PRE-FEASIBILITY REPORT & ENVIRONMENTAL MANAGEMENT PLAN Of MINING OF COLOUR GRANITE – 1.983 HA SY.NO: 61/4A & 4B, POLAVARAM VILLAGE, SANKAVARAM MANDAL, EAST GODAVARI DISTRICT, ANDHRA PRADESH By M/s. SILICON ROCS, MANAGING PARTNER: SMT. M. MADHU PRIYA, D.NO.4-3-39/F, BOJJAVARI THOTA, PITAPURAM (V & M), EAST GODAVARI (D), ANDHRA PRADESH-533450.

Upload: trinhnhi

Post on 29-Jul-2018

225 views

Category:

Documents


1 download

TRANSCRIPT

PRE-FEASIBILITY REPORT

&

ENVIRONMENTAL MANAGEMENT PLAN

Of

MINING OF COLOUR GRANITE – 1.983 HA SY.NO: 61/4A & 4B, POLAVARAM VILLAGE,

SANKAVARAM MANDAL, EAST GODAVARI DISTRICT,

ANDHRA PRADESH

By

M/s. SILICON ROCS, MANAGING PARTNER: SMT. M. MADHU PRIYA,

D.NO.4-3-39/F, BOJJAVARI THOTA,

PITAPURAM (V & M), EAST GODAVARI (D),

ANDHRA PRADESH-533450.

1

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

1.0 EXECUTIVE SUMMARY: The Granite Mining project of M/s. Silicon Rocs – 1.983Ha is located at Sy.No:

61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra

Pradesh.

The Principle Mine Lease was granted on the name of M/s. Silicon Rocs vide

Director Mines & Geology, Notice No: 11411/R1.3/2015, Dated 20-06-2015 for

a period of 20 Years.

The Mining plan has been approved by Deputy Director Mines & Geology,

Kakinada, vide Lr. No: 2258/MP-RJY/2015, Dated 09-11-2015.

TABLE-1: SALIENT FEATURES OF THE PROJECT SITE

S.No Particulars Details

1. Name of the Project M/s. Silicon Rocs

2. Nature Colour Granite Mining

Size of the Project 1.983 Ha

Type of Land Patta Land

3. Location Details

Survey No 61/4

Village Polavaram

Mandal Sankavaram

District East Godavari

State Andhra Pradesh

Latitude & Longitude 1). 170 24’ 30.1” N – 820 17’ 34.9” E

2). 170 24’ 35.3” N – 820 17’ 33.0” E

3). 170 24’ 35.1” N – 820 17’ 29.8” E

4). 170 24’ 28.3” N – 820 17’ 30.7” E

Toposheet No 65 K/7

4 Govt. Orders

Mine Lease Order DMG Notice No: 11411/R1.3/2015,

Dated 20-06-2015

Mine Plan Approval Letter No: 2258/MP-RJY/2015,

Dated 09-11-2015

2

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

5 Environmental Setting

Nearest Village Polavaram – 0.3 Km (NE)

Nearest Town Sankavaram – 16.0 Km (SW)

Nearest Railway Station Annavaram – 20.5 Km (SSE)

Nearest Airport Rajahmundry Airport – 60Kms (SW)

Inter State Boundary None

Water Bodies None

Forests Sarlanka RF - 1.0 Kms (N)

Uligogula RF - 1.8 Kms (W)

Pedda Garrangi RF - 1.8 Kms (NNW)

Santapaidipala RF - 2.1 Kms (E)

Anantaram RF - 2.8 Kms (SE)

Bavuruvaka RF - 6.1 Kms (S)

Raghavapatnam RF - 6.3 Kms (ENE)

Chikilinta RF - 7.3 Kms (WNW)

Vatangi RF - 9.5 Kms (N)

Historical /Important Places None

Ecologically Sensitive Areas None

6 Project Requirements

Water Requirement 4.2 KLD

Power Requirement 80 KVA D.G. Set

Man Power Requirement 34 No’s

7 Mining Method Open Cast Semi Mechanized

8 Project Cost 80 Lakhs

9 EMP Budget Rs. 3.70 Lakhs (Capital Cost)

Rs. 2.60 Lakhs (Recurring Cost)

10 Present Proposal New Mine and Applied for EC

11 Appraisal Category B2 category

3

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION

2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT: Project Details: The Granite Mining project of M/s. Silicon Rocs – 1.983Ha is located at Sy.No:

61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra

Pradesh.

