pre- feasibility reportenvironmentclearance.nic.in/writereaddata/online/tor/0_0... · 2015. 3....

25
PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility Report APPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director) 0 PRE- FEASIBILITY REPORT

Upload: others

Post on 25-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    0

    PRE- FEASIBILITYREPORT

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    1

    EXECUTIVE SUMMARY

    The proposed project of 284 ha area is of river bed sand mining and falls under Category- “A”, as per

    EIA Notification 2006 & amendments thereof of Ministry of Environment and Forests, New Delhi.

    The mining lease area is located in Stretch 1- Majhoni, Patwe bhorwa, Majhayara, Kakna, Baisa,

    Manjhira, Maldaun, Bisunpur, Govindpur, Jitarpur, Saran, godiya, Godiya, Lakhnouri, Kunani,

    Jogipahadi, Khudbadi, Domuhan Stretch 2: Matihani, Ghoda bhahiyar, Baghaunia, Chora, Sahoda,

    Ranadih Stretch 3: Barodha Stretch 4: Sabalpur Stretch 5: Pair, Ran Gaon, Kachmachiya, Douki,

    Sabalpur Tehsil: Rajon, Amarpur, Banka, Belhar, Sambhu Ganj, Barahat, Dhoraiya District: Banka,

    Bihar. The proposed project activity will be carried out in the bed of the Chandan River, Badua River,

    Odhni River, Sukhniya River, Cheer River. Surface Geological plans of the above blocks are attached

    as Annexure II to Annexure VI.

    Mine lease has been proposed in favor of M/S Mahadev Enclave Pvt. Ltd. (Shri Manoj Kumar Pachisia -

    Director) through letter no 754/M dated 10/11/2014 (Annexure I). The proposed rate of production is

    10042985 TPA of Sand. The estimated project cost is Rs. 21, 93, 80,000.

    The salient features of the project are detailed below:

    Mining Lease Area 284 ha

    Location of mine

    All the mining blocks from Stretch-1 to Stretch-5are proposedon the the Chandan River, Badua River, Odhni River, SukhniyaRiver, Cheer River . Stretch & block wise coordinates (Latitude& Longitude) is attached as Annexure VII.

    Toposheet No.72L/13, 72L/14, 72L/9, 72K/16, 72K/12, 72O/04, 72P/01,

    72P/02, 72P/5, 72P/6

    River/Nalla/Tanks/Lakes etcChandan River, Badua River, Odhni River, Sukhniya River,

    Cheer River

    Topography

    Stretch-1 (70ASML to 110 ASML)

    Stretch-2 (69 ASML to 97 ASML)

    Stretch-3 (82 ASML)

    Stretch-4 (108 ASML )

    Stretch-5 (66ASML to 86 ASML)

    Minerals of mine Sand

    Proposed production of mine 10042985 Tonnes per annum

    Method of mining Opencast Semi-Mechanized Mining

    Drilling/Blasting No drilling and blasting is proposed

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    2

    Water demand 9 KLD

    Sources of water From available sources through tankers

    Ultimate depth of Mining 2 m bgl or above ground water level whichever comes first

    Man power 66

    Solid Waste

    Small amount of top soil will be generated, which will be used

    for purposed of applied for applied area stacked and later spread

    in the excavated area of off river bed blocks

    Nearest railway station Stretch 1:

    Banka Railway Station approx. 2 km in SW From Block-10.

    Murahara Railway Station approx. 2 km in East From Block-6.

    Stretch 2:

    Sultanganj Railway Station approx. 30 Km in NE from Block-

    6.

    Ghorparan Railway Station approx. 20 km in SW from Block-1.

    Stretch 3:

    Banka Railway Station approx. 3 km in South direction.

    Stretch 4:

    Mandar Hill Station approx. 3 km in NE direction.

    Stretch 5:

    Mandar Hill Station approx. 6 km in SW from block-4.

    Panjwara Station approx. 12 km in West from block-1.

    Nearest state highway/national

    highway

    SH -25 about 1 km W direction from Block 10 Stretch I

    SH 19 about 6 Km NW direction from Block 6 Stretch I

    NH-80 about 30 Km N directions from Block 1 Stretch I

    NH-80 about 25 km Ndirection from block 6 stretch 2

    SH- 22 200 m NE direction from block I stretch 2.

    NH-80 about 40 Km N from block I stretch 3.

    SH-25 about 500 m NE direction from block- 1 of stretch -3

    NH-80 about 50 km N direction from block -1 of stretch-4

    SH-17 about 1 km NE direction from block-1 of stretch-4

    SH-84 about 300 meter NW direction from block -5 of stretch-

    5

    NH-80 about 40 KM N direction from block -1 of stretch- 5

    Nearest Airport

    Stretch 1:

    Patna International Airport approx 200 km in North West

    direction.

