pre-feasibility reportenvironmentclearance.nic.in/writereaddata/online/tor/0_0...dalpatpura cheja...
TRANSCRIPT
PRE-FEASIBILITY REPORT
OF
DALPATPURA CHEJA PATHAR
MINING PROJECT
(M.L. No. 141/04, ML Area:1.0 ha)
Near
(Village-Dalatpura)
Tehsil- Neem Ka Thana
District-Sikar (Raj.)
PROJECT PROPONENT
Smt Resham Devi W/o Shri Rohitas Singh Yadav
H. No. 38-A, Miyawali Colony Gurgaon (Haryana)
Contact Person: Shri Gyani Ram
(Authorized Signatory)
Email: [email protected]
INDEX
S. NO. PARTICULARS PAGE NO.
1.0 EXECUTIVE SUMMARY 1
• ENVIRONMENTAL MANAGEMENT PLAN 2
• AIR POLLUTION CONTROL 2
• WATER MANAGEMENT 2
• NOISE POLLUTION CONTROL 2
• LAND RECLAMATION 2
• SOLID WASTE MANAGEMENT 2
• GREEN BELT DEVELOPMENT 2
2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3
3.0 PROJECT DISCRIPTION 3
4.0 SITE ANALYSIS 7
5.0 PLANNING BRIEF 11
6.0 PROPOSED INFRASTRUCTURE 11
7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN 12
8.0 PROJECT SCHEDULE & COST ESTIMATES 12
9.0 ANALYSIS OF PROPOSAL 13
Dalpatpura Cheja Pathar (Road Metal & Masonry Stone) Mining Project, (M. L. No. 141/04, Area 1.0
ha) at Village: Dalatpura, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-Feasibility Report
Smt Resham Devi W/o Shri Kartar Singh Yadav 17
PRE – FEASIBILITY REPORT
1.0 EXECUTIVE SUMMARY
This is proposal for Dalpatpura Cheja Pathar (Road Metal & Masonry Stone)
Mining Project, (M. L. No. 141/04, Area 1.0 ha) near Village: Dalpatpura,
Tehsil: Neem Ka Thana, District: Sikar (Rajasthan) of Smt Resham Devi W/o
Shri Kartar Singh Yadav.
Table No-1
Salient features of the Project
S. No. Particulars Details
A. Mining Lease Details
1. Name of the Project Dalatpura Cheja Pathar (Road Metal & Masonry Stone)
Mining Project, (M. L. No. 141/04, Area 1.0 ha)
2. Mineral Dalatpura Cheja Pathar (Road Metal & Masonry Stone)
3. Mining Lease Number M.L. No. 141/2004
4. Mining Lease Area 1.0 ha.
5. Applicant Smt Resham Devi W/o Shri Kartar Singh Yadav
B Location
6. Village Dalpatpura
7. Tehsil Neem Ka Thana
8. District Sikar
9. State Rajasthan
10. Latitude & Longitude Latitude - 27°50’37” N - 27°50’43” N;
Longitude - 76°03’56”E - 76°04’02”E
C. Other details
11. Cost of the project Rs. 10 Lacs
12. Cost for Environmental
Protection Measures
Rs. 0.50 Lac per annum
13. Cost for CSR Rs. 0.50 Lac per annum
14. Seismic Zone II
ENVIRONMENTAL MANAGEMENT PLAN
AIR POLLUTION CONTROL
� Sharp drill bits will be used for drilling to reduce generation of dust.
� Green Belt will be developed inside & outside of the lease area and 33% of the
total lease area.
Dalpatpura Cheja Pathar (Road Metal & Masonry Stone) Mining Project, (M. L. No. 141/04, Area 1.0
ha) at Village: Dalatpura, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-Feasibility Report
Smt Resham Devi W/o Shri Kartar Singh Yadav 18
� Periodical water spraying on the haul roads will be done.
WATER MANAGEMENT
� There is no surface water body in and around the mining lease area.
