precast 1 concepts pdf
TRANSCRIPT
![Page 1: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/1.jpg)
Dr. Kim S Elliott
University of Nottingham, UK
The Design and Construction of Precast Concrete Structures
www.nottingham.ac.uk
Lecture course and frame design workshop
KL : 24-25 July 2006
KK : 27-28 July 2006
![Page 2: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/2.jpg)
Programme:1. Conceptual issues and architectural features
2. Precast concrete in mixed construction
3. Precast flooring and composite slabs
4. Precast frame analysis and components
5. Diaphragm action and frame stability
6. Connections
7. Progressive collapse
8. 10 storey frame design exercise
+ Special presentation from Belgium (May 2006)
![Page 3: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/3.jpg)
Conceptual Issues and Architectural Features
The Design and Construction of Precast Concrete Structures
![Page 4: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/4.jpg)
Precast concrete – friend or foe
?
![Page 5: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/5.jpg)
Precast concrete – friend ……
Vaux
hall
Cro
ss, L
ondo
n, 1
995
![Page 6: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/6.jpg)
Precast concrete – … foe
Prec
ast w
all f
ram
e, c
196
0, M
anch
este
r, U
K
![Page 7: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/7.jpg)
Padd
ingt
on S
tatio
n, L
ondo
n.
7 September 2003
![Page 8: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/8.jpg)
“British Precast” – concerted efforts
![Page 9: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/9.jpg)
Aalborg’s prize winning staircase
Prec
ast s
tairs
for T
ubor
g, D
enm
ark
![Page 10: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/10.jpg)
and many special projects ….
![Page 11: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/11.jpg)
UK Concrete Society Winner …
Cam
brid
ge S
cien
ce P
ark,
UK
, 198
8
![Page 12: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/12.jpg)
and Loser !
Nat
iona
l Bui
ldin
g Fr
ame,
Por
tsm
outh
Uni
vers
ity, U
K, 1
966
![Page 13: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/13.jpg)
..and all in safe working conditions ?
![Page 14: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/14.jpg)
DO YOU KNOW THESE MEN ?
![Page 15: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/15.jpg)
Contents
Background to the problem
Conceptual Issues and Architectural Features
![Page 16: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/16.jpg)
Contents
Current climate for precast concrete
![Page 17: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/17.jpg)
Contents
Current climate for precast concrete
Buildability of skeletal frames
34
![Page 18: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/18.jpg)
Contents
Current climate for precast concrete
Buildability of skeletal frames
Integrated architectural structures
4
![Page 19: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/19.jpg)
Contents
Current climate for precast concrete
Buildability of skeletal frames
Integrated architectural structures
Discussion and future developments
![Page 20: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/20.jpg)
Current climate for precast concrete
Understanding the basic principles of precast concrete design and construction
![Page 21: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/21.jpg)
Current climate for precast concrete
Understanding the basic principles of precast concrete design and construction
Infill wall diagram
DIAGONAL TENSION
![Page 22: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/22.jpg)
Current climate for precast concrete
![Page 23: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/23.jpg)
Current climate for precast concrete
![Page 24: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/24.jpg)
Current climate for precast concrete
Diagram of floor slab with no tie steel and screed Bournemouth
Understanding the basic principles of precast concrete design and construction
![Page 25: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/25.jpg)
Current climate for precast concrete
Understanding the basic principles of precast concrete design and construction
FRICTION
END REACTIONNO TIE STEEL
![Page 26: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/26.jpg)
Current climate for precast concrete
Spalling photo Bournemouth Spalling
![Page 27: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/27.jpg)
Current climate for precast concrete
![Page 28: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/28.jpg)
Current climate for precast concrete
![Page 29: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/29.jpg)
Current climate for precast concrete
500 kN connector made and tested
Wel
ding
bra
cket
s fo
r Llo
yds
of L
ondo
n
![Page 30: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/30.jpg)
Current climate for precast concrete
100 % repetition increases productivity by up to 50 %
3.6
m w
ide
hollo
w c
ore
floor
s, M
GM
Hot
el, L
as V
egas
11 m x 3.6 = 40 sq.m per unit
![Page 31: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/31.jpg)
Current climate for precast concrete
Modular construction - repeated 360 times
Sim
mon
s H
all o
f Res
iden
ce, M
IT, U
SA
![Page 32: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/32.jpg)
Current climate for precast concrete
‘Egan Report’ 1998Rethinking Construction :
… sustained improvement targets:
10 % savings in capital costs
10 % reduction in construction time
20 % less defects
20 % improvement in predictability
![Page 33: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/33.jpg)
Current climate for precast concrete
Egan Report called for maximum use of standard components and processes ….
