preliminary draft not for circulation
DESCRIPTION
PRELIMINARY DRAFT not for circulation. feasibility and review of housing plan for KOMANI PARK CRU. KOMANI PARK CRU. Feasibility and Review of Housing Plan. prepared for. LUKHANJI LOCAL MUNICIPALITY Private Bag X7111, Queenstown , 5320 Tel: (04 5 ) 807-2606 Fax: (04 5 ) 807-2637. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/1.jpg)
Chris Hani District MunicipalityLUKHANJI LOCAL MUNICIPALITY
March 2014
PRELIMINARY DRAFTnot for circulation
feasibility and review of housing plan for KOMANI PARK CRUKOMANI PARK CRU
![Page 2: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/2.jpg)
![Page 3: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/3.jpg)
Feasibility and Review of Housing Plan
KOMANI PARK CRUKOMANI PARK CRU
March 2014
by
prepared for
CNdV africa (Pty) Ltdenvironmental planning, urban design, landscape architecture
17 New Church Street Cape Town 8000Tel: 021 424-5022 Fax: 021 424-6837
Kantey & TemplerPO Box 15087,Beacon Bay, 5205Tel: 041 373-0738
IQ Vision110 Sarel Cillier Street Strand 7140Tel: 021 853-3902
EASTERN CAPE DEPARTMENT OF HUMAN SETTLEMENTS 31-33 Phillip Frame Road ChiselhurstTel: (043) 711- 9735
LUKHANJI LOCAL MUNICIPALITYPrivate Bag X7111, Queenstown, 5320
Tel: (045) 807-2606
Fax: (045) 807-2637
![Page 4: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/4.jpg)
![Page 5: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/5.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 5
CONTENTS
2.1 INTRODUCTION
2.1.2 Purpose of the Report
2.1.2 Background of this Report
2.1.3 Terms of Reference
2.1.4 Background to Settlement
2.2 Status of Housing Project and Waiting List
2.3 Land Identification and Ownership
2.4 Engineering
2.5 Environment
2.6 Geo-tech
2.7 Distribution of Social Facilities
2.8 Current Spatial Development Framework
2.9 Future plans of other Sector Departments
2.10 Approval by Council
2.11 Summary and Recommendations
LIST OF FIGURES
Figure 2.1 .1 Locality Plan
Figure 2.1.2 Aerial Photograph
Figure 2.1.3 Visual Survey
Figure 2.2.1 Statistical Background
Figure 2.3.1 Cadastral Layout
Figure 2.4.1 Engineering
Figure 2.5 .1 Environment
Figure 2.6.1 Geo-tech
Figure 2.7.1 Distribution of Social Facilities
Figure 2.8.1 Current Spatial Development Framework
LIST OF ANNEXURESAnnexure 1 OwnershipAnnexure 2 Title DeedAnnexure 3 S.G. Diagram
![Page 6: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/6.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 6
CONTENTS
GLOSSARY
Informal Site: A Site occupied by a household or to which a household has customary rights, e.g. Permission to occupy (PTO, no longer formally in use) or community agreement via a meeting of elders including headman or chief.
Formal Site: A site occupied by a household or to which a household is entitled to have a registered right recorded at the Deeds Registry with a title deed and surveyors diagram and/or registered General Plan. However, in many instances title deeds have not been issued nor ownership registered.
In-Situ upgrade project: Formalising of tenure and installation of services and possibly also construction of a subsidised dwelling on land on which people are already living. Generally refers to a project larger than one unit.
Greenfields project: New project site which there has been no formal or informal settlement, industry, infrastructure to date. Project sites are often outside of existing urban development.
Infill Project: New project site within existing urban development usually on under utilised or vacant land and which often can help to promote physical integration between spatially isolated parts of the settlement.
Rectification projects: Repair or rebuilding of defective existing houses built through one or other government housing program.
Erven: The plural of ‘erf’ meaning plots of land each registered as an ‘erf’ in a deeds registry and forming part of a registered General Plan.
Plots: The plural of ‘plot’ meaning unregistered pieces of land informally laid out.
Portion: A plot of land forming part of a proposed or approved (by LM Council) subdivision layout but which has not yet been registered by the Surveyor General as a general plan and for which erf numbers have not yet been registered.
