Precast Plant Quality System Documentation Set
McCreary Concrete Products, Inc. 5001 E. 106th Street
Indianapolis, IN 46280
Using This Document
This document contains an outline with 12 main headings. Each heading is a volume. Each volume represents a set of documentation that is related to one another. Volume 1 is the quality control manual. A basic quality control manual has been written which can be used and modified by the user to add plant specific details. The remaining 11 volumes will be filled with documentation that either currently exists, or should exist in a precast concrete plant to show compliance to a quality system.
Each volume of this documented system is to be contained in (1) three ring binder. The edge of the binder will be labeled with volume heading. The contents can be then separated into subsets using divider sheets. Different size binders will be needed in some instances to hold the volume of documents and records that may exist. This will vary from plant to plant. In most instances, a 1” binder will meet or exceed the volume requirements.
The purpose for using 12 binders is so that they can be kept together in a library where anyone can see them. This accomplishes two goals. First of all, by being accessible, anyone can refer to the documentation when necessary. It also makes it easy to access when an auditor shows up to examine the system for compliance to a standard. And second, displaying the quality control system in this manner demonstrates to employees and visitors that the quality system is important and supported by management.
A basic way of viewing a documented quality assurance system is to think say it, do it, and prove it. You need to say what you do, in other words, document the process. Then do what you say you are doing by following the written procedures. And finally you must prove it. The proof is in the records generated by the system to show evidence of continuous compliance. By following this format, developing a documented quality system can be done in less time, with less resources, allowing the precaster to do what they do best; make quality precast products
Volumes for Documentation Set
1. Precast Concrete Plant Quality Control Manuala. Management Quality Policyb. Company QC Organizational Chartc. Description of responsibilities for QC personneld. Description of training requirements
i. QC personnelii. Production staffiii. Forklift operatorsiv. Batch plant operatorsv. Drivers
e. Housekeeping Planf. Production Procedures
i. Pre pour inspection proceduresii. Post pour inspection proceduresiii. Final inspection proceduresiv. Curing proceduresv. Product repair proceduresvi. Nonconformance procedurevii. Mix qualification procedureviii. Raw material testing proceduresix. Equipment calibration proceduresx. Product performance test proceduresxi. Hot weather concreting procedurexii. Cold weather concreting procedure
g. Minimum strength requirementsi. Strippingii. Shipping
h. Product tolerancesi. Quality control records – Sample of forms and documentation
2. Training Documentation Manuala. Quality Personnel
i. Applicable ACI certificationsii. Concrete fundamentals and quality education
b. Production Personneli. Specific safety trainingii. Vibrator trainingiii. Batch plant operator training
c. QC Meetingsd. Safety Toolbox Talks
3. Purchased Material Compliance Recordsa. Aggregate reportsb. Cement / supplementary cementitious materials mill certificatesc. Reinforcing mill certificatesd. Certificates of compliance
i. Admixturesii. Sealants & connectorsiii. Water
4. Plant Equipment Recordsa. Forming (identification, annual inspection)b. Slings and lifting devicesc. Batching tolerancesd. Batch plant inspection criteriae. Calibration recordsf. Concrete mix formulas
5. Pre Pour Inspection Log
6. Post Pour Inspection Log
7. Quality Inspection and Testing Loga. Daily checks logb. Concrete testing recordsc. Curing recordsd. Weekly Curing Ambient Temperature Chartinge. Absorption testing
8. Final Inspection Log
9. Concrete Batch Reports
10. Product Specific Recordsa. Proof of conformanceb. Stormwater concrete pipe requirements (when applicable)c. Round manhole component requirements (when applicable)d. Box culvert requirements (when applicable)e. Septic tank requirements (when applicable)
11. Standards Manual for Test Methods and Specificationsa. ASTMb. AASHTOc. ANSId. ISO
12. Plant Safety Manuala. Management commitment and employee involvementb. Hazardous communications programc. Confined space programd. Hearing conservation programe. Powered industrial truck programf. Control of hazardous energy program (lockout / tagout)g. Emergency response programh. Employee safety training program
© Copyright 2007 by Sam Lines
Precast Concrete Plant Quality Control Manual
Volume 1Issued February 14, 2008
© Copyright 2007 by Sam Lines
Management Quality PolicyMcCreary Concrete Products, Inc. is committed to providing quality products to our customers. To meet this objective, we will implement and follow the procedures detailed by this quality system manual.
Our quality objectives are:
Customer satisfaction
On-time delivery
Zero defects
Continuous improvement
The success of this quality management system is dependent on the support of top management and employee involvement. The General Manager of McCreary Concrete Products, Inc., by placing his signature below, is demonstrating his support. Employees at all levels within the organization are charged with the responsibility of following this quality management system.