    Stretch 2:

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    3

    2. INTRODUCTION

    2.1 Identification of Project and Project Proponent

    The proposed project of 284 ha area is of river bed sand mining and falls under Category- “A”, as per

    EIA Notification 2006 & amendments thereof of Ministry of Environment and Forests, New Delhi.

    The mining lease area is located in Stretch 1- Majhoni, Patwe bhorwa, Majhayara, Kakna, Baisa,

    Manjhira, Maldaun, Bisunpur, Govindpur, Jitarpur, Saran, godiya, Godiya, Lakhnouri, Kunani,

    Jogipahadi, Khudbadi, Domuhan Stretch 2: Matihani, Ghoda bhahiyar, Baghaunia, Chora, Sahoda,

    Ranadih Stretch 3: Barodha Stretch 4: Sabalpur Stretch 5: Pair, Ran Gaon, Kachmachiya, Douki,

    Sabalpur Tehsil: Rajon, Amarpur, Banka, Belhar, Sambhu Ganj, Barahat, Dhoraiya District: Banka,

    Bihar.. The proposed project activity will be carried out in the bed of the Chandan River, Badua River,

    Odhni River, Sukhniya River, Cheer River. Surface plans of the above blocks are attached as Annexure

    II to Annexure VI.

    Mine lease has been proposed in favor of M/S Mahadev Enclave Pvt. Ltd. (Shri Manoj Kumar Pachisia -

    Director) through letter no 754/M dated 10/11/2014 (Annexure I). The proposed rate of production is

    10042985 TPA of Sand. The estimated project cost is Rs. 21, 93, 80,000.

    The details of the project and its proponent are given below:

    Name of the applicant M/S Mahadev Enclave Pvt. Ltd.

    (Shri Manoj Kumar Pachisia-Director)

    Name & Address of POA Holder M/S Mahadev Enclave Pvt. Ltd.

    (Shri Manoj Kumar Pachisia-Director)

    B-37, Ayodhya Marg

    Gaya Airport approx 170 km in West direction.

    Stretch 3:

    Patna International Airport approx 200 km in North west

    direction.

    Stretch 4:

    Gaya Airport approx 210 km in West direction.

    Stretch 5:

    Patna International Airport approx 220 km in North West

    direction.

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    4

    Hanuman Nagar, Jaipur, Rajasthan

    Pincode- 302012

    Name of Mine District Banka Sand Blocks (Stretch 1 to 5) Mining

    Project

    Area Total Sum of Area of 1 stretch to 5 Stretch is 284 ha

    (Stretch No.- 1): 243 ha

    (Stretch No.- 2): 18.90 ha

    (Stretch No.- 3): 2.50 ha

    (Stretch No.- 4): 2.30 ha

    (Stretch No.- 5): 17.39 ha

    Mineral Sand

    2.2 Brief description of the nature of the project

    It has been proposed to collect approximately 10042985 tonnes per annum of sand. No mining activity

    will be undertaken during the monsoon season. So the river bed material will be replenished during the

    monsoon season every year.

    Surface Mining: The mining is confined to excavation of sand from the river bed. The operation will be

    Semi- Mechanized in which the river bed material will be collected in its existing form. Sand Mining

    will be carried out only upto a depth of 2 m bgl or above ground water level, whichever comes first.

    Mining will be carried out only during the day time. Excavation of river bed material will be completely

    stopped during the monsoon season.

    2.3 Need for the project and its importance to the country and region

    The project lies on the river bed of Chandan River, Badua River, Odhni River, Sukhniya River and

    Cheer River. The sediment in the form of river bed material (RBM) deposited in the last many years had

    changed the shape of the river bed from a valley to a raised land. Because of this, every year during

    monsoon season, heavy and devastating floods damage large tracts of land lying on both the banks of the

    river. Hence, it is necessary to remove the materials so that the river gets channelized.

    This project operation will provide employment directly and indirectly to the people residing in vicinity,

    thus improving the Socio-economic status of the area.

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    5

    2.4 Demands-Supply Gap

    The demand for sand is ever growing with the growth of the infrastructure sector in our country. The

    mineral is used mainly in the construction activities like buildings, bridges etc. The requirement for the

    mineral is always high in the nearby cities and towns. Therefore there is always a good demand of the

    mineral in the domestic market.

    2.5 Domestic/ Export Markets

    DOMESTIC MARKET

    There is always an ever increasing demand of these minerals in the domestic market.

    EXPORT MARKET

    The proposed mining activity is for indigenous consumption only for real state, road making etc. So no

    export will be envisaged.

    2.6 Employment Generation

    The total direct manpower requirement for the proposed mining operation will be around 66. Indirect

    employment is also expected due to the associated activities.