ACRONYMS
BLMC Biodiversity Land Management Class
CBA Critical Biodiversity Area
CRU Community Residential Unit
ECBCP Eastern Cape Biodiversity Conservation Plan
ECDHS Eastern Cape Department of Human Settlement
EIA Environmental Impact Assessment
GP General Plan
HSP Human Settlement Plan
LM Local Municipality
MHSP Municipal Human Settlement Plan
SA South Africa
SANBI South African National Biodiversity Institute
SDF Spatial Development Framework
![Page 7: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/7.jpg)
![Page 8: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/8.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 8
INTRODUCTION 2.1
2.1.1 PURPOSE OF THE REPORT
The purpose of this report is to describe the key elements to be taken into account when assessing the feasibility of Komani Park CRU as a Human Settlement Project and to recommend whether it should be approved or not.
2.1.2 BACKGROUND TO THIS REPORT
This report is one of twelve Human Settlement Project feasibility reports for Lukhanji Municipality. It is designed so that it can be part of a single document that includes the other eleven projects.
2.1.3 TERMS OF REFERENCE (Part C.3 Scope of work Tender No. SCMU11-12/13-A0240)
The project terms of reference for the feasibility report are summarised as follows:
Ascertain the feasibility of the project within each MHSP. The study shall reveal the developmental opportunities and constraints in relation to:
1. Determination of housing demand and potential beneficiary status
2. Land identification and ownership3. Availability of bulk services and confirmation of capacity4. Environmental conditions;5. Geo-technical conditions6. Alignment with Municipal Spatial Planning7. Visual survey (area visits)8. Future development plans of other sector departments 9. Provision of recommendation and proposals to ECDHS
2.1.4 BACKGROUND TO SETTLEMENT
• Registered Owner: Lukhanji Municipality, see Annexure 1
• Property Description: Erven 3664 and 3665, Queenstown
• Title Deed Restrictions: Title Deed to be requested: Deeds office King Williams Town (See
Annexure 2)
• Servitudes: None (See Annexure 3)
• Site Size: Erf 3664 1.1haErf 3665 1.4ha Total: 2.5 ha
• The Komani Park CRU project is an urban project located in Queenstown within Lukhanji Municipality.
• Queenstown is the main administrative, commercial and educational centre of Lukhanji Municipality and surrounding farms. It is located approximately 188km north of East London and 165km south of Aliwal North on the N6 national road, see Fig. 2.1.1.
• Komani Park is a middle to high income suburb in Queenstown , situated south east of Queenstown CBD on Komani Street, south of the railway line, see Fig. 2.1.2.
• The Komani Park CRU Project is proposed to be on two public open space parks within Komani Park, see Fig 2.1.2.
• The first site, Komani Park CRU (a), is an estalished recreational park on Kowie Crescent, in the northern corner of Komani Park. The second site, Komani Park CRU (b), is a public open space south of Komani park, bound by Klaas Smit Rd to the north, Tarka Place to the east and Bashee Road to the south, see Fig. 2.1.2.
![Page 9: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/9.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 9
Locality Plan Figure 2.1.1
![Page 10: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/10.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 10
Aerial Photograph Figure 2.1.2
![Page 11: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/11.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 11
VISUAL SURVEY Figure 2.1.3
a. POS on Kowie Crescent b. POS on Kowie Cresent from the South c. A view down Klaas Smit Road
d. POS on Klaas Smit Road along western boundary e. POS on Klaas Smit Road along eastern boundary
![Page 12: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/12.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 12
STATUS OF HOUSING PROJECTS AND WAITING LISTS 2.2
• The sites are located on Erven 3664 and 3665 Queenstown. They are both shown as public space on General Plan No. 8717, see Annexure 3.
• The Title Deed has been requested at the Deeds Office in King Williams Town.
• The land currently functions as public open space and as such is owned by Lukhanji Municipality.
• The number of beneficiaries have not yet been proposed for this project.
• Beneficiary waiting list have been requested from the municipality however they are still awaited for this project.