_________________________
Richard M. Craven
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 2 of 26
© Copyright 2007 by Sam Lines
Company QC Organizational Chart
Designation of Responsibility for QC PersonnelGeneral Manager
Has the ultimate responsibility for the Quality Management System Responsible for dedicating resources to the quality department Ensures Completeness of work orders and product drawings
Site Manager
Responsible for verifying product requirements in process
Oversees daily operations of plant
Human Resources and Operations
Responsible for employee training
Oversees Safety Program
Quality Control Inspector
Responsible for the management of the Quality Management System
Responsible for in process and final inspections and testing to include:
o Quality of raw materials
o Quality of forms
o Concrete quality
o Placement and consolidation of concrete
o Product dimensions
o Positioning of embedded items
o Curing of concrete
o Handling, storing and transporting products
o Recordkeeping
o Has authority to halt production processes for quality issues
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 3 of 26
General Manager
Sales Manufacturing Controller H/R & Operations Quality
InspectionSite Manager
© Copyright 2007 by Sam Lines
Description of Training Requirements
Quality Control Inspectors
ACI Field Testing Technician – Grade 1
Concrete Production and Quality Training
o NPCA: Production and Quality School; and/or
o PCA: Concrete Principles and Practices; and/or
o PCI: Level II Certification
o Internal Training per ASTM Standard for Cylinder Breaks
Site Manager
ACI Field Testing Technician – Grade 1
Concrete Production and Quality Training
o NPCA: Production and Quality School; and/or
o PCA: Concrete Principles and Practices; and/or
o PCI: Level II Certification
o McCreary Concrete Products Vibration Basics Class
o Internal Training per ASTM Standard for Cylinder Breaks
Forklift Operators
Powered Industrial Truck Training and Certification
Batch Plant Operator
Concrete Production and Quality Training
o Determined by our Ready Mix Supplier
Delivery Truck Drivers
Specialized Licensing and Training
o Indiana Commercial Drivers License-Class B minimum
o McCreary Concrete Products- 40 Hour Specialized Loading and Hauling Course
ACI is the trademark for the American Concrete InstituteNPCA is the trademark for the National Precast Concrete AssociationPCA is the trademark for the Portland Cement AssociationPCI is the trademark of the Precast/Prestressed Concrete Institute
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 4 of 26
© Copyright 2007 by Sam Lines
Housekeeping PlanSafety is a priority. Good housekeeping is critical to eliminating slips, trips and falls. Each employee is responsible for picking up trash and debris and placing it in the proper container throughout the day. Any spill will be cleaned promptly. Tools and equipment will be put away when not in use. The use of extension cords and hoses will be kept to a minimum, and they will be stored when not in use. All electrical panels/boxes will remain closed unless work is being performed on them. Lockout/Tagout procedures will be used to ensure equipment is not in a “live” state or has the potential to become “live” during maintenance operations. All blocking for structure storage, when not in use shall be stored in bins until time of use.
Storage yard shall be kept free of large debris, blocking materials of all types, especially those small enough to lodge in between dual rims of trucks. Storage yard shall be kept free of tools, cords, hoses, and other items that may pose safety hazards. All employees are responsible for housekeeping in the Storage yard.
The quality control inspector will inspect the plant and storage yard daily to make sure this policy is being followed. Acknowledgement that the housekeeping inspection is completed will be documented on the Daily Plant Inspection Form, located in Volume 7 of the series of manuals.
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 5 of 26
© Copyright 2007 by Sam Lines
Production ProceduresA. Pre-Pour Inspection Procedure
A pre-pour inspection will be performed on each form prior to casting. As a minimum, the following items will be checked:
o Form dimensions
o Form tightness
o Form cleanliness
o Form release agent application
o Positioning, size, and securing of reinforcement
o Placement, securing, and location of embedded items
o Placement, securing, and location of blockouts
The record of the inspection will be made on the pre-pour inspection form for the date the product is to be cast. To identify that the pre-pour inspection is complete, and that the form is ready for casting, we will use a laminated two sided, color coded card, affixed to steel forms with a magnet, or hung on a nail on wooded forms. Red side of card (NO GO) to face out until form has received the proper pre-pour inspection. Upon receiving a no deficiencies rating, the card will be turned over so the Green side (GO) is facing out. This GO rating ensures production personal the form has been properly checked and is ready to pour. Forms will not be cast until they have been inspected and approved. Special attention shall be taken in the following matters:
1. Reinforcemen t : Reinforcement should be stored, sorted and accessible. Areas used for fabrication should be clean and orderly. Personnel safety and keeping the material free from contaminates and damage are the primary concerns.2. Sub-assemblies: Sub-assembly areas for forms, steel embeds and reinforcing steel should be accessible, capable of producing desired assemblies and adequate for the facility. Assembly of units should be by specification and follow all current industry standards.3. Casting: Casting areas should be adequate and orderly to control the fabrication process of all types of precast concrete.
a. Placing : Concrete should be deposited in the forms in methodsthat maintain a consistent and uniform finish surface. It shouldnot, by means of placing, disturb or displace any embed itemspreviously placed. Care should be exercised to see that form oilsdo not inhibit the design performance of anchors or reinforcing. prevention of corrosion through and on finished surfaces must be considered when placing reinforcing, reinforcing supports, and ties.b. Consolidating: Vibration in addition to removing air voids should also evenly distribute the concrete and in some cases
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 6 of 26
© Copyright 2007 by Sam Lines
orientate the aggregates for a desired finish. At no time will the vibrator be used to move fresh concrete.c. Curing: Protection must be provided during the initial curing ofconcrete placement to attain desired concrete strengths. consistent curing conditions of temperature, humidity and time are required to maintain finish consistency. Controlling excessive heat and air movement reduces conditions that cause shrinkage cracks.d. Stripping: Removal of the product from its form is most critical in regards to its structural capacity. Stripping methods should notdamage the finish surface. Forms should be designed to allowstripping of the product. Concrete strengths are critical for theperformance of lifting devices and reinforcing. Proper concretestrengths prior to stripping must be attained. Lifting equipment
must be adequate and in a condition to allow safe and successfulstripping of the product.e. Finishing: Finish areas must be provided to perform the various methods of attaining the final surface treatment of the product. Special considerations should be given for finishing methods using chemicals or that create excessive dust particles. The product should be supported and positioned for the safety of the personnel working on and around the product. Equipment for finishing techniques must be adequate to maintain consistency from piece to piece. Imperfections which appear may require repair. Patching must be aesthetically acceptable and structurally sound.
