vegetat

RUS&CPM8 Roadsid

RUS&CPM9 Raised R

RUS&CPM10 Paveme

RUS&CPM11 Traffic Is

RUS&CPM12 Crash Ba

RUS&CPM13 Sight Ra

RUS&CPM14Marker 

Distance

Any RUS&CPM Repeate

Any RUS&CPMAny un‐r

Monitor

Any Road Safety

 Hazards

Any Imm

for Repa

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Item Descriptio

nt Maintenance

d Shoulder Maintenence

e Maintenance

Maintenance of Bridge and

tions on the Pavement Surfa

t and Emergency Works Res

ion Control

e Signs Maintenance 

Reflective Pavement Marker

nt Markings ‐ (Lines, Text, S

sland and Roundabout Main

arrier Maintenance 

ils, Hand Rail and Pedestria

Posts (Guard Stones, Bound

e Markers, Hazard)

ed Non‐Conformance in Con

reported Non‐Conformance 

ring Consultant

mediate Safety Hazard to Ro

air

Bathinda Network in P

Table

5 km

on

Mini

fo

No

5km

5km

 other Structures

ace and Shoulders

ponse 

rs

Symbols etc)

ntenance

n Barrier Maintenance 

dry, Edge, Culvert, 

secutive Months

 identified by the 

oad Users Instructed 

T

Punjab (India) 

e  4‐17: Verificati

m Audit Length Start Location

imum Audit Length

or Each Recorded

on ‐ Conformance

Numbe

Confo

Rec

Minim

Len

Con

m (1km for ravelling 

or cracking or 

edgebreake)

m (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

Total  Score

 

ion of Audit – Se 

n      S4      km 0   to   km 5

er of Non‐

ormances 

corded

mum Audit 

ngth A

ntractor

Number of Non

Conformances

Recorded

Minimum Aud

Length A

MC

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

1 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

  55

ction S4 – Km 0.

n‐

it 

Non‐

Conformances 

Weighting 

B

Sub‐

 Con

Week

2

1

2

2

1

2

1

2

2

2

1

1

1

2

6

6

6

00 to Km 5.00 

Weighting 

No of

nsecutive 

ks/Months 

C

Total Non‐

Conformance 

Score 

A*B*C

Contractor

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 2

1 0

1 0

1 0

1 0

1 0

0 0

1 0

0 0

2

Total Non‐

Conformance 

Score 

A*B*C

MC

0

0

0

0

0

0

0

0

0During M

res

0

0

0

0

0

0

0

0

0

Comments

MC Audit the missing RPMs

tored between km 2+800 to

   

Photo 

Reference N

 were found 

o 3+000

 

No.

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : JULY 2016

Non‐Conformance 

Relating To

RUS&CPM1 Pavem

RUS&CPM2 Unsea

RUS&CPM3 Drain

RUS&CPM4 Routi

RUS&CPM5 Obstr

RUS&CPM6 Incide

RUS&CPM7 Veget

RUS&CPM8 Roads

RUS&CPM9 Raise

RUS&CPM10 Pavem

RUS&CPM11 Traffic

RUS&CPM12 Crash

RUS&CPM13 Sight 

RUS&CPM14Marke

Distan

Any RUS&CPM Repea

Any RUS&CPMAny u

Monit

Any Road Safety

 Hazards

Any Im

for Re

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Item Descrip

ment Maintenance

aled Shoulder Maintenence

age Maintenance

ne Maintenance of Bridge a

ructions on the Pavement Su

ent and Emergency Works R

tation Control

side Signs Maintenance 

d Reflective Pavement Mark

ment Markings ‐ (Lines, Text

c Island and Roundabout M

h Barrier Maintenance 

Rails, Hand Rail and Pedest

er Posts (Guard Stones, Bou

nce Markers, Hazard,Road D

ated Non‐Conformance in C

un‐reported Non‐Conforman

toring Consultant

mmediate Safety Hazard to 

epair

Bathinda Network in P

Table

ption

M

5

and other Structures

urface and Shoulders

Response 

kers

t, Symbols etc)

Maintenance

trian Barrier Maintenance 

undry, Edge, Culvert, 

Delineators)

Consecutive Months

nce identified by the 

Road Users Instructed 

R

Punjab (India) 

e  4‐18: Verificatio

Minimum Audit Length

 for Each Recorded

 Non ‐ Conformance

Nu

C

M

5km (1km for ravelling 

or cracking or 

edgebreake)

5km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

Total  Score

Road Section: S4; Length of 

 

on of Audit – Sec 

umber of Non‐

Conformances 

Recorded

inimum Audit 

Length A

Contractor

Number 

Conform

Reco

Minimum

Leng

M

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

Audit Section: 5 km; Locati

  56

ction S4 – Km 5.0

of Non‐

mances 

rded

m Audit 

gth A

MC

Non‐

Conformances 

Weighting 

B

0 2

0 1

0 2

0 2

0 1

0 2

0 1

0 2

0 2

0 2

0 1

0 1

0 1

0 2

0 6

0 6

0 6

ion from km 5 to km 10

00 to Km 10.00 

Sub‐Weighting 

No of

 Consecutive 

Weeks/Months 

C

Tota

Confo

Sc

A*

Cont

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0

0

0

l Non‐

rmance 

core 

B*C

ractor

Total Non‐

Conformance 

Score 

A*B*C

MC

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

Comments

   

Photo 

Reference N

No.

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : JULY 2016

Non‐Conformance 

Relating To

RUS&CPM1 Paveme

RUS&CPM2 Unsealed

RUS&CPM3 Drainage

RUS&CPM4 Routine 

RUS&CPM5 Obstruct

RUS&CPM6 Incident 

RUS&CPM7 Vegetati

RUS&CPM8 Roadside

RUS&CPM9 Raised R

RUS&CPM10 Paveme

RUS&CPM11 Traffic Is

RUS&CPM12 Crash Ba

RUS&CPM13 Sight Ra

RUS&CPM14Marker P

Distance

Any RUS&CPM Repeate

Any RUS&CPMAny un‐r

Monitor

Any Road Safety

 Hazards

Any Imm

for Repa

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Item Description

nt Maintenance

d Shoulder Maintenence

e Maintenance

Maintenance of Bridge and o

tions on the Pavement Surfa

and Emergency Works Resp

ion Control

e Signs Maintenance 

Reflective Pavement Markers

nt Markings ‐ (Lines, Text, Sy

sland and Roundabout Maint

arrier Maintenance 

ils, Hand Rail and Pedestrian

Posts (Guard Stones, Boundr

e Markers, Hazard,Road Delin

ed Non‐Conformance in Cons

reported Non‐Conformance i

ring Consultant

mediate Safety Hazard to Roa

air

Bathinda Network in P

Table  4

5 km A

n

Minim

for 

Non

5km (

o

e

5km 

other Structures

ce and Shoulders

ponse 

s

ymbols etc)

tenance

n Barrier Maintenance 

ry, Edge, Culvert, 

neators)

ecutive Months

identified by the 

ad Users Instructed 

T

Punjab (India) 

4‐19 : Verificatio

Audit Length Start Location   

mum Audit Length

Each Recorded

n ‐ Conformance

Number

Confor

Reco

Minimu

Leng

Contr

(1km for ravelling 

or cracking or 

edgebreake)

0

(1km for Shape) 0

1km 0

5km 0

1km 0

N/A 0

5km  0

5km 0

5km/1km

5km/1km 0

5km 0

5km 0

5km 0

5km 0

0

0

0

Total  Score

 

on of Audit – Sec 

   S4      km 15   to   km 20

r of Non‐

mances 

orded

um Audit 

gth A

ractor

Number of Non

Conformances

Recorded

Minimum Aud

Length A

MC

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

1 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

  57

ction S4 – Km 15.

n‐

it 

Non‐

Conformances 

Weighting 

B

Sub‐W

 Con

Week

2

1

2

2

1

2

1

2

2

2

1

1

1

2

6

6

6

.00 to Km 20.00

Weighting 

No of

nsecutive 

ks/Months 

C

Total Non‐

Conformance 

Score 

A*B*C

Contractor

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 2

1 0

1 0

1 0

1 0

1 0

0 0

1 0

0 0

2

Total Non‐

Conformance 

Score 

A*B*C

MC

0

0

0

0

0

0

0

0

0During

res

0

0

0

0

0

0

0

0

0

Comments

g MC Audit the missing RPMs

stored between km 17+650to

   

Photo 

Reference N

s were found 

o 17+700

No.

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : JULY 2016

Non‐Conformance 

Relating To

RUS&CPM1 Pavem

RUS&CPM2 Unseal

RUS&CPM3 Draina

RUS&CPM4 Routin

RUS&CPM5 Obstru

RUS&CPM6 Inciden

RUS&CPM7 Vegeta

RUS&CPM8 Roadsi

RUS&CPM9 Raised

RUS&CPM10 Pavem

RUS&CPM11 Traffic 

RUS&CPM12 Crash B

RUS&CPM13 Sight R

RUS&CPM14Marke

Distan

Any RUS&CPM Repeat

Any RUS&CPMAny un

Monito

Any Road Safety

 Hazards

Any Im

for Rep

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Item Descripti

ment Maintenance

led Shoulder Maintenence

ge Maintenance

e Maintenance of Bridge and

uctions on the Pavement Surf

nt and Emergency Works Res

ation Control

ide Signs Maintenance 

 Reflective Pavement Marke

ment Markings ‐ (Lines, Text, S

Island and Roundabout Mai

Barrier Maintenance 

Rails, Hand Rail and Pedestria

r Posts (Guard Stones, Boun

ce Markers, Hazard,Road De

ted Non‐Conformance in Con

n‐reported Non‐Conformance

oring Consultant

mmediate Safety Hazard to Ro

pair

Bathinda Network in P

Table 

on

Min

fo

N

5km

5km

d other Structures

face and Shoulders

sponse 

ers

Symbols etc)

ntenance

an Barrier Maintenance 

dry, Edge, Culvert, 

elineators)

nsecutive Months

e identified by the 

oad Users Instructed 

Roa

Punjab (India) 

4‐20 : Verificatio

nimum Audit Length

or Each Recorded

on ‐ Conformance

Numb

Conf

Re

Minim

Le

Co

m (1km for ravelling 

or cracking or 

edgebreake)

m (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

Total  Score

d Section: S5; Length of Aud

 

on of Audit – Sec 

ber of Non‐

formances 

ecorded

mum Audit 

ength A

ntractor

Number of N

Conformanc

Recorded

Minimum Au

Length A

MC

0 0

1 1

0 0

0 0

0 0

0 0

1 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

dit Section: 5 km; Location f

  58

ction S5 – Km 5.0

Non‐

ces 

d

udit 

A

Non‐

Conformances 

Weighting 

B

Su

 C

We

2

1

2

2

1

2

1

2

2

2

1

1

1

2

6

6

6

from km 5 to km 10

00 to Km 10.00

ub‐Weighting 

No of

Consecutive 

eeks/Months 

C

Total Non‐

Conformanc

Score 

A*B*C

Contractor

1 0

1 1

1 0

1 0

1 0

1 0

1 1

1 0

1 0

1 0

1 0

1 0

1 0

1 0

0 0

1 0

0 0

2

ce 

r

Total Non‐

Conformance 

Score 

A*B*C

MC

0

1Low s

0

0

0

0

0Du

0

0

0

0

0

0

0

0

0

0

1

Comments

shoulder, reverse slope obse

km 5+000 to 10+000

ring MC Audit no Vegetation

between km 5 to 10

   

Photo 

Reference N

erved between 

0

n was found 

0

No.