Project Proponent: Smt. Madhu Priya is the Managing Partner and having their registered office at

D.No.4-3-39/F, Bojjavari Thota, Pitapuram, East Godavari, Andhra Pradesh-

533450.

2.2 BRIEF DESCRIPTION OF THE NATURE OF THE PROJECT: As per EIA Notification dated 14th Sep, 2006 and as amended till date, the

project falls under, Category “B2, which requires obtaining Environmental

Clearance from SEIAA, Andhra Pradesh, Ministry of Environment & Forests,

Govt. of India.

The method of mining will be open cast semi mechanized method by

forming of proper benches.

The mining of Granite production will be approximately 4,400

m3/Annum.

The lease area is 1.983 Ha.

Total minable reserves available is 1,84,610 m3.

OB / Waste generated entire lease period will be 2,94,740 m3.

The Granite will be transported through trucks.

4

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

2.3 NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY/

REGION:

Rapid industrialization and growth in infrastructure has made global as well as

domestic demand for Granite. So number of Granite manufacturing quarries &

industries are coming up in this sector. Granite is the chief material in this

sector, for the export industries like monuments, flooring slabs, Kitchen

articles, sculptures & export. The size & quality parameters for supply of the

mineral will be as per the requirements of the user industry.

The mining and associated activities in the mineral rich areas increase the gain

s in gross domestic product (Gross Domestic Product). Total of 34 people will

be employed for the mining activity. It will create ample opportunity for

employment to local population. For the mineral production applicant will pay

royalty, direct and indirect taxes will also paid and it will also contributing to

the regional revenue.

The proposed Granite mining project will cater the need of requirement for

individual and market. Besides this, the project will prove beneficial in terms of

socio economic development.

2.4 DEMAND – SUPPLY GAP: Granite is a constituent for infrastructural development projects like buildings

and constructions. It has high demand in region due to increase in industrial

and other infrastructural activities.

2.5 IMPORTS VS. INDIGENOUS PRODUCTION:

The excavated granite will be dispatched to the block cutting industries located

in the state and at different parts in the country. There will be indigenous

inputs in the entire mining activity. The Granite is used in various

Construction and Architectural uses as well as making decorative items, which

also have export market.

5

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

2.6 EXPORT POSSIBILITY: Granite produced from the mine will fulfill the needs of the region and surplus

if any, will be considered for export.

2.7 DOMESTIC/ EXPORT MARKETS:

Domestic Market

The mineral is used in Tiles flooring, column making, graveyard, pre fabrication

unit, statue making and in small usages like monument of table top, name

plate, vases, candle holder etc.

Export Market

The proposed mining activity is for indigenous consumption only for real state,

decorative accessories etc.

2.8 EMPLOYMENT GENERATION: The total number of man power is required for the mining activity is 34 people.

Skilled labour will operate the technical jobs and unskilled will do the other

jobs. Following personnel are employed at the mine site.

Designation No. of Persons Mines Manager 1 Mine Surveyor 1 Mine Foreman 1 Mine Mate 1 Mechanical Engineer 1 Electrical Supervisor 1 Electrician 1 Mechanics 3 Operators 9 Fitters & Helpers 15 Total 34

6

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

3.0 PROJECT DESCRIPTION: The project activity is Granite mining. In India, the number of operating

opencast mines is steadily increasing as compared to underground mines. It is

due to low gestation period, higher productivity, and quick rate of investment.

On the contrary, opencast mining attracts environmental concerns such as

solid waste management, land degradation and socio-economical problems.

Most of the adverse impacts of mines are amenable to technological control by

providing necessary preventive and control measures and finally through

effective environmental management of the operating mines. Environment

Clearance is required for project from State Environmental Impact Assessment

Authority/State Expert Appraisal Committee as per MoEF, EIA notification

2006 & Its Amendments thereof.

3.1 TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IF ANY; The mining of Granite is carried out by open-cast semi-mechanized method.

This is an independent project. No interlinked project is proposed.

3.2 LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC

LOCATION, AND PROJECT BOUNDARY & PROJECT SITE LAYOUT) WITH

COORDINATES;

The Granite Mining project of M/s. Silicon Rocs – 1.983Ha at Sy.No: 61/4,

Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra

Pradesh.

