M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR ESTABLISHMENT OF MOLASSES BASED DISTILLERY HAVING CAPACITY: 160 KLD ALONGWITH 7.0 MW CO GEN POWER AT VILLAGE: CHANDANPUR, BLOCK: GANGESHWARI, DISTRICT: JYOTIBA PHULE NAGAR, STATE: UTTAR PRADESH BY M/s TRIVENI ENGINNERING & INDUSTRIES LTD, UNIT: CHANDANPUR

Upload: others

Post on 25-Apr-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

PRE – FEASIBILITY REPORT

FOR

ESTABLISHMENT OF MOLASSES BASED

DISTILLERY HAVING CAPACITY: 160 KLD

ALONGWITH 7.0 MW CO GEN POWER

AT

VILLAGE: CHANDANPUR,

BLOCK: GANGESHWARI,

DISTRICT: JYOTIBA PHULE NAGAR,

STATE: UTTAR PRADESH

BY

M/s TRIVENI ENGINNERING & INDUSTRIES LTD,

UNIT: CHANDANPUR

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 1

PRE - FEASIBILITY REPORT

1.0 Executive Summary

(I) Introduction

Triveni Engineering & Industries Ltd unit Chandanpur is proposing Molasses based Distillery capacity is

160 KLD along with 7.0 MW of Co-Generation Power Plant at Village : Chandanpur , Block

Gangeshwari , District – Jyotiba Phule Nagar, Uttar Pradesh.

Triveni Engineering & Industries Ltd having 7 Sugar mills, 6 Co – generation unit and 3 distillery spread

over 8 locations in Uttar Pradesh. With seven sugar units located across Uttar Pradesh, Triveni is one of

the largest integrated sugar manufacturing companies in India.Group altogether has a capacity of sugar

cane crushing to about 61,000 TCD. Name of the sugar units and respective capacities are as under :

Khatauli, Muzaffarnagar : 16,000 TCD

Deoband, Saharanpur : 14,000 TCD

Ramkola Kushinagar : 6,500 TCD

Sabitgarh, Bulandshehar : 7,000 TCD

Chandanpur, JP Nagar : 6,000 TCD

Raninagal, Moradabad : 5,500 TCD

MilakNarainpur, Rampur : 6,000 TCD

Triveni presently operates four co-generation power plants, one at Deoband, two at Khatauli and one at

Sabitgarh unit with combined capacity of 80 MW. Apart from the co-generation facilities, the company

also has two incidental co-generation plants at Chandanpur & Milak Narayanpur with a total capacity of ~

23 MW.

Triveni entered the distillery business in 2007 with an aim to integrate its sugar operations and to reduce

the impact of its cyclicality, with the commissioning of one of the largest single stream molasses based

distilleries in India in Muzaffarnagar district in U.P.

The proposed plant is adjacent to nearby Sugar Mill named Triveni Engineering & Industries Ltd, Unit:

Sugar, Chandanpur having 6000 TCD capacity and for this proposed distillery project Molasses and

Bagasse will be sourced from nearby and adjacent sugar mills.

As per EIA Notification dated 14th Sep., 2006 and as amended from time to time; Molasses based

distillery having capacity more than 100 KLD falls in Category ‘A’, Project or Activity - 5(g).

TABLE – 1

Salient Features of the Project

Sr No Particulars Details

1 Nature and Size of Project Proposed Molasses based distillery having

capacity 160 KLD along with 7.0 MW Co-

generation Power Plant.

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 2

(100 % molasses based Distillery)

2 Category of the Project As per EIA Notification dated 14th Sep.,

2006 and as amended from time to time;

Molasses based distillery having capacity

more than 100 KLD falls in Category ‘A’,

Project or Activity - 5(g).

3 Locations Details

Village Chandanpur Khadar

Block Gangeshwari

Tehsil Hasanpur

District Jyotiba Phule Nagar

State Uttar Pradesh

Latitude 28°34'26.47"N

Longitude 78˚17’38.65” E

Toposheet No 53L/2, 53L/3 , 53L/6 and 53L/7

4 Area Details

Total Plant Area Total land for proposed Distillery – 14.53

Hectare

Greenbelt / Plantation Area ~33% of the project area will be covered

under green belt plantation of 4.79 Hectare.

5

Environmental Setting Details (with approximate aerial distance & direction

from plant site)

Nearest Village Chandanpur Khadar – 0.55 Km in South

East direction,

Khurtia– 1.04 km in East direction,

Ramnagar– 1.12 in South West direction.

