pre-commissioning tests for ac side of solar power plant

5
S.NO. EQUIPMENT DETAILS TEST DETAILS INSULATION RESISTANCE TEST PI TEST VOLTAGE RATIO & TAP CONTINUITY TEST MAGNETIC BALANCE TEST VECTOR GROUP TEST WINDING RESISTANCE (HV SIDE) AT ALL TAPS WINDING RESISTANCE (LV SIDE) AT ALL TAPS MAGNETIZATION CURRENT TEST BDV OF TRANSFORMER OIL (And Oil Filterization) TAN ᵹ & CAPACITANCE CHECKS OLTC operational test Checking of: 1)Valves position (on / off), 2)Gasket joints to avoid oil leakage, 3)Earthing CONFIRMITY TEST (1) Visual external damage to any part of the transformer (2) Buchholz alaram + trip contacts (3) WTI & OTI alaram + trip contacts (4) MOG contacts (5) Phase Sequence Check (6) colour of silica gel/Oil level/leakage, if any (7) Abnormality, if any. INSULATION RESISTANCE TEST PI TEST VOLTAGE RATIO & TAP CONTINUITY TEST MAGNETIC BALANCE TEST VECTOR GROUP TEST WINDING RESISTANCE (HV SIDE) AT ALL TAPS WINDING RESISTANCE (LV SIDE) AT ALL TAPS MAGNETIZATION CURRENT TEST BDV TEST OF TRANSFORMER OIL (And Oil Filerataion) Checking of: 1)Valves position (on / off), 2)Gasket joints to avoid oil leakage, 3)Earthing CONFIRMITY TEST (1) Visual external damage to any part of the transformer (2) Bucholz alaram + trip contacts (3) WTI & OTI alaram + trip contacts (4) MOG contacts (5) Phase Sequence Check (6) colour of silica gel/Oil level/leakage, if any (7) Abnormality, if any. INSULATION RESISTANCE TEST PI TEST VOLTAGE RATIO & TAP CONTINUITY TEST MAGNETIC BALANCE TEST VECTOR GROUP TEST WINDING RESISTANCE (HV SIDE) AT ALL TAPS WINDING RESISTANCE (LV SIDE) AT ALL TAPS MAGNETIZATION CURRENT TEST BDV TEST OF TRANSFORMER OIL LIST OF PRE-COMMISSIONING TESTS OF AC EQUIPMENTS POWER TRANSFORMER 1 INVERTER TRANSFORMER 2 3 Auxiliary transformer

Upload: gosolar-ventures-pvtltd-wwwezysolarecom

Post on 22-Jan-2018

3.308 views

Category:

Business


0 download

TRANSCRIPT

Page 1: Pre-Commissioning Tests for AC Side of Solar Power Plant

S.NO. EQUIPMENTDETAILS TESTDETAILSINSULATIONRESISTANCETESTPITESTVOLTAGERATIO&TAPCONTINUITYTESTMAGNETICBALANCETESTVECTORGROUPTESTWINDINGRESISTANCE(HVSIDE)ATALLTAPSWINDINGRESISTANCE(LVSIDE)ATALLTAPSMAGNETIZATIONCURRENTTESTBDVOFTRANSFORMEROIL(AndOilFilterization)TANᵹ&CAPACITANCECHECKSOLTCoperationaltestCheckingof:1)Valvesposition(on/off),2)Gasketjointstoavoidoilleakage,3)Earthing

CONFIRMITYTEST(1)Visualexternaldamagetoanypartofthetransformer(2)Buchholzalaram+tripcontacts(3)WTI&OTIalaram+tripcontacts(4)MOGcontacts(5)PhaseSequenceCheck(6)colourofsilicagel/Oillevel/leakage,ifany(7)Abnormality,ifany.

INSULATIONRESISTANCETESTPITESTVOLTAGERATIO&TAPCONTINUITYTESTMAGNETICBALANCETESTVECTORGROUPTESTWINDINGRESISTANCE(HVSIDE)ATALLTAPSWINDINGRESISTANCE(LVSIDE)ATALLTAPSMAGNETIZATIONCURRENTTESTBDVTESTOFTRANSFORMEROIL(AndOilFilerataion)Checkingof:1)Valvesposition(on/off),2)Gasketjointstoavoidoilleakage,3)EarthingCONFIRMITYTEST(1)Visualexternaldamagetoanypartofthetransformer(2)Bucholzalaram+tripcontacts(3)WTI&OTIalaram+tripcontacts(4)MOGcontacts(5)PhaseSequenceCheck(6)colourofsilicagel/Oillevel/leakage,ifany(7)Abnormality,ifany.INSULATIONRESISTANCETESTPITESTVOLTAGERATIO&TAPCONTINUITYTESTMAGNETICBALANCETESTVECTORGROUPTESTWINDINGRESISTANCE(HVSIDE)ATALLTAPSWINDINGRESISTANCE(LVSIDE)ATALLTAPSMAGNETIZATIONCURRENTTESTBDVTESTOFTRANSFORMEROIL

