Page 1: Pre-Application Consultation Report

September2017zanderplanning.co.uk 1

Pre-ApplicationConsultationReport

ProposedMixedBusinessandResidential ScotlandStreet,Glasgow

Zephyr(ScotlandSt)Ltd

September2017

Page 2: Pre-Application Consultation Report

September2017zanderplanning.co.uk 2

Date: 8Sept2017Version: Final

Authorisedby:

Page 3: Pre-Application Consultation Report

Zephyr(ScotlandSt)Ltd Contents

September2017zanderplanning.co.uk 3

CONTENTS

1. Introduction .............................................................................................................. 4

2. OverviewofthePre-ApplicationConsultation ........................................................... 5

3. PublicFeedback......................................................................................................... 8

4. Conclusions .............................................................................................................10

Appendices

Appendix1 LocationPlan

Appendix2 CopyofPANacknowledgement

Appendix3 CopyofPublicNotice

Page 4: Pre-Application Consultation Report

Zephyr(ScotlandSt)Ltd ScotlandStreet,Glasgow

September2017zanderplanning.co.uk 4

1. Introduction

1.1 Zephyr(ScotlandSt)LtdhasappointedZanderPlanningLtdasPlanningConsultantstoacton

their behalf in respect of the proposed mixed use development to include alterations,

demolitionsandchangeofuseofexistingbuildingstobusinessspace/restaurant/caféuseand

residential and small scale retail/restaurant/café development (in principle) together with

access,parking,landscapingandengineering/infrastructureworks.

1.2 TheproposeddevelopmentwillrepresentamajordevelopmentandaProposalofApplication

Notice(PAN)waslodgedon29June2017(reference17/01647/DC).

1.3 Theapplicationsiteboundaryisshowninappendix1.

1.4 In this regard the PAN proposed a consultation event on the 26 August 2017.

AcknowledgementofthePANisenclosedinAppendix2.

1.5 This document includes an overview of the pre-application consultation undertaken by our

clientand includesdetailsof thepre-applicationconsultationevent,whichtookplaceon26

August2017.Thisreportalsoprovidesananalysisoftheresponsesreceived.

1.6 Thisreportcomprisesthefollowingsections:-

• Section2:Overviewofthepre-applicationconsultation;

• Section3:PublicFeedback-Analysisofkeyissuesraised;and

• Section4:Conclusion

Page 5: Pre-Application Consultation Report

Zephyr(ScotlandSt)Ltd ScotlandStreet,Glasgow

September2017zanderplanning.co.uk 5

2. OverviewofthePre-ApplicationConsultation

2.1 ThePlanningetc. (Scotland)Act 2006 recognises the importanceof consulting communities

andstakeholdersonplanningproposals.

2.2 As‘bestpractice’ourclienthasembracedthecommunityconsultationproceduresassetout

in the Town and Country Planning (Development Management Procedure) (Scotland)

Regulations2013.Inundertakingcommunityconsultation,ourclienthassoughttofollowthe

guidance set out in PlanningAdviceNote 3/2010 - Community Engagement, bymaking the

consultationprocessinclusive,openandaccessibletoeveryone.

2.3 Theminimumrequirementassetout in the legislation isaperiodofconsultation lasting12

weeksfromthesubmissionofthePANtotheCouncil.Thecommunityconsultationmustasa

minimum:

a) Informcommunitycouncilsoftheproposal;

b) Hostapubliceventtoallowawiderpublicaudiencetoviewtheproposalsandmaketheir

viewsknownaheadofthesubmissionoftheplanningapplication;and

c) Theeventhastobeadvertisedinalocalpaperatleast7daysinadvance.

2.4 From the outset, our clientwas keen to liaisewith asmany relevantmembers of the local

community as possible and has taken various steps to meet with local businesses, ward

councillorsandlocalcommunitycouncilstoexplaintheproposalsonaonetoonebasis.

2.5 Thissectionofthereportsetsoutthekeystepsofthepublicconsultation.

InitialNotification

2.6 To comply with the regulations, a copy of the PAN was sent to Kinning Park Community

Council and the adjoining Laurieston, Anderston, Ibrox and Cessnock and Pollockshields

CommunityCouncilsatthesametimethePANwaslodgedwithGlasgowCityCouncil.Atthe

same time an offer was made to the Community Councils if they wished the applicant to

attendandpresenttheproposalatoneoftheirmeetings.