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : JULY 2016

Non‐Conformance 

Relating To

RUS&CPM1 Paveme

RUS&CPM2 Unseale

RUS&CPM3 Drainag

RUS&CPM4 Routine

RUS&CPM5 Obstruc

RUS&CPM6 Incident

RUS&CPM7 Vegetat

RUS&CPM8 Roadsid

RUS&CPM9 Raised R

RUS&CPM10 Paveme

RUS&CPM11 Traffic I

RUS&CPM12 Crash B

RUS&CPM13 Sight Ra

RUS&CPM14Marker 

Distanc

Any RUS&CPM Repeate

Any RUS&CPMAny un‐

Monito

Any Road Safety

 Hazards

Any Imm

for Repa

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Item Descriptio

ent Maintenance

ed Shoulder Maintenence

ge Maintenance

e Maintenance of Bridge and

ctions on the Pavement Surf

t and Emergency Works Res

tion Control

de Signs Maintenance 

Reflective Pavement Marker

ent Markings ‐ (Lines, Text, S

sland and Roundabout Main

arrier Maintenance 

ails, Hand Rail and Pedestria

Posts (Guard Stones, Bound

e Markers, Hazard,Road De

ed Non‐Conformance in Con

‐reported Non‐Conformance

ring Consultant

mediate Safety Hazard to Ro

air

Bathinda Network in P

Table  4

5 km

on

Min

fo

No

5km

5km

d other Structures

face and Shoulders

sponse 

rs

Symbols etc)

ntenance

an Barrier Maintenance 

dry, Edge, Culvert, 

lineators)

nsecutive Months

e identified by the 

oad Users Instructed 

Punjab (India) 

4‐21 : Verificatio

m Audit Length Start Locatio

imum Audit Length

or Each Recorded

on ‐ Conformance

Numb

Conf

Re

Minim

Le

Co

m (1km for ravelling 

or cracking or 

edgebreake)

m (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

Total  Score

 

on of Audit – Sec 

n      S5      km 15   to   km 20

ber of Non‐

formances 

ecorded

mum Audit 

ength A

ontractor

Number of N

Conforman

Recorde

Minimum A

Length A

MC

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

1 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

  59

ction S5 – Km 15.

0

Non‐

nces 

d

Audit 

A

Non‐

Conformances 

Weighting 

B

S

W

2

1

2

2

1

2

1

2

2

2

1

1

1

2

6

6

6

.00 to Km 20.00

ub‐Weighting 

No of

 Consecutive 

Weeks/Months 

C

Total No

Conforma

Score 

A*B*C

Contract

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 2

1 0

1 0

1 0

1 0

1 0

2 0

1 0

0 0

2

n‐

nce 

or

Total Non‐

Conformance 

Score 

A*B*C

MC

0

0

0

0

0

0

0

0

0D

0

0

0

0

0

0

0

0

0

Comments

During MC Audit the missing

found restored between km

   

Photo 

Reference N

g RPMs were 

m 16 to 17

 

No.

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : JULY 2016

Non‐Conformance 

Relating To

RUS&CPM1 Paveme

RUS&CPM2 Unseale

RUS&CPM3 Drainag

RUS&CPM4 Routine

RUS&CPM5 Obstruc

RUS&CPM6 Incident

RUS&CPM7 Vegetat

RUS&CPM8 Roadsid

RUS&CPM9 Raised R

RUS&CPM10 Paveme

RUS&CPM11 Traffic Is

RUS&CPM12 Crash B

RUS&CPM13 Sight Ra

RUS&CPM14Marker 

Distance

Any RUS&CPM Repeate

Any RUS&CPMAny un‐

Monitor

Any Road Safety

 Hazards

Any Imm

for Repa

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Item Descriptio

ent Maintenance

ed Shoulder Maintenence

ge Maintenance

e Maintenance of Bridge and

ctions on the Pavement Surf

t and Emergency Works Res

tion Control

de Signs Maintenance 

Reflective Pavement Marker

ent Markings ‐ (Lines, Text, S

sland and Roundabout Main

arrier Maintenance 

ails, Hand Rail and Pedestria

Posts (Guard Stones, Bound

e Markers, Hazard,Road Del

ed Non‐Conformance in Con

‐reported Non‐Conformance

ring Consultant

mediate Safety Hazard to Ro

air

Bathinda Network in P

Table  4

5.34

on

Mini

fo

No

5km

5km

d other Structures

ace and Shoulders

ponse 

rs

Symbols etc)

ntenance

n Barrier Maintenance 

dry, Edge, Culvert, 

lineators)

secutive Months

e identified by the 

oad Users Instructed 

Punjab (India) 

4‐22 : Verificatio

4 km Audit Length Start Loca

imum Audit Length

or Each Recorded

on ‐ Conformance

Numb

Conf

Re

Minim

Le

Con

m (1km for ravelling 

or cracking or 

edgebreake)

m (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

Total  Score

 

n of Audit – Sect 

tion      S5      km 20   to   km

ber of Non‐

formances 

ecorded

mum Audit 

ength A

ntractor

Number of N

Conforman

Recorded

Minimum A

Length A

MC

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 1

0 0

0 0

0 0

0 0

0 1

0 0

0 0

  60

tion S5 – Km 20.0

m 25.340

Non‐

ces 

d

udit 

A

Non‐

Conformances 

Weighting 

B

Su

 

W

2

1

2

2

1

2

1

2

2

2

1

1

1

2

6

6

6

00 to Km 25.340

ub‐Weighting 

No of

Consecutive 

Weeks/Months 

C

Total Non

Conforman

Score 

A*B*C

Contracto

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

4 0

1 0

0 0

0

 

n‐

nce 

or

Total Non‐

Conformance 

Score 

A*B*C

MC

0

0

0

0

0

0

0

0

0

2Cent

0

0

0

0

24RUS&

0

0

26

Comments

terline Pavement marking fa

between km 24 to 25+

&CPM‐ 10 ( 4 months From 

July 2016)

   

Photo 

Reference N

aded/missing 

+340  13 & 14

April 2016 to 

No.

 

OM

 

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : JULY 2016

Non‐Conformance 

Relating To

RUS&CPM1 Paveme

RUS&CPM2 Unseale

RUS&CPM3 Drainag

RUS&CPM4 Routine

RUS&CPM5 Obstruc

RUS&CPM6 Incident

RUS&CPM7 Vegetat

RUS&CPM8 Roadsid

RUS&CPM9 Raised R

RUS&CPM10 Paveme

RUS&CPM11 Traffic I

RUS&CPM12 Crash B

RUS&CPM13 Sight Ra

RUS&CPM14Marker 

Distanc

Any RUS&CPM Repeate

Any RUS&CPMAny un‐

Monito

Any Road Safety

 Hazards

Any Imm

for Repa

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Item Descripti

ent Maintenance

ed Shoulder Maintenence

ge Maintenance

e Maintenance of Bridge and

ctions on the Pavement Surf

t and Emergency Works Res

tion Control

de Signs Maintenance 

Reflective Pavement Marke

ent Markings ‐ (Lines, Text, 

sland and Roundabout Mai

arrier Maintenance 

ails, Hand Rail and Pedestria

Posts (Guard Stones, Boun

e Markers, Hazard)

ed Non‐Conformance in Con

‐reported Non‐Conformance

ring Consultant

mediate Safety Hazard to R

air

Bathinda Network in P

Table  4

5.8

on

Mi

N

5k

5k

d other Structures

face and Shoulders

sponse 

ers

Symbols etc)

ntenance

an Barrier Maintenance 

dry, Edge, Culvert, 

nsecutive Months

e identified by the 

oad Users Instructed 

Punjab (India) 

4‐23 : Verificatio

80 km Audit Length Start Loc

nimum Audit Length

for Each Recorded

Non ‐ Conformance

Num

Con

R

Min

L

Co

km (1km for ravelling 

or cracking or 

edgebreake)

km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

Total  Score

 

on of Audit – Sec

cation           B8        Km 9.2  

mber of Non‐

nformances 

Recorded

imum Audit 

Length A

ontractor

Number of N

Conforman

Recorded

Minimum A

Length A

MC

1 1

0 0

0 0

0 0

0 0

0 0

0 0

0 1

0 0

0 0

0 1

0 0

0 0

0 0

0 0

0 2

0 0

  61

tion B8 – Km 9.2

 to   Km 15

Non‐

nces 

d

Audit 

A

Non‐

Conformances 

Weighting 

B

Su

 

W

2

1

2

2

1

2

1

2

2

2

1

1

1

2

6

6

6

200 to Km 15.00

ub‐Weighting 

No of

Consecutive 

Weeks/Months 

C

Total Non

Conforman

Score 

A*B*C

Contracto

1 2

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

3 0

1 0

0 0

2

n‐

nce 

or

Total Non‐

Conformance 

Score 

A*B*C

MC

2 Pav

0

0

0

0

0

0

2R

0

0

1Cent

p

0

0

0

0

12

0

17

Comments

vement shoves are observed

Km 13+395 to 13+40

oadside signs were damage

maintained between km 9.

tral Verge kerbs maintenanc

ainting faded between km 9

RUS & CPM ‐ 8 & 11

   

Photo 

Reference N

d  between 

15 & 16

ed &  not 

2 to 12

17, 18 ,19 & 2

21

ce poor and 

9.2 to 1022, 23 & 24

o.

20 , 

4

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : JULY 2016

Non‐Conformance 

Relating To

RUS&CPM1 Paveme

RUS&CPM2 Unseale

RUS&CPM3 Drainag

RUS&CPM4 Routine

RUS&CPM5 Obstruc

RUS&CPM6 Inciden

RUS&CPM7 Vegetat

RUS&CPM8 Roadsid

RUS&CPM9 Raised 

RUS&CPM10 Paveme

RUS&CPM11 Traffic I

RUS&CPM12 Crash B

RUS&CPM13 Sight Ra

RUS&CPM14Marker

Distanc

Any RUS&CPM Repeat

Any RUS&CPMAny un‐

Monito

Any Road Safety

 Hazards

Any Im

for Rep

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Item Descriptio

ent Maintenance

ed Shoulder Maintenence

ge Maintenance

e Maintenance of Bridge and

ctions on the Pavement Surf

t and Emergency Works Res

tion Control

de Signs Maintenance 

Reflective Pavement Marke

ent Markings ‐ (Lines, Text, S

Island and Roundabout Mai

Barrier Maintenance 

ails, Hand Rail and Pedestria

r Posts (Guard Stones, Bound

ce Markers, Hazard)

ed Non‐Conformance in Con

‐reported Non‐Conformance

oring Consultant

mediate Safety Hazard to Ro

air

Bathinda Network in P

Table  4

5 km

onfo

N

5km

5km

d other Structures

face and Shoulders

sponse 

rs

Symbols etc)

ntenance

an Barrier Maintenance 

dry, Edge, Culvert, 

nsecutive Months

e identified by the 

oad Users Instructed 

Punjab (India) 

4‐24 : Verificatio

m Audit Length Start Locatio

Minimum Audit 

Length

or Each Recorded

on ‐ Conformance

Numb

Conf

Re

Minim

Le

Co

m (1km for ravelling 

or cracking or 

edgebreake)

m (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

Total  Score

 

on of Audit – Sec

n           B8        Km 15    to    

ber of Non‐

formances 

ecorded

mum Audit 

ength A

ntractor

Number of N

Conforman

Recorded

Minimum Au

Length A

MC

0 0

0 0

0 0

0 0

0 0

0 0

1 1

0 0

2 0

0 1

0 0

0 0

0 0

0 0

0 0

0 1

0 0

  62

tion B8 – Km 15.