![Page 34: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/34.jpg)
Current climate for precast concrete
Egan Report called for maximum use of standard components and processes
Prec
ast c
oncr
ete
tow
n ne
ar to
Hel
sink
i
![Page 35: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/35.jpg)
Current climate for precast concrete
Stack cast wall panels in Far East
Stac
k ca
st p
anel
s at
Joh
orB
aru,
Mal
aysi
a
![Page 36: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/36.jpg)
Current climate for precast concrete
Economic indicators of
precast concrete
C factor =Cost of 1 day skilled labour
Cost of 1 cu. m. insitu concrete
![Page 37: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/37.jpg)
Current climate for precast concrete
UK where ratio of factory/site labour costs 1.5 – 2.0 : 1
Let C = 1.0
LABOUR £40-50
RC £50
Not
tingh
am U
nive
rsity
, UK
, 200
3
![Page 38: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/38.jpg)
Current climate for precast concrete
Scandinavia C = 1.4
LABOUR €120
RC €80-90
Arla
nda
Airp
ort,
Stoc
khol
m, 2
000
![Page 39: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/39.jpg)
Current climate for precast concrete
Southern Europe (Italy, Portugal)
C = 0.7
LABOUR €50
RC €70
italy
![Page 40: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/40.jpg)
Current climate for precast concreteLABOUR US$40
RC US$75Brazil
C = 0.55
![Page 41: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/41.jpg)
Current climate for precast concrete
Australia
C = 0.5
LABOUR AUS $65
RC AUS $130
![Page 42: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/42.jpg)
Economic indicators for precast concrete
Hong Kong
C = 0.2
LABOUR HK$100
RC HK$480
![Page 43: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/43.jpg)
Current climate for precast concrete
Far East (e.g. Malaysia)
C = ?
Scho
ol B
uild
ing
at K
uant
an, M
alay
sia,
199
4
italy
![Page 44: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/44.jpg)
Current climate for precast concrete
Far East (e.g. Malaysia)
C = 0.2 - 0.3
LABOUR R 50-70
RC R 180
Scho
ol B
uild
ing
at K
uant
an, M
alay
sia,
199
4
italy
![Page 45: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/45.jpg)
Current climate for precast concrete
Economic indicators of
precast concrete
Crane factor =Daily hire of typical crane
Daily labour rate
50 t mobile over 3 months
![Page 46: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/46.jpg)
Current climate for precast concrete
Crane factor UK
Scandinavia
Europe
Far East
Brazil
Australia
![Page 47: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/47.jpg)
Current climate for precast concrete
Crane factor UK 8 - 12
Scandinavia 6 - 10
Europe 10 - 15
Far East ?
Brazil 15 - 20
Australia 17 - 20
![Page 48: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/48.jpg)
Current climate for precast concrete
Crane factor UK 8 - 12
Scandinavia 6 - 10
Europe 10 - 15
Far East 25 - 30
Brazil 15 - 20
Australia 17 - 20
![Page 49: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/49.jpg)
Current climate for precast concrete
Economic indicators of
precast concrete
Factory and site labour efficiency
Man x day / sq.m.
