pre-submittal meeting · assessment report dated nov 2016 – available for review) on-site...

17
1 CITY OF PHOENIX REQUEST FOR QUALIFICATIONS WATER SERVICES DEPARTMENT PROJECT NO. WS90400074-1 LIFT STATION 51 REFURBISHMENTS DESIGN SERVICES Pre-Submittal Meeting

Upload: others

Post on 19-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pre-Submittal Meeting · Assessment Report dated Nov 2016 – available for review) On-site Geotechnical Evaluation ... Coordination of Maintenance of Plant Operations. 9 ... Cover

1

CITY OF PHOENIXREQUEST FOR QUALIFICATIONS

WATER SERVICES DEPARTMENT

PROJECT NO. WS90400074-1

LIFT STATION 51 REFURBISHMENTSDESIGN SERVICES

Pre-Submittal Meeting

Page 2: Pre-Submittal Meeting · Assessment Report dated Nov 2016 – available for review) On-site Geotechnical Evaluation ... Coordination of Maintenance of Plant Operations. 9 ... Cover

2

PROJECT NO. WS90400074-1

Emeka Ekpe, Contracts SpecialistPoint of Contact for Submittals and RFQ QuestionsOffice of the City [email protected] (602) 256-4107

Nikhil Parekh, PEProject Manager

Welcome and Introductions

Page 3: Pre-Submittal Meeting · Assessment Report dated Nov 2016 – available for review) On-site Geotechnical Evaluation ... Coordination of Maintenance of Plant Operations. 9 ... Cover

3

Sign-in please

Sign-in sheet and PowerPoint will be posted on Procurement’s website:https://www.phoenix.gov/streets/procurement/current-opportunities

Click on respective project, then click on:■ Planholder List ■ RFQ ■ Notification

It is your responsibility as an RFQ holder to determine, prior to submittal, if any Notifications have been issued

Please hold questions until Q&A period

This is the ONLY opportunity to discuss this project with City staff

Meeting Overview

Page 4: Pre-Submittal Meeting · Assessment Report dated Nov 2016 – available for review) On-site Geotechnical Evaluation ... Coordination of Maintenance of Plant Operations. 9 ... Cover

4

All Firms SHOULD Be Registered in the Vendor Management System PRIOR TO SUBMITTING A PROPOSAL

New Firms – After Registering, the City will send an e-mail with a vendor number approx. 2 days

NEW: The VENDOR NUMBER is to be included on the cover of the Statement Of Qualifications OR Proposal package envelope. Information on how to register with the City is available at:

https://www.phoenix.gov/finance/vendorsreg

Vendor Registration

Page 5: Pre-Submittal Meeting · Assessment Report dated Nov 2016 – available for review) On-site Geotechnical Evaluation ... Coordination of Maintenance of Plant Operations. 9 ... Cover

5

Project Description

Project Scope of Work

Questions?

Submittal Requirements

Selection Schedule

Questions?

Agenda

Page 6: Pre-Submittal Meeting · Assessment Report dated Nov 2016 – available for review) On-site Geotechnical Evaluation ... Coordination of Maintenance of Plant Operations. 9 ... Cover

Project Description Location: NE of the

Intersection of Tatum Blvd. and Union Hills

LS Wet Pit/Dry Pit Facility

Facility Currently Offline

Current Design Capacity ~ 8 mgd(Firm)

6

LS 51

Courtesy: Google Map

Page 7: Pre-Submittal Meeting · Assessment Report dated Nov 2016 – available for review) On-site Geotechnical Evaluation ... Coordination of Maintenance of Plant Operations. 9 ... Cover

Scope of Work

7

Design of Civil, Mechanical, Electrical and Associated Improvements (evaluated in Hydraulic Analysis & Condition Assessment Report dated Nov 2016 – available for review)

On-site Geotechnical Evaluation

Developing Cost Estimates

Basis of Design and Construction Design Documents

Assistance w/ Design Bid Build

Page 8: Pre-Submittal Meeting · Assessment Report dated Nov 2016 – available for review) On-site Geotechnical Evaluation ... Coordination of Maintenance of Plant Operations. 9 ... Cover

Scope of Work

8

CA &I SERVICES (City’s Option)

Obtain Permits and Approvals

Oversight of Construction

Activities via Field Inspections

Review of Submittals, Shop

Drawings, RFI, etc.