Page 6: Pre-Application Consultation Report

Zephyr(ScotlandSt)Ltd ScotlandStreet,Glasgow

September2017zanderplanning.co.uk 6

2.7 Acopyof thePANwas also sent toeachof theGovanward councillorswith theofferof a

previewsession.Issuedtothefollowing:-

CllrBell

CllrYoung

CllrDornan

CllrKane

2.8 In addition to the above, the PAN was notified to Scotland Street School Museum, 225

Scotland Street, Glasgow, G5 8QB, Strathclyde Passenger Transport, 131 St Vincent Street,

Glasgow,G25J,HistoricEnvironmentScotland,LongmoreHouse,SalisburyPlace,Edinburgh,

EH91SHandMurgitroyd,ScotlandHouse,ScotlandStreet,Glasgow,G58PL

PublicExhibition

2.9 ThepublicexhibitionwasadvertisedinEveningTimeson18August2017.Thiswasmorethan

7 days in advance of the exhibition to accord with the legislation. A copy of the advert is

locatedwithinAppendix3.

2.10 ThepublicconsultationeventwasheldonSaturday26thAugust2017 from12pmto5pmat

theScotlandStreetSchoolMuseum,Glasgow.

2.11 Thevenuewaschosenasitissituatedincloseproximitytotheapplicationsiteandiscentral

tothelocalcommunity.

2.12 ThiseventwasmannedbyrepresentativesofPage\ParkandZanderPlanning,whowereon-

handtoansweranyqueries.

2.13 Boards were exhibited allowing people to learn more about the proposal and developer

beforeaskingquestionsormakingcommentsonthefeedbackforms.

Page 7: Pre-Application Consultation Report

Zephyr(ScotlandSt)Ltd ScotlandStreet,Glasgow

September2017zanderplanning.co.uk 7

AttendanceandFeedback

2.14 Thepresentedwasviewedbyapproximately30membersofthepublic.

2.15 Thecompletedfeedbackformswerecollectedattheeventbyteammembers.Alternatively,it

wasadvisedthatcompletedformscouldbereturnedtoZanderPlanningbypost/email.

Page 8: Pre-Application Consultation Report

Zephyr(ScotlandSt)Ltd ScotlandStreet,Glasgow

September2017zanderplanning.co.uk 8

3. PublicFeedback-AnalysisofKeyIssuesRaised

3.1 Thissectionhighlightstheprincipleplanningissuesraisedbythoseconsultedthroughoutthe

engagementprocess. This includesanalysisof the completed feedback forms received from

thepublicconsultationevent.

3.2 As previously stated, feedback forms were distributed at the exhibition and people were

advised that they could submit comments on the day, by post or via email. A total of 10

feedbackformswerereceived.

FeedbackfromCompletedForms

3.3 The feedback form comprised questions about the proposed development. The questions

posedwerekeptshortandsimpletoencouragepeopleto leavewrittenfeedbackandthere

wasalsotheopportunitytoprovidefurthercommentsshouldtherespondentwishtodoso.

3.4 Theoverallfeedbackwaspositiveandtherewasacleardesiretoseethesitedevelopedand

regenerated.

3.5 Ofthosewhorespondedallsupportedtheproposedmixedusedevelopment,allconsidered

the proposals for selected retention and conversion of buildings for business use were

acceptableandallconsideredthescaleofthedevelopmenttobeappropriatetothelocation.

Specificcommentsincluded:

• “Excellentidea”

• “Encouragingthedevelopmentofstalledsite”

• “This is what the area needs as long as its doesn’t encroach onto to the school

buildingandgrounds”

• “Theareaneedsthis!”

3.6 A joint meeting with Pollokshields and Kinning Park Community Councils (including

representativesofPollokshieldsCommunityTrust)alsotookplacewheretheproposalswere

Page 9: Pre-Application Consultation Report

Zephyr(ScotlandSt)Ltd ScotlandStreet,Glasgow

September2017zanderplanning.co.uk 9

presentedtothecommittee.TheCommunityCouncilswerepositiveregardingtheproposals

butraisedthefollowingmatters:

• KeentoseehowthesitecanintegrateintothePollokshieldscommunity

• Want to encourage pedestrian/cycle connectivity through the site with a path

connectionontoShieldsRoad

• ProvidebuildingfrontageontoShieldsRoad

3.8 ItwasagreedthattheapplicantwouldcontinuetohavedialoguewiththeCommunityCouncil

duringthecourseoftheapplicationanddevelopmenttokeepthemappraisedofprogress.

3.9 Inthecontextoftheregulations,havingreviewedandconsideredthefeedback,theapplicant

islookingatpedestrianconnectionsandcreatingafrontageontoShieldsRoad.Theseaspects

willformpartoftheapplicationsubmission.

Page 10: Pre-Application Consultation Report

Zephyr(ScotlandSt)Ltd ScotlandStreet,Glasgow

September2017zanderplanning.co.uk 10

4.0 Conclusions

4.1 Thisreportprovidesareviewofthepublicconsultationundertakenbyourclientinrelationto

theplanningapplicationfortheproposedmixedbusiness/residentialdevelopmentatScotland

Street,Glasgow.