Top sheet No: 65 K/7

Geographical Coordinates:

The Location Map, Topographical Map, Site Photographs & Mine Layout Sketch

is provided at Figure No: 3.1 & Figure No: 3.2.

Latitude 170 24’ 30.1” N

Longitude 820 17’ 34.9” E

7

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

FIGURE 3.1 – PROJECT LOCATION MAP

M/s. Silicon Rocs.

8

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

FIGURE 3.2 – TOPOGRAPHICAL MAP

9

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

FIGURE 3.3 – PROJECT SITE PHOTOGRAPHS

10

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

FIGURE 3.4 – PROJECT SITE LAYOUT

11

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

3.3 DETAILS OF ALTERNATE SITES CONSIDERED AND THE BASIS OF

SELECTING THE PROPOSED SITE, PARTICULARLY THE ENVIRONMENTAL

CONSIDERATIONS GIVEN INTO SHOULD BE HIGHLIGHTED:

No alternative site has been taken into consideration as the mineral (Granite) is

available at this site.

3.4 SIZE OR MAGNITUDE OF OPERATION: Mine area for the Proposed Granite Mine is – 1.983 Ha and proposed

production Capacity is 4,400 m3/Annum.

3.5 PROJECT DESCRIPTION WITH PROCESS DETAILS (A SCHEMATIC

DIAGRAM / FLOW CHART SHOWING THE PROJECT LAYOUT,

COMPONENTS OF THE PROJECT ETC. SHOULD BE GIVEN).

Details regarding topography geology, mineable reserves, and production

details, Method of mining and extent of mechanization are given below;

3.5.1 Topography: Topographically the subject area is a plane land and small elongated outcrops of

Granatic terrains occurred here and there.

3.5.2 Regional Geology: The Regional Geology around the lease area covered by toposheet no 65 K/7

consists of charnokites and migmatites group of rocks of Eastern ghats mobile

belt of Archean age. The subject area consists of Migmatite rocks.

3.5.3 Local Geology: The accessory minerals are fine to medium in grain and formed around the

elongated feldspar crystals due to that in hand specimen and migmatite rock is

looking attractive in nature. The rocks can be useful for cutting and polishing

purposes as colour granite.

12

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

3.5.4 Geological Reserves: Geological traverses in the quarry and the study of exposures in the quarry

facilitated to access the shape and size of the deposit in the area. It is a plain

terrain sheet rock deposit exposed up to ground level. The surface of sheet rock

is wavy and gradually undulated.

The exposed granite deposit is found to be irregular in shape, the volume of the

deposit is computed by cross sectional area method by multiplying the cross

sectional area with Proved 20m, Probable 20m and Possible 20m depth from

the top RL.

Sections Sectional Area (M2)

Sectional Influence (M)

Volume (M3)

Recovery @ 23% (M3)

A-A1 10,550 30 3,16,500 72,795

B-B1 9,955 30 2,98,650 68,690

C-C1 6,250 30 1,87,500 43,125

Total 8,02,650 1,84,610

Total Geological Reserves = 8,02,650 m3.

Extraction of Market Grade Reserves @ 23% Recovery = 1,84,610 m3.

3.5.5 Life of the Mine:

Total Mineable Reserves = 184610/4400 = 42 Years

Production per Year

3.5.6 Method of Mining: The colour granite in the quarry lease applied area is exposed on the surface

with boulders. Hence, it is proposed to mine the boulders sheet by open cast,

semi mechanized methods, by developing the branches of 6m height in 2

phases of 3m each. Wire saw cutting will deployed based on the favorable

conditions. The development of benches in the sheet rock will be maintained

@ 600 safety slopes.

13

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

The separation of blocks from the mother rock will be carried out by drilling,

wedge cutting, blasting, excavation will be done by the machinery.

The secondary splitting, dressing of blocks will be done manually.

Therefore mining operations are to be carried out in this area in 2 stages.

1. Development

2. Production.

Stage – 1

The removal of weathered and under sized boulders will be cleared in the

quarry lease applied area for the next five years by using excavator.

Rock Splitting/Wedging:

Thus 20’ x 20 to 40’ x 20’ to 40’ mass will be separated from mother rock. Then

horizontal holes will be drilled at the bottom of the bench, by wedging or

blasting with water cartridges and cardex fuse, bottom separation will be

achieved.