4. Storage: Products stored for future shipment should be adequatelysupported and blocked to prevent damage. Position of blocking isdetermined by design and must be maintained in storage. Precautionsshould be taken to prevent chipping, warpage, cracking, contamination, orstaining of the product in the storage area. It should be stored in an orderly and accessible manner.
5. Shipping: Loaded products must be properly blocked to prevent cracking and damage to the finished surface. Panels must be adequately secured during transporting to prevent shifting and damage. Some instances may require protection from contamination to the finished surface. The product should be scheduled for the desired delivery sequence of the installer. If possible, they should be orientated at the desire of the erector.
B. Post Pour Inspection Procedure
A post pour inspection of each product will be performed. As a minimum, the following items will be included in the inspection:
o The evidence of any damage such as spalls or cracks
o Excessive bugholes or honeycombing
o The dimensions of the product and cast in items are within tolerance
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 7 of 26
© Copyright 2007 by Sam Lines
o Exposed reinforcing
o Assembly of any components to the casting
o Ambient outdoor temperature for curing purposes
o Permanent identification of the product as required
The results of the inspection will be recorded on a post pour inspection form for the date the product was cast. Any defects noted are to be repaired and re-inspected before the product passes inspection. Any product which cannot be repaired, or does not conform to the required specifications will be permanently identified as nonconforming with the word ‘CULL” clearly marked on said piece. All castings that are approved will be designated with a distinct mark that identifies the casting as accepted. This mark is to be the NPCA Certified Plant logo upon successful completion of the plant certification process. On items too small in nature to me marked with said logo, (ie. Parking bumpers, distribution boxes, risers, survey markers, etc.) a tag will be placed on the skid in which they are stacked for storage and delivery. All structures will be marked with a permanent identification number to include the casting mold from which they were poured, job name or number if required, and date of production. This can be done by either etching said information into piece during casting, spray painting information onto structure after strip, if the exterior finish allows, or with an identification tag affixed to structure and/or the skid structure is stored/hauled on.
All forms to be marked with an identification number, either welded or clearly painted onto exterior in a visible location. Tanks, to have this number etched into corner of top slab during finishing. (see fig. 1) Each gang form (Bumpers) to carry a letter designator. (ie., A, B, C, D, etc.) This designator, in conjunction with the #1, to be etched into the bottom of first bumper of each gang form. (see fig. 2) Bumpers to be stacked as such: the higher letter in alphabetical order remains on top of the lower number (ie. Skid #1 has products from gang E on bottom row, gang D on top of E, Gang C on top of D, Gang B on top of C, and Gang A on top of B. (see fig. 3) Skid # 2, as follows bottom to top: J, I, H, G, F. Bumpers will be stripped in such a way as to always place bumper #1 in each row over bumper #1 in the previous row. (ie., A1 over B1, over C1, over D1, over E1). (see fig. 3)
This process prevents the need for marking all bumpers, and ensures proper quality and inventory tracking of individual units.
C. Final Inspection Procedure
Before shipment, all products will be inspected to assure that the product conforms to requirements and is properly identified.
Shipments containing more than 5 units of the same product will have 1 product for every 13 shipped inspected. If a defect is found, 2 additional products will be inspected. If a defect is found in either of those products, all remaining product will be inspected.
Any defects noted are to be repaired and re-inspected before the product passes inspection. Any product which cannot be repaired, or does not conform to the required specifications will be permanently identified as nonconforming with the
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 8 of 26
© Copyright 2007 by Sam Lines
word ‘CULL” clearly marked on said piece. Only products which pass inspection will be shipped unless the purchaser is notified and agrees to accept the product with the nonconformance.
The final inspection, including any nonconformances or customer acceptance of a defect, will be recorded on the final inspection form.
D. Curing Procedures Procedure
The typical curing process for all products is by non-mechanical means. Castings will be protected from moisture loss after pouring and prior to stripping.
For concrete with a temperature above 55° F, the form will be covered with a plastic sheet of no less than 6 mils thick. Alternative curing methods such as a curing membrane may be used when applied at a rate not exceeding 200 SF per gallon.
Heat Curing (only when used) – Accelerated curing by heat or steam may be performed. When it is done, concrete will not be subjected to hot air or steam until after a minimum of 30 minutes or after the initial set of the concrete. The casting will be protected against moisture loss by covering or the addition of steam when using an accelerated method. The concrete curing temperature will be monitored and will not exceed 150° F. The rise in temperature will be limited to a maximum of 40° per hour.