LISTOFPRE-COMMISSIONINGTESTSOFACEQUIPMENTS

POWERTRANSFORMER1

INVERTERTRANSFORMER2

3 Auxiliarytransformer

Page 2: Pre-Commissioning Tests for AC Side of Solar Power Plant

CONFIRMITYTEST(1)Visualexternaldamagetoanypartofthetransformer(2)PhaseSequenceCheck(3)colourofsilicagel/Oillevel/leakage,ifany(4)Abnormality,ifany.

PHYSICALCHECKINGOFVARIOUSELECTRICAL&MECHANICALPARTS

CONTINUITY&CONTROLCIRCUITCHECK11kVVCB

IRTest(1)CloseCondition(RY,YB,BR,RE,YE,BE)(2)OpenCondition(RR',YY',BB')ContactResistanceTestTimingTest(1)Opentime(2)ClosetimeCoilresistancetest(1)Closingcoil(2)Trippingcoil-1(3)Trippingcoil-2(4)Motorwinding

ControlCircuit&Operationalchecks(1)Manualchargingofspring(2)Mechanicalclosing&tripping(3)Chargingofspringthroughmotor(4)Trippingthroughrelays/releases(5)Breakerclosecommandblockingwhenrelay/releasesisinoperatedcondition(6)Abnormality,ifany

Maintenance&generalcheck-ups(1)Inspectionforphysicaldamage(2)cleaning&tightnessofbreakerbolts(3)Alignmentofbreaker(4)Earthingconnection(5)Gaspressurelowoperation(6)Abnormality,ifany

CTIRTEST(P-E,S-E,P-S,S-S)WindingResistanceTestMagnetizationcharacteristiccheckRatio,Polarity&CircuitcheckGeneralchecks1)Inspectionforphysicaldamage2)Continuitycheckforammeterand/orrelaycircuits

PTIRTEST(P-E,S-E,P-S,S-S)WindingResistanceTestRatio,Polarity&CircuitcheckGeneralchecks1)Inspectionforphysicaldamage2)ContinuitycheckforVoltmeterand/orrelaycircuits

LBSIRTESToneachpoleMeasurementofcontactresistanceforallthreephasesManualcheckingofoperation(closeoropen)byHandleCheckingofInterlocks(mechanicalandelectrical)HVDCTestBusBars:-1)IRTEST2)ContactResistanceTestCHECKUPOFALLALARAMSANDANNUNCIATION

SPACEHEATEROPERATIONCHECK

INTERFACECHECKBETWEENPANELS

TESTSOFPROTECTIVERELAYSONSETTINGSCONFIGURED

11KVHTPANELS,RMUPANELS,C&RPANEL,RTCC

PANEL

MULTIFUNCTIONRELAYS

3 Auxiliarytransformer

4

Page 3: Pre-Commissioning Tests for AC Side of Solar Power Plant

NUMERICALRelay1)SecondayInjectionTest(accordingtoservicesettingofrelay)a)TimeCurrentcharacteristicstestsforO/Cunitb)InstantaneousO/Cunitprotectionc)TimeCurrentcharacteristicstestsforE/Funitd)InstantaneousE/Funitprotection

2)GeneralChecks:-Inspectionforphysicaldamage,wiringcheck,ResettingofLEDswithcover

TRIPPINGRelay(86,NumericalRelay)

1)Insulationresistancetest(betweenallterminalsandbody,betweenvariousciruits)

2)CoilResistanceTest3)CoilPickup&dropofftest

4)GeneralCheck:-Inspectionforphysicaldamage,wiringcheckofrelay,cleaning&pressureofrelaycontacts,Flagoperationandresettingofflagswithcover