Splitting the mass:

For splitting the mass from mother rock the line drilling and wedging method

is in use; with jack hammers and this waste will be dumped yard using tipper.

Stage – 2

After removal of weathered and under sized boulders.

The large boulders will be subjected to splitting into required sizes of

blocks by using Jack Hammers by drilling series of deep holes at right

angles at regular intervals, later by inserting feather and wedges in these

holes and hammering with sledge hammer will release the blocks.

The burner cutters will be deployed for shaping the boulders.

The boulders will be splitted to the required sizes with drilling and if

required by using chemical compound at the source only. The boulders

separated will be brought to the dressing yard for dressing.

If the boulders which fit into the required market grade size will be

transformed into cuboids.

14

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

Secondary Splitting:

After separation from the mother rock it is properly checked by washing with

water to identify defects and cracks. Based on this observation, the size is

decided and the blocks are marked and separated by drilling and wedging.

The separated pieces will be examined for defects and lines, then the block or

blocks are marked in clear area and holes are drilled along the line of marking

with the help of feathers and wedges the waste portions are separated forming

a rectangular blocks. Any bulges will be removed by drilling and wedging

making it perfect blocks. A perfect block is that all the sides shall make with

each other 900.

Dressing:

After primary separation the rock mass will be carefully examined to avoid hair

line cracks, mineral segregations and veins etc., The dressing of the rough

blocks will be made by chipping the edges and geometrically equating the

edges of the block at the dressing yard. The rough blocks obtained after

primary cut it will be dressed for obtained good geometric shape of granite.

3.5.7 Extent of Mechanization: The machinery requirement is mainly for drilling and transporting the

materials. The details of required machinery are presented in Table 3.2.

TABLE 3.2: MACHINERY REQUIREMENTS

S.No. Description Number(s)

1. Excavator 1

2. Tipper 2

3. Compressor 1

4. Jack Hammers 3

15

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

3.5.8 Year wise Production Details:

The year wise production proposed is shown in the following table

TABLE 3.3: YEAR WISE PRODUCTION DETAILS

Year Working

area

Bench

Height

(m)

Volume

(m3)

Production (m3)

Granite

@23%

waste

@77%

1st

(2015-2016)

2600 6 15600 3588 12012

2nd

(2016-2017)

3300 6 19800 4554 15246

3rd

(2017-2018)

3400 6 20400 4692 15708

4th

(2018-2019)

3450 6 20700 4761 15939

5th

(2019-2020)

3200 6 19200 4416 14784

Total 15950 95700 22011 73689

Average 3190 19140 4402 14737

3.5.9 Loading & Transport:

Blocks from mother rock separated by excavator and the slope of the ramp is

gentle the rough block will be brought to the dressing yard by excavator/tipper.

Here after the dressing the blocks will be transported to destination by Trucks.

3.5.10 Waste Generation & Disposal:

It is estimated that in the five years a total of 73,689 m3 of waste is expected to

be generated with an average of 14,737m3 per annum. The waste generated will

be dumped towards SE side of the lease area in an area of 2000m2. The year

wise waste generation in next 5 years as follows

16

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

TABLE 3.3: YEAR WISE WASTE GENERATION

Year Granite Waste (Cum)

I 12,012

II 15,246

III 15,708

IV 15,939

V 14,784

Total 73,689 Average 14,737

3.6 RAW MATERIAL REQUIRED ALONG WITH ESTIMATED QUANTITY,

LIKELY SOURCE, MARKETING AREA OF FINAL PRODUCTS, MODE OF

TRANSPORT OF RAW MATERIAL AND FINISHED PRODUCT

No raw material will be required. The final product will be sent to consumer

industries based on their demand. The mode of transportation of raw material

will be by road. Trucks will be used for transportation to the end users.

3.7 RESOURCES OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED IN

THE PROJECT, IF ANY, SHOULD BE BRIEFLY OUTLINED

Mineral will be utilized and sent for use to different end users. Some of the

rejects/ waste will be used for the maintenance of roads.