Nearest Town & City Hasanpur– 16.18 Km in North,

Ujhari –11.14 km in north

Sambhal– 25.21 km in East.

Nearest National Highway / State

Highway

Babrala Rajpur-Kesarpur Marg – 0.16 km

(Adjacent to the Industry in the West

direction)

Nearest Railway station Sambhal Railway Station (27.14 km in East

direction)

Nearest Airport IGI New Delhi (~ 115 km in East direction)

National Parks, Reserved Forests No National Park, Wild Life Sanctuary,

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 3

(RF)/ Protected Forests (PF),

Wildlife Sanctuaries, Biosphere

Reserves, Tiger/ Elephant Reserves,

Wildlife Corridors etc. within 10 km

radius

Biosphere Reserve, Tiger / Elephant

Reserve, Wildlife Corridors, Reserved

Forests (RF) / Protected Forests (PF) etc.

falls within 10 km radius of the plant site.

River / Water Body (within 10 km

radius)

Bagad Mahawa Nadi (2.08 km in West

direction)

Bagad or Tikta Nadi ( 4.11 km in East

direction)

Ganga River (6.02 Km in West direction)

6 Cost Details

Total Project Cost 20000.0 Lakhs

Cost for Environment Management

Plan

Capital Cost : 5600.0 Lakh or 56 Crores

Recurring cost : Rs 3.2 Crores /Annum

7 Basic Requirements for the project

Fresh Water Requirement 960 KLD (@6.0 KL/KL of Products)

Source :Ground Water

Power Requirement 4500 KW

Source –Co Generation Power Plant – 7.0

MW (In House)

Man Power Requirement 148.0 (Source:- Unskilled / Semi-Skilled -

Local Area; Skilled- Local & Outside)

8 Product Mix Ethanol /ENA/RS

9 Working Days 365 Days

2.0 Identification of project and project proponent

Triveni Engineering and Industries Ltd are having 7 Sugar mills, 6 Co – generation unit and 1 distillery

spread over 8 locations in Uttar Pradesh. With seven sugar units located across Uttar Pradesh, Triveni is

one of the largest integrated sugar manufacturing companies in India. Group altogether has a capacity of

sugar cane crushing to about 61,000 TCD. Name of the sugar units and respective capacities are as

follow:

Khatauli, Muzaffarnagar : 16,000 TCD

Deoband, Saharanpur : 14,000 TCD

Ramkola Kushinagar : 6,500 TCD

Sabitgarh, Bulandshar : 7,000 TCD

Chandanpur, JP Nagar : 6,000 TCD

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 4

Raninagal, Moradabad : 5,500 TCD

Milak Narainpur, Rampur : 6,000 TCD

Triveni presently operates four co-generation power plants, one at Deoband, two at Khatauli and

one at Sabitgarh unit with combined capacity of 80 MW. Apart from the co-generation facilities, the

company also has two incidental co-generation plants at Chandanpur & Milak Narayanpur with a total

capacity of ~ 23 MW. Triveni entered the distillery business in 2007 with an aim to integrate its sugar

operations and to reduce the impact of its cyclicality, with the commissioning of one of the largest single

stream molasses based distilleries in India in Muzaffarnagar district in U.P.

Now Triveni Engineering and Industries Ltd is proposing molasses based Distillery having capacity 160

KLD along with 7.0 MW of Co-Generation Power Plant at village Chandanpur, Block: Gangeshwari,

Tehsil: Hasanpur, District –Jyotiba Phule Nagar, Uttar Pradesh of M/s Triveni Engineering and Industries

Ltd, Unit – Chandanpur.

2.1 Brief description of the project

Brief description of the project proposed site meets the guidelines prescribed by Ministry of Environment,

Forest and Climate Change for setting of an industry. Geographical coordinates of the site are

28˚34’26.47”N, 78˚17’38.65”E. It is located adjacent to the Babrala Rajpur –Kesarpur Marg to the site.

Table 2.1,

Project Highlights

Sr No Name of the proponent M/s. Triveni Engineering and Industries Ltd,

Unit: Chandanpur

1. Khasra No.

154, 153, 149, 156, 100, 101, 103, 104, 106, 107,

108, 109, 111, 112, 116, 117, 118, 121, 122, 124,

127, 128, 129, 131, 133, 134, 135, 137, 197, 192,

132 in Vill

2. Location of the project

At village – Chandanpur, Block :Gangeshwari,

Tehsil :Hasanpur, Dist.-Jyotiba Phule Nagar, Uttar

Pradesh,

3. Land

Total land allocated =14.53 Hectare.