Km 20

Non‐

ces 

d

udit 

A

Non‐

Conformances 

Weighting 

B

Su

 

W

2

1

2

2

1

2

1

2

2

2

1

1

1

2

6

6

6

.00 to Km 20.00

ub‐Weighting 

No of

Consecutive 

Weeks/Months 

C

Total Non

Conforman

Score 

A*B*C

Contracto

1 0

1 0

1 0

1 0

1 0

1 0

1 1

1 0

1 4

1 0

1 0

1 0

1 0

1 0

0 0

1 0

0 0

5

n‐

nce 

or

Total Non‐

Conformance 

Score 

A*B*C

MC

0

0

0

0

0

0

1

0

0During

2Cent

0

0

0

0

0

6

0

9

Comments

Vegetation found on sho

g MC Audit the missing RPM

restored between km 15 

terline Pavement marking fa

between km 15 to 16

RUS&CPM ‐ 10

   

Photo 

Reference N

ulder

Ms were found 

to 17

ded/missing 

625 & 26

No.

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : JULY 2016

Non‐Conformance 

Relating To

RUS&CPM1 Pave

RUS&CPM2 Uns

RUS&CPM3 Drai

RUS&CPM4 Rou

RUS&CPM5 Obs

RUS&CPM6 Incid

RUS&CPM7 Veg

RUS&CPM8 Roa

RUS&CPM9 Rais

RUS&CPM10 Pave

RUS&CPM11 Traf

RUS&CPM12 Cras

RUS&CPM13 Sigh

RUS&CPM14Mar

Dist

Any RUS&CPM Rep

Any RUS&CPMAny 

Mon

Any Road Safety

 Hazards

Any 

for R

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Item Desc

ement Maintenance

ealed Shoulder Maintenen

inage Maintenance

tine Maintenance of Bridge

tructions on the Pavement

dent and Emergency Works

etation Control

dside Signs Maintenance 

sed Reflective Pavement M

ement Markings ‐ (Lines, Te

ffic Island and Roundabout 

sh Barrier Maintenance 

ht Rails, Hand Rail and Pede

rker Posts (Guard Stones, B

tance Markers, Hazard)

eated Non‐Conformance in

 un‐reported Non‐Conform

nitoring Consultant

 Immediate Safety Hazard 

Repair

Bathinda Network in P

Table  4

cription

ce

e and other Structures

t Surface and Shoulders

s Response 

arkers

ext, Symbols etc)

Maintenance

estrian Barrier Maintenanc

Boundry, Edge, Culvert, 

n Consecutive Months

mance identified by the 

to Road Users Instructed 

Punjab (India) 

4‐25 : Verificatio

5 km Audit Length Start 

Minimum Audit Length

 for Each Recorded

 Non ‐ Conformance

5km (1km for ravelling 

or cracking or 

edgebreake)

5km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

ce  5km

5km

Total  Score

 

on of Audit – Sec 

Location           B8        Km 2

Number of Non‐

Conformances 

Recorded

Minimum Audit 

Length A

Contractor

Numb

Confo

Re

Minim

Le

0

0

0

0

0

0

1

0

1

0

0

0

0

0

0

0

0

  63

tion B8 – Km 20.

20   to   km 25

ber of Non‐

ormances 

ecorded

mum Audit 

ength A

MC

Non‐

Conformance

Weighting 

B

0 2

0 1

0 2

0 2

0 1

0 2

1 1

0 2

1 2

0 2

0 1

0 1

0 1

0 2

0 6

0 6

0 6

.00 to Km 25.00

es 

Sub‐Weighting 

No of

 Consecutive 

Weeks/Months 

C

T

Co

C

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0

1

0

otal Non‐

nformance 

Score 

A*B*C

ontractor

Total Non‐

Conformance

Score 

A*B*C

MC

0 0

0 0

0 0

0 0

0 0

0 0

1 1

0 0

2 2

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

3 3

Comments

Vegetation found on 

Cat eyes missing betw

to 24

   

Photo 

Reference N

shoulder

ween Km 23 

No.

TNM 

OPRC World Monthly Progre

4.4

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 22 (Ju

Audit Inspect

[Photograph N

Photo R

Photo R

Photo R

OGY AND MENT LTD.

angrur Mansa Batly 2016) 

tion’s Photog

Numbers As R

 eference No. 

 

 eference No. 

 

eference No.  

thinda Network in 

graphic Recor

Referred in Ab

Punjab (India)

rd of Non‐Co

bove Tables (

 

  

 

 

nformances

(From Table 4

Photo

Photo

Photo

 

4.10 To Table 

 o Reference N

o Reference N

o Reference N

  64

4.25)] 

No. 2 

No. 4 

No. 6 

 

 

 

TNM 

OPRC World Monthly Progre

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 22 (Ju

Photo R

Photo R

Photo Re

OGY AND MENT LTD.

angrur Mansa Batly 2016) 

 eference No. 

 

 eference No. 

 

 eference No. 

thinda Network in 

11 

Punjab (India)

 

 

 

 

Photo

Photo 

Photo 

 

 o Reference N

 Reference N

 Reference N

  65

No. 8 

o. 10 

o. 12 

 

 

 

 

TNM 

OPRC World Monthly Progre

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 22 (Ju

Photo Re

Photo Re

Photo Re

OGY AND MENT LTD.

angrur Mansa Batly 2016) 

 eference No. 

 

 eference No. 

 

 eference No. 

thinda Network in 

13 

15 

17 

Punjab (India)

 

 

 

Photo 

Photo 

Photo 

 

 Reference N

 Reference N

 Reference N

  66

o. 14 

o. 16 

o. 18 

 

 

 

 

TNM 

OPRC World Monthly Progre

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 22 (Ju

Photo Re

Photo Re

Photo Re

OGY AND MENT LTD.

angrur Mansa Batly 2016) 

 eference No. 

 

 eference No. 

 

 eference No. 

thinda Network in 

19 

21 

23 

Punjab (India)

 

 

 

 

Photo 

Photo 

Photo 

 

 Reference N

 Reference N

 Reference N

  67

o. 20 

o. 22 

o. 24 

 

 

 

 

TNM 

OPRC World Monthly Progre

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 22 (Ju

Photo Re

OGY AND MENT LTD.

angrur Mansa Batly 2016) 

 eference No. 

 

thinda Network in 

25 

Punjab (India)

 

 

 

Photo 

 

 Reference N

  68

o. 26 

 

 

TNM 

OPRC World Monthly Progre

5 ENV

5.1

5.2

SI. 

No. 

De

1  RO

wit

day

any

of 

2  Bo

Ma

3  Co

and

fac

ma

4  Co(bonowama

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 22 (Ju

VIRONME

Environmen

This  part  ofmanagementIssues relatedstaff  at  site, management

Complianceguidelines

Table  5‐

escription Act

OW Encroachm

thin five work

ys of observin

y encroachme

ROW. 

rrow Area 

anagement 

nstruction pla

d Contractor‘

cilities 

anagement 

nstruction waoth hazardoun‐hazardous aste) anagement. 

OGY AND MENT LTD.

angrur Mansa Batly 2016) 

ENTAL&S

ntalManage

f  the  report t conducted dd to functionaair  pollution

t were discus

e as per En

‐1: Complianc

tivity 

Co

ment 

king 

ng 

ent 

N

ants 

‘s  com

impl

aste s and 

Sr

thinda Network in 

OCIALMA

ement

highlights  tduring the moality of equipn  control  actsed. Observa

nvironment

ce as per Env World 

Status as Pe

ontractor’s M

Nil 

Not applicabl

All regulatormpliance obtaand adequatementation ospecific EMP

Stored, reuserecycled & so

regularly.  

Punjab (India)

ANAGEME

the  activitiesonth of July 2ment’s, healttivities,  dust tions and key

tal Perform

ironmental PBank guideli

MPR  M

Regu

requ

e.  Reco

of  b

be 

main

y ained e of site P. 

Facilplanmainwithraise

d, old 

Solid

Was

Man

as  p

Act.

Spill

othe

shou

oil c

othe

store

wast

 

ENT

s  related  to 2016.  th and safetyemission  coy issues have 

mance Indic

Performancenes 

Action Requ

Measures to b

ular  observ

uired. 

ords  of  reha

borrow area   

closed   

ntained at sit

lities  for  lant  site  shntained  in  ach  the  obsed by the MC

d  and  H

ste 

nagement  to 

per  Provision

age  of  bitu

er  hazard 

uld  be  contr

ontaminated

er  waste  sh

ed  under  h

te facility. 

 

  the  Environ

y of labour anontrol,  water been explain

cators as p

Indicators as

ired / 

be taken  

vation  is   

abilitation 

closed/to 

shall  be 

e.  

Bo

abor  and ould  be ccordance servations C  

R2

Hazardous 

Material 

be  done 

ns  of  the 

men  and 

material 

rolled  and 

d sand and 

hould  be 

hazardous 

OcnpaoPac

  69

nment  and 

d other contrand  waste  w

ned in the rep

per World

s per 

Remar

Borrow area old Camp Site

Refer  MPR  o2016. 

Organic composting  unot  maintainplastic  wastalso  dumpedorganic  wasProper  segand  disposacarried out. 

 

social 

ractor water port. 

Bank

ks  

near the e 

of  June, 

Waste unit  was ned  and te  was d  in  the ste  pit. gregation l  to  be 

TNM 

OPRC World Monthly Progre

5  Am

(AA

con

str

6  AmLevconstr

7  Reg

com

8  EnvMaPro

9  OpMaProlabduma

10  Machaarcremexccon

11  Precomdisto inccom

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 22 (Ju

mbient Air Qu

AQ) in 

nstruction 

etches. 

mbient Noise vels (ANL) in nstruction etches. 

gulatory 

mpliance. 

vironmental anagement ocess. 

perational anagement ocesses includbour deploymring routine aaintenance w

anagement ofance discoverchaeological mains at any scavated undentract. 

evention of mmunicable seases spreadnew areas ducreased mmunication

OGY AND MENT LTD.

angrur Mansa Batly 2016) 

ality  Mittakthe

sprindu

Mittake

mo

mo

Dorelic

conup

Envi

malink beeap

ding ment and ork. 

As

ma

f any ry of 

site er the 

ding ue to 

s. 

HIVcamothe

o

thinda Network in 

tigation measken for enhane AAQ by regnkling of watust suppressi

 

tigation measen for reducinnoise level &nitoring has bcarried as penitoring sche

cumentationecord keepingcenses/ permsents & renewpdated regula

EnvironmentScreening,

ironmental ImAssessment &Environmentnagement Plaspecific roaden submittedproved by cli

s per scheduleroutine and

aintenance w

Not found.

V‐AIDS awarep is conducteer measures tn regular bas

Punjab (India)

sures ncing ular er for on. 

Dust

barr

both

impr

basis

sures ng the & been er dule. 

Impr

help

Nois

gene

 and g of its/ wed/ arly. 

To b

al 

mpact & al an of ds has  and ent. 

To  b

the 

cont

notif

and 

ame

e of d work. 

Impr

prov

(Per

Equi

for 

main

worl

If  f

arch

the 

docu

ness ed and taken ses. 

Awa

be 

cont

cam

shou

they

 

t  suppres

riers and Plan

h the camp s

roved  on 

s.  

roved  planta

p  to  attenu

se 

eration.  

be complied r

be  maintaine

clauses  s

tract  agreem

fication of M

its  su

endments.  

rovement req

vision  of 

rsonal  P

ipment)  to  t

routine 

ntenance  wo

ld bank norm

found,  any 

haeological  re

project  site

umented.  

areness  camp

organized 

tract  agreem

p  site  Condo

uld be filled a

y are empty.

 

ssion  / 

ntations in 

sites  to be 

priority 

DncpiBd

ation  will 

uate  the 

pollution 

Gdb

egularly.   

ed  as  per 

setup  in 

ent & EIA 

MoEF 2006 

ubsequent 

Spowdwir 

quired  for 

PPEs 

Protective 

he  labour 

and 

ork  as  per 

ms.  