3.8 AVAILABILITY OF WATER ITS SOURCE, ENERGY /POWER

REQUIREMENT AND SOURCE;

Water Requirement:

The daily water requirement will be 4.2 KLD, which will be sourced from

outside Tankers

REQUIREMENT KLD

Dust suppression on haul roads 1.6 Green belt 0.9 Domestic Activities 1.5

Others 0.2 Total water required 4.2

17

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

Power Requirement: There will not be any requirement of power supply for the proposed project

activity. The Quarry activities are envisaged to be carried out only during day

time by manually and Semi mechanized method. All the equipment shall be

operated with diesel as motive power. One D.G set of 80 KVA is proposed for

back-up power and other requirements.

3.9 QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) AND

SCHEME FOR THEIR MANAGEMENT/DISPOSAL:

About 14,737 m3 of waste in every year and about 73,689 m3 of waste in first

plan period and about 2,94,740 m3 of waste in an entire lease period of the

mine will be generated. The waste generated will be dumped towards SE side of

the lease area in an area of 2000m2.

No liquid effluent will be generated at the mine site. The domestic wastewater

of 4.2 KLD generated will be sent to septic tanks followed by soak pits.

4.0 SITE ANALYSIS 4.1 CONNECTIVITY (Mine Site) MODE DESCRIPTION

Nearest Railway Station Annavaram - 20.5 Kms (SSE)

Nearest Airport Rajahmundry Airport – 60Kms (SW)

Nearest Highway NH-5 – 20.0 Kms (S)

Nearest Seaport Kakinada Port – 50.0 Kms (S)

4.2 LAND FORM, LAND USE AND LAND OWNERSHIP 4.2.1 Land Form: The lease area is covered in the Survey of India Topo Sheet No: 65 K/7 and is a

barren mound.

18

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

4.2.2 Land Use:

The sanctioned lease area is a Patta Land, 1.983 Ha and being not to put any

other use.

4.2.3 Land Ownership: The sanctioned lease area is Patta Land, 1.983 Ha.

4.3 TOPOGRAPHY:

Topographically the subject area is a plane land and small elongated outcrops of

Granatic terrains occurred here and there.

4.4 EXISTING LAND USE PATTERN (AGRICULTURE, NON-AGRICULTURE,

FOREST, WATER BODIES (INCLUDING AREA UNDER CRZ)), SHORTEST

DISTANCES FROM THE PERIPHERY OF THE PROJECT TO PERIPHERY OF

THE FORESTS, NATIONAL PARK, WILD LIFE SANCTUARY, ECO

SENSITIVE AREAS, WATER BODIES (DISTANCE FROM THE HFL OF THE

RIVER), CRZ. IN CASE OF NOTIFIED INDUSTRIAL AREA, A COPY OF THE

GAZETTE NOTIFICATION SHOULD BE GIVEN.

The existing land use is Patta land and being not to put any other use

S.NO PARTICULARS DETAILS

1. Archeological Important Places None

2. Ecological Sensitive areas (National park, Wild Life Sanctuary & Biosphere Reserve etc.)

None

3. Reserved Forests Sarlanka RF - 1.0 Kms (N)

Uligogula RF - 1.8 Kms (W)

Pedda Garrangi RF - 1.8 Kms

(NNW)

Santapaidipala RF - 2.1 Kms (E)

Anantaram RF - 2.8 Kms (SE)

Bavuruvaka RF - 6.1 Kms (S)

Raghavapatnam RF - 6.3 Kms

(ENE)

Chikilinta RF - 7.3 Kms (WNW)

Vatangi RF - 9.5 Kms (N)

4. River/Water Bodies None

19

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

4.5 EXISTING INFRASTRUCTURE: There are no buildings & structures within the mine lease area except some

vegetations existing in the lease area which will be cleared when required.

Basic Amenities:

A) Communication & Post-Office:-

The Nearest Post & Telegraph Office is at Sankavaram – 16.0 Km (SW)

B) Government & Private Schools: - Sankavaram – 16.0 Km (SW)

C) Nearest Hospital: - Sankavaram – 16.0 Km (SW)

D) Nearest Dispensary is at Sankavaram – 16.0 Km (SW)

4.7 CLIMATIC DATA FROM SECONDARY SOURCES:

4.8 SOCIAL INFRASTRUCTURE AVAILABLE:

S.NO PARTICULARS DETAILS

1. Minimum Temp 18°C

2. Maximum Temp 38°C

3. Average Annual Rainfall 1100 mm

Particulars Name Distance with Direction

Nearest Habitation Polavaram 0.3 Kms (NE)