The open plot within existing premises will be

utilised to setup a new distillery.

4. Project 160 KLD Molasses based Distillery along with 7.0

MW Co gen power.

5. Product Rectified Spirit / Extra Neutral alcohol / Ethanol

(AA)

6. Operation days per annum 365 Days

7. Main Raw Material Molasses 720 MT/Day

8. Total Water Requirement 960 KLD @ 6.0 KL/Product

9. Source of Fresh Water Ground Water (area falls under safe block)

10. Power Requirement 4500 KWH

Source- CO-generation Power Plant-7.0 MW (In-

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 5

House)

11. Fuel

Bagasse (238 T/Day

Slop (356 KLD)

Source:Adjacent and nearby Sugar Mills

12. Steam 54 TPH

13. Effluent Treatment System

Spent wash will be concentrated in Multi effect

evaporation and then used as fuel in incineration

boiler of capacity 60 TPH along with bagasse/other

biomass.

Secondary effluent like MEE condensate and Blow

down, lees will be treated in Secondary ETP and

reutilised in process and other use.

14. Manpower Approx 148 Number

15. Total Project Cost 20000.0 Lakhs

16. Capital expenses for

Environment management 5600.0 Lakhs

2.3 Need of project and its importance to the country and region

As an agro based industry, Sugar industry in India is dependent on monsoon. Its financial viability

drastically gets affected due to weather conditions as well as market. Therefore, it is forced to explore the

alternative products from the available resources so as improve its financial stability. Molasses based

distillery is one of such an alternative. Because raw material availability i.e. molasses is fulfilled in-

house, sugar mills produces own power (electricity). Therefore, the management of the factory has

planned to establish a 160 KLPD molasses based distillery.

In India, mainly three types of alcohol are popularly produced, i.e. Rectified spirit (RS), Extra neutral

alcohol (ENA) and Anhydrous alcohol (Ethanol). Of these, RS is used for large number of industrial,

scientific, laboratory, medical and many other applications. Thus, demand for the same is immense and it

is ever increasing. ENA is used for making liquors and other alcoholic beverages. AA is a fuel alcohol; it

is used for blending with petrol in the ratio of maximum 26:7.

Table 2.2,

Expected performance of sugar factory for next five years

Season

Cane

Crush

Lac MT

Sugar

Production

Lac MT

Press Mud

Production

Lac MT

Molasses

Production

Lac MT

Molasses

required for

existing

Distillery

Unit Lac MT

Molasses

available

for new

distillery

Lac MT

2017-18 77.5 8.8 2.4 3.5 2.35 1.14

2018-19 85.0 9.6 2.7 3.8 2.35 1.48

2019-20 95.0 10.7 3.0 4.3 2.35 1.93

2020-21 105.0 11.9 3.3 4.7 2.35 2.38

2021-22 105.0 11.9 3.3 4.7 2.35 2.38

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 6

Molasses is a by-product of sugar industry. The above table shows the expected availability of molasses

as a raw material for the proposed distillery unit. Since, the cane crushing capacity of various project is

going to increase, thus the molasses production will also increase. In addition, keeping in mind dynamics

situation of sugar production cycle, company also envisage to use B-Heavy molasses as and when it is

viable to use. Therefore, it has decided to install a new distillery (molasses Based) of 160.0 KLD along

with co gen power 7.0 MW. The distillery unit will be producing, RS/ENA/AA which are very significant

for other industries, medical services, etc. Ethanol is used to blend with petrol, thus able to save valuable

foreign exchange on import of fossil fuel.

2.4 Import vs. Indigenous production

The process is straight line and the technology even for the pollution control/disposal is available

indigenously.

2.5 Export possibility

The finished products viz. Rectified Spirit (RS), Extra Neutral Alcohol (ENA) and Anhydrous Alcohol

(AA) is having great export potential.

2.6 Domestic / Export markets

Market places such as New Delhi, Ghaziabad, Chandigarh, Pune, Surat and Vadodara as well as chemical

industries of Uttarakhand, Uttar Pradesh and Haryana are the potential domestic market for rectified

spirit, ENA as well as AA. ENA could be an exportable product.