4.2 The public exhibitions were very not well attended by the general public. This, from

experience,islargelyduetothenon-contentiousnatureoftheproposalandwhereitdoesnot

raiseanysignificantissueslocally.HowevertherehasbeengoodengagementwiththeKinning

ParkandPollokshieldsCommunityCouncils.

4.3 Overall, the general feedback from those who attended the public consultation event was

extremelysupportive.

4.4 In terms of the applicants statutory obligation it is considered that consultation exercise

meets and exceeds the requirements for set out in the Town and Country Planning

(DevelopmentManagementProcedure)(Scotland)Regulations2013.

Page 11: Pre-Application Consultation Report

Zephyr(ScotlandSt)Ltd ScotlandStreet,Glasgow

September2017zanderplanning.co.uk 11

Appendices

Page 12: Pre-Application Consultation Report

Zephyr(ScotlandSt)Ltd ScotlandStreet,Glasgow

September2017zanderplanning.co.uk 12

Appendix1

Page 13: Pre-Application Consultation Report

Zephyr(ScotlandSt)Ltd ScotlandStreet,Glasgow

September2017zanderplanning.co.uk 13

Garage

SHIELD

S R

OAD

274

15.2m

Shelter

El Sub Sta

165169

Industrial Estate

Sub Sta

El

Lighting Gantry

Scotland Street SchoolMuseum of Education

225

10.4m

187191 to 195

WB

SCOTLAND STREET11.2m

350a-350

Former HowdensWorks

Lighting Gantry

371

Underground Station

Shields Road

350

KEYSite boundary

0 5 10 20 50m

-(--)-

---

HS-

PPA-

0-D

R-A

-000

0

29/0

6/17

Loca

tion_

Plan

How

dens

: Dem

oliti

on W

arra

nt 0

1Ze

phyr

(Sco

tland

St)

Ltd

Rev

isio

ns:

Page

\ Pa

rk A

rchi

tect

s

20 J

ames

Mor

rison

Stre

et, G

lasg

ow G

1 5P

E, U

K

T 01

41 5

53 5

440

F 0

1415

53 5

441

mai

l@pa

gepa

rk.c

o.uk

ww

w.pa

gepa

rk.c

o.uk

Title

:

Clie

nt:

Proj

ect:

Dat

e:

Dra

win

g N

o:

Scal

e:C

AD

Ref

:

Rev

isio

n:- 1:

1000

@A3

Page 14: Pre-Application Consultation Report

Zephyr(ScotlandSt)Ltd ScotlandStreet,Glasgow

September2017zanderplanning.co.uk 14

Appendix2

Page 15: Pre-Application Consultation Report

Zephyr(ScotlandSt)Ltd ScotlandStreet,Glasgow

September2017zanderplanning.co.uk 15

Executive Director

Richard BrownDevelopment and Regeneration

ServicesGlasgow City Council

231 George StreetGlasgow G1 1RX

Phone 0141 287 8555Fax 0141 287 8444

Zander Planning LtdPer Alex Mitchell31 Balmoral DrivePA7 5HRPA7 5HR

Our ref: DECISION

GCC Application Ref:17/01647/DC

14 July 2017

Dear Sir/Madam

SITE: Site To West Of School Museum 225 Scotland Street Glasgow

PROPOSAL: Use of site (including demolition of buildings) as business space, restaurant/cafe, residential and small scale retail/restuarant cafe development with associated access, parking, landscaping and infrastructure/engineering works.

Your Proposal Of Application Notice, 17/01647/DC, received on 29 June 2017 is considered to be satisfactory.

The notice has been placed on the list of applications where it will remain for as long as it is current.

You are reminded that a period of at least 12 weeks must elapse between giving the notice and submitting any such application. During that time, the required pre-application consultation must take place. The planning application must be accompanied by a pre-application consultation report. An application which does not include the required report is invalid and the Council must decline to determine it. Before doing so, the Council may request additional information. If the Council declines to determine your application, it will advise you of the reason for its opinion that you have not complied with the pre-application consultation requirements.

Glasgow City Council offers processing agreements for all major applications. It is assumed that you will wish to take up this offer unless you formally choose not to do so. I suggest that you should contact the case officer to discuss this process as soon as possible, and to confirm whether you wish to take up this offer.

Should you require any additional information regarding the decision, please contact the case officer

Page 16: Pre-Application Consultation Report

Zephyr(ScotlandSt)Ltd ScotlandStreet,Glasgow

September2017zanderplanning.co.uk 16

Appendix3

Page 17: Pre-Application Consultation Report

Zephyr(ScotlandSt)Ltd ScotlandStreet,Glasgow

September2017zanderplanning.co.uk 17

Page 18: Pre-Application Consultation Report

Zephyr(ScotlandSt)Ltd ScotlandStreet,Glasgow

September2017zanderplanning.co.uk 18