    Manpower requirement

    3. PROJECT DESCRIPTION

    3.1 Type of project including interlinked and interdependent projects, if any

    The proposed project for excavation of Sand is an independent project in which minerals excavated will

    be directly sold in the local markets.

    S. No. Category Numbers

    1. Administration 3

    2. Supervisor 3

    3. Skilled 25

    4. Un-skilled 35

    TOTAL 66

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    6

    3.2 Location

    The mining lease area is located in Stretch 1- Majhoni, Patwe bhorwa, Majhayara, Kakna, Baisa,

    Manjhira, Maldaun, Bisunpur, Govindpur, Jitarpur, Saran, godiya, Godiya, Lakhnouri, Kunani,

    Jogipahadi, Khudbadi, Domuhan Stretch 2: Matihani, Ghoda bhahiyar, Baghaunia, Chora, Sahoda,

    Ranadih Stretch 3: Barodha Stretch 4: Sabalpur Stretch 5: Pair, Ran Gaon, Kachmachiya, Douki,

    Sabalpur Tehsil: Rajon, Amarpur, Banka, Belhar, Sambhu Ganj, Barahat, Dhoraiya District: Banka,

    Bihar..The proposed project activity will be carried out in the bed of the Chandan River, Badua River,

    Odhni River, Sukhniya River and Cheer River.

    The mining lease area falls in Survey of India Toposheet No. 72L/13, 72L/9, 72K/2L, 72L/13, 72P/1,

    72P/1.

    A Stretch wise Buffer map of 10 km radius is attached as Annexure VIII- to Annexure XII.

    The project site is located at:

    All the mining blocks from Stretch-1 to Stretch-5are proposed on the Chandan River, Badua River,

    Odhni River, Sukhniya River and Cheer River. Stretch & block wise coordinates (Latitude & Longitude)

    is attached as Annexure VII.

    Vicinity map showing site location is given below:

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    7

    Fig: Location maps the project sites along the river

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    8

    3.3 Details of alternate sites considered

    Mineral is site specific as well as the lease has been allotted in the particular area. Hence no alternative

    site is examined for mining.

    3.4 Size or magnitude of operation

    The proposed mine has lease over an area of 284 ha. The maximum rated capacity of the project will be

    10042985 TPA which will be excavated out in layers.

    3.5 Project description with process details

    The mining project is located on the river bed of Chandan River, Badua River, Odhni River, Sukhniya

    River and Cheer River. The mining is confined to excavation of Sand from the river bed. The operation

    will be open cast Semi Mechanized with use of excavators/JCBs etc. Proper benching of 1.0 m height

    and 6m width will be maintained for mining blocks as per guideline M.M.R-1961, under rule 106 Which

    the river bed material will be collected in its existing form. No drilling /blasting are required as the

    material is loose in nature. Mining will be done in layers of 1 m each which will avoid ponding effect. It

    will be done leaving a safety zone from bank for bank protection. Mining will be carried out only during

    the day time. Excavation of river bed material will be completely stopped during the monsoon season.

    3.5.1 Mining Process:

    Applied area has been allotted for a period of 5years in five stretches namely Chandan River, Badua

    River, Odhni River, Sukhniya River and Cheer River. Applied Area consist of 284 ha area in 32 blocks.

    Mining will be done in five stretches in each block leaving safety distance form bank and stream for

    river bed blocks and barrier zone of 7.5 m around the Applied Area.

    The sand is won from agriculture fields adopting mining and simultaneous reclamation method. The

    lessee (settlee) purchases/ (pays compensation for the land), from the farmers for short periods.

    The sand shall be excavated by backhoe type excavators capacity & mineral is directly loaded into large

    trucks for dispatch to consumers situated in and around Banka District. Water is sprinkled in the area

    from where the sand is to be removed before the operation starts and thereafter at regular intervals to

    keep the dust allayed at the source itself. Removal of soil (overburden) precedes the winning of sand.

    Once a pre-determined area has been exhausted of the sand, it shall be replenished by sand during

    monsoon period levelled it & maintained its maximum original topography.

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    9

    There is no need for drilling & blasting as hard rock is not encountered in sand mining. Therefore

    Environment and Ecology of the area remains undisturbed.

    Light weight excavators/JCB will be deployed for extraction. Mining shall be carried through the

    formation of benches. Height & width of benches shall be kept 1.0m & 6m with face slope 400. Haul

    road having width 6.0 & gradient 1:12 shall be provided for the movement of machineries &

    transportation of sand. Mineral will be loaded in trucks of 25 tonne capacity. There will be no OB or

    waste generation as the sand is exposed in the river bed.