SSapwp

such  an 

emains  in 

  shall  be 

 

ps  should 

as  per 

ment.  At 

om  Boxes 

as soon as 

 

  70

Dust  barriernot  found camp site. A vplants  were in the name oBelt.  Requiredone immedi

Green  Belt developed onbasis. 

Sewage  trplant  wasoperational. water  was dumped in opwithin site.  immediate  mrequired. 

Safety Safety  shoes,and  Goggleperson  workwelding)  tprovided. 

 

rs  were in  the very few planted of Green e  to  be ately. 

to  be n priority 

reatment s  not 

Waste directly 

pen area 

measures 

helmets, ,  Jackets es  (for ing  with to  be 

TNM 

OPRC World Monthly Progre

5.3

SI. No. 

1  Sw

2  S

3  C

4  ADH

5  CC

6  Ap

7  F

 

5.4

SI. No. 

1  Soma

2  Sane

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 22 (Ju

StatusofGe

Ta

Facilities

Separate  Driwater facility 

Security 

Creche Facilit

Availability Doctor  /  MeHelp 

Cooking  faciCanteen 

Awareness posters 

First Aid Facil

StatusofPh

T

Indicators 

olid waste anagement  

nitation etwork 

OGY AND MENT LTD.

angrur Mansa Batly 2016) 

eneralfacilit

able  5‐2 : Sta

nking  Providrinkby co

Provicamp

ty   Not R

of edical 

Detafacilitavaila

lities/  Proviin  Caother

Awarrelatecampposte

ity   First both first store

hysicalEnvir

Table  5‐3 : St

Stat

Not Mainta

Provide

thinda Network in 

tiesatContr

atus of Gener

Stat

ided.  Treatmking water  haontractor at p

ided.  Gated p sites is prov

Required.  

ils  of  nties/  local able.  

ided. Meal  faamp  site  for r camp reside

reness  posteed  to  occupp  site.  Road  sers need to be

Aid  boxes camp  sites. aid  room  wae room.  

ronmentalA

tatus of Physi

tus  Re

ained Cont

ed  Cont

Punjab (India)

ractorCamp

al facilities at

tus 

ment  facility as  been  provproject site.  

entry  for vided.  

earby  Meddoctors 

acility  is provproject  staff ents.  

ers  are  instapation  safetysafety  awaree provided. 

are  providedAt old  campas  being  use

AspectsonS

ical Environm

 sponsibility

tractor 

tractor 

 

pSite

t Contractor 

for vided 

Regulasystem

both  Providpoint regula

The operafacilitylabou

dical are 

Agreehospitof  thmedic

vided and 

‐  

alled y  at eness 

More installof the

d  at p  site ed  as 

First  APlacembox mshall used f

Site

mental Aspect

A

Segregatiomaintainepit was usUrgent att

‐ 

 

Camp Site 

Action

ar  Maintenam to be done

ding  a  Securiof  the  Campar basis. 

camp  site tors  and  drivy  is  not  requr is employed

ement may betal or medicae  Emergenccal requireme

number of aled and on  see project road

Aid  box  to ment  and  acmay  be  improbe  maintainefor any other 

ts on Site 

Action requir

on  yard ed.  Organic sed as dump atention is req

  71

n / Remarks 

nce  of  filter.  

ity  Guard  at p  to  be  main

has  the  favers  only,  thuired.    Otherd. 

e done with tal authority focy  services  aents.  

wareness poselected  junctd.  

be  managedccessibility  ooved.  Dispened  and  shoupurposes. 

red 

was  not composting area.  quired.  

 

rs  and  RO 

the  entry ntained  on 

acility  for hus  Creche rwise  local 

he nearest or facilities and  other 

sters to be tion points 

d  properly. f  First  aid sary  room uld  not  be 

Remarks 

‐ 

‐ 

TNM 

OPRC World Monthly Progre

3  Wtre

4  StoPla

1.

2.

3.

4.

5.

5  Du1. 2. 3.

6  Sa

7  Oi

8  PPLa

9  DGSta

10  Plaanca

 

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 22 (Ju

aste water eatment facil

ockyard anning 

Solid Platfor

Segregation Materials  

Layout of Ya

Ground Leveling  

Covering vehicles fine  parttransportati

ust SuppressioHaul Road  Stock Yard  Open Area Camp Site  

fety Equipme

l & Grease Tr

PEs provided tbour 

G sets adequaack  

antation insidnd around themp site  

OGY AND MENT LTD.

angrur Mansa Batly 2016) 

ity Providebut notfunctio

 

rms   ProvideDG  setother installain camp s

of  ‐  

ard  Approvlayout is  awfrom cl

Mainta

of for 

ticle on   

‐ 

on 

in 

Not mainta

ent   Partiallmainta

rap   Provide

to  Partiallmainta

ate  Provide

de e 

Not provide

thinda Network in 

ed t onal.  

Cont

 

ed  for ts  and 

ations both 

sites. 

Cont

Cont

ved plan 

waited lient.  

Cont

ained  Cont

Cont

ained Cont

ly ained. 

Cont

ed.   Cont

ly ained. 

Cont

ed   Cont

ed.  Cont

Punjab (India)

tractor 

tractor 

tractor 

tractor 

tractor 

tractor 

tractor 

tractor 

tractor 

tractor 

tractor 

tractor 

 

To  be  mfunctionalwaste  waprimary should  bePPCB requ

 

To be Mai

 

‐ 

Should be

‐ 

Dust barripriority. water spridone on re

General sabe improv

To  be  clregularly. 

ImprovemRequire program fbeen prov

‐ 

New  Saplhealthy  / available be re‐planpossible, a

 

made  operal.  Proper  trater  to  be water  teste  placed  onuirements.  

intained regu

e maintained 

iers shall be in

inkling shouldegular interva

afety measurved. 

leaned  and  

ment requiredTraining  & for use of PPvided to labou

lings  to  be  pgrowing  /  mfrom  nearbynted  in new cas immediate

  72

ational  and reatment  of done  and 

ting  facility nsite  as  per 

ularly. 

regularly. 

nstalled on 

d also be als. 

es needs to 

maintained 

d.  Awareness 

PE which has urs.  

planted  and mature  trees y  areas  may camp site,  if e measure.  

 

‐ 

 

 

 

 

 

 

 

 

 

 

 

 

TN 

OM

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

5.5 Status

Activities 

Camp Layout Plan 

Consent to Establishment (CTE) for Hot Mix Plant (Apollo) 

Consent to Operation (CTO)

for Hot Mix Plant (Apollo) 

NOC for change of Land Use 

Permission for Withdrawal of Ground Water for Construction

LOGY AND MENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

ofStatuaryCle

StatutoryAuthority

PWD, Sang

Punjab StaPollution Con

Board 

) Punjab StaPollution

Control Boa 

District TowPlanner, Bath

 

Central GroWater Boa

 

Bathinda Network in P

earancesApplic

Table  5‐4

y y 

WheRequi

rur Befo

Constru

ate ntrol 

BefoConstru

ate n ard 

BefoConstru

wn hinda 

BefoConstru

und ard 

BefoExtrac

Punjab (India) 

cableforproje

4 : Status of Statu

en ired 

Camp‐1: Khia

ore uction 

Appliedcamp seweraletter PIPL/OPdated 3

ore uction 

AppliedPIPL/OP14/010 09.2013

ore uction 

AppliedPIPL/OP14/ 24.10.2 

ore uction 

Applied16.04.2

ore ction 

AppliedOPRC/P14/007 No.908Mansa.

 

ctandCampsi

uary Clearances A

Applied 

ala Khurd Camp a

d  with  reviselayout  plan  witge  system  vid

nPRC/186/  20131.07.2013 

d  vide  letter  nPRC/PWD/  201

dated  23 

d  vide  letter  nPRC/  PWD  /201

027  date2013 

d dated 2013 

d  vide  PIPPWD/201/2013‐

Receivin3  at  DC  offic 

  73

te

Applicable for pr

Status 

Obtain

at Km. 64+050; 3

ed th de o. 13 

‐ 

o. 3‐23. 

Obtained ZO/BTI/201304.10.2013 

o. 3‐ed 

Obtained ZO/BTI/WPCdated  19.1/APC/2013/19.12.2013 

Obtained 997DTP(B)/517.04.2013 

L/ 

ng ce 

In  process (letter  no2015)  has office  Man16341) date

roject and Camp

ed / Approved 

3KM LHS 

vide  NOC 3/  NOC  ‐110  da

vide  NOC C/  2013  /F‐112.2013  &  ZO//  F‐  148  da

vide  letter 55  da

Gentle  remin.  PIPL/OPRC/6been  given  to nsa  (receiving ed on 30.07.2015

p site 

Expiry Da

NA 

No. ted 

03.10.20 

No. 164 /BTI ted 

30.06.20 

no. ted  NA 

der 18/ DC no. 

NA  

ate  Rem

14  Renewrequired abeen es

16  Not in udemo

Extractiofrom localbore wellpaymen

   

marks 

 

wal is not as plant has tablished 

use; to be obilized 

 

n of water lly available l owner on nt mode. 

TN 

OM

C

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

Installation of Generators 

Explosive License for 

Storing Fuel Oil, Lubricants, 

Diesel, etc. at Construction 

Camp 

Camp‐2: Khiala K

Camp Layout Plan 

Consent to Establishment 

(CTE) for Hot Mix 

Plant (Linhoff) 

Consent to Operation (CTO)

for Hot Mix Plant (Linhoff) 

Storage Handling and Transport of Hazardous Materials 

LOGY AND MENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Punjab ElectricityBoard 

Chief Cont.Explosive

Kalan Camp at K

PWD, Sang

Punjab StaPollution Con

Board 

) Punjab Sta

Pollution ConBoard 

Punjab StaPollution Con

Board 

Bathinda Network in P

y Befo

Installa

. of es 

BefoInstalla

M. 61+600; 0.3K

rur Befo

Constru

ate ntrol 

BefoConstru

ate ntrol 

BefoConstru

ate ntrol 

BefoConstru

Punjab (India) 

ore ation 

Applied2014 ‐ 123.04.2 

ore ation 

Applied2014‐ 122.04.2

KM RHS 

ore uction 

Appliedlayout seweraletter n/2014 d

ore uction 

Applied10830929.03.1

ore uction 

Applied130825dated 1

ore uction 

AppliedID no. 111.06.2

 

d  PIPL/ADMIN15/078 dated 2015 

d  PIPL/ADMIN15/018 dated 2015 

d  revised  camplan  wit

ge  system  vidno. PIPL/OPRC/40dated 09.09.2014

d ID Nos. 96 dated 1014 

d ID Nos. 53 and 130818816.05.1014 

d application 1421038 dated 2014 

  74

N/ Obtained  vdated 27.04

N/  Obtained P/NC/PB/14dated 22.04

mp th de 08 4 

‐ 

Obtained vidZO/BTI/2014dated 17.04

Obtained vidZO/BTI/WPCZO/BTI/APC21.05.2014 

Obtained HWM/MMSdated 28.08

ide  memo  00074.2015 

vide 4/4153  (P31704.2015 

de NOC No. 4/ NOC ‐123 4.2014 

de NOC No. C/  2014/F‐180 /2014 /F‐163 da

vide  letter S‐2014/16826448.2014 

760 10.04.20

no. 010)  31.12.20

NA 

16.04.20

& ted 

30.06.20

no. 27.08.20

17 

17 

15 Renew

required abeen es

19 Indus

R14MNS

15 Applied fo

(Applic3467

   

 

 

 

wal is not as plant has tablished 

stry ID S1083075 

or renewal cation ID 7370) 

TN 

OM

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

Installation of Generators 

 

Permission for Withdrawal of Ground Water for Construction

 

Registration of Vehicles & RoadEquipments 

PUC of all Vehicles/ Machinery 

Labour license 

Labour License 

Sand Mining 

Quarry for Aggregates 

Debris Disposal Sites 

LOGY AND MENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Punjab ElectricityBoard 

 

Central GroWater Boa

 Motor VehiDepartme

Motor VehiDepartme

Labour Commission

Sangrur 

Labour Commission

Bathinda

Dept. of Geo.Mining 

Dept. of Geo.Mining 

Gram Panch

Bathinda Network in P

y Befo

installa

und ard 

BefoExtrac

icle nt 

Befoconstru

icle nt 

Befooperat

ner  ‐

ner, a 

. And  Befooperat

. And  Befooperat

ayat Befo

Operat

Punjab (India) 

ore ation 

Applied2014‐1523.04.2

ore ction 

AppliedOPRC/P14/007 No.908Mansa.

ore uction 

Applied

ore ional 

Applied

Appliedletter PIPL/AD15/39 d

Appliedvide PIPL/AD15/40 d

ore ional 

‐ 

ore ional 

‐ 

ore tional 

AppliedPIPL/OPdated 0

 

d  PIPL/ADMIN5/078  date2015 

d  vide  PIPPWD/201/2013‐

Receivin4  at  DC  offic 

Other Clear

d various date 

d various date 

d  for  renewal  vidn

DMIN/2014‐ dated 15.12.2014

d for renewed letter  n

DMIN/2014‐ dated 15.12. 201

d  vide  letter  nPRC/  101/20102.05.2015 

  75

N/ ed 

Obtained vid000761 date

L/ 

ng ce 

In  process (letter  no2015)  has office  Man16341) date

rances 

Obtained 

Various date

de o. 