� Domestic waste water generated from office toilet will be disposed in soak pits
via septic tank.
NOISE POLLUTION CONTROL
� Proper maintenance of all machines will be carried out which will reduce noise
generation during operations.
� Workers exposed to high noise levels will be provided with ear defenders.
LAND RECLAMATION
� Total mining lease area is 1.0 hectares.
� The total excavated area will be used as water reservoir.
SOLID WASTE MANAGEMENT
� The generated solid waste i.e. powder and chips will come across during the
period of mining, the maximum quantity of waste has market and sold to market
as a second grade mineral.
GREEN BELT DEVELOPMENT
� Around 20 trees will be planted each year inside &outside the lease area and 33
% of the total lease area.
� Local species will be preferred for plantation
� Tree guards will be provided for production
2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION
I. Identification of Project and Project Proponent
Smt Resham Devi W/o Shri Kartar Singh Yadav is involved in business of minor
mineral from the mining lease for Dalatpura Cheja Pathar (Road Metal &
Masonry Stone) ML No. (141/2004) for an area of 1.0 ha. located near Village:
Dalatpura, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Dalpatpura Cheja Pathar (Road Metal & Masonry Stone) Mining Project, (M. L. No. 141/04, Area 1.0
ha) at Village: Dalatpura, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-Feasibility Report
Smt Resham Devi W/o Shri Kartar Singh Yadav 19
II. Brief Description of the Nature of Project
This is proposal for Dalatpura Cheja Pathar (Road Metal & Masonry Stone) Mining
Project, (M. L. No. 141/04, Area 1.0 ha) near Village: Dalatpura, Tehsil: Neem Ka Thana,
District: Sikar (Rajasthan) of Smt Resham Devi W/o Shri Kartar Singh Yadav. As per EIA
Notification dated 2006, as amended time to time, this project is comes under “A”
Category.
III. Need for the Project & Its Importance to the Country/ Region
The mineral Dalpatpura Cheja Pathar (Road Metal & Masonry Stone) is used in various
construction activities and will be sold to nearby markets to fulfill the requirements of
the local people.
IV. Demand – Supply Gap
Considering the demand of mineral sufficient availability of the mineral in the area, it is
essential to have Dalatpura Cheja Pathar (Road Metal & Masonry Stone) mine to sustain
the supply of stone for construction purpose.
V. Imports vs. Indigenous Production
It is a cheap mineral used in construction activities in rural areas therefore export is
not possible
VI. Export Possibility
There is no export possibility as these mineral is quite cheap and locally available in
abundance and used in rural areas.
VII. Domestic/Export Markets
These minerals have only domestic market and will fulfill the requirement of local. The
stone may also be supplied to stone crusher proposed to be installed outside the lease
area.
VIII. Employment Generation (Direct and Indirect) due to the Project
Total manpower required for the project will be 15 persons. The workers will be
employed directly from nearby villages.
3.0 PROJECT DESCRIPTION
I. Type of Project Including Interlinked And Independent Projects, If Any
This is opencast mining project. There is no interlinked or interdependent
project based on mineral produced. The mineral will be sold directly.
II. Location (map showing general location, specific location, and project
boundary & project site layout) with coordinates
Dalpatpura Cheja Pathar (Road Metal & Masonry Stone) Mining Project, (M. L. No. 141/04, Area 1.0
ha) at Village: Dalatpura, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-Feasibility Report
Smt Resham Devi W/o Shri Kartar Singh Yadav 20
Figure1: Location Map
Dalpatpura Cheja Pathar (Road Metal & Masonry Stone) Mining Project, (M. L. No. 141/04, Area 1.0
ha) at Village: Dalatpura, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-Feasibility Report
Smt Resham Devi W/o Shri Kartar Singh Yadav 21
III. Details of Alternate Sites Considered
No alternative site has been taken into consideration due to availability of
mineral resources in the area.