Coordination of Maintenance of

Plant Operations

Page 9: Pre-Submittal Meeting · Assessment Report dated Nov 2016 – available for review) On-site Geotechnical Evaluation ... Coordination of Maintenance of Plant Operations. 9 ... Cover

9

QUESTIONS?

Page 10: Pre-Submittal Meeting · Assessment Report dated Nov 2016 – available for review) On-site Geotechnical Evaluation ... Coordination of Maintenance of Plant Operations. 9 ... Cover

10

General Information – 10 points

Design Experience of the Prime Firm – 20 points

Construction Administration Experience of Prime Firm –15 points

Experience of Key Personnel & Subconsultants – 20 points

Project Understanding & Approach - 30 points

Overall Evaluation of the Firm – 5 points

Statement of Qualifications Criteria

Page 11: Pre-Submittal Meeting · Assessment Report dated Nov 2016 – available for review) On-site Geotechnical Evaluation ... Coordination of Maintenance of Plant Operations. 9 ... Cover

11

Cover Letter (company name, address and contact information)

Evaluation Criteria (including project organizational chart)

Additional Content (resumes or other information)

MAXIMUM pages permitted is 13 pages:

Statement of Qualifications Criteria (Continued)

Page 12: Pre-Submittal Meeting · Assessment Report dated Nov 2016 – available for review) On-site Geotechnical Evaluation ... Coordination of Maintenance of Plant Operations. 9 ... Cover

12

Each page side with criteria information will be counted.

Pages that have photos, charts, and graphs will be counted toward maximum number of pages.

Cover letter, front and back covers, Table of Contents and tab dividers will NOT be counted toward the maximum page limit, UNLESS they include information that may be considered by the selection panel.

Statement of Qualifications Criteria(Continued)

Page 13: Pre-Submittal Meeting · Assessment Report dated Nov 2016 – available for review) On-site Geotechnical Evaluation ... Coordination of Maintenance of Plant Operations. 9 ... Cover

13

Submit 6 copies of the SOQ.

SOQ due: 12:00pm Noon – Arizona local timeFriday, October 13, 2017Phoenix City Hall200 West Washington Street, 6th FloorSubmittal Box

Statement of Qualifications Criteria (Continued)

Page 14: Pre-Submittal Meeting · Assessment Report dated Nov 2016 – available for review) On-site Geotechnical Evaluation ... Coordination of Maintenance of Plant Operations. 9 ... Cover

14

Grounds for Disqualification:

Receipt of submittal after specified cut-off date and time.

Too few copies of the submittal.

Deposit of submittal in the wrong location.

Violating “Contact with City Employees” policy.

Grounds for Disqualification (Continued)

Page 15: Pre-Submittal Meeting · Assessment Report dated Nov 2016 – available for review) On-site Geotechnical Evaluation ... Coordination of Maintenance of Plant Operations. 9 ... Cover

15

Notification (if any)

Plan Holder List

Award

Pre-submittal Power Point Presentation

Pre-submittal Sign-in sheet

https://www.phoenix.gov/streets/procurement/current-opportunities

Street Transportation Procurement Section WEBPAGE

Page 16: Pre-Submittal Meeting · Assessment Report dated Nov 2016 – available for review) On-site Geotechnical Evaluation ... Coordination of Maintenance of Plant Operations. 9 ... Cover

16

Mr. Emeka Ekpe, Contracts [email protected]

PROJECT NO. WS90400074-1LIFT STATION 51 REFURBISHMENTS

DESIGN SERVICES

QUESTIONS AFTER TODAY

Page 17: Pre-Submittal Meeting · Assessment Report dated Nov 2016 – available for review) On-site Geotechnical Evaluation ... Coordination of Maintenance of Plant Operations. 9 ... Cover

17

QUESTIONS?