Obtained  v563  dated labours 

o. 

Obtained  vi20/2013  da50 labours 

‐ 

‐ 

o. 13   

de memo ed 27.04.2015 

Gentle  remin.  PIPL/OPRC/6been  given  to nsa  (receiving ed on 30.07.2015

es 

ide  License  no.‐19.02.2013  for  1

ide  License  no.  ‐ted  06.05.2013 

10.04.20

der 18/ DC no. 

NA  

Various da

Various da

‐  L‐100  31.12.20

‐  L‐for   

NA 

NA 

NA 

17 

Extractiofrom localbore wellpaymen

ates Engaged

pro

ates Engaged

pro

16  Applied fo

Not Appprocur

existing sa

Not Appprocur

existing sa

Ch. 6+300road. Not debris be

   

 

n of water lly available l owner on nt mode. 

d for OPRC oject 

d for OPRC oject 

or renewal. 

‐ 

plicable as red from and quarry 

plicable as red from and quarry 

0 R/S on S‐2 required as ing reused. 

TN 

OM

T

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

Canal Water Permission 

Forest Clearance

5.6 Future

Following key iss

1. Air pollu

2. Air pollu

3. Waste ha

4. Safety pr

These are the ke

issues may be re

LOGY AND MENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

IrrigationDepartme

e Forest 

Departme

ekeyissuesas

sues may arise du

tion from Hot M

tion from road c

andling and man

ractices during ro

ey potential issue

solved and mana

Bathinda Network in P

n nt 

nt Befo

Operat

reviewedfrom

uring future cons

ix Plant operatio

onstruction work

nagement during 

oad construction

es that may arise 

aged if good envi

Punjab (India) 

Applieddated 0

ore tional 

Various

mtheworkspro

struction work as

on. 

k. 

road constructio

n.  

during further ro

ironmental pract

 

d for renewal 06.10.2015 

s dates for differe

ogrammeandw

s there may be ch

on.  

oad construction

tices and environ

  76

Renewed  vreceipt  no01.10.2015 

ent Sections 

workmethod

hange in scenario

n work and chang

nmental managem

vide  serial  no. o.  110485  da

o in the working 

ge in working me

ment plan to be 

Z, ted  31.03.20

NA 

method and wor

ethod and workin

implemented. 

16  Applied fo

Applicatioclearances

by PSan

rking program. 

ng program. How

   

or renewal 

on for forest s submitted PWD, ngrur 

wever, these 

TN 

OM

6

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

6 ROADSA

6.1 Introd

This se

Safe an

practic

The Sec

by the 

6.2 Crash

Crash a

Contra

The pr

Month

Table 6

LOGY AND MENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

AFETYAND

duction

ction presents th

nd efficient netw

es in accordance

ction also contai

World Bank Team

Records

analysis is presen

ctor. The fatal cr

incipal data sour

ly Progress Repo

6‐1 gives the sna

Bathinda Network in P

TRAFFICMA

he road safety pe

work are the prim

e with the provisi

ns recommendat

m Leader.   

nted by using cra

rashes are verifie

rce  for this  repo

orts (MPRs). The d

pshot of total cra

Punjab (India) 

ANAGEMEN

erformance of th

me aims of the O

ions of the contra

tions based on c

ash records from

ed with the police

ort was the Road

data format is pr

ashes on the OPR

 

T

e network in term

OPRC project. MC

act ‐ to ensure th

ontinuous road s

m the years 2013

e records for auth

d Crash database

rogressively bein

RC network year 

  77

ms of crash recor

C is making all ef

hat the Contracto

safety assessmen

3 to present (July

henticity. 

e maintained by 

g improved to pr

wise. 

rds and findings 

fforts with the he

or builds and ope

nt being carried o

y 2016). The info

M/s PIPL and su

rovide meaningfu

of the road safet

elp standards, sp

erates safer road

out by the Monit

ormation is extra

ubmitted to Mon

ul details. 

ty audit.  

pecifications, gui

s. 

toring Consultant

acted from the M

nitoring Consulta

   

delines and 

t as desired 

MPRs of the 

ant  through 

TN 

OM

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

Table 6

 

LOGY AND MENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Sr. No.  Road

Total 

6‐2 gives the sna

Sr. No.  Road

Total 

Bathinda Network in P

d Name MaN

S1 

S2 

S3 

S4 

S5 

B8 

pshot of total fat

d Name MaN

S1 

S2 

S3 

S4 

S5 

B8 

Punjab (India) 

Table 6‐1: OPRC

ar. 2013 to Nov. 2013 

59 

81

talities on the OP

Table 6‐2: OPR

Tota

ar. 2013 to ov. 2013 

13 

23 

 

C Network Crash

Dec. 2013 to Nov.2014 

78 

86

PRC network yea

RC Network Fatal

al Fatalities 

Dec. 2013 to Nov.2014 

15 

  78

h Details (Up To J

Dec. 2014 toNov. 2015 

71 

98 

r wise. 

lities Details (Up

on Network

Dec. 2014 toNov. 2015 

July 2016) 

o  Dec. 201Nov. 20

50

64

p to July 2016) 

o  Dec. 201Nov. 20

15

18

15 to 016 

Total 

2

3

15 to 016 

To

4

Crashes 

19 

258 

17 

10 

10 

15 

329

otal 

44 

10 

64 

   

TN 

OM

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

6.3 Crash

The aim of 

first report

history, the

There w

There w

S2 sect

65% of

Figure   

11.

LOGY AND MENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Analysis

this crash analys

ted by the contra

e identification o

were 329 crashes

were 64 fatalities

tion accounted fo

f crashes were at

6‐1 to Figure 6‐1

3

106.13

3

44

S1 S2

Length

Section Le

Bathinda Network in P

sis is to examine 

actor.  There are

f any trend will a

s reported from 

s from March 20

or most crashes (

tributed to spee

11 depict various

Figure 6‐1: O

7.29 24.971

S3 S4

h v Fataliti

ength (L) Fataliti

Punjab (India) 

the crash history

 many factors w

assist in developi

March 2013 to Ju

13 to July 2016.

(258) and most fa

ding and overtak

 attributes of cra

OPRC Network –

25.34 281 5

S5

ies

es (F)

 

y and trends in th

hich contribute t

ng strategies to d

uly 2016. 

atalities (44). 

king. 35% of cras

ash statistics. 

 

– Section Length 

  

8.65 10

B8

  79

he occurrence of

to the occurrenc

decrease the num

hes were single v

v Number of Fat

0.08

S1

f these crashes si

ce of road crashe

mber of road cra

vehicle – leaving 

talities & Fatality

0.12

0.04

S2 S3

Fatality

Fatality Ra

nce April 2013 w

es. Although it’s a

shes.  

the carriageway

y Rates 

0.01

0.06

S4 S5

y Rates

ate/Year (F)

when the crash re

a very short peri

y. 

0.100.09

B8 AVERAG

   

ecords were 

iod of crash 

 

E

TN 

OM

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

19 1

S1

LOGY AND MENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

258

111.3

106.13

1 S2

Length 

Total Crashes (C)

Bathinda Network in P

Figure 6‐2

17 107.29 24.97

S3 S4

v Crashes

) Section Lengt

Punjab (India) 

: OPRC Network

10 1525.34 28.6

S5 B8

h (L)

 

     

 

k – Section Lengt

       

65

  80

h v Number of C

0.49

0.7

S1 S

Crashes & Crash R

710.68

2 S3

Crash R

Crash Rate

Rates 

0.12 0.12

S4 S5

Rates

e/year(R)

0.15

0.47

B8 AVERA

   

 

7

AGE

TN 

OM

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

6.4 Trend

Total 8

There w

Total n

The tot

LOGY AND MENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

inCrashes

8 crashes were re

were 2 fatal cras

umber of fataliti

tal number of cra

Bathinda Network in P

Figure 

eported on the ne

hes, resulting in 

es in the 4th Year

ashes this year (6

T

Punjab (India) 

6‐3: OPRC Netw

etwork for report

2 fatalities (S2 Ro

r stands at 18 wh

64) is down by 10

329

2

TOTAL SPE

Speedi

 

   

work – Speeding &

ting month of Ju

oad). 

hich is more than

0, compared to th

213

6

EDING PERC

ng & Align

  81

& Alignment as F

ly 2016 (All on S2

n twice compared

he number of cra

5

115

CENT  RUN‐O

nment as F

Factors in Crashe

2 Road)  

d to total fatalitie

ashes same time 

5

35

OFF PERCEN

Factors

es 

es last year (8). 

previous year (7

NT

74). 

   

TN 

OM

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

23

1ST YEAR

LOGY AND MENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

15

2ND YEA

Toatl Fata

Bathinda Network in P

F

8

R 3RD YE

alities ‐ Yea

135

1

Punjab (India) 

Figure 6‐4: OPRC

Figure 6

1

EAR 4TH 

ar Wise

23

3950

11

2332

2 3 4

Total Cra

 

 

C Network – OPR 

6‐5 : OPRC Netw

18

YEAR

059 63

6

240

495

5 6

shes This Y

Third Year

  82

RC Network – Fat

work – Crash Tren

13

1

S2 Se

6874

81

5664

7 8 9

Year v Last

Fourth Year

tality Trend 

nd 

9

2

ection Fat

8793

98

10 11 12

t Year

 

7

3

alities ‐ Ye

15

4

ear Wise

   

TN 

OM

 

  

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

6.5 RoadS

Road s

treatm

work‐s

Safety 

6.6 RoadS

Head o

establis

The ma

(mobile

The mo

and un

the inte

The gre

While t

urgent 

LOGY AND MENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Cras

Fata

SafetyAudit

afety audit is a p

ent approaches 

ites, is carried o

Audits, IRC Code

SafetyAuditFin

on crashes, crash

sh possible trend

ain behavioural f

e phone use whil

ost significant ris

nsafe (helmet) dr

ersections, inade

eatest risks are fo

the total numbe

speed managem

Bathinda Network in P

  Dec  Jan

shes  5  6

lities  0  0

powerful tool for

such as black sp

ut by MC along 

es and in accorda

ndings

hing  into slow m

ds in road user be

factor continues 

le driving), drivin

sks relate to unsa

rivers/passengers

equate clear zone

or pedestrians, c

er of crashes hav

ment measures.