    Bench will advance parallel to the banks of the river. Height of bench will be 3.0 m. Workings will be

    restricted within the Applied Area/ khasra as per the description report given by Mining Department.

    Mining activities will be carried out in a manner so that there is no obstruction to the movement of water

    flow, if any, during rainy season. The bench will be in the form of slices/ strips parallel to the banks of

    the river. Roads in the Applied Area for the movement of loaded trippers/ trucks will not have slopes

    more than 1 in 20. However, movement of trucks after mineral loading will be towards both sides

    through approach roads connecting to tar roads. Every block will have its own approach roads, well

    connected to main highways. No processing of mineral will be done.

    Mining will be done upto a maximum depth of 2 m in layers of 1.0 m each which will avoid ponding

    effect.

    Mining will be confined within central 3/4th width of the river. This will prevent collapse of bank

    and erosion.

    It will be done leaving a safety zone of total of 1/4th of the width of the river from the banks for

    bank protection.

    Excavated area will be replenished naturally due to sediment inflow from the catchment area.

    Working Depth (below ground level)

    During the entire lease period, the deposit will be worked from the top surface to 2 m bgl or above

    ground water level, whichever comes first.

    3.6 Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area of

    Final Product/S, Mode of Transport of Raw Material and Finished Product

    No raw material will be required in the proposed project. The operation involves the excavation of sand

    in its existing form and transported to the end users/ market.

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    10

    3.6.1 Use of Mineral

    The mineral sand is used:

    As construction material for buildings

    As raw material for construction of dams,

    In roads making, paving, etc.

    3.6.2 Mineral Beneficiation

    No mineral beneficiation is involved for this mineral.

    3.7 Resource optimization/ recycling and reuse

    Minerals are generally depleting asset once mined; but minerals like sand will be replenished naturally.

    Thus a scientific approach will be taken up for excavation of mineral with systematic method.

    3.8 Availability of water its source, energy/ power requirement and source

    3.8.1 Water Requirement

    Activity Water requirement (KLD)

    Dust suppression 4

    Domestic 5

    Total 9

    Thus total water requirement will be 9 KLD. This water will be supplied from the bore well from nearby

    villages through tankers as well as from surface water sources for dust suppression. Additional water

    will also be required for plantation purpose.

    Apart from this water for plantation will also be required.

    3.8.2 Power Requirement

    All the activities will be carried out in a manual manner. The material will be excavated and loaded

    directly into tractors by the workers themselves. The operation will be done only from sun rise to sun

    set. So there is no power requirement for the mining activity.

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    11

    3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their management/

    disposal.

    3.9.1 Solid Waste Generation & its Disposal

    In this project small amount of top soil will be generated, which will be used for purposed of applied for

    applied area stacked and later spread in the excavated area of off river bed blocks. Small amount of

    domestic waste will be generated by the workers at the site, which will be disposed off through proper

    municipal way. No other waste generation is expected.

    3.9.2 Liquid Effluent

    No liquid effluent will be generated at the mine site due to the mineral excavation.

    4. SITE ANALYSIS

    4.1 Connectivity

    4.1.1 Nearest Railway Station

    Stretch 1:

    Banka Railway Station approx. 2 km in SW From Block-10.

    Murahara Railway Station approx. 2 km in East From Block-6.

    Stretch 2:

    Sultanganj Railway Station approx. 30 Km in NE from Block-6.

    Ghorparan Railway Station approx. 20 km in SW from Block-1.

    Stretch 3:

    Banka Railway Station approx. 3 km in South direction.

    Stretch 4:

    Mandar Hill Station approx. 3 km in NE direction.

    Stretch 5:

    Mandar Hill Station approx. 6 km in SW from block-4.

    Panjwara Station approx. 12 km in West from block-1.

    4.1.2 Nearest Airport

    Stretch 1:

    Patna International Airport approx 200 km in North West direction.

    Stretch 2:

    Gaya Airport approx 170 km in West direction.

    Stretch 3:

    Patna International Airport approx 200 km in North west direction.

    Stretch 4:

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    12

    Gaya Airport approx 210 km in West direction.

    Stretch 5:

    Patna International Airport approx 220 km in North West direction.

    4.1.3 Nearest Highway

    SH -25 about 1 km W direction from Block 10 Stretch I

    SH 19 about 6 Km NW direction from Block 6 Stretch I

    NH-80 about 30 Km N directions from Block 1 Stretch I

    NH-80 about 25 km N direction from block 6 stretch 2

    SH- 22 200 m NE direction from block I stretch 2.

    NH-80 about 40 Km N from block I stretch 3.