DIFFERENTIAL(Numerical)Relay(87T)1)DifferentialPick-upcheck2)StabilityCheck3)SecondaryInjectionTesta)TimeCurrentcharacteristicstestsforO/Cunitb)InstantaneousO/Cunitprotectionc)TimeCurrentcharacteristicstestsforE/Funitd)InstantaneousE/Funitprotection4)OverFluxing5)UnderVoltageunittest6)OverVoltageunittest7)RestrictedE/FProtection(HTSide)8)RestrictedE/FProtection(LVSide)9)GeneralCheckup:-Inspectionforphysicaldamage,wiringcheckofrelay,LEDindication&Pushbuttonoperation,Servicesettingre-storedAuxiliaryRelay(ElectromechanicalRelay)1)Insulationresistancetest(betweenallterminalsandbody,betweenvariousciruits)2)CoilResistanceTest3)CoilPickup&dropofftest4)GeneralCheck:-Inspectionforphysicaldamage,wiringcheckofrelay,cleaning&pressureofrelaycontacts,Flagoperationandresettingofflagswithcover

MULTIFUNCTIONRELAYS

4

Page 4: Pre-Commissioning Tests for AC Side of Solar Power Plant

IRTest(1)CloseCondition(RY,YB,BR,RE,YE,BE)(2)OpenCondition(RR',YY'.BB')

ContactResistanceTestTimingTest(1)Opentime(2)Closetime

Coilresistancetest(1)Closingcoil(2)Trippingcoil-1(3)Trippingcoil-2(4)Motorwinding

ControlCircuit&Operationalchecks(1)Manualchargingofspring(2)Mechanicalclosing&tripping(3)Chargingofspringthroughmotor(4)Trippingthroughrelays/releases(5)Breakerclosecommandblockingwhenrelay/releasesisinoperatedcondition(6)Abnormality,ifany

Maintenance&generalcheck-ups(1)Inspectionforphysicaldamage(2)cleaning&tightnessofbreakerbolts(3)Alignmentofbreaker(4)Earthingconnection(5)Gaspressurelowoperation(6)Abnormality,ifany7)testforleakageofair/gas

InsulationResistance(R-E,Y-E,B-E)ContactResistanceTestCheckingofmechanicalinterlokbetweenIsolator&Earthswitch(ifthemodelisIsolatorwithEarthswitch)OpretionalChecks(1)MechanicalCheck(2)ElectricalCheck(theoperatingmechanismofthe3polesshallbewellsynchronized)InsulationResistance(P-E)CounterTest

Maintenance&Generalcheck-ups(1)Inspectionforphysicaldamage(2)Cleaning&tightnessofbolts(3)Earthingconnection(4)Abnormality,ifany

IRTEST(P-E,S-E,P-S,S-S)WindingResistanceTestMagnetizationcharacteristiccheckRatio,Polarity&Circuitcheck

Generalchecks1)Inspectionforphysicaldamage2)Continuitycheckforammeterand/orrelaycircuits

IRTEST(P-E,S-E,P-S,S-S)WindingResistanceTestRatio,Polarity&CircuitcheckGeneralchecks1)Inspectionforphysicaldamage2)ContinuitycheckforVoltmeterand/orrelaycircuitsIRTEST(P-E,S-E,P-S,S-S)WindingResistanceTestRatio,Polarity&Circuitcheck

7 LA

HorizontalMountedDoubleBreakIsolator&Earthswitch

6

CT8

PT9

5 SF6CIRCUITBREAKER

CVT10

Page 5: Pre-Commissioning Tests for AC Side of Solar Power Plant

CapacitancemeasureofcapacitorsectionGeneralchecks1)Inspectionforphysicaldamage2)ContinuitycheckforVoltmeterand/orrelay

11 INSULATORS HIGHVOLTAGETESTPHYSICALCHECKINGOFLAYING&TERMINATIONCONTINUITYTESTINSULATIONRESISTANCETESTPIVALUEHIGHVOLTAGETEST(DC/AC)PHYSICALCHECKINGOFLAYING&TERMINATIONCONTINUITYTESTINSULATIONRESISTANCETESTEARTHRESISTANCETESTPHYSICALCHECKINGOFCONNECTIONSCONTINUITYOFGROUNDINGCONNECTIONS&JOINTSCHECKINGOFCOMPLETEEARTHINGNETWORKCheckingofinterpanelwiring,protectionrelays,terminalblockcontacts,earthingEnsuringtheinterlockbetweenIsolators&SF6circuitbreakerIRtestbetweenControl,CT,PTcircuits&earth

16 Battery,Batterycharger&DCDB

Checkingofconnections,physicaldamage,voltageatoutputterminals

17 UPS&Battery Checkingofconnections,physicaldamage,voltageatoutputterminals18 PLCC,Wavetrap Checkingofconnections,earthing

C&RPanel15

14 EARTHING

LTCABLES13

12 HTCABLES

CVT10