Punjab (India) 

 Table 6‐3: OP

Crashes

n  Feb  Mar 

12  9 

10  1 

r improving the s

pot treatments w

with monthly ne

nce with the prin

moving vehicle an

ehaviours and de

to be excessive 

ng while intoxicat

afe overtaking op

s, stray animals, 

es, hazards in cle

yclists and vehic

ve come down, t

 

PRC Network – S

s 4th Year (Dec. 2

Apr  May  Jun

8  9  7

2  3  0

safety of the roa

which is also part

etwork performa

nciples of ‘Safe Sy

nd vehicle  leavin

eficiencies in road

speed with resp

ted or under the 

pportunities, illeg

poor road work

ear zones, inadeq

les involved in ov

he number of fa

  83

Summary of Cras

2015 to Nov. 201

ne  July  Aug 

8   

2   

ad network in a p

 of this contract

ance audit in acc

ystem Approach

ng the carriagew

d safety.  

pect to prevailing

influence of drug

gal parking, un‐ro

k practices, poor 

quate delineation

vertaking manoe

atalities on OPRC

sh Statistics 

16) 

Sep  Oct 

   

   

proactive manne

. Road Safety Au

cordance with Au

’.  

ay are predomin

g conditions, lack

gs. 

oadworthy and o

facilities for vuln

n and signposting

euvres 

C Network have r

Nov   

  64 

  18 

er. It complemen

udit which also in

ustralia’s Guide t

nantly  reflected 

k of driver conce

overloaded vehic

nerable road use

g.  

risen sharply fro

ts more tradition

ncludes road safe

to Road Safety P

in crashes. MC h

entration, driver 

les, unrestrained

ers, lack of traffic

m 8 to 18, callin

   

nal reactive 

ety audit of 

Part 6: Road 

has tried  to 

inattention 

d (seat belt) 

c control at 

ng for some 

TN 

OM

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

6.7 RoadS

The mo

Withou

Police t

Preven

Speed 

Improv

Improv

To sup

Contra

continu

Employ

Institut

Safety 

6.8 WayF

MC has

MC has

Keepin

 

 

 

 

 

 

 

LOGY AND MENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

SafetyStrategie

ost  important  st

ut this it will be d

to help educate d

nt driving under t

Zoning and Traff

vement of junctio

vement of curve 

port the safe roa

ctors to ensure c

uously improve im

y Smart Technolo

tional arrangeme

Engineers. 

orward

s conducted train

s introduced stric

g in view the fac

Bathinda Network in P

es

trategy  to  reduce

difficult to lower 

drivers to comply

he influence of a

fic Calming Meas

ons and intersect

delineation with 

ad system concep

compliance to IR

mplementation. 

ogy – VMS, Speed

ents for technica

ning sessions for 

ct compliance of 

tors and issues id

Punjab (India) 

e  crashes on OP

crash rates as th

y with the rules, 

alcohol and enfor

ures on roads pa

tion delineation a

enhanced signag

pt, a strategic app

RC SP ‐55, quality

 

d Camera, Social 

l skills developm

the contractor o

traffic control an

dentified in Secti

 

PRC network  is  t

e majority of the

as well as enforc

rcement of seatb

assing through to

and signposting.

ge and crash bar

proach is needed

y of implementat

Media to achiev

ment by holding w

on ‘Safe System A

nd TMP at work s

ion 6.7, MC will a

  84

owards  speed  co

e crashes are due

cement. 

belt and helmet u

owns and villages

riers. 

d to make roadsid

tion in and aroun

ve sustainable ch

workshops, traini

Approach’, ‘Speed

sites and use of p

assist the client in

ontrol  through  e

e to excessive spe

use. 

s. 

de environment 

nd road worksite

ange in road safe

ing courses for st

d Zoning Guidelin

personal protect

n developing the

enforcement  and

eed. 

more forgiving.  

es by training the

ety.  

takeholders ‐ Co

nes ‘and ‘Enhance

ion equipment (P

eir road safety str

d/or engineering

 

eir road safety e

ntractor, Counci

ed Curve Delinea

PPE) for workers

rategies in Punjab

   

g measures. 

ngineers to 

ls and Road 

ation’. 

b. 

TN 

OM

  

 

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

6.9 Distrib

LOGY AND MENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

butionoffatalc

Bathinda Network in P

crashesintheO

Punjab (India) 

OPRCnetwork

Figure 6‐6

 

6 : Fatal Crash Lo   

  85

cations at Sectio

on S1 

 

   

TN 

OM

 

 

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

LOGY AND MENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Bathinda Network in PPunjab (India) 

Figure 6‐7

 

7 : Fatal Crash Lo

  86

cations at Sectio

on S2 

   

 

TN 

OM

 

 

  

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

LOGY AND MENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Bathinda Network in PPunjab (India) 

Figure 6‐8

 

  

 8 : Fatal Crash Lo

   

  87

cations at Sectio

on S3 

 

   

TN 

OM

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

LOGY AND MENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Bathinda Network in PPunjab (India) 

Figure 6‐9

 

 

     

9 : Fatal Crash Lo     

  88

cations at Sectio

on S4 

   

TN 

OM

 

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

LOGY AND MENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Bathinda Network in PPunjab (India) 

Figure 6‐10

 

 

  

0 : Fatal Crash Lo       

  89

ocations at Sectio

on S5 

   

TN 

OM

 

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

LOGY AND MENT LTD.

ect for Sangrur Mansa No 22 (July 2016) 

Bathinda Network in PPunjab (India) 

Figure 6‐11

 

 

   

1 : Fatal Crash Lo

  90

ocations at Sectio

on B8 

   

TNM TM 

OPRC WorlMonthly Pro

7 CO

7.1

7.1

SI. No. 

1. 

2. 

3. 

4. 

5. 

6. 

7. 

8. 

9. 

7.1

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 22

ONTRACT

Contract’s

1.1 KeySta

Table  7

Road Mana

Road AssetManager 

Senior Site 

Site Engine

Site Engine

ConformanUnit 

Material En

Contract Fi

Plant & Equ

1.2 KeySta

SI. No. 

1.  D(H

2.  MSy

3.  BrEn

4.  RoMCo

5.  EnSp

6.  So

Y AND NT LTD.

or Sangrur Mansa (July 2016) 

TOR’SSTA

sStaffaspe

affofLead

‐1: Contract

Position 

ager 

t Manager/R

Engineer 

eer (Construc

eer (Mainten

nce Managem

ngineer 

nancial Man

uipment Eng

affPresent

Table  7‐2

Position

esign EngineHighways) 

Management ystem/IT Ma

ridge ngineer/Con

oad Safety Management/onsultant 

nvironment pecialist  

ocial Speciali

a Bathinda Netwo

AFFAND

erContract

Contractor

or’s Key Staf

N

isk 

ction)

ance) 

ment 

nager 

gineer

tatSiteinJu

2: Key Staff o

n E

eer 

nager 

sultant 

/Design 

ist 

ork in Punjab (Ind

DCONSTR

tAgreemen

rPresentat

ff as per Con

Numbers

1  M

1  Ja

1  Pu

2 YoPa

Ch

2  Pa

Ra

1  Se

1  Sa

1  Pr

1 R 

uly2016

of Profession

New Profengineering C

Staf

Ziauddin A

Gopal K

Rashid N

Dhanraj N

Manoj K

Minati S

dia) 

RUCTION

nt

tSiteinthe

ntract Agree

Name of Pe

Mukesh Kuma

askarn Singh

ushpraj Singh

ogender Natandey 

hinu Singla

ankaj Kumar

akesh Kumar

ewak Singh S

anjay Pandey

raveen Kaha

K Singh

nal Engineer

essional Consultant ff 

A Khan 

hatri 

Najfi 

Nagdev 

umar

Sinha

EQUIPM

emonthofJ

ment and Pr

erson  M

ar 

A

r

Sidhu 

ing Consulta

MonitoriR

The MonitConsultantthe Contrapresence oaddress vasafety and vide TNM LTNM/OPRCdated 25 Juof the PEC have met tdiscuss the

   

MENTS

July2016

resent at Site

Monitoring CRema

Full T

Acting as Billials

Full T

Full T

Full T

Full T

Full T

Full T

Full T

Full T

Full T

ant 

ing Consultaemarks 

oring t has notifiedactor to ensuof PEC team trious road other issuesLetter numbC/505/2016 uly 2016. Mateam membthe MC to e issues. 

91 

Consultant arks 

Time 

ng Engineer o 

Time 

Time

Time

Time 

Time

Time 

Time 

Time 

Time

ant 

d ure to 

s er 

any bers 

 

SN

TNM TM 

OPRC WorlMonthly Pro

7.2

Sl. No. 

Eq

1  Hot M

2  WMM

3  Paver with se(Bitum

4  Hydrau

5  Backho

6  Motor

7  Loader

8  Paver for WM

9  Contrarespon

10  ContraInspecand Di

11  Vibrato

12  Pneum

13  Tipper

14  Water

15  Pavem

16  Bitume

17  Power

18  Falling(Pavemtesting

19  CalibraProfilo

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 22

Contracto

Table  7

quipment TyCharacteris

ix Plant (Bat

 Mixing Plan

Finisher Hydensor controminous Work

ulic Excavato

oes  

r Grader 

r  

Finisher MecMM Work 

actor’s patronse vehicles 

actor’s generction Vehicleisplacement 

ory Rollers  

matic Tyre Ro

r/Trucks  

r Tanker 

ment Marking

en Pressure 

r Broom 

g Weight Defment deflectg) 

ated Roughnometer 

Y AND NT LTD.

or Sangrur Mansa (July 2016) 

or’sConstru

7‐3: Construc

ype and stics 

ch type) 

nt 

drostatic ol s)  

ors 

chanical 

l and 

ral s (with GPS meters) 

oller 

g Plant 

Distributor 

flectometer ion 

ness 

a Bathinda Netwo

uctionEqui

ction Equipm

As PeAg

MinimumCapacity

100 TPH

60 TPH

100 TPH

1.0 m³ bucket

0.5 m³ bucket

150 kw

1.0 m³ bucket

100 TPH

 

 

8‐10 T

8‐10 T

5.5 m³

6 m³

 

 

 

 

 

ork in Punjab (Ind

ipment’sJu

ment as per C

er Contract reement 

m y 

MinimNumb

H 1

  1

H 2

2

2

  1

2

H  1

2

3

3

2

15

3

1

1

2

1

1

dia) 

uly2016

Contract Agr

Pr

mum bers 

Capa

128 T& 20TP

250 T

600 T

0.9‐1m

0.5 mbuck

120 m

1.61.7&

m

250T

8‐10

15M

5 14‐24

1200

reement/ Pr

resent at Site

city Numb

TPH00 H 

1 ea

TPH  1 

TPH 2 

1.0 3 

m³ ket 

m3/h  3 

6‐&2.4 3 

TPH  1 

0 T  4 

MT  1 

4 m3 33

00L  4 

   

resent at Site

bers 

ach 

Submarkma

a

92 

Remarks

 

 

 

 

 

 

 

 

 

 

let the pavemking work anade the in‐hoarrangement

 

 

 

 

ment d also ouse ts 

TNM TM 

OPRC WorlMonthly Pro

7.3

SI No. 

10 

11 

7.4

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 22

Contracto

P

Road Mana

CMU, Team

Field Engin

HR& Adm. 