Records for accelerated curing processes, if used, will be kept and include the following information:
o Time of initial set (ASTM C403)
o Ambient curing temperature measured a minimum of once per week
o Inspection of cured products for evidence of plastic shrinkage cracking and documentation of any damage found
E. Product Repair Procedure
A qualified person (General Manager, Sales Manager, Site Manager, or Quality Control Inspector) will determine whether the defect is minor or major in nature. If the defect will not impair the function or expected life of the product, then the defect will be considered minor, all other defects will be considered major. Defects will be repaired according to the following process:
Minor Defects – To repair a honeycomb area or spalling, any loose debris will be removed and the area surrounding will be cut away. The mating surface will be dampened. Depending on type of product and the ultimate end use of said product, Meadow Patch 20 or Meadow Plug will be used to patch the area. Cracks 1/8” to 3/8”, spanning 18” or will be filled with a 2 part epoxy gun, using Simpson Epoxy-Tie ET-22. Cracks longer than 18” will be covered with a 2 part epoxy and ports will be set every 12”. A thin, clear 2 part epoxy will be pumped into the top port until it comes out the next port down. This procedure will be repeated until the lowest port seeps epoxy. If the crack goes through the piece, this procedure will be repeated on both sides of the product. The material will be used in accordance with the manufacturers recommended procedures.
Major Defects – Major defects that affect the function or life of the product will not be repaired. The casting will be scrapped or re-classified if it meets another
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 9 of 26
© Copyright 2007 by Sam Lines
specification. Products with defects that are considered major will be clearly designated and will be permanently identified as nonconforming with the word ‘CULL” clearly marked on said piece
All defects will be documented on the inspection records. Any repairs made will be re-inspected before the casting is approved. The re-classification or rejection of any product with a major defect will be documented.
F. Mix Qualification Procedure
Standard slump concrete will be proportioned by a volumetric method by a qualified individual. Each recipe will be proportioned, documented and labeled for identification. The nominal compressive strength will be designed to exceed the required minimum compressive strength by either one standard deviation (when a minimum of 20 test samples are available) or 1,200 psi. Changes in the mix design will be documented. Unless specified, all mixes shall have a water-cement ratio no lower than .35 and no higher than .45.
When Self-Consolidating Concrete (SCC) is used, the qualification process will involve the SCC admixture manufacture. SCC will be tested daily at the beginning of the pouring operation. A specified range for the spread of the SCC will be determined for each design used. The mix will be considered to be within specification when two consecutive tests for spread fall within the specified range.
The air content, maximum water-to-cement ratio and minimum compressive strength will be as specified by the customer’s requirements.
G. Raw Material Testing Procedure
All raw materials will be tested by the supplier, and shipped with a certificate of conformance or mill certificate.
H. Equipment Calibration Procedure
A listing of all equipment used to measure the materials used in making or testing the concrete will be listed and calibrated at least annually. The list will include, but not be limited to, the following:
o Weight Scales
o Admixture dosing equipment / meters
o Moisture sensing equipment
o Air entrainment meter
o Compressive test machine
o Thermometers
o Rule or tape measure
I. Product Performance Test Procedure
Proof of Conformance to Specifications – When required, conformance to specification will be by design calculations or by performance testing. Performance testing will be verified by an independent expert or by a licensed professional engineer.
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 10 of 26
© Copyright 2007 by Sam Lines
o Round Manholes – The following inspections will be performed on the applicable round manholes produced:
Reinforcing Steel – A minimum of three cages from each production day, but not less than 3%, will be inspected for compliance to requirements. The cage will be verified with the design, the type of reinforcing used will be verified, and the connection method will be checked. These inspections will be documented and kept on file for a minimum of three years.
Flat Slab Tops – Flat slab tops will be verified by design calculations or by proof testing. A licensed professional engineer or an independent expert will verify the results of proof testing. The design will conform to ASTM C478.
Absorption testing – Absorption testing will be conducted per ASTM C497 a minimum of once per year on the mix design with the lowest amount of cementitious material. The results from this testing will be documented and maintained at the plant for a minimum of three years.
Step Testing – A test of the steps will be conducted a minimum of once per year in accordance with the requirements of ASTM C497. The testing will meet the requirements of ASTM C478.
Sanitary Manhole Vacuum Testing – When required, vacuum testing will be performed according to ASTM C1244. The results from this inspection will be documented and maintained at the plant for a minimum of three years.
Joint Design and Testing – Joints will be designed and verified per ASTM C443, ASTM C990, or as required by the customer’s specification. Leakage testing by either hydrostatic or vacuum testing will be conducted on the gasketed connections annually, or when the joint or gasket material changes. The results from this testing will be documented and maintained at the plant for a minimum of three years.
o Septic Tanks - The following inspections will be performed on applicable septic tanks produced:
Structural Proof of Design – Proof of design will be performed by either calculations or by proof testing. Design calculation will be stamped by a licensed professional engineer. Performance testing will be verified by an independent expert or by a licensed professional engineer.
Watertightness Testing – Septic tanks will be verified for water tightness according to the applicable section of ASTM C1227 or the requirements of local authority with jurisdiction, whichever is more stringent. A minimum of one septic tank produced from each form will be tested at least once per year unless a greater
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 11 of 26
© Copyright 2007 by Sam Lines
frequency is required by the customer. The results from this testing will be documented and maintained at the plant for a minimum of three years.