    SH-25 about 500 m NE direction from block- 1 of stretch -3

    NH-80 about 50 km N direction from block -1 of stretch-4

    SH-17 about 1 km NE direction from block-1 of stretch-4

    SH-84 about 300 meter NW direction from block -5 of stretch- 5

    NH-80 about 40 KM N direction from block -1 of stretch- 5

    4.2 Land form, land use and land ownership

    The proposed activity is to take place in the bed of the Chandan River, Badua River, Odhni River,

    Sukhniya River, Cheer River. The entire lease area is deposited with river bed material. The entire lease

    area is deposited with river bed material.

    The lease has been granted in favor of M/S Mahadev Enclave Pvt. Ltd. (Shri Manoj Kumar Pachisia -

    Director) through letter no 754/M from District Mining Department dated 10/11/2014 for mining of

    sand.

    4.3 Physiography

    The Banka district lies between north latitude 24o30’0’’ to 25o 07’00’’ and east longitude 86o30’00’’to

    87o12’00’’. The district covers a total area of 3019.5 sq. km. The climate of this district is on the whole

    dry, hot in summer and mild cold in winter. The climate of the district is characterized by hot summer

    and a pleasant winter. April to June comprises summer month while November to March makes cold

    eason. The southwest monsoon breaks in the month of June and continues upto the end of September.

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    13

    The average annual rainfall in the district is 1168 mm. The district receives major amount (86%) of

    precipitation during the monsoon period.

    The district is bounded in the north by Bhagalpur, in the south by Deoghar, in the east by Godda, in the

    west by Jamui, in the NW by Munger and in the southeast by Dumka districts. The district is having

    population density 533 person/km2 and the decadal growth rate of the last decade (1991-2001) is

    24.47%. The population of schedule tribes and schedule caste are 4.7%and 12.43%of the total

    population respectively. There are two statutory towns namely Banka and Amarpur. The most populous

    block is Dhuraiya and the least populous is Phulidumar.

    The Banka district lies in south of the river Ganga and constitutes a part of the Ganga River Basin. It

    falls under Badua –Chandan sub-basin. It has three watershed,namely Badua Nala ,Chandan river

    watershed and the left bank watershed of Burigeria Nala & on the eastern side Odhni & Sukhniya

    drainages. The major part of the district falls under Chandan river watershed.

    Five major rivers/nalas, namely Badua N.(forming the north western boundary), Chandan R. which

    flows through the central part of the district and the Odhni & Sukhniya (forming the eastern boundary of

    the district) drains the area. All the five rivers/nalas originate from the hilly tracks present in the south of

    the district and flows from south to north direction. The streams namely Kudar, Orni, Panchkatia &

    Cheer are the main tributaries of Chandan,while Lohargara,Karunior,Belharna are the main tributaries of

    Badua. All the rivers are ephemeral in nature.

    Source: Mine Plan

    4.4 Geology:

    4.4.1 Regional Geology

    Regionally the area constitutes a part of the Ganga River Basin. The north-eastern part is predominantly

    characterized by sedimentary lithology in the Sub-Himalayan zone comprising Subathus, Dagshais,

    Kasaulis and Siwaliks. A general Regional stratigraphic sequence in the area is given below-

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    14

    Showing the Geological Succession and their geographic distribution

    The Tertiaries are exposed in Masan area of North Champaran District, as seriesof low hillocks. They

    represent Upper Siwaliks of the Sub-Himalayas and consist of sandstone and claystone, disturbed by

    folding and thrust faulting. The entire sequence here occurs as an inlier in the alluvial terrain.The

    Quaternary of North Bihar Plains, between the tortuous course of Ganga and Himalayan foothills, are

    represented by Older Alluvium Group (OAG) (Bhangar) and Newer Alluvium Group (NAG) (Khader).

    The OAG is represented by Mirganj Formation, Khajauli Formation and Madhubani Formation in

    Gandak basin, Gandak- Kosi interfluve and Kosi basin, respectively. The NAG includes the Vaishali

    Formation, the Jainagar Formation and Purnea Formation in Gandak basin, Gandak-Kosi interfluve and

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    15

    Ganga-Kosi-Mahananda interfluve. In the whole region the uppermost formation is the Present Flood

    Plains, Diara formation, Channel Bars and Sand Dunnes.In central Bihar Plains the OAG forming the

    highest terrace, in the Son-Ganga alluvial tract, and NAG forming younger terraces, as Older Flood

    Plains, are exposed all along the Alluvial Upland. The Present Flood Plain deposits are confined with

    then channels. The Vindhyans, in Bihar, are exposed in Rohtas and Bhabhua districts as scarps and

    plateau. They comprises gritty to fine cemented sandstones, shales, flagstones, quartzites, sandy

    siltstones, limestone breccias and porcellanites, the shales often being pyritiferous. The Gondwana rocks

    occur as sporadic outlier basins, in the parts of Nalanda district. The main rock types are sandstones, fine

    to coarse or gritty sandstone, ironstone,

    shales, Carbonaceous shales, coal seams and boulder beds. They are largelycemented, jointed, fractured,

    faulted and intruded by dykes and sills. Along the northern fringe of the Chotanagpur Granite Gneiss