Nearest Town Sankavaram 16.0 Km (SW)

District Headquarter Rajahmundry 60.0 km (SW)

Nearest Railway station Annavaram 20.5 kms (SSE)

Nearest Airport Rajahmundry 60.0 Kms (SW)

Nearest Port Kakinada 50.0 kms (E)

Nearest High way NH-5 20.0 kms (S)

NearestDispensary&Govt. Hospital Sankavaram 16.0 Km (SW)

Education Facilities Sankavaram 16.0 Km (SW)

20

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

5.0 PLANNING BRIEF 5.1 PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, AND

TRANSPORTATION ETC.) TOWN AND COUNTRY PLANNING/

DEVELOPMENT AUTHORITY CLASSIFICATION

The project activity is mining of Granite, which will be done by opencast semi

mechanized method by forming benches. The ultimate pit limit is marked as

shown on the Geological Plan & Sections. Conceptual plan period production &

development details as furnished in the Conceptual Mine Plan. Dumping will

be done at designated area within the lease area. At the end of the Conceptual

Period complete dumps will be afforested and wherever possible and along road

sides greenbelt development will be carried out. Safety bunds, fencing &

retaining walls shall be constructed as per the directions and guidelines of

Directorate General of Mines Safety.

5.2 POPULATION PROJECTION:

The man power of mines includes Mines manager, Engineer, Geologist, skilled

and unskilled Labours and medical officers etc. As for the Socio-Economic is

concerned from the quarry activity nearby villagers shall get direct employment

for about 34 persons. The proposed Quarry activities also shall bring the

positive change in the villages.

5.3 LAND USE PLANNING (BREAKUP ALONG WITH GREEN BELT ETC.)

• Greenbelt will be developed in an area of 0.44 Hectares in lease period.

• Plantation will be done along the Buffer zone of the Lease area and Waste

dumps.

• Plant species like Pongamia & Neem will be used to develop green belt.

• About 10 Saplings will be planted along both sides of the Haul road of

50mts length at 5 mts spacing

21

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

5.4 ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL AND SOCIAL): The existing road network will be sufficient to meet the proposed production

capacity. However, required infrastructure for transport within the leasehold

area will be further strengthened and improved. No new routes or alternations

are required in this regards.

5.5 AMENITIES/FACILITIES

It is proposed to provide the site services like Mines office and other statutory

constructions like Rest Shelter, First Aid, Work shed and Drinking water as

required near the QL.

Manager’s Room – 6m x 6m x 3m with ACC roof

Rest Room – 6m x 6m x 3m with ACC roof

Toilets – 2m x 1.5m x 3m

First Aid – Provision is made in the Manager’s Room

Drinking water – Provision is made in the Rest Room

6.0 PROPOSED INFRASTRUCTURE: 6.1 INDUSTRIAL AREA (PROCESSING AREA- MINE LEASE AREA)

The total mine lease area is 1.983 Hectares. Mines office and other statutory

constructions like rest shelter, first aid, work shed are available at the site and

the same will be utilized for future.

6.2 RESIDENTIAL AREA (NON PROCESSING AREA) As the local person will be given preference for employment, hence no

residential area/ housing is proposed.

22

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

6.3 GREEN BELT: • Greenbelt will be developed in an area of 0.44 Hectares in lease period.

• Plantation will be done along the Buffer zone of the Lease area and Waste

dumps.

• Plant species like Pongamia & Neem will be used to develop green belt.

• About 10 Saplings will be planted along both sides of the Haul road of

50mts length at 5 mts spacing

Year Name of Plant No. of Plants

Area Spacing Area in Ha

1st Year Pongamia & Neem 36 2.5m x 2.5m 0.022

2nd Year Pongamia & Neem 36 2.5m x 2.5m 0.022

3rd Year Pongamia & Neem 36 2.5m x 2.5m 0.022

4th Year Pongamia & Neem 36 2.5m x 2.5m 0.022

5th Year Pongamia & Neem 36 2.5m x 2.5m 0.022

Total 180 0.11

Lease Period

Total 720 0.44

6.4 SOCIAL INFRASTRUCTURE:

Local people will be employed for excavation activity. The project will provide

the indirect means of earnings in the area of vehicle driving, shops,

construction etc. As a result the project will bring a positive impact on the

adjacent civilization. The proponent will spend 1% of profit for the development

of the area i.e. medical facilities, schools, temples and other social work.