2.7 Employment Generation

Proposed project will be 148 direct employment opportunities, in which about 80 will be for skilled and

about 68 for unskilled persons. Apart from this, the project is anticipated to give plenty of indirect

opportunities to transporters, shopkeepers and various facility providers such as schools, medical

facilities, etc.

3.0 PROJECT DESCRIPTION

3.1 Type of project

Proposed unit is based on 100.0 % molasses based operation for 160.0 KLD along with 7.0 MW CO-

generation power Plant. Molasses is a by-product from the sugar industry which will be used as raw

material in the proposed new distillery. Molasses based distillery capacity above 100 KLPD is placed

under item 5 (g) - for distillery unit as ‘A’ category as per EIA Notification, 2006 (as amended in 2009)

and will be appraised at central level.

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 7

3.2 Location with coordinate

For EIA Study 5.0 & 10.0 km radial study area is covered and the same is shown on SOI Topo sheets

53L/2, 53L/3, 53L/6 and 53L/7 in the map below Fig: 1.1 & 1.2 respectively.

Latitude and Longitude of the site at four corners and in the centre given below in Table 2.3

Table; 2.3, Latitude and longitude of the project site

Corners Directions Latitude and Longitude

1st East Lat : 28°34'23.09"N, Long: 78°17'47.99"E

2nd South Lat : 28°34'17.68"N, Long: 78°17'41.47"E

3rd West Lat : 28°34'28.17"N, Long: 78°17'29.75"E

4th North Lat : 28°34'34.18"N, Long: 78°17'35.83"E

Centre Centre Lat : 28°34'26.47"N, Long: 78°17'38.65"E

3.3 Details of alternative site considered and basis of selecting the proposed site:

Alternative sites for the proposed project are not considered, because of following reasons –

1. The project proponent is having land which is adequate for the proposed units as well as ancillary units

thereof such as storage, treatment, disposal units, etc.

2. The present site meets the guidelines for sitting of an industry prescribed by MoEF & CC,

3. Proposed site is situated adjacent to the existing sugar unit. Proposed site is adequate for raw material

availability and fuel.

4. No rehabilitation or restoration issues involved with the proposed site,

5. The plot is open and barren, thus minimal disturbance to the ecology,

6. Infrastructure and resources such as road, water, electricity, manpower, etc is already available.

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 8

Fig : 1.1, Toposheet Map within 10.0 Km radius.

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 9

Fig : 1.2, Toposheet Map within 5.0 Km radius.

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 10

Fig : 1.3, Location of Proposed Project Site.

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

11 Establishment of Molasses based distillery having capacity 160.0 KLD molasses based distillery along with 7.0 MW Co-

Generation Power Plant at Village: Chandanpur, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh)

3.4 Size or magnitude of operation

New molasses based distillery of 160 KLD along with 7.0 MW co gen power.

3.5 Project description with process details

Proposed unit will be 100.0 % molasses based for capacity 160 KLD. Co gen power generation will

be 7.0 MW. Triveni Engineering & Industries Ltd, Unit: Chandanpur, decided to adopt the latest

technology to achieve Zero Liquid Discharge (ZLD) for the proposed distillery unit.

Manufacturing Process:

The production process involves the following stages:

1. Fermentation

2. Distillation

Fermentation- Molasses is the chief raw material used for production of alcohol. Molasses contains

about 50% total sugars, of which 30 to 33% are cane sugar and the rest are reducing sugar. During

the fermentation, yeast strains of the species Saccharomyces cerevisieae, a living microorganism

belonging to class fungi converts sugar present in the molasses such as sucrose or glucose in to

alcohol. The continuous fermentation process involves addition of fresh nutrients medium either

continuously or intermittent withdrawal of portion of nutrient for recovery of fermentation products.

In continuous process, fermenter is in constant usage with little shut down and after initial

inoculation of yeast culture, further inoculation is not necessary.

Distillation- After fermentation, the next stage in the manufacturing process is to separate alcohol

from fermented wash and to concentrate it to 95%. This is called Rectified Spirit (RS). For this

purpose, method of distillation is employed. After separation of alcohol, the remaining part is the

effluent of the process i.e. spent wash and spent lees.

Re-distillation to manufacture Extra Neutral Alcohol (ENA)

ENA is prepared by re-distillation of the rectified spirit (RS) for the removal of impurities like higher

alcohols, aldehydes and methyl alcohol. This is done by, remixing rectified spirit with soft water and

distilling it in the ENA column.