IV. Size and magnitude of operation
Proposed Production of Dalpatpura Cheja Pathar (Road Metal & Masonry Stone)
20,000 TPA from the mine located near near Dalatpura, Tehsil: Neem Ka Thana,
District: Sikar, (Rajasthan)
PROJECT DESCRIPTION WITH PROCESS DETAILS
A. Salient features along with project vicinity details of the Mining
project is given below:
Table - 2
Salient Features of the Project
S. No. Particulars Details
1. Name of the Project Dalatpura Cheja Pathar (Road Metal & Masonry
Stone) Mining Project
2. Mineral Dalatpura Cheja Pathar (Road Metal & Masonry
Stone)
3. Mining Lease Number M.L. No. 141/2004
4. Mining Lease Area 1.0 ha
5. Lease Holder (Proposed) Smt Resham Devi W/o Shri Kartar Singh Yadav
6. Bench Height & Width Height: 6 m, Width: 6m
7. Total Geological Reserves 1262500 tonnes
8. Mineable Reserves 1012500 tonnes
9. Life Of Mine 50 years @ 20,000 TPA
10. General Ground Level 370 mRL
11. Elavation 372 mRL 342 mRL
12. Water table 50 m bgl
13. Ultimate Working Depth 25 m gl
B. GEOLOGY OF THE AREA
Regional Geology
Delhi Super Group
Ajabgarh Group
Thanagaji
Formation
Andalusite-biotite-schist
Sariska
Formation
Brecciated ferruginous
quartzite
Kushalgarh
Formation
a. Calc-gnesis
b. Amphibole
Dalpatpura Cheja Pathar (Road Metal & Masonry Stone) Mining Project, (M. L. No. 141/04, Area 1.0
ha) at Village: Dalatpura, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-Feasibility Report
Smt Resham Devi W/o Shri Kartar Singh Yadav 22
c. Quartzite
Alwar Group Pratapgarh
Formation
Massive Quartzite
Kankawahi
Formation
Phyllite
schist
C. METHOD OF MINING
The proposed method of mining will be semi mechanized Opencast mining method. For
the systematic working of open pit mines, benching will be done. The height of bench
will not be kept more than 6 m and the width of benches shall not be less than the bench
height. The main development work will be formation of systematic benching. This
benching will also give the desired production of Masonary stone.
a. Drilling
The drilling will be done with the help of compressor and drills.
b. Blasting
The hole will be blasted by using ANFO.
c. Loading and Transportation
Hydraulic dumpers and tippers will be deployed for transportation of Dalatpura
Cheja Pathar (Masonary stone) from working to consumers.
PROCESS FLOW CHART OF MINING
TOP SOIL & O.B. REMOVAL
DRILLING
BLASTING
LOADING
TRANSPORT
TO CONSUMERS
Dalpatpura Cheja Pathar (Road Metal & Masonry Stone) Mining Project, (M. L. No. 141/04, Area 1.0
ha) at Village: Dalatpura, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-Feasibility Report
Smt Resham Devi W/o Shri Kartar Singh Yadav 23
d. LOADING & TRANSPORT
Mechnical Hydraulic dumpers and tippers will be deployed for transportation of
Dalatpura Cheja Pathar (Road Metal & Masonry Stone) from working to
consumers.
e. CONCEPTUAL PLAN
At the end of life of mine total excavated area will be 0.82 ha which will be
converted into water reservoir & 0.18 ha. area will be used for plantation.
(i) Raw Material Required Along With Estimated Quantity, Likely Source,
Marketing Area of Final Products, Mode of Transport of Raw Material and
Finished Product
This is existing Dalatpura Cheja Pathar (Road Metal & Masonry Stone) mining
Lease. The mineral will be used for construction purposes. No raw material will
be required to dependent industries.
(ii) Resources Optimization/ Recycling and Reuse Envisaged in the Project, if
any, should be briefly Outlined
� No waste water will be generated from mining operation
� Domestic sewage water generated from office toilet will be disposed in soak
pits via septic tank.