J. Hot Weather Concreting Procedure
It is preferred that the fresh plastic concrete temperature be no greater than 90° F. When the fresh temperature of the concrete reaches 87° F, the batch plant operator will be notified. The concrete temperature will then be monitored for each batch by the batch plant operator.
If the addition of ice and increase in sprinkling aggregates does not reduce the fresh mix temperature to below 90° F, then concrete production will be discontinued.
K. Cold Weather Concreting Procedure
It is preferred that the fresh plastic concrete temperature be no less than 50F. When the fresh temperature of the concrete reaches 55° F, the batch plant operator will be notified. The concrete temperature will then be monitored for each batch by the batch plant operator.
If the fresh concrete temperature falls below 50° F, the concrete production will be discontinued.
Since a significant amount of aggregate can be stored indoors, the aggregate temperature will increase in storage. Therefore, after additional storage time, concrete production may be resumed once the combined temperature of the aggregates and cement exceeds 40° F.
L. Ready Mix Loading/Mixing Procedure
The concrete raw materials loading and mixing will be monitored for each batch by the batch plant operator. The Loading procedure is a follows:
1. The correct/adjusted amount of water for the mix design is added to the revolving mixer drum.
2. The sand* and gravel/stone are weighed and added to the revolving mixer drum. (*Air entraining admixture is added to the top of the sand after weighing and prior to adding to the revolving mixer drum).
3. Cement and/or Flyash are weighed and added to the revolving mixer drum.
4. Remaining admixtures are added to the mix.
5. Batch will be mixed for a minimum of 70 drum revolutions before discharge.
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 12 of 26
© Copyright 2007 by Sam Lines
Minimum Strength RequirementsA. Stripping Strength
Stripping strength for sign bases, all parking bumpers and survey markers shall be a minimum of 1500 psi, all other products produced, unless specified by an engineer or deemed job specific shall be a minimum of 3000 psi.
B. Shipping Strength
Shipping strength for all products produced, unless specified by an engineer or deemed job specific shall be a minimum of 4000 psi.
C. 28 Day Strength
The 28 day strength of all products produced, unless specified by an engineer or deemed job specific shall be a minimum of 4000 psi.
Test Cylinders will be made in accordance with ASTM C31/C31M-06- Standard Practice for making and Curing Concrete Test Specimens in the Field.
All products will not be stripped until desired stripping strengths are achieved. This process will be documented through the making, curing and breaking of cylinder specimens. A minimum of 2 stripping cylinders will be made daily for each mix design and/or product line poured. These cylinders will be made per the guidelines set forth in ASTM C31/C31M-06, and the following tests will also be performed: Air Content: ASTM C143/C143M, Slump: ASTM C173/C173M or C231, and Temperature: ASTM C1064/C or C 1064M. Cylinders will be cured at or near the actual form/bed until the product is ready to strip. At said strip time, 1 cylinder will be tested and recorded in accordance with ASTM C39/C 39M-05, Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens and C1231/ C1231M-00, Standard Practice for Use of Unbonded Caps in Determination of Compressive Strength of Hardened Concrete Cylinders. If said cylinder achieves the desired stripping strength, the product can be stripped and the other cylinder will be tested to show an average strength. If the cylinder does not achieve desired strength, more curing time (actual time determined by QC personnel) will be provided, then the second cylinder will be tested and documented in accordance with the above stated ASTM’s. If at this time, the cylinders have not achieved the required stripping strength, the product will be allowed to cure for additional time, and tested/documented with a rebound hammer in accordance to ASTM C 805-02, Standard Test Method for Rebound Number of Hardened Concrete. This process will be repeated until desired strength is achieved. If strengths are not met, products will be considered substandard and reclassified or rejected.
7 day and 28 day strength cylinders will be made a minimum of once per week per mix design/product type. These cylinders will be made per the guidelines set forth in ASTM C31/C31M-06, and the following tests will also be performed: Air Content: ASTM C143/C143M, Slump: ASTM C173/C173M or C231, and Temperature: ASTM C1064/C or C 1064M. Cylinders will be cured at or near the actual form/bed until the product is ready to strip. At said strip time the 7 day and 28 day cylinders will be removed from their molds and placed outside to simulate
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 13 of 26
© Copyright 2007 by Sam Lines
the curing conditions of the products they are to represent. At the 7 and 28 day times, the cylinders will be tested and recorded in accordance with ASTM C39/C 39M-05, Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens and C1231/ C1231M-00, Standard Practice for Use of Unbonded Caps in Determination of Compressive Strength of Hardened Concrete Cylinders. If at these times, the shipping and/or design strength is not met, the product will be allowed to cure for additional time, and tested/documented with a rebound hammer in accordance to ASTM C 805-02, Standard Test Method for Rebound Number of Hardened Concrete. If, after performing this test, strengths are not met, products will be considered substandard and reclassified or rejected.
Per ASTM C1231, pads used in compression testing will be “flipped” after 50 cylinder breaks, and discarded after 100 cylinder breaks. Records of the “flipping” and discard procedure will be kept track of on the QC labs dry erase board as a running total. A start of use date will be documented, as well as a running total via tick marks. When 50 breaks have occurred, the date will be documented, and the pads will be flipped. Upon completion of a cycle of 100, the pads will be replaced and a new cycle will commence.