Anhydrous Alcohol (AA)

Anhydrous alcohol is an important product required by industry. As per IS specification it is nearly

100% pure or water free alcohol. Alcohol as manufactured by Indian distilleries is rectified spirit,

which is 94.68% alcohol. It is not possible to remove remaining water from rectified spirit by straight

distillation as ethyl alcohol forms a constant boiling mixture with water at this concentration and is

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 12

known as azeotrope. Therefore, special process for removal of water is required for manufacture of

anhydrous alcohol.

The various processes used for dehydration of alcohol are as follows

i) Azeotropic Distillation

ii) Molecular Sieves

iii) Pervaporation / Vapour permeation system.

We will use Molecular Sieves process for dehydration of alcohol.

Fig:1.4, Schematic Flow chart of RS / ENA /AA

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 13

3.6 Raw Materials required for finished products

Raw materials for the proposed project will be available from the local market. Molasses as raw

material will be available from adjacent inhouse sugar mills. Product wise raw material consumption

is given below:

Sr No Particular Quantity,

MT/Day

Storage Source of raw material &

Mode of Transportation

1. Molasses 720 MT/Day 30 Days Adjacent sugar mills and other

local sugar units.

Tanker will be used for

molasses transport.

2. Other Chemicals

Sulphuric Acid 68 kg/Day 15 Days Nearby Market by Truck.

15 Days storage will be

provided. Sodium

Hydrooxide

(Caustic)

10.0 Kg/Day 15 Days

Enzymes 6.0 kg/Day 15 Days

NH2-CO– NH3

(Nutrient : 46% N2

10.0 kg/Day 15 Days

Antifoam Agent 135 kg/Day 15 Days

3.7 Resource optimization / recycling and reuse envisaged in the project

Optimum utilization of the available resources is strived by the management. These resources include

land, water, steam, molasses and power. Press-mud is a by-product of sugar factory that will be used

for making manure by mixing fermenter sludge and potash rich fly ash generated in the distillery.

Thereby, nutrients will be recycled.

3.8 Water Requirement

Water required for proposed project will be 960.0 m3/Day. Water balance for the proposed distillery is

given in Fig : 1.5.

3.8.1 Availability of water and its source

Necessary fresh water requirement for the proposed project will be met from tube well. Water will be

required for domestic, industrial process and utility purpose. As the area fall in Safe Zone as per

CGWA Ground water assessment 2011. Water level in the ranges from 4.90 – 6.05 m bgl during pre-

monsoon season.

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

14 Establishment of Molasses based distillery having capacity 160.0 KLD molasses based distillery along with 7.0 MW Co-

Generation Power Plant at Village: Chandanpur, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh)

Fig : 1.5 Water Balance for 160.0 KLD (Molasses based )

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

15 Establishment of Molasses based distillery having capacity 160.0 KLD molasses based distillery along with 7.0 MW Co-

Generation Power Plant at Village: Chandanpur, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh)

3.8.1 Steam & Power requirement

Steam requirement for the proposed project is 60 TPH at 3.5 Kg/cm2 (g) for 160 KLD (Molasses

based). Therefore, a new incineration boiler of capacity 60.0 TPH with 45 Kg/cm2 (g) pressure will be

installed and this will supply steam to proposed 7.0 MW turbo-alternator. It will fulfil the steam as

well as power requirement of distillery.

3.8.2 Fuel

Slop and Bagasse will be used as a fuel for the steam generation activity of the proposed industry. The

requirement of Bagasse and slop is given in table below

Fuel Slop Bagasse

160.0 KLD (100.0 %

Molasses based)

356 KLD 238 MT/Day

Source In – House, it is concentrate

from MEE.

Procured from adjacent and

nearby sugar mills / road

transport.

Bagasse will be procured from adjacent sugar mills of our group and other sugar mills present in

nearby areas.

3.8.3 Quantity of Waste Water Generation & disposal scheme

Spent Wash Treatment: Estimated daily total water requirement of distillery will be (input) 4142

m3/d. However, during day-to-day operations 3182 m3/day water will be recycled and thus fresh water

requirement will be restricted to 960 m3/day. Effluent in the form of spent wash will be 1120 m3 /day.

It will be treated concentrated in Multi effect evaporation and then concentrate from MEE will be

utilised in Incineration fired boiler as a fuel along with bagasse/other biomass/coal. Flow diagram for

spent wash treatment is given in Fig : 1.6.