(iii) Availability of Water Its Source, Energy /Power Requirement and Source
A. Water requirement:
Total water requirement for the proposed project will be 2 KLD which will be
sourced from nearby villages.
B. Power requirement:
The electric power will not be used in the process of mining. Only HSD Fuel will
be required for operating machineries.
(iv) Quantity of Waste to Be Generated (Liquid and Solid) And Scheme for Their
Management/Disposal:
Domestic sewage water generated from office toilet will be disposed in soak pits
via septic tank.
4.0 SITE ANALYSIS
(i) Connectivity
Dalpatpura Cheja Pathar (Road Metal & Masonry Stone) Mining Project, (M. L. No. 141/04, Area 1.0
ha) at Village: Dalatpura, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-Feasibility Report
Smt Resham Devi W/o Shri Kartar Singh Yadav 24
The lease area is about ~ 32 km from Neem Ka Thana. Jaipur International
airport, Jaipur is at a distance of 115 km from the mine site. Dabala Railway
Station is around ~ 13 km. The lease area is well connected through roads.
(ii) Land Form, Land Use and Land Ownership
Existing Land Use Pattern
The total ML area of 1.0 ha comprises of Government land recorded as Gair
Mumkin Pahar in revenue records.
(iii) Topography
The lease area is highly folded and faulted. No nallah, river passing through the
mine area.
(iv) Existing Land Use Pattern {Agriculture, Non-Agriculture, Forest, Water
Bodies (Including Area Under CRZ)}, Shortest Distances From The
Periphery Of The Project To Periphery Of The Forests, National Park,
Wild Life Sanctuary, Eco Sensitive Areas, Water Bodies (Distance From
The HFL Of The River), CRZ. In Case Of Notified Industrial Area, A Copy Of
The Gazette Notification
Table –3
Environmental Settings
S. No. Particular Details
1. Nearest Village Dalatpura
2. Nearest city/ town Neem Ka Thana
3. Nearest Railway Station Dabala Railway Station at a distance of ~13 km in E
direction from mine site.
4. Nearest Airport Jaipur International Airport, Jaipur 115 km From the
mine site
5. Archaeological Important Place None, within 10 km radius area of mine site.
6. Ecological Sensitive Areas
(National Park, Wildlife
Sanctuary, Biosphere Reserve
etc.)
There is no National Park, Wild Life Sanctuaries,
Biosphere Reserves, Tiger Reserves, Wildlife
Corridors, etc. within 10 km radius.
7. Reserved/Protected Forest
within 10 km radius
• Banita PF ~ 5.0 km In S direction from Mine site
Dalpatpura Cheja Pathar (Road Metal & Masonry Stone) Mining Project, (M. L. No. 141/04, Area 1.0
ha) at Village: Dalatpura, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-Feasibility Report
Smt Resham Devi W/o Shri Kartar Singh Yadav 25
• Mina Ka Nangal PF~4.0 km from mine site
• Kharjo PF~7.5 km From Mine site
• Balupur PF ~ 4.3 km from mine site
• Hasimpur PF ~ 9.0 km from mine site
8. Nearest River / water body
within 10 km. radius
• None, within 10 km radius area of mine site.
Dalatpura Cheja Pathar (Road Metal & Masonry Stone) Mining Project, (M. L. No. 141/04, Area 1.0 ha) Village: Dalatpura, Tehsil: Neem Ka Thana,
District: Sikar (Rajasthan)
Pre-Feasibility Report
Smt Resham Devi W/o Shri Kartar Singh Yadav 26
Figure 2: Key plan
Dalpatpura Cheja Pathar (Road Metal & Masonry Stone) Mining Project, (M. L. No. 141/04,
Area 1.0 ha) Village: Dalatpura, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-Feasibility Report
Smt Resham Devi W/o Shri Kartar Singh Yadav 27
(v) Existing Infrastructure:
There is no building & structure within mining lease area except some
vegetations existing on the lease area which will be cleared when required.