Product Tolerances
Bugholes, chips, voids, and honeycombing 3/8" maximum depth
Maximum size joint gap 3/8”
Length, width, height, and diameter (inside):0 to 5 ft +/- 1/4” 5 to 10 ft +/- 3/8”10 and over +/- 1/2"
Squareness (determined by inside diagonal dims.):0 to 10 ft 1/2”10 and over 3/4"
Wall thickness +3/8”, -1/8”
Top and bottom slab thickness +1/2”, -1/8”
Standard Weight Concrete:
Minimum cement content 564 lbs.Maximum w/cm ratio .45Slump w/ water reducing admixture 3 1/2” min.,7 1/2” max.Spread (SCC only) 22” to 28”Air content 6%, + 2%, - 2%
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 14 of 26
© Copyright 2007 by Sam Lines
Quality Control Records Prepour Inspection Form
Post Pour Inspection Form
Final Inspection Form
Daily Plant Inspection Form
Concrete Testing Form
Concrete Mix Design Form
Tank Watertightness Testing Form
Bi-Annual Quality Control Meeting
Weekly Curing Ambient Temperature Charting
Safety Toolbox Talks
Manhole/Handhole Absorption Test
Rebound Hammer Test
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 15 of 26
© Copyright 2007 by Sam Lines
Prepour Inspection FormProduct or Job: ____________________________________
Inspection Date:
Mon Tue Wed Thu Fri Sat
Form Condition
Form Cleanliness
Form Joints
Release Agent / Retarder
Design Length (ft/in)
Set Up Length (ft/in)
Design Width (ft/in)
Set Up Width (ft/in)
Design Depth (ft/in)
Set Up Depth (ft/in)
Blockouts
Squareness
End and Edge Details
Reinforcing Steel
Reinforcing Size
Reinforcing Spacing
Reinforcing Rustification
Cast-in Items
Lifting Devices
Comments:__________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
QC Inspector: ________________________________________ Date: __________________
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 16 of 26
© Copyright 2007 by Sam Lines
Post Pour Inspection FormProduct or Job: ____________________________________
Casting Date:
Inspection Date:
Mon Tue Wed Thu Fri Sat
Stripping Strength (psi)
Casting Finish
Coating Finish (if applicable)
Cast Length (ft/in)
Cast Width (ft/in)
Cast Depth (ft/in)
Cracks or Spalls
Squareness
Honeycombing / Bugholes
Bowing / Camber
Exposed reinforcement
Embedment Item Locations
Openings and Blockouts
Lifting Devices
Markings
Outside temp </= 25 deg F.
*Outside temp > 25 deg F.
Comments:__________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
____*If outside ambient temp <25 Deg. F. product to remain in building for 24 hrs to cure.
QC Inspector: _________________________________________ Date: __________________
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 17 of 26
© Copyright 2007 by Sam Lines
Final Inspection Form For Non-Stock Precast
Final Inspection Date: ____________________________________
Product or Job: ____________________________________
Number of Units: ____________________________________
Casting / Unit Type: ____________________________________
Casting Pour Date: ____________________________________
____ Post Pour Inspection Compete? Yes or No
____ Check product and compare it to the order
____ Check product markings for correct information
____ Check to make sure manufacture name or trademark is visible
____ Check for cracks, spalls, or damage
____ Check installed components
____ Check accessories (manuals, control panels, mastic, etc.) and compare to the order
____ Make sure concrete strength exceeds minimum requirement for shipment
QC Inspector: ________________________________________ Date: __________________
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 18 of 26
© Copyright 2007 by Sam Lines
Daily Plant Inspection Form
Monday Check here if Holiday or Plant is Not in Operation
Date: __________
Yards of concrete produced on this day: _________
Housekeeping Inspection Performed By: _________________________________
Storage Area Inspection Performed By: _________________________________
Tuesday Check here if Holiday or Plant is Not in Operation
Date: __________
Yards of concrete produced on this day: _________
Housekeeping Inspection Performed By: _________________________________
Storage Area Inspection Performed By: _________________________________
Wednesday Check here if Holiday or Plant is Not in Operation
Date: __________
Yards of concrete produced on this day: _________
Housekeeping Inspection Performed By: _________________________________
Storage Area Inspection Performed By: _________________________________
Thursday Check here if Holiday or Plant is Not in Operation
Date: __________
Yards of concrete produced on this day: _________
Housekeeping Inspection Performed By: _________________________________
Storage Area Inspection Performed By: _________________________________
Friday Check here if Holiday or Plant is Not in Operation
Date: __________
Yards of concrete produced on this day: _________
Housekeeping Inspection Performed By: _________________________________
Storage Area Inspection Performed By: _________________________________
Saturday Check here if Holiday or Plant is Not in Operation
Date: __________
Yards of concrete produced on this day: _________
Housekeeping Inspection Performed By: _________________________________
Storage Area Inspection Performed By: _________________________________
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 19 of 26
© Copyright 2007 by Sam Lines
Safety Toolbox Talks
Date:______________ Instructor:_______________
Topic of Discussion:_______________________________________________________________
Recommendations from Personnel:___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Personnel in attendance:_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 20 of 26
© Copyright 2007 by Sam Lines
Vibrator Training Course
Date:______________ Instructor:_______________
Type of Vibration: AIR, ROTARY, EXTERNAL STICK, INTERAL BOTH
Personnel in attendance:_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 21 of 26
© Copyright 2007 by Sam Lines
Concrete Testing Form
Date of Pour: ________________
Mix Design/Formula Number: ________________
Batch Number: ________________
Specimen ID Number: ________________
Mix Proportions:
Please see daily batching tickets.