Other Effluent: The remaining moderately polluted effluent due to spent lees and evaporating

condensate will be treated in polishing unit and recycled in the same unit. Estimated domestic effluent

will be 12.0 m3/d, which will be treated separately in septic tank and soak pit. Quantity of waste to be

generated & scheme for their disposal is given in the following chart.

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 16

Fig: 1.6, Flow Chart of Spent Wash treatment strategy ( 160 KLD )

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 17

Fig: 1.9, Flow Chart for condensate polishing unit

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 18

3.9.1 Solid waste

The proposed industrial activity could generate solid waste in the form of yeast and ETP sludge, boiler

ash. These are biodegradable material. The quantity and disposal technique is given briefly in the

following Table 2.3.

Table: 2.3,

Solid waste generation and disposal

Sr No Solid Waste Operation Phase Uses / Disposal

1 Total Ash 67.5 MT/Day Due to high potash content, will be

used as manure.

2 Yeast Sludge 16.0 MT/Day Will be mixed with press mud of

Sugar mill and sold to the farmer.

3 Condensate

polishing unit

sludge

5.0 KLD Will be mixed with press mud of

Sugar mill and sold to the farmer.

3.9.2 Air Emission and control

One incineration boiler of capacity 60 TPH will be used with working pressure of 45 Kg/cm2. Bag

filter of 125 % capacity system will be attached to the boiler. DG Set with adequate stack height and

acoustic enclosures will be installed for the proposed project.

3.9.3 Noise pollution

The plant and equipment will be specified and designed with a view to minimize noise pollution. The

major noise producing equipment will be provided with sound proof devices and silencers. DG set will

be provided with acoustic enclosures. Ear Plugs and ear muffs will be provided to the workers in

utility section. Greenbelt will be developed.

3.9.4 Health and Safety Measures

Triveni Engineering and Industries Ltd, Unit - Chandanpur strives to provide hygienic & safe work

place and continually improve the effectiveness of Health & Safety system.

To meet these objectives, the TEIL will;

Comply all relevant Laws, regulation, statutory provisions & codes of practice,

Continually asses risks & hazards so as to evolve establish & upgrade hazard control measures,

emergency preparedness, & risks mitigation and correct the deficiency identified in timely

manner.

Ensure safe handling, storage, use and disposal of all substance & materials which are classified

as hazardous to health & environment,

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 19

Create awareness in employees by providing appropriate training, motivation information’s so as

to create individual sense of duty, responsibility & participations & an institutionalize culture of

continually improvement in safety, health & environment matters,

Make supervisors responsible for implementation of the safety precautions, use of safety devices,

& the safety of the people,

Empower employees at all levels to be responsible & accountable for their personal health &

safety,

Fire protection system will be provided in accordance to the local fire authorities regulations. The

firefighting system will consist of a hydrant network. It also incorporates suitable firefighting

equipment and flameproof lighting and power control arrangements.

Portable fire extinguishers will be provided in strategic locations in new construction area.

3.10 Schematic representation of the feasibility drawing which give information of EIA purpose

Figure 3.6: Procedure of Environmental Clearance

4.0 SITE ANALYSIS

4.1 Connectivity

The site is well connected by road, railway. It is adjacent to the Babrala Rajpur-Kesarpur Marg.

Sambhal Railway Station is approx. 27.14 km away from the project site. The international airport IGI

New Delhi is approx. 115 km.

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 20

4.2 Land form, land use and ownership

The factory is holding 14.53 Hectare of land. The land is flat, open and already under the possession of

the M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur. So out of available land, a

provision of approx. 4.79 Hectare is for green belt and rest 9.74 Hectare for the proposed distillery and

ancillary units thereof such as boiler house, turbine, storage etc.

4.3 Topography

The terrain is almost flat. The geographical coordinates of the area are 28°34'26.47"N and

78˚17’38.65” E. The proposed site is 193 meter above the mean sea level. General slope in the is from

North west to South East.

4.4 Land use pattern

The proposed project requires no additional land, existing land is under the ownership of Triveni

Engineering and Industries Ltd, Unit - Chandanpur. Therefore, no social issues are involved. There

won’t be change in the land use pattern since the land is under the possession of the industry. There is

no sanctuary, bio-sphere reserve or national park in the 10 km radius area. The land surrounding the

project site is used for agricultural purpose. There are more than 35 villages within 10 km of the study

area. River Ganga is approx. 6.02 km away from the project site in West direction.