    Complex are low-grade supracrustals covering the Kharagpur hills, Rajgir hills and Gaya hills referred

    to as the Satpura Range, comprises schists, ferruginous phyllite, quartzite and phyllitic shales. The Bihar

    Mica belt comprises a sequence of folded hornblende schists, amphibolite, mica-schist, quartzite and

    calc-silicates intruded by circular to oval shaped granitic plutons, dolerites, pegmatites and quartz veins.

    There are may old mines of mica in this belt. The Archaeans are the oldest rock formation in the state.

    The most predominant rocktype is mainly of gneisses and granitic rocks with lesser amount of schists,

    quartzites, basic intrusives and pegmatoides. They are exposed in Aurangabad, Gaya, Nawada,Jamui,

    Bhagalpur and Banka districts.

    Source: Mine Plan

    4.4.2 Local Geology

    The sand exposed in the River bed of Chandan, Badua, Odhni, Sukhniya & Cheer and surrounding areas

    is the product of the deposition of the sediments brought and deposited in the flood plains of River

    Ganga. These sediments are of recent geological formation. The litho-units exposed within the river and

    surrounding areas have formed as water borne sediments brought by flood water during rainy season

    every year and deposited in riverbed.

    The litho units encountered in the riverbed and surrounding areas belongs to the Shivalik super groups.

    The size of the sediments towards the source i.e. host rock is course and at the tale end of the river the

    grain size is reduced to smaller sizes resulted in the formation of clay beds. The following sequences

    have been observed in the area, i.e. Top soil/ Alluvium followed by sand deposition (as shown in the

    figure below).

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    16

    Sand and silt are deposited in the middle of the river whereas fine sand and soil are deposited at the

    fringe of the riverbanks.

    Soil/ alluvium varying in thickness from 0.20m to 0.60m m constitute the top horizons in the area

    suitable for agriculture. River Ganga meanders through the area exposing the alluvium and soil at the

    banks. Sand is found in the river bed upto a depth of more than 3.0 m. The major part of bed remains

    dry as water flows in a single stream during the non-monsoon seasons. Only during rainy seasons the

    entire flood plain has water, when there will be no mining done.

    The surface Geological Plan of each stretches is illustrated below:

    Stretches No. PLATE No.i 3A to 22Aii 23A to 28Aiii 29Aiv 30Av 31A to 34A

    Source: Mine Plan

    4.5 Existing land use pattern

    The mine lease area is flat river bed and river banks. There is no forest land or agriculture land in the

    mine lease area. The entire mining lease lies within River bed of Chandan River, Badua River, Odhni

    River, Sukhniya River, Cheer River.

    Top Soil/

    Alluvium

    Sand/GravelDeposition

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    17

    4.6 EXISTING INFRASTRUCTURE

    The site being on river bed has no existing infrastructure, except for connecting road for transportation.

    4.7 SOIL CLASSIFICATION

    Banka district is characterized by a wide variety of soils, which can be broadly grouped into two

    categories, the alluvial soil and hilly soil. The alluvial soil derived partly from the older alluvium deposit

    and partly form the newer flood plain deposit is characterized by light grey to dark grey colour and fine

    texture. The hilly soil derived from the weathered product of rocks is coarse grained, ferruginous, low in

    nitrogen, medium to high potash and acidic in nature.

    Source: Mine Plan

    4.8 Climatic data from secondary sources

    Climate & Rainfall

    The climate of the district is characterized by hot summer and a pleasant winter. April to June comprises

    summer month while November to March makes cold eason. The southwest monsoon breaks in the

    month of June and continues upto the end of September. The average annual rainfall in the district is

    1168 mm. The district receives major amount (86%) of precipitation during the monsoon period.

    5. PLANNING BRIEF

    5.1 Planning concept

    Applied area has been allotted for a period of 5years in five stretches namely Chandan, Badua, Odhani,

    Sukhniya & Cheer. Applied Area consist of 284ha area in 32 blocks. Mining will be done in five

    stretches in each block leaving safety distance form bank and stream for river bed blocks and barrier

    zone of 7.5 m around the Applied Area.

    The sand is won from agriculture fields adopting mining and simultaneous reclamation method. The

    lessee (settlee) purchases/(pays compensation for the land), from the farmers for short periods.