Road Asset

Plant & Eq

Contract Fi

Road Safet

Billing/QS 

Quality Con

Reviewof

Monitoringthe Contrareplaced ssubmitted credentialsnot  in  accobservatio

In  Contracworking asIt  is  very Manager aConsultant   

Y AND NT LTD.

or Sangrur Mansa (July 2016) 

or’sStaffPr

Table  7‐4

Position  

ager 

m Leader 

neer 

t Manager 

uipment Eng

inancial Man

ty officer 

ntrol In‐char

fContracto

g Consultantact Agreemeome of  its eto  the Mons and has foucordance  wons were sub

ctor’s  staff  ts Asset Manacritical  for as per the Ct of this requ

a Bathinda Netwo

resent–July

4 : Contact N

Muk

S.S.

Pank

Parv

Jask

gineer R.K.S

nager Parv

Ram

Jask

rge  Sanj

or’sStaff

t has undertnt and actuaengineers  fronitoring Consund that the

with  the  critbmitted to th

there  is  no ager and Billsuccess  of  tontract Agreuirement vid

ork in Punjab (Ind

y2016

No. of Contra 

Name of Pe

kesh Kumar

Sidhu

kaj Kumar

veen Kahar

karan Singh

Singh

veen Kahar

mesh Patil

karan Singh

jay Pandey

taken a  revieal present at om the site. sultant  for  r qualificationteria,  contaihe Employer.

permanent ing Engineerthis  project eement. Thee letter TNM

dia) 

actor’s Staff 

rson 

ew of  the Cthe site in thThe CVs of 

review.   Monns and experned  in  the  

Asset  Manar which affecthat  the  co

e ContractorM/OPRC/505/

Present at S

Contact 

8288032

8288032

8288032

8288032

8288032

8288032

8288032

8288032

8288032

8288032

ontractor’s he month of the newly anitoring Conrience of thecontract. 

ager,  one  enct the progreontractor  aphas been no/2016 dated

   

ite 

No. 

760 

757 

763 

780 

796 

782 

780 

778 

796 

753 

Key Staff  reJuly 2016. C

appointed ennsultant has e replaced enMonitoring 

ngineer  has ess of Asset Mppoints  a  fuotified by th 25 July 2016

93 

 Remarks

 

 

 

 

 

 

 

 

 

quired as peContractor hangineers werreviewed  thngineers werConsultant

dual  chargeManagemenull  time  Assehe Monitorin6. 

 

er as re he re ’s 

es nt. et ng 

TNM TM 

OPRC WorlMonthly Pro

8 PA

Thi

the

cur

Con

As 

Pav

rec

Con

8.1 D

8.1

8.2 Su

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 22

AYMENTS

s Chapter de

e Contractor'

rrent descrip

ntractor’s Pa

per  the  Gen

vement Roug

ommends  to

ntractor: 

i.

ii.

Disputesand

1.1 Claim

There  is  a

PIPL), aris

detailed i

hearings s

and 16 Ju

ummaryM

The  Summ

during the

 

Y AND NT LTD.

or Sangrur Mansa (July 2016) 

S&DISPU

escribes the 

's next paym

tion of the C

ayment – Mo

neral  Condit

ghness and P

o  the  Emplo

Provisional 

CONFORMA

Contractor h

to process t

the  absence

Monitoring 

requirement

has  failed  t

software  av

withheld. 

dClaims 

an Arbitratio

sing out price

n PCC of the

so far.  . The

ly 2016. The

an‐Hourso

mary  of  the

e Month of J

a Bathinda Netwo

UTES

recommend

ment corresp

Claims submi

onth of July,

tions  of  the

Pavement De

oyer  to  con

payment  fo

ANCES. 

has procured

he collected

e  of  the  req

Consultant 

ts.  Despite 

o  the  softw

vailable  at  th

on Case  betw

e adjustmen

e contract. T

 Arbitral Trib

 next hearing

ofMonitorin

  inputs  of  t

uly 2016 is g

ork in Punjab (Ind

dation of the

onding to th

itted by the C

 2016 

  Contract  A

eflections ha

sider  any  of

or  the  mon

d the profilo

d roughness d

quired  softw

and  therefo

Monitoring 

ware  availabl

he OPRC  site

ween Claima

t formula, co

The case is w

bunal heard 

g is schedule

ngConsulta

the  Monitor

given in Table

dia) 

 Monitoring 

he Month of 

Contractor t

Agreement  a

ave yet to be

f  the  follow

nth  of  July 

ometer at th

data has not

ware,  the  IR

ore  cannot  b

Consultant

e  at  the  pro

e,  it  is  recom

ant  (Chief  En

ontained in t

with the Arbi

the argumen

ed to be held

antTeam

ing  Consulta

e 8.1 and 8.2

Consultant 

July 2016. T

o the Client.

nd  consider

e collected, t

wing  alternat

2016  corre

e OPRC proj

t been arran

I  data  could

be  accepted

repeated  re

oject  site.  U

mmended  th

ngineer,  PW

the clause 4

itration Tribu

nts of the re

d in August 2

ant’s  team  i

2. 

   

regarding th

This Chapter

 

ring  that  the

he Monitorin

tives  for  pay

esponding  t

ject site but 

ged at the p

d  not  be  ve

d  to  fulfil  th

eminders,  th

Until  the  tim

hat  some am

WD)  and Resp

48.1 of GCC a

unal. There 

spondent’s c

2016. 

n  terms  of 

94 

he approval o

 also include

e  data  of  th

ng Consultan

yment  to  th

to  100  NON

the softwar

project site. I

erified  by  th

e  contractu

he  Contracto

e, makes  th

mount may b

pondent  (M/

and as furthe

have been 1

counsel on 1

man  –  hou

 

of 

es 

he 

nt 

he 

N‐

re 

In 

he 

al 

or 

he 

be 

/s 

er 

14 

15 

rs 

TNM TM 

OPRC WorlMonthly Pro

Sl.  No. 

Sl. No. 

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 22

Employee N

Yogendra B

‐ 

Harpreet Si

Dr. Sohan S

Dr. Vinay M

Dr. Asha Sh

Ta

Employee N

Deepak Kum

Varinder Si

Happy Sing

Neeru Bala

Rohit Jinda

Gadi Moshe

Emilia De L

Note: Only 

Y AND NT LTD.

or Sangrur Mansa (July 2016) 

Table  8‐1 : M

Name 

Bhatnagar 

ngh 

Singh Seehra 

Maitri 

arma 

ble  8‐2 : Ma

Name  D

mar  P

ngh CS

gla  AA

  S

l  H

el  S

a Ossa HE

actual work

a Bathinda Netwo

Man Hours (f

De

Project MTeam Lea

OPRC OpSpecialist

Principal 

PavemenSpecialist

Data Ana

Environm

an Hours (for

Designation

Project Engin

CAD Expert/LSurveyor

AM‐Accounts/Ad

Secretary/As

Head Clerk 

Senior Engin

Hydraulic/DrExpert

king days are

ork in Punjab (Ind

for the mont

esignation 

Manager cumader

perational t/Asset Man

Auditor

nt Design t

alyst/Statistic

mental Specia

Tota

r the month 

neer

Land 

dministrator

ssistant

eer

rainage 

TOTAL (B

e included in

dia) 

th of July 20

Man HourHom

m 1

ager

1

cian 

alist

al (A)

of July 2016

Man HoIn Hom

4

16

19

20

3

B) 6

 man hours,

016) – Key Ex

rs/Days In me Office

144/18 

‐ 

152/19 

‐ 

‐ 

16/2 

312 

6) – Non Key 

ours/Days me Office

40/5 

68/21 

92/24 

00/25

32/4 

‐ 

632 

 Holidays ar

   

xperts 

Man Hours/DaysOn Field 

64/8 

‐ 

56/7 

‐ 

40/5 

‐ 

160 

Experts 

Man Hours/DaOn Field

160/20 

40/5 

8/1 

‐ 

‐ 

‐ 

‐ 

208 

re not consid

95 

s  Total MaHours

208 

‐ 

208 

‐ 

40 

16 

472 

ys d 

TotalMan Hours

200

208

200

200

32

‐ 

840

dered 

 

an 

s

TNM TM 

OPRC WorlMonthly Pro

9 AP

9.1

9.1

9.1

9.2

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 22

PPENDIX

Minuteso

1.1 Minute

The 

in  t

Arbi

out 

argu

1.2 Minute

No d

of Ju

MECMeet

Y AND NT LTD.

or Sangrur Mansa (July 2016) 

ofMeeting

esofArbitr

Arbitral Trib

he  conferen

itration betw

price adjust

uments of th

esofDisput

dispute was 

uly 2016 

tingAgenda

a Bathinda Netwo

ralTribuna

bunal held its

nce  room  o

ween Claima

ment formu

e responden

teResoluti

raised and f

a

ork in Punjab (Ind

alMeeting

s 13th & 14t

f  the  Institu

nt (Chief En

ula, containe

nt’s counsel.

onBoard(D

forwarded to

dia) 

th Meeting o

ution  of  eng

gineer, PWD

d in the con

DRB)Meet

o DRB so DR

on 15 & 16th

gineers,  to 

D) and Respo

tract. The A

ing

B Meeting w

   

h July, 2016 i

deliberate  o

ondent (M/s

rbitral Tribu

was not held 

96 

in Chandigar

on  matter  o

 PIPL), arisin

nal heard th

in the mont

 

rh 

of 

ng 

he 

th 

TNM TM 

OPRC WorlMonthly Pro

9.3

Sl. No. 

Di

1  2

2  4

3  5

4  5

5  5

6  5/

7  5

8  5

9  8

10  10

11  12

12  12

13  12

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 22

Correspon

spatched Date 

2/7/2016 

4/7/2016 

5/7/2016 

5/7/2016 

5/7/2016 

/7 /2016 

5/7/2016 

5/7/2016 

8/7/2016 

0/7/2016 

2/7/2016 

2/7/2016 

2/7/2016 

Y AND NT LTD.

or Sangrur Mansa (July 2016) 

ndenceby

Letter

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

a Bathinda Netwo

Monitoring

Table  9‐

r No.

/474/2016

/475/2016

/476/2016

/477/2016

/478/2016

/479/2016

/480/2016

/481/2016

/482/2016

/483/2016

/484/2016

/485/2016

/486/2016

ork in Punjab (Ind

gConsultan

‐1 : Correspo

Subject

Reported CCompany S

Expenses Fand SweepProject Off

Unauthoriz

UnauthorizDumping OShoulder O

Status of MIncompletePost ConstrResult 

Regarding CFor CulvertWork On S2

Crack InvesReport Of S

ImplementSide Furnit

Reported CCamp Site 

Adjusted MResults Forof June 201

TMP For FuS1 Road at + 315 

Road SafetyDamaged G

IPC ‐ 26

dia) 

nt

ondence Sen

Crash  Near Site  

or Office Boyer at TNM ice 

zed Activities

zed ActivitiesOf Debris On Of S1 Road  

Minor  e Works  andruction Test 

Canal Closer t Widening 2 Road  

stigation S2 Road  

ation of Roaure  

Crash Near 

Monthly Audir The Month 16

ull Closure of2 + 165 to 2

y Hazard ‐Guard Fence

nt 

Sent 

Team Le

y  Team Le

s  Team Le

s  Team Le

d  Team Le

Team Le

Team Le

d  Team Le

Team Le

t  Team Le

f  

Team Le

Team Le

Team Le

   

By 

eader 

eader 

eader 

eader 

eader 

eader 

eader 

eader 

eader 

eader 

eader 

eader 

eader 

97 

Sent To

Patel infra. Pvt. Ltd 

Executive Engineer 

Executive Engineer 

Executive Engineer 

Patel infra. Pvt. Ltd 

Executive Engineer 

Patel infra. Pvt. Ltd 

Patel infra. Pvt. Ltd 

Patel infra. Pvt. Ltd 

Patel infra. Pvt. Ltd 

Patel infra. Pvt. Ltd 

Patel infra. Pvt. Ltd 

 Patel infra. Pvt. Ltd 

 