Table 4.1,

Salient features of the project location

Nearest City/ Town Hasanpur– 16.18 Km in North,

Ujhari –11.14 km in north

Sambhal– 25.21 km in East.

Railway Station Sambhal Railway Station (27.14 km in East direction)

Airport IGI New Delhi (~ 115 km in East direction)

River Bagad Mahawa Nadi (2.08 km in West direction)

Bagad or Tikta Nadi ( 4.11 km in East direction)

Ganga River (6.02 Km in West direction)

Schools Government school in Chandanpur, Khurtia and Ramnagar village for

primary education. New English medium school and Junior college,

Ujhari approx 11.14 km from the project site.

Colleges SLDM Inter Collage is approx. 5.11 km from project site.

JSLS Inter Collage approx. 13.57 km from the site.

Medical and health

care centers

Satyawati Hospital within approx. 15.34 km from the project site.

Banks HDFC Bank is. 16.65 km In Hasanpur from the project site

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 21

Market places Gangeshwari is a nearest market place at approx. 3.54 km from the

project site.

Protected Area/

Sanctuaries/NP

None within 15.0 km radius

CRZ applicability Not applicable

Seismicity Seismic Zone- IV (High)

4.5 Existing Infrastructure

Proposed project is new project. There are no existing infrastructures within the project site. The

nearest residential area to the factory is at a distance of 0.55 km towards south east. There is an

agricultural and cultivated land in the surrounding area of the site. Within 10 km Influence Zone, there

is no Tropical Forest, Biosphere Reserve, National Park, Wild Life sanctuary. Hasanpur tehsil is

16.19 km from site towards north.

4.6 Soil Classification

The soils of the district can be classified into two major groups based on its texture & composition

characteristics.

1. Khader and low land soil

2. Upland or Bangar soil.

4.7 Climatic data from secondary sources

The district falls in the subtropical region and the climate is classified as tropical to subtropical type.

The climate is characterised by a hot summer and biting cold, winter is associated with general

dryness, except during the southwest monsoon where humidity is high. The rainy season extends from

end of June to September or mid of October. Extreme temperature are recorded during winter &

summer months.

The mean daily maximum temperature is about 40oC and the mean daily minimum temperature is

about 25oC during May and June. The mean monthly maximum relative humidity in the morning and

evening is 84% to 74% respectively and is varies from 21% to 84%.

A study of rainfall data from six rain gauge stations around the district, the annual mean rainfall is

1046 mm at Amroha. Amroha received highest rainfall in 1990 (1813.0 mm) which is 1.76 times more

than normal. Whereas lowest was in 1987 (492.1 mm) which is 1.84 times less than normal. The

Hasanpur highest rainfall was recorded in 1975 (1404 mm) which is 1.59 time more than normal,

whereas lowest was in 1987 (402.4 mm) which is 2.19 times less than normal annual rainfall.

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 22

4.8 Social Infrastructure available

Infrastructure such as school, colleges, market, banks, hospitals, public transport, road, drinking water,

electricity, post, telecommunication, radio, etc are easily available to the local people within 15.0 km

radius of project site.

The present project is proposed by one of the leading and progressive sugar industry from western

Uttar Pradesh.

The sugar factory has already initiated several activities for the development of the region. Some of

the prime activities are as follows.

The factory is providing medical aid to the employees and their dependents

It provides primary school educational facilities to the children of workers

It helps member farmers by supplying organic and chemical fertilizers, press-mud and

thedeveloped cane seeds approved by Government agency like NSI Kanpur. The factory also

arranges field demonstration to educate the farmers in sugarcane cultivation through application of

scientific methods

Regular tree plantation with development being done every year through the separate tree

plantation cell in their campus and surrounding area. For nearby schools, hospitals free of cost

plants are provided.

5.0 PLANNING BRIEF

5.1 Planning concept

(i) Planning Concept (type of industries, facilities, transportation etc.) Town and country

Planning/ Development authority classification.

The proposed project is molasses based distillery. Facilities required for the proposed project will be

provided as per requirement. Transportation of raw material and final product will be done via existing

road network and cement concrete road will be developed within the proposed project area.

(ii) Population Projection

Temporary influx of people will be there as the managerial and supervisory staff will generally be

outsider. A projection may be made by a governmental organization, or by those unaffiliated with a

government.