Test Results:
Slump/Spread: ________ Temperature: ________
Unit Weight: ________ Air Content: ________ Yield: ________
Stripping Cylinder Compressive Strength: ___________ psi @ _____ days.
Stripping Cylinder Compressive Strength:____________psi @ _____ days.
Average Strip Compressive Strength: _____________psi
7 Day Cylinder Compressive Strength: ____________ psi
7 Day Cylinder Compressive Strength: ____________ psi
Average 7 day Compressive Strength: ____________ psi
28 Day Cylinder Compressive Strength: ____________ psi
28 Day Cylinder Compressive Strength: ____________ psi
Average 28 day Compressive Strength: ____________ psi
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 22 of 26
© Copyright 2007 by Sam Lines
Concrete Mix Design Form
Formula Number: ______________ Plant: _______________
Formula Name: ____________________________________________________________
Design Compressive Strength: _________________ PSI @ 28 days
Water-to-cement Ratio: __________
Design Air Content: __________ %
Design Unit Weight, Batched: ___________ PCF
Coarse Aggregate Ratio: __________
Cement (type ___ ): ________________ LBS. from __________________________________
Fly Ash: ________________ LBS. (Fly Ash % = _________ ) from ______________________
Water: _________________ LBS. ______________ GAL.
Coarse Aggregate: _____________ LBS. (SSD) (Type: ______________________________ )
Sand: _______________ LBS. (SSD) (Type: _____________________________________ )
Air Entrainment Admixture: ___________ OZ. (Name: _______________________________ )
Water Reducing Admixture: __________ OZ (Name: ________________________________ )
Set Accelerating Admixture: __________ OZ (Name: ________________________________ )
Notes: ____________________________________________________________________
Mix Design Approval:
_________________________________________________________Production Manager Date
_________________________________________________________Ready Mix Supplier, Quality Manager Date
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 23 of 26
© Copyright 2007 by Sam Lines
Tank Watertightness Testing Form
Date Tested: __________________
Location of Test: __________________
Product Tested: __________________
Product Serial # __________________
____________________________________________________________________________
TEST SPECIFICATIONS
Test Requested By: _________________________________
Test Performed By: _________________________________
Test Witnessed By: _________________________________
Description of Test: __*see C-1227 below_________________
Product Tested To: ____ASTM C-1227-9.2.2 Perfomance test methods___
Additional Comments: ______________________________________________
______________________________________________
Water level reading: Start: _________” End: _________” Time: _____ Min.
(Allow the tank to stabilize before beginning the timed test. Refer to the latest edition of ASTM C 1227 for requirements.)*“C-1227-9.2.2 Water-Pressure Testing-Seal the tank, fill with water and let stand for 24 hours. Refill the tank. The tank is approved if water level is held for 1 hour.”
Pass _________ Fail __________
Signature: _______________________________________________
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 24 of 26
© Copyright 2007 by Sam Lines
Weekly Curing Ambient Temperature ChartingProduct or Job: ____________________________________
Casting Date:
Inspection Date:
Mon Tue Wed Thu Fri Sat
Concrete temp </=55 deg F.
(proceed to next step) N/A N/A N/A N/A N/A N/A
Concrete temp > 55 deg F.
Starting ambient temp deg F.
Low ambient temp deg F.
High ambient temp deg F.
Outside temp </= 25 deg F.
Outside temp > 25 deg F.