6.5 CONNECTIVITY (TRAFFIC AND TRANSPORTATION ROAD / RAIL / METRO/ WATER WAYS ETC.)

MODE DESCRIPTION

Nearest Railway Station Annavaram - 20.5 Kms (SSE)

Nearest Airport Rajahmundry Airport – 60Kms (SW)

Nearest Highway NH-5 – 20.0 Kms (S)

Nearest Seaport Kakinada Port – 50.0 Kms (S)

23

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

6.6 DRINKING WATER MANAGEMENT (SOURCE & SUPPLY OF WATER): The total water requirement of the project is 4.2 KLD which will be used for

Dust Suppression, Greenbelt Development & Domestic purposes and will be

sourced from nearby villages through Tankers.

6.7 SEWERAGE SYSTEM: Domestic Waste Water will be sent to Septic Tank followed Soak pit. Outside

discharge is not envisaged.

6.8 INDUSTRIAL WASTE MANAGEMENT: There is no generation of Industrial Solid waste due to this mining activity.

6.9 SOLID WASTE MANAGEMENT: About 14,737 m3 of waste in every year and about 73,689 m3 of waste in first

plan period and about 2,94,740 m3 of waste in an entire lease period of the

mine will be generated. The waste generated will be dumped towards SE side of

the lease area in an area of 2000m2.

6.10 POWER REQUIREMENT & SUPPLY/SOURCE: There will not be any requirement of power supply for the proposed project

activity. The Quarry activities are envisaged to be carried out only during day

time by manually and Semi mechanized method. All the equipment shall be

operated with diesel as motive power. One D.G set of 80 KVA is proposed for

back-up power and other requirements.

7.0 REHABILITATION AND RESETTLEMENT (R and R PLAN): 7.1 POLICY TO BE ADOPTED (CENTRAL/STATE) IN RESPECT OF THE PROJECT AFFECTED PERSONS INCLUDING HOME OUSTEES, LAND OUSTEES AND LANDLESS LABOUR (A BRIEF OUTLINE TO BE GIVEN). Not Applicable as the lease area is Patta Land and there is no involvement of

Rehabilitation and Resettlement plan.

24

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

8.0 PROJECT SCHEDULE AND COST ESTIMATES: 8.1 LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATE OF

COMPLETION (TIME SCHEDULE FOR THE PROJECT WILL BE GIVEN).

The project will be started once obtain the Environmental Clearance and other

necessary approvals from respective departments of state Government.

8.2 ESTIMATED PROJECT COST AND ALONG WITH ANALYSIS IN TERMS

OF ECONOMIC VIABILITY OF THE PROJECT

Total project cost – 60 Lakhs

EMP Capital Cost – 3.70 Lakhs

EMP Recurring Cost – 2.60 Lakhs

9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)

The Granite lease is result in growth of the surrounding areas by

increasing direct and indirect employment opportunities in the region

including ancillary development and surrounding infrastructure. Special

emphasis on Financial and Social Benefits is being given to the local

people including tribal population, if any in the area.

The project will bring economical benefits to the state by the way of

Royalty.

Development of social amenities is in the form of medical facilities and

providing books and school uniforms to the poor students nearby

schools.

No major adverse effect on environment is envisaged as the required

mitigation measures are will be given priority

25

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

10.0 ENVIRONMENTAL MANAGEMENT PLAN: 10.1 POLLUTION SOURCES & CONTROL MEASURES:

S.NO PARTICULARS SOURCE CONTROL MEASURES & MANAGEMENT

1. Air Pollution Drilling,

Loading &

Un Loading

Haul Roads

Transportation ,

Waste Handling

&

D.G. Set (80

KVA)

a) Wet Drilling System

b) Jackhammer are provided with

Gunny bags

c) Regular Sprinkling of Water on

haul roads

d) Greenbelt Development along

the Buffer Zone of the Lease area,

Haul roads & Waste Dumps

e) 5.0 Mts of stack height is

provided for DG Set

( H = h + 0.2 x √ KVA)

= 3+ 0.2 x √80 KVA = 4.78mts

f) Provision of dust masks

g) Cloth for drillers

2. Water

Pollution

Domestic Waste

Water

a).1.2KLD of Domestic wastewater

will be sent to the septic tank

followed by soak pit.

b). Retention wall at the foot of the

dump for allowing clean water

out.

c).Garland drains will be provided

around the waste dump.

d).Siltation tanks construction at

the discharge end of garland

drains to arrest silt.