(iii) Assessment of infrastructure demand (Physical & Social)

The Company will assess the demand of infrastructure (Physical & Social) in nearby area of the

proposed site and will be developed in under corporate social responsibilities programs.

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 23

(iv) Amenities/Facilities

The Company will develop the Amenities/Facilities in nearby area of the proposed project site as per

requirement of local people under corporate social responsibilities programs.

1.2 Proposed Infrastructure

The proposed project will be carried out in the area owned by the M/s Triveni Engineering and

Industries Ltd, Unit - Chandanpur. The total allocated land for the proposed project is 14.53 Hectares.

5.2.1 Residential Area

The residential colony is in place (for existing sugar unit). It has capacity to accommodate additional

families of proposed distillery unit. Since, most of the employees of the sugar mill are local.

5.2.2 Greenbelt Area

The total greenbelt area provided is ~ 4.79 Hectare.

5.2.3 Social infrastructure

The physical infrastructures such as land, roads, power, water, transportation etc are easily available

for the proposed unit. Raw material and filler material are also available with factory adequately. Very

minor influx of population is anticipated due to the project. Available social infrastructure such as

schools, colleges, market, medical facilities, etc. is adequate to support the probable minor population

increase.

5.2.4 Connectivity

The site is well connected by road, railway. It is adjacent to the Babrala Rajpur-Kesarpur Marg.

Sambhal Railway Station is approx. 27.14 km away from the project site. The international airport IGI

New Delhi is approx. 115 km.

5.2.5 Sewerage system

Estimated domestic effluent will be 12 m3/d, which will be treated separately in septic tank and soak

pit.

5.2.6 Drinking water management

Triveni Engineering and Industries Ltd, Unit - Chandanpur draws water from well and supply the

drinking water to factory as well as the staff colony.

5.2.7 Industrial Waste management

The proposed Molasses based distillery would be based on “ZERO EFFLUENT DISCHARGE”.

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 24

5.2.8 Solid Waste Management

Spent wash generated during s operation, would be concentrated in Multi-effect evaporator and then

used as fuel in incineration boiler.

Fly ash from the Boiler would be utilized as manure.

Yeast sludge will be mixed with Press Mud for manufacturing Organic Manure.

5.2.9 Power requirement and source

The total power requirement for the proposed project will be 4500 KWH, which will be sourced from

Co generation power plant of 7.0 MW and for emergency DG set will be installed.

6.0 Rehabilitation and Resettlement (R & R) Plan

(i) Policy to be adopted (Central/State) in respect of the project affected persons including home

oustees, land oustees and landless labourers (a brief outline to be given).

The proposed plant is adjacent to own Sugar Mill named Triveni Engineering and Industries Ltd, Unit

- Chandanpur. The land is already under the possession of TEIL. Therefore, there will not be any

displacement of people and hence, Rehabilitation & Resettlement is not applicable.

7.0 Project Schedule and Cost Estimates

(i) Likely date of start of construction and likely date of completion (time schedule for the

project to be given).

The project will start only after obtaining Environmental Clearance and all other required clearance

and will complete within 1.5 years of commencement.

(ii) Estimated project cost along with analysis in term of economic viability of the project.

Total cost of the Project: Rs. 200.00 Crores

Cost for Environment Protection Measures:

Capital Cost: Rs. 56.00 Crores

Recurring Cost/annum: Rs. 3.20 Crores/annum

8.0 Analysis of Proposal

(i) Financial and social benefits with special emphasis on the benefit to the local people including

tribal population, if any, in the area.

Proposed project will result in growth of the surrounding areas by increasing ancillary development

and supporting infrastructure. Special emphasis on Financial and Social benefits will be given to the

local people including tribal population, if any, in the area.

Development of social amenities will be in the form of medical facilities, education to underprivileged

and creation of self-help groups.

M/s Triveni Engineering and Industries Ltd, Unit - Chandanpur PRE-FEASIBILITY REPORT

Establishment of Molasses based distillery having capacity 160.0 KLD along with 7.0 MW Co-Generation Power Plant at

Village: Chandanpur Khadar, Block Gangeshwari, Distt; Jyotiba Phule Nagar (Uttar Pradesh) 25

Uttar Pradesh state will get revenues in terms of taxes. Business opportunities for local community

will be available like transport of raw material/product to market, fly ash transport to Brick

manufactures, maintenance & house-keeping contract work etc.