![Page 50: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/50.jpg)
Current climate for precast concrete
Case study is 10 storey frame of area 16,000 m comprising :
RC Columns
PSC Beams
RC Walls
RC Staircases
200 deep PSC hollow core slabs
60 mm insitu concrete topping
2
![Page 51: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/51.jpg)
Current climate for precast concrete
Man x day rate
RC Columns 2.5 / cu.m
PSC Beams
RC Walls
RC Staircases
PSC slabs
Insitu topping
UK rates 1996-2000
![Page 52: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/52.jpg)
Current climate for precast concrete
Man x day rate
RC Columns 2.5 / cu.m
PSC Beams 2.0 / cu.m
RC Walls 2.2 / cu.m
RC Staircases 3.2 / cu.m
PSC slabs
Insitu topping
UK rates 1996-2000
![Page 53: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/53.jpg)
Current climate for precast concrete
Man x day rate
RC Columns 2.5 / cu.m
PSC Beams 2.0 / cu.m
RC Walls 2.2 / cu.m
RC Staircases 3.2 / cu.m
PSC slabs 0.13 / sq.m
Insitu topping 0.05 / sq.m
Average = 0.35 – 0.40 man days /sq.m.
![Page 54: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/54.jpg)
Contents
Buildability of skeletal frames
34
![Page 55: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/55.jpg)
Buildability of precast skeletal structures
Dimensional stability to within 6 mm
![Page 56: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/56.jpg)
Buildability of precast skeletal structures
Dimensional stability to within 6 mm
![Page 57: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/57.jpg)
Buildability of precast skeletal structures
Precast Concrete Technology
Cube strength : 50 – 100 MPaVariation : 3 - 5 MPaWater / cement ratio : 0.3 – 0.4PFA : < 30% x cement contentSelf compacting concrete in all precast factoriesRecycled concrete coarse aggregate : < 20%18 hour strength : 20 – 30 MPa Shrinkage strain : 150-300 x 10-6
![Page 58: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/58.jpg)
Buildability of precast skeletal structures
Stockyard after 24 hours
Prec
ast b
eam
s fo
r Llo
yds
of L
ondo
n
![Page 59: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/59.jpg)
Buildability of precast skeletal structures
6 st
orey
col
umns
at G
rand
isla
nd, M
anch
este
r
Column pitching on-site Day 1
![Page 60: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/60.jpg)
Buildability of precast skeletal structures
Fixing shear walls by Day 5
Shea
r wal
ls a
t Gra
nd is
land
, Man
ches
ter
![Page 61: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/61.jpg)
Buildability of precast skeletal structures
Fixing beams by Day 8
Bea
m-c
olum
n bo
lted
conn
ectio
n
![Page 62: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/62.jpg)
Buildability of precast skeletal structures
Fixing prestressed slabs by Day 12
16 m
spa
n x
400
mm
dee
p ho
llow
cor
e flo
or u
nits
![Page 63: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/63.jpg)
Buildability of precast skeletal structures
Skeletal structure after 4 weeks
Dud
ley
Hill
sho
ppin
g ce
ntre
, Birm
ingh
am, U
K
![Page 64: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/64.jpg)
Buildability of precast skeletal structures
Parking structure after 4 weeks
Cro
ss s
pan
car p
ark,
UK
![Page 65: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/65.jpg)
Buildability of precast skeletal structures
Parking structure after 5 months
The
Big
App
le, H
elsi
nki
![Page 66: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/66.jpg)
Buildability of precast skeletal structures
500,000 sq. m Europark, Italy
![Page 67: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/67.jpg)
Buildability of precast skeletal structures
218 m
192
m
![Page 68: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/68.jpg)
Buildability of precast skeletal structures
218 m
6 expansion zones, mainly 75-100 m x 75 m
![Page 69: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/69.jpg)
Buildability of precast skeletal structures
![Page 70: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/70.jpg)
Buildability of precast skeletal structures
Shopping centre after 6 months
Kep
ong
Mal
l, M
alay
sia
![Page 71: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/71.jpg)
Buildability of precast skeletal structures
..in spite of interruptions!!