3. Noise

Pollution

Drilling,

Material

Handling,

Loading,

D.G. Set &

Movement of

vehicles

a). Periodical maintenance of

machinery

b). Thick green belt along the

Buffer Zone of the Lease area

c). Acoustic enclosure for the DG

sets

d). Speed of vehicles will be

limited

e). Provision of earmuffs/ear

plugs to employees

26

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

4. Solid Waste

Rock Waste /

Over Burden waste

14,737 m3 per

annum and

2,94,740 m3 in

lease period

a).The waste generated will be

dumped in a dumping yard over

an area of 2000 sq.mts towards

South East side of the lease area.

b).Retaining wall will be

constructed around the dump

c).Garland drains will be

constructed around the dump

d).Rock Waste is crushed into

smaller sizes and used as a road

metal

e).Over Burden waste is used in

filling low lying areas

f).Rejected material is used in

making of tiles

5. Reclamation - Reclamation will be taken up on

need basis before the conclusion

of Mining operations.

27

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

10.2 BUDGET FOR IMPLEMENTATION OF EMP:

S. No. PARTICULARS CAPITAL COST RECURRING COST

1 Dust Suppression 50000 38500

2 Greenbelt 20000 21500

0 1800

0 3600

0 20000

3 Retaining Wall 85000 2000

4 Siltation Tank 20000 2000

5 Garland Drain 70000 2000

6 Septic Tank& Soak Pit 25000 2000

7 First Aid Facility 50000 80000

8 Environmental Monitoring 0 60000

9 Others 0 0

Safety Shoes 10200 5100

Helmet 6800 3400

Hand Gloves 10200 5100

Ear Plugs 5100 2550

Dust Protection Cloths 8160 4080

Gunny Bags For Jack Hammers 12000 6000

Total 372460

Say 3.70 Lakhs 259630

Say 2.60 lakhs

28

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

10.3 ENVIRONMENTAL MONITORING PLAN:

S.

No.

Potential

Impact

Action to be

Followed

Parameters

for

Monitoring

Frequency of

Monitoring

Location

1 Air

Emissions

Ambient air quality

within the premises

of the Mine Lease

Area and nearby

habitations to be

monitored.

PM10, PM2.5,

SO2, NOx and

CO.

Periodic during

operation

phase As per

CPCB/ APPCB

guidelines

Four

Locations

2 Noise Noise generated

from various mining

activities

Spot Noise

Level

recording

Periodic during

operation

phase

Four

Locations

3 Water & Waste Water Quality

Sampling & Analysis of Waste Water

As per CPCB Guidelines

Periodic during operation phase

Two Locations

4 Soil Quality Sampling & Analysis

As per CPCB Guidelines

Periodic during operation phase

One Location

5 Health Employees and Labor health check ups

All relevant parameters

Regular check ups

Annually

11.0 OCCUPATIONAL HEALTH & SAFETY: The management of occupational safety & health is the prime responsibility of

mine management. The following facilities will be provided to the employs;

Provision of Dust masks to prevent exposure of persons to dust

Provision of ear muffs/ear plugs for protecting workmen from adverse

affects of noise

Regular health monitoring of workers will be carried out.

First Aid Facility at site.

29

M/s. Silicon Rocs – 1.983Ha Sy.No: 61/4, Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra Pradesh. PRE-FEASIBILITY REPORT

12.0 CONCLUSION: The Granite Mining project of M/s. Silicon Rocs – 1.983 Ha at Sy.No: 61/4,

Polavaram Village, Sankavaram Mandal, East Godavari District, Andhra

Pradesh will be environmental compatible to the surrounding due to the high

standards of pollution control measures to be adopted during the operational

phase.

Environmental Management Plan will help minimize adverse impacts on the

environment. Where impacts occur, immediate action must be taken to reduce

the escalation of effects associated with these impacts.

To ensure the relevance of this document to the specific mine development

stage, it needs to be reviewed throughout all phases. Hence, it is requested that

necessary Environmental Clearance may be accorded for implementation of the

project.