    The sand shall be excavated by backhoe type excavators capacity & mineral is directly loaded into large

    trucks for dispatch to consumers situated in and around Banka town. Water is sprinkled in the area from

    where the sand is to be removed before the operation starts and thereafter at regular intervals to keep the

    dust allayed at the source itself. Removal of soil (overburden) precedes the winning of sand. Once a pre-

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    18

    determined area has been exhausted of the sand, it shall be replenished by sand during monsoon period

    levelled it & maintained its maximum original topography.

    There is no need for drilling & blasting as hard rock is not encountered in sand mining. Therefore

    Environment and Ecology of the area remains undisturbed.

    Light weight excavators/JCB will be deployed for extraction. Mining shall be carried through the

    formation of benches. Height & width of benches shall be kept 1.0m & 6m with face slope 400. Haul

    road having width 6.0 & gradient 1:12 shall be provided for the movement of machineries &

    transportation of sand. Mineral will be loaded in trucks of 25 tonne capacity. There will be no OB or

    waste generation as the sand is exposed in the river bed.

    Bench will advance parallel to the banks of the river. Height of bench will be 3.0 m. Workings will be

    restricted within the Applied Area/ khasra as per the description report given by Mining Department.

    Mining activities will be carried out in a manner so that there is no obstruction to the movement of water

    flow, if any, during rainy season. The bench will be in the form of slices/ strips parallel to the banks of

    the river. Roads in the Applied Area for the movement of loaded trippers/ trucks will not have slopes

    more than 1 in 20. However, movement of trucks after mineral loading will be towards both sides

    through approach roads connecting to tar roads. Every block will have its own approach roads, well

    connected to main highways. No processing of mineral will be done.

    Mining will be done upto a maximum depth of 2 m in layers of 1.0 m each which will avoid ponding

    effect.

    Mining will be confined within central 3/4th width of the river. This will prevent collapse of bank

    and erosion.

    It will be done leaving a safety zone of total of 1/4th of the width of the river from the banks for

    bank protection.

    Excavated area will be replenished naturally due to sediment inflow from the catchment area.

    The break up of year wise production schedule from each stretch is as below-

    Year Stretch No./Quantities of Sand in Tonnes Total quantities ofSand (Tonnes)1 2 3 4 5

    I 8827560 554922 70367 63239 526896 10042985II 8827560 554922 70367 63239 526896 10042985III 8827560 554922 70367 63239 526896 10042985IV 8827560 554922 70367 63239 526896 10042985V 8827560 554922 70367 63239 526896 10042985

    Total 44137801 2774612 351838 316199 2634485 50214925

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    19

    5.2 Population projection

    Main occupation in district Banka is agriculture. The demographic details of the nearby villages in

    district Banka is given below.

    The socioeconomic details of District Banka are as below:

    S. No. Description Number Percentage toRespective Total

    1 Gender wise Total Population 2373053 100

    Male 1242704 52.36

    Female 1130349 47.64

    Sex Ratio (Male/Female) 910

    2 Gender wise Total Population

    (0-6 age group)

    4375282 100

    Male 193179 51.50

    Female 182103 48.50

    Sex Ratio of 0-6 age group population 1.05

    3 Number of Households and Household Size 381601

    Urban Area/Rural Area 13604/367997

    Highest Household size 43274 (Dhuraiya)

    Lowest Household size 23632 ( Phulidnmar)

    4 Total Population of Scheduled CasteCommunity

    247885 100

    Male 118195 47.70

    Female 129663 52.30

    5 Total Population of General Community(including OBC)

    90432 100

    Male 45901 50.75

    Female 44531 49.25

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    20

    6 Total Literates Population 965321 100

    Male 590961 61.22

    Female 374360 38.78

    7 Total Workers 908106 100

    Male 704626 77.60

    Female 203480 22.40

    Overall Gender Gap in work participation rate 64.0

    8 Total Main Workers 965321 100

    Male 590961 61.20

    Female 374360 38.80

    Overall gender gap in work participation rate ofmain workers

    55.20

    9 Total Marginal Workers 731026 100

    Male 470427 64.35

    Female 260599 35.65

    Overall gender gap in work participation rate ofMarginal workers

    9.2

    10 Total Household Industrial Workers 240528 100

    Male 130246 54.15

    Female 110282 45.85

    11 Total Agricultural Workers 602412 100

    Male 398148 66.0

    Female 204264 34.0

    12 Total Cultivators 403828 100

    Male 214601 53.15

    Female 189221 46.85

    13 Total Agricultural Labour 360286 100

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    21

    Source: Mine Plan

    5.3 Landuse planning

    The land use of the mine lease area is the river bed of Chandan River, Badua River, Odhni River,

    Sukhniya River, Cheer River and there will be no change in landuse after operation. The sand will be

    replenished every year during the monsoon season. The ultimate land use of the mine lease area will not

    be changed.