Kep
ong
Mal
l, M
alay
sia
![Page 72: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/72.jpg)
Buildability of precast skeletal structures
Frame and wall construction in Sydney
![Page 73: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/73.jpg)
Buildability of precast skeletal structures
Speed of precast constructionm per week
Floor bay area
100 m
75 m
50 m
Floor bay = beam span x slab span
2
2
2
2
![Page 74: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/74.jpg)
Buildability of precast skeletal structures
Speed of precast constructionm per week
Floor bay area < 4 storey
100 m 1000 - 1500
75 m 900 - 1200
50 m 700 - 1000
2
2
2
2
![Page 75: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/75.jpg)
Buildability of precast skeletal structures
Speed of precast construction?? m per week2
2
2
2
![Page 76: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/76.jpg)
Buildability of precast skeletal structures
Speed of precast construction1200 m per week2
2
2
2
![Page 77: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/77.jpg)
Buildability of precast skeletal structures
Speed of precast constructionm per week
Floor bay area < 12 storey
100 m 600 - 900
75 m 400 - 700
50 m 300 - 500
2
2
2
2
![Page 78: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/78.jpg)
Contents
Integrated architectural structures
4
![Page 79: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/79.jpg)
Integrated architectural structures
![Page 80: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/80.jpg)
Integrated architectural structures
![Page 81: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/81.jpg)
Integrated architectural structures
![Page 82: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/82.jpg)
Alternative finishes
Natural stone
Polished granite
Acid etched
Grit blasted
Polished
Recon Portland stone
Recon sandstone
Brick slips/halves
Pigments
Paint
![Page 83: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/83.jpg)
Integrated architectural structures
![Page 84: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/84.jpg)
Integrated architectural structures
![Page 85: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/85.jpg)
Integrated architectural structures
![Page 86: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/86.jpg)
Integrated architectural structures
![Page 87: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/87.jpg)
Integrated architectural structures
![Page 88: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/88.jpg)
Integrated architectural structures
![Page 89: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/89.jpg)
Integrated architectural structures
![Page 90: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/90.jpg)
Integrated architectural structures
![Page 91: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/91.jpg)
Integrated architectural structures
![Page 92: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/92.jpg)
Spun columns.
Opera House, Erfurt, Germany (2006)c. BFT Journal 26 March 2006
![Page 93: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/93.jpg)
Integrated architectural structures
![Page 94: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/94.jpg)
Integrated architectural structures
![Page 95: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/95.jpg)
Integrated architectural structures
RM6000
per sq. m !!
![Page 96: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/96.jpg)
Contents
Discussion and future developments
![Page 97: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/97.jpg)
Future Developments
Self compacting concrete, now upto C90
![Page 98: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/98.jpg)
Future Developments
Self compacting concrete with 1% volume steel or polypropylene fibres
![Page 99: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/99.jpg)
Future Developments
Self compacting concrete: surface crazing, corner bleeding and mould oil patches
![Page 100: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/100.jpg)
Future Developments
Mixed construction and SCC (New Wembley terraces)
![Page 101: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/101.jpg)
Future Developments
Accurate SCC surface finish: 2 mm depression / 3 m length
![Page 102: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/102.jpg)
Future Developments
Prestressed tee beams
Double – tee slabs
![Page 103: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/103.jpg)
Future Developments
75 kg/m Termacol floor units2
![Page 104: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/104.jpg)
![Page 105: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/105.jpg)
Future Developments
Robotic formwork
![Page 106: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/106.jpg)
Future Developments
Concrete delivery
![Page 107: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/107.jpg)
Future Developments
![Page 108: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/108.jpg)
Future Developments
Split skin system
Phase 1
![Page 109: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/109.jpg)
Future Developments
Split skin systemPhase 2
![Page 110: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/110.jpg)
Future Developments
Split skin system
Phase 3
![Page 111: precast 1 concepts pdf](https://reader033.vdocument.in/reader033/viewer/2022051412/549e485cb4795951208b46c2/html5/thumbnails/111.jpg)
Future Developments – mixed construction