Total lease area is Government waste land.
5.0 PLANNING BRIEF
(i) Planning Concept (Type of Industries, Facilities, and Transportation etc.)
Town and Country Planning/Development Authority Classification
This is a mining Project.
(ii) Population Projection
Manpower required will be engaged from nearby areas 15 workers will be
employed. No significant influx of people is anticipated in the area.
(iii) Land Use Planning
The extent of proposed mining lease area is 1.0 ha. The area comprises of govt.
waste land.
(iv) Assessment of Infrastructure Demand (Physical & Social)
Lessee will assess the demand of infrastructure (Physical & Social) in nearby
area of the proposed mine site and same will be developed under social work
(v) Amenities/Facilities
Lessee will develop the Amenities/Facilities in the nearby area of the proposed
mine site as per requirement of local people of the nearby area under
corporate social responsibility programs.
6.0 PROPOSED INFRASTRUCTURE
(i) Residential Area (Non Processing Area)
This is not required as mine workers will come from nearby villages.
Temporary rest shelters will be provided.
(ii) Green Belt
Around 20 trees will be planted each year inside &outside the lease area and
33 % of the total lease area. Local species will be preferred for plantation
Tree guards will be provided for production
(iii) Connectivity
The lease area is about ~ 32 km from Neem ka Thana. Jaipur International
airport, Jaipur is at a distance of 115 km from the mine site. Dabala Railway
Station are around ~ 13 km. The lease area is well connected through roads.
Dalpatpura Cheja Pathar (Road Metal & Masonry Stone) Mining Project, (M. L. No. 141/04,
Area 1.0 ha) Village: Dalatpura, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-Feasibility Report
Smt Resham Devi W/o Shri Kartar Singh Yadav 28
(iv) Water Management (Source & Supply of water)
Total water requirement for the project will be 2 KLD which will be used for
domestic as well as dust supression purpose and sourced from nearby
village.
(v) Sewerage System
Not applicable
(vi) Industrial Waste Management
No industrial waste water will be generated from this mine during mining
operation.
(vii) Solid Waste Management
The generated solid waste will be used for construction works.
(viii) Power Requirement & Supply/Source
Electric power will not be required in mining operations.
7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN
(i) Policy To Be Adopted (Central/State) In Respect Of The Project Affected
Persons Including Home Oustees, Land Oustees And Landless Laborers
(Brief Outline To Be Given)
Not Applicable as the lease area falls in government land.
8.0 PROJECT SCHEDULE & COST ESTIMATES
(i) Likely Date Of Start Of Construction And Likely Date Of Completion (Time
Schedule For The Project To Be Given)
This is a case of existing mine. Now Environmental Clearance is required As
per EIA Notification dated 2006, as amended time to time, this project is comes
under B Category.
(ii) Estimated Project Cost Along With Analysis In Terms Of Economic
Viability of the Project
���� Total Project Cost : Rs 10.0 Lac
���� Environment Protection Cost : Rs 0.50 Lacs Per annum
���� Cost for CSR : Rs 0.50 Lacs Per annum
9.0 ANALYSIS OF PROPOSAL
���� Proposed Dalatpura Cheja Pathar (Masonry Stone) Mining Lease will result in
growth of the surrounding areas by increasing direct and indirect employment
Dalpatpura Cheja Pathar (Road Metal & Masonry Stone) Mining Project, (M. L. No. 141/04,
Area 1.0 ha) Village: Dalatpura, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-Feasibility Report
Smt Resham Devi W/o Shri Kartar Singh Yadav 29
opportunities in the region including ancillary development and supporting
infrastructure. Special emphasis on Financial and Social benefits will be given
to the local people including tribal population, if any, in the area.
���� Development of social amenities will be in the form of medical facilities,
education to underprivileged and creation of self help groups.
���� No major adverse effect on environment is envisaged as the required