    5.4 Amenities/facilities

    The following facilities/amenities will be extended by the mine management:

    A temporary rest shelter will be provided for the workers near to the site for rest.

    Provisions will also be made for following in the rest shelter:

    First aid box along with anti-venoms to counteract poison produced by certain species of small

    insects, if any.

    Sanitation facility i.e. septic tank or community toilet facility will be provided for the workers.

    Canteen will be made available near the sites.

    6. PROPOSED INFRASTRUCTURE

    6.1 Industrial area (Processing Area)

    No industrial area is proposed.

    6.2 Residential area (Non Processing Area)

    As the local people will be given employment, no residential area/ housing is proposed.

    6.3 Green belt

    The area of the proposed project lies in the river bed and in agriculture fields & devoid of any forest

    land.

    Male 182146 50.55

    Female 178140 49.45

    14 Total ‘Other Workers’ 248168 100

    Male 124596 50.20

    Female 123572 49.80

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    22

    Mining activities in River Bed blocks will not cause any harm to riparian or aquatic vegetation as

    mining will be only in the dry river bed portions of the river leaving safety distance from the bank.

    Hence it proposed to plant trees along the banks (wherever possible), along the road sides or near the

    civic amenities in consultation with village authority/local bodies.

    In river bed mining cases plantation will be done along the barrier zone i.e. around the periphery of the

    Applied Area of 7.5m width. It is proposed to have plantation along the road sides on both sides to

    provide cover against dust dissemination and also to act as noise absorber. Plantation will also be carried

    out as social forestry programme in villages, school/ and the areas allocated by the village

    authority/local bodies.

    Native plants like Mango, Neem, Eucalyptus, Peepal, Gulmohar, and other local species will selected in

    suitable combination, so that can grow fast and also have good leaf cover. It is proposed to plant 1,000 –

    1,500 no’s of native species every year.

    Year Saplings to beplanted

    Species Place of Plantation

    I 1500 Mango, Neem,Eucalyptus Peepal,Shisham, Babool,Gulmohar, Arjuna

    Along the road sides,banks and barrier zoneII 1500

    III 1500

    IV 1500

    V 1500

    VI 1000 Social forestry programme

    in the nearby villages.VII 1000

    VIII 1000

    Total 10,500

    6.4 Social infrastructure

    Road facility (existing roads will be maintained regularly) Employment opportunity Medical camps Social awareness camps, Donations to schools Secondary employment opportunities Formation of self help groups for the women in nearby villages

    6.5 Drinking Water Management

    Water required for drinking purpose will be obtained through tankers.

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    23

    6.6 Sewerage System

    No sewerage system is proposed at the mine site. However, septic tanks will be made available near the

    site for sanitation purpose.

    6.7 Industrial Waste Management

    Not applicable

    6.8 Solid Waste management

    No solid waste is expected. Hence, no management is required.

    6.9 Power Requirement & Supply/ Source

    All the activities will be carried out in a manual manner. The operation will be done only from sun rise

    to sun set hence there is no power requirement for the proposed activity.

    7 REHABILITATION AND RESETTLEMENT (R&R) PLAN

    Not Applicable

    8 ENVIRONMENT MANAGEMENT FUND

    As per the conditions of Saidhantik Letter, it has been proposed to allocate Environment Management

    Fund. The settlee shall deposit/pay an amount equal to 50% of the due contract money along with

    installments towards the ‘Mines and Minerals Development, Restoration and Rehabilitation fund.

    9. PROJECT SCHEDULE & COST ESTIMATES

    9.1 Likely date of start of construction and likely date of completion.

    The project will commence once Environmental Clearance and other necessary certificates are obtained

    from the respective departments.

    9.2 Estimated project cost along with analysis in terms of economic viability of the project

    The estimated cost of the project will be Rs 21, 93, 80,000.

  • PROJECT: District Banka Sand Blocks (Stretch 1 to 5) Mining Project Pre-Feasibility ReportAPPLICANT: M/S Mahadev Enclave Pvt. Ltd (Manoj Kumar Pachisia, Director)

    24

    10. ANALYSIS OF PROPOSAL

    The project involves collection of river bed material. This is very essential in order to prevent widening

    of the riverbeds and to prevent flooding off and damage to the adjoining areas. This can only be

    achieved by maintaining the existing course of the river.

    The river banks, on both sides are covered by vegetation and human habitats. Widening of river banks

    results in excessive erosion; resulting in damage to flora, agricultural land and settlements which are

    situated at very close proximity.

    This project operation will provide livelihood to the poorest section of the society. It provides

    employment to the people residing in vicinity directly or indirectly by the project. The sand extracted is

    in high demand in the local market. This also ensures scientific method of sand extraction.

    ***********