Comments:__________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
____*If outside ambient temp <25 Deg. F. product to remain in building for 24 hrs to cure.
QC Inspector: _________________________________________ Date: __________________
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 25 of 26
© Copyright 2007 by Sam Lines
Manhole/Handhole Absorption TestProduct or Job: __________________________ Cast Date:__________ Test Date:________
Core #1 2 3
Drying Start Time:
Drying Finish Time:
Dry Weight:
Wet Weight:
Weight Difference:
% Absorption:
Instructions: Test Method B: “Test method B absorption test specimens shall consist of three 1 1/2” diameter cores as taken from the two ends and the center area of each tile, or manhole section.” ASTM C497.7.3.2- Specimens
“Dry specimens in a ventilated mechanical convection oven at a temperature of 221 to 239 deg F.” ASTM C497.7.4.1- Drying Specimens
“Dry specimens for a minimum of 24 hours.” ASTM C497.7.4.1.2-Test Method B
“Weigh the oven dried specimens immediately upon removal from the oven where the drying temperature is 221 to 239 deg. F.” ASTM C497.7.4.2- Weighing Dried Specimens
“Within 24 hours, carefully place the dried specimen that has been weighed in a suitable receptacle that contains clean water at a temperature of 50 to 75 deg F. Use distilled water, rain water, or tap water that is known to have no effects on test results, Heat the water to boiling in not less than 1 hour and not more than 2 hours. Do not apply live steam to the water to shorten the preboil periods until 1 hour of heating by gas or electricity has been completed. Continue the boiling for a period of 3 hours. At the end of the 3 hour boiling period, turn off the heat and cool the specimen for a period of 3 hours by running cold tap water into the boiler, or by placing the specimen in a separate container of water. The temperature of the cooling water shall not exceed 65 deg. F.” ASTM C497.7.3.2-Immersion and Boiling, Test Method B
“Remove the water-cooled specimens from the water, place on an open drain rack, and allow to drain for 1 minute. Remove the remaining superficial water by quickly blotting the specimen with a dry absorbent cloth or paper. Weigh the specimen immediately following blotting.” ASTM C497.7.4.4-Reweighing Wet Specimens
“Weigh specimens weighing less than 1 kg to an accuracy of 0.10% of the specimen mass. Weigh specimens weighing more than 1 kg to an accuracy of 1 g.” ASTM C497.7.4.5- Scale Sensitivity
“ Take the increase in the mass of the boiled specimen over its dry mass as the absorption of the specimen, and express it as a percentage of the dry mass. Report the result as an average of the three 1 1/2” diameter cores as taken from 1 tile or manhole, The absorption, as calculated by the Test Method B procedure, shall be considered satisfactory when its value does not exceed a value that is 0.5% less than the absorption designated in the Test Method A procedure.” ASTM C 497.7.5.2 Calculation and Report
“ The single operator, standard deviation has been found to be 0.157%. Therefore, results of two properly conducted tests by the same operator on the same material should not differ by more than 0.44%” ASTM C497.7.7.1.2
1. (Wet Wt.- Dry Wt. = Difference) 2. (Difference/ Dry Wt.)x 100 = Absorption %
example: (1.) Wet= 399 g – Dry 388 g = 11 g. (2.) 11g/388 g = .0283 x100 = 2.38%
QC Inspector: _________________________________________ Date: _________________
Issue Date: 14 February, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 26 of 26
© Copyright 2007 by Sam Lines
Rebound Hammer TestProduct or Job: ____________________________________
Casting Date:
Inspection Date:
Mon 1 2 3
Area Tested: 1
Design Strength: 2
Type of Aggregate: 3
Finish of Product: 4
Form Material: 5
Curing Conditions: 6
Exposure: 7
Air Temp: 8
Hammer Orientation: 9
Hammer I.D. : 10
Time of Test:
Average Reading:
Concrete Strength:
Comments for Discarded readings:
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
QC Inspector: _________________________________________ Date: __________________
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 2 of 26
© Copyright 2007 by Sam Lines
Prepour Inspection Form- ManholesProduct or Job: ____________________________________ Date:__________________
Inspection Date:
Design Actual
Product Type Base Barrel Cone Flattop
Form Condition
Form Cleanliness
Form Joints
Release Agent / Retarder
Length (ft/in)
Width (ft/in)
Depth (ft/in)
Block out 1
Block out 2
Block out 3
Block out 4
WWR Reinforcing Size
WWR Reinforcing Style
Steel Area
Wire Diameter
Cage Diameter
Cage Length
Cage Overlap
Reinforcing Rustification
Cast-in Items
Lifting Devices
Comments:__________________________________________________________________
___________________________________________________________________________
* A minimum of 3 steel cages or 3% of each daily run, whichever is greater, chosen on a random basis by QC personnel, regardless of fabrication method, will be checked.
QC Inspector: ________________________________________ Date: __________________
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 3 of 26
© Copyright 2007 by Sam Lines
Post Pour Inspection Form-ManholesProduct or Job: ____________________________________ Date:___________________
Casting Date:
Inspection Date:
Mon Tue Wed Thu Fri Sat
Product Type
Stripping Strength (psi)
Casting Finish
Coating Finish (if applicable)
Cast Length (ft/in)
Cast Width (ft/in)
Cast Depth (ft/in)
Cracks or Spalls
Honeycombing / Bugholes
Exposed reinforcement
Embedment Item Locations
Lifting Devices
Markings
Internal Diameter
Wall Thickness
Height of 2 Opposite Sides
Block out 1- Height/Size
Block out 2- Height/Size
Block out 3- Height/Size
Block out 4- Height/Size
Invert 1- Elevation/Size
Invert 2- Elevation/Size
Invert 3- Elevation/Size
Invert 4- Elevation/Size
Comments:__________________________________________________________________
____________________________________________________________________________
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 4 of 26
© Copyright 2007 by Sam Lines
QC Inspector: _________________________________________ Date: __________________Air Meter Calibration Form
Date of Calibration: __________________
Location of Test: __________________
Meter #: __________________
____________________________________________________________________________
TEST SPECIFICATIONS
Test Requested By: _________________________________
Test Performed By: _________________________________
Test Witnessed By: _________________________________
Description of Test: __*see C-231-A1-Calibration of Apparatus____________
Product Tested To: ____ASTM C-231-A1 Calibration of Apparatus
Additional Comments: ______________________________________________
Initial Pressure As Found:______________________________________________
New Initial Pressure: __________________________________________________
Pass _________
Signature: _______________________________________________
*THIS CALIBRATION TO BE PERFORMED EVERY 3 MONTHS
Date of Next Calibration:: __________________
Issue Date: 31 March, 2008 Volume 1: QUALITY CONTROL MANUAL
Approved by: ___________________________________ Page 5 of 26