 

TNM TM 

OPRC WorlMonthly Pro

14  12

15  12

16  13

17  13

18  13

19  20

20  20

21  20

22  20

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 22

2/7/2016 

2/7/2016 

3/7/2016 

3/7/2016 

3/7/2016 

0/7/2016 

0/7/2016 

0/7/2016 

0/7/2016 

Y AND NT LTD.

or Sangrur Mansa (July 2016) 

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

a Bathinda Netwo

/487/2016

/488/2016

/489/2016

/490/2016

/491/2016

/492/2016

/493/2016

/494/2016

/495/2016

ork in Punjab (Ind

IRI Data

MPR Obserthe Month Compliance

CV of Key P

Traffic Divefor  Sangru(S1) Road aCrossing Be+ 365 to Ch

Pavement ESeehra’s Re

Variation Ofor WideninBridge at R( 5 Span 9.5Clear Span Drain CrossBhawanigaBhikhi – Ko( S2 )

Variation Ofor WideninBridge 2 SpClear & 3.6over KotlaBat RD 54 + 0250 DegreeBhawaniga–Bhikhi – K( S2 ) road

Variation Ofor WideninBridge at  R6 Span 8. 7Clear ) overCrossing BaKothamir –Sabo Road 

Variation Ofor WideninBridge 3 SpClear & 3.6over Kotla 

dia) 

rvations for April 2016 –e Report 

Personnel 

ersion Plan r –Sunam at Bypass etween Ch 2 h 2 + 550  

Expert Dr. eport 

Order No. 1 ng of ExistingD 100 + 700 50 m each ) Over Lisarasing rh – Sunam –otshamir Roa

Order No. 2 ng of Existingpan 3.50 m 60 m each c/cBeanch Cana040 (Skew ine ) rh  – Sunam 

Kotshamir 

Order No. 3 ng of ExistingRD 20 + 600 (0 m each r Lisara Drainathinda – – Talwandi (B8 )

Order No. 4 ng of Existingpan 3.00 m 60 m each C/Branch Cana

Team Le

– Team Le

Team Le

Team Le

Team Le

g     

–d 

Team Le

c l n 

Team Le

g ( 

Team Le

C al  

Team Le

   

eader 

eader  Pr

eader 

eader 

eader 

eader 

eader 

eader 

eader 

98 

Patel infra. Pvt. Ltd 

oject Directo( PRBDB ) 

Patel infra. Pvt. Ltd 

Patel infra. Pvt. Ltd 

Patel infra. Pvt. Ltd 

Patel infra. Pvt. Ltd 

Patel infra. Pvt. Ltd 

Patel infra. Pvt. Ltd 

Patel infra. Pvt. Ltd 

 

or     

TNM TM 

OPRC WorlMonthly Pro

23  20

24  20

25  20

26  20

27  20

28  21

29  21

30  21

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 22

0/7/2016 

0/7/2016 

0/7/2016 

0/7/2016 

0/7/2016 

1/7/2016 

1/7/2016 

1/7/2016 

Y AND NT LTD.

or Sangrur Mansa (July 2016) 

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

TNM/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

a Bathinda Netwo

/496/2016

/497/2016

/498/2016

/499/2016

/500/2016

/501/2016

/502/2016

/503/2016

ork in Punjab (Ind

Crossing  BSunam – BhKotshamir RD 73 + 450250 )

 

Variation ofor 4 LanninBhawanigaBhikhi – Ko( S2 ) in Bhifrom Ch 5455 + 700 

Variation ofor 4 LanninBhawanigaBhikhi – Ko( S2 ) in Chefrom Ch 3940 +700

Variation ofor 4 LanninBhawanigaBhikhi ‐ Kot( S2 ) in Mafrom Ch 8486 + 060 

SubmissionM/S PATEL InfrastructuFor the mo2016

Network inData Analy

Hindrance Wires of Eleat Ch 91 + 691 + 820 RHBhawanigaBhikhi – KoRoad   

Canal CloseWidening WBhawanigaBhikhi – Ko( S2 ) at Ch 

Submission21 for the mJune 2016

dia) 

hawanigarh hikhi – Road ( S2 ) a0 ( Stew in 

rder No. 5 ng Road of rh – Sunam –otshamir Roaikhi Town 4 + 030 to Ch

rder No. 6 ng Road of rh – Sunam –otshamir Roaeema Town 9 + 300 to Ch

rder  No. 7 ng of rh – Sunam –tshamir  Roaaur Town 4 + 030 to Ch

n of MPR of 

ure Pvt. Ltd. nth of June 

formation &sis.  

due to Stay ectric Poles 620 and Ch HS on rh – Sunam –otshamir (S2 

er for CulvertWork on rh – Sunam –otshamir Roa36 + 130

n of MPR No.month of 

– 

at 

– d 

 

Team Le

– d 

 

Team Le

– ad 

 

Team Le

Team Le

&  Team Le

– ) 

Team Le

– d 

Team Le

.  Team Le

   

eader 

eader 

eader 

eader 

eader 

eader 

eader 

eader 

99 

Patel infra. Pvt. Ltd 

Patel infra. Pvt. Ltd 

Patel infra. Pvt. Ltd 

Executive Engineer 

Patel infra. Pvt. Ltd 

Executive Engineer 

Executive Engineer 

Executive Engineer 

 

TNM TM 

OPRC WorlMonthly Pro

31  22

32  25

33  25

34  27

35  27

36  29

37  29

38  29

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 22

2/7/2016 

5/7/2016 

5/7/2016 

7/7/2016 

7/7/2016 

9/7/2016 

9/7/2016 

9/7/2016 

Y AND NT LTD.

or Sangrur Mansa (July 2016) 

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

a Bathinda Netwo

/504/2016

/505/2016

/506/2016

/507/2016

/508/2016

/509/2016

/510/2016

/511/2016

ork in Punjab (Ind

Issue RegarPersonnel o

Various CritIssues and of MEC Me

Report SouProject DireVarious Issu

Audit Resumonth of Ju

Official Corprotocol 

Invoice no.& 0042 for :1st June 20June 2016.

UnauthorizExcavation By Contractof NH 64 

Cost EstimaVariation APainting of on S2 RoadCh 26 + 410over Bridgeapprox. )

dia) 

rding Key of M/S PIPL

tical Pendingnotification eeting  

ught By ector on ues  

lts for the uly 2016 

rrespondenc

 TNM/0041 the period 016 to 30th 

zed Activity on S2 Road ting Agency 

ate for Approval for Sunam ROB

d section b/w0 ( Less Rail e 400 m 

Team Le

g  Team Le

Team Le

Team Le

e   Team Le

Team Le

Team Le

 w 

Team Le

   

eader 

eader 

eader  Pr

eader 

eader 

eader  Pr

eader 

eader 

100 

Executive Engineer 

Patel infra. Pvt. Ltd 

oject Directo

Patel infra. Pvt. Ltd 

Patel infra. Pvt. Ltd 

oject Directo

Executive Engineer 

Executive Engineer 

 

or

or 

TNM TM 

OPRC WorlMonthly Pro

9.4

Sl. No. 

D

1   1

2   1

3   4

4   4

5   4

6   4

7   7

8   8

9   9

10   11

11   8

12   12

13   14

14   12

15   18

16   18

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 22

Correspon

Date On  Letter 

/7/2016 

/7/2016 

/7/2016 

/7/2016 

/7/2016 

/7/2016 

/7/2016 

/7/2016 

/7/2016 

1/7/2016 

/7/2016 

2/7/2016 

4/7/2016 

2/7/2016 

8/7/2016 

8/7/2016 

Y AND NT LTD.

or Sangrur Mansa (July 2016) 

ndenceRec

Letter

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

Endst. n

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

a Bathinda Netwo

ceived

Table  9‐2 

r No. 

/922/2016 

/923/2016 

/925/2016 

/926/2016 

/927/2016 

/928/2016 

/930/2016 

/931/2016 

/932/2016

/935/2016 

o. 1103 

/936/2016 

/938/2016 

/937/2016 

/939/2016 

/940/2016 

ork in Punjab (Ind

: Correspond

IPC‐26 

Complianc19 for the 

Canal Clos

SubmissioDrawing S36+130

Site observ2016 RoadManagem

Submissioperformanreport of J

Submissiofor variatiopainting o

Reported dkm 9‐10 R

Submissiokey person

Reported c

Withheld aincomplet

Status of mworks andTest result

Regardingfor the mo

TMP for furoad at ch

Adjusted mresults for2016

Canal  Clos

dia) 

dence Receiv

Subject 

ce of Mc’s Mmonth of Ap

ser 

n of construlab Culvert a

vation 29th Jd safety and ent 

n of networknce InspectioJune 2016

n of cost eston approval f ROB Sunam

damage to MHS S1 road

n of qualificanal

crash near c

amount for me balance st

minor incomd post constrts.

 submission onth of June 

ull Road closu. 2+165 to 2+

monthly Audr the month o

ser 

ved 

PR no. pril 2016 

ction at ch 

une Traffic 

k on 

timation for m

MBCB 

ation of 

amp site 

minor atus plete uction 

of MPR 2016 

ure of S2 +315 dit of June 

   

Received Date 

1/7/2016 

4/7/2016 

4/7/2016 

4/7/2016 

4/7/2016 

5/7/2016 

8/7/2016 

8/7/2016 

11/7/2016

11/7/2016

12/7/2016

14/7/2016

14/7/2016

14/7/2016

19/7/2016

19/7/2016

101 

Rema

Recei

Recei

Recei

Recei

Recei

Recei

Recei

Recei

6  Recei

6  Recei

6  Recei

6  Recei

6  Recei

6  Recei

6  Recei

6  Recei

 

arks 

ved 

ved 

ved 

ved 

ved 

ved 

ved 

ved 

ved 

ved 

ved 

ved 

ved 

ved 

ved 

ved 

TNM TM 

OPRC WorlMonthly Pro

17   18

18   18

19   18

20   25

21   25

22   25

23   25

24   27

25   29

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 22

8/7/2016 

8/7/2016 

8/7/2016 

5/7/2016 

5/7/2016 

5/7/2016 

5/7/2016 

7/7/2016 

9/7/2016 

Y AND NT LTD.

or Sangrur Mansa (July 2016) 

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

PIPL/OPRC/

No. 1

a Bathinda Netwo

/941/2016 

/942/2016 

/943/2016 

/945/2016 

/946/2016 

/947/2016 

/948/2016 

/949/2016 

1335 

ork in Punjab (Ind

Hindrance28+400 to

Hindrancech. 91+620RHS on S2

Submissiofor Improvjunction o

Submissiofor 4th yea

Submissiofor 4th yea

Traffic MaC/D worksat ch 26+1

Submissiodrawing sl26+150

UnauthoriExcavationcontractin

Regardingculvert on34.680 

dia) 

e due to utilit 45+200 on S

e due to stay 0 LHS and 91 road 

n of typical dvement of mn OPRC Netw

n of plan andr work progr

n of plan andr work progr

nagement Ps in Sunam fo150 

n of construab culvert at

zed activity:n on S2 road ng Agency of 

 900m dia ne S2 road at R

ties Ch. S2 road

wire at 1+820 

drawings minor work

d profile ramme 

d profile ramme 

lan of our lane 

ction t ch. 

 by NH 64

ew RD 

   

19/7/2016

19/7/2016

19/7/2016

28/7/2016

28/7/2016

28/7/2016

28/7/2016

28/7/2016

30/7/2016

102 

6  Recei

6  Recei

6  Recei

6  Recei

6  Recei

6  Recei

6  Recei

6  Recei

6  Recei

 

ved 

ved 

ved 

ved 

ved 

ved 

ved 

ved 

ved