KOMANI PARK CRU
Population (SDF 2005) Not Specified
Population (2011 Census) 1883 (Komani Park)
Ex. Units (SDF 2005) Not Specied
No. Households (Census 2011) 494 (Komani Park)
Proposed Units (EC DHS) Awaited
Waiting List (Lukhanji LM) Awaited
Figure 2.2.1 Statistical Background
![Page 13: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/13.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 13
Cadastral Layout Figure 2.3.1
![Page 14: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/14.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 14
ENGINEERING (Kantey and Templer) 2.4
BULK SERVICES Existing Services
....
INTERNAL SERVICES Existing Services
....
GEOTECHNICAL CONDITIONS....
EXISTING INTERNAL SERVICES ARE ADEQUATE AND REQUIRE NO UPGRADING
Await K&T
TOP STRUCTURE....
TRAFFIC IMPACT ASSESSMENT...
ROADS AND ACCESSIBILITY...
THE PROJECT IS FEASIBLE FOR DEVELOPMENT OF HUMAN SETTLEMENTS.
![Page 15: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/15.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 15
Engineering (Kantey and Templer) Figure 2.4.1
![Page 16: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/16.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 16
ENVIRONMENT 2.5
• There appears to be no wetlands or significant Critical Biodiversity Areas on the proposed CRU sites.
• There are no water courses flowing through or near the sites.
• Housing development would need to ensure that it remains 32m from the River or watercourse so as to avoid triggering NEMA EIA Regulations, namely Listing No. 40 as identified in the Government Notice R. 344 (Listing Notice 1).
• There appears to be no environmental concerns that could impede the Human Settlement Project.
![Page 17: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/17.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 17
Environment Figure 2.5.1
![Page 18: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/18.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 18
GEO-TECH (Kantey and Templer) 2.6
• Preliminary and Phase 1 geotechnical site investigations are required to obtain a more accurate evaluation of the development potential of each site, but the initial indications are that the geology is suitable for further development of these areas.
• Some potential geotechnical constraints have been identified for further investigation which may have an impact on the extent of the developable land and/or the development costs.
• The recommended typical foundations for subsidy housing are conventional strip foundations or light rafts to cater for variations in soil profile and minor soil movements.
• On sloping terrain, some earthworks and retaining walls may be required to create level platforms for houses and this can have significant cost implications.
• Foundations should be placed on well compacted natural soil, engineered fill or rock. Founding conditions will have to be inspected by the engineer to confirm suitable soil conditions with adequate bearing capacity and to check for any seepage or groundwater problems.
• In terms of the geotechnical information available, the proposed housing projects appear to be feasible and planning should proceed with further investigations on individual sites. (Outeniqua Geotechnical Services cc, 2013 )
![Page 19: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/19.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 19
Geo-tech (Kantey and Templer) Figure 2.6.1
Study Area
![Page 20: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/20.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 20
DISTRIBUTION OF SOCIAL FACILITIES 2.7
• Using 1 km walking distance as a measure of efficiency when it comes to proximity to social facilities. The following can be found in Komani Park:
• There is only one school that is within 1 km walking distance from the sites.
• There are a number of primary schools and 2 high schools that are within 2 km from the site.
• There are 2 clinics and a hospital situated within 2 km walking distance.
• The police station is situated in Queenstown CBD.
• The sites are located relatively far from facilities and are more suitable for private car owners. Reliable public transport will be a requirement should the Human Settlement Project commence.
![Page 21: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/21.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 21
Distribution of Social Facilities Figure 2.7.1
![Page 22: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/22.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 22
CURRENT SPATIAL DEVELOPMENT FRAMEWORK 2.8
• The Lukhanji SDF 2005 proposes the site be utilised for public open space.
• The proposed Human Settlements Project is not in line with the SDF.
• The municipality is currently reviewing its SDF and must seek to incorporate the project into its SDF should it be found suitable to do so. However, it is the recommendation of this report that the properties remain public open space.
• Erf 13120, Victoria Grounds, is located just east of The Mall, Queenstown, abutting the N6 main route on the east entrance of Queenstown.
• Victoria Grounds, owned by the Housing Development Agency, is more suitable for the purposes of the CRU project.
Victoria Grounds: Alternative Site
![Page 23: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/23.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 23
Current Spatial Development Framework Figure 2.8.1
The Site
![Page 24: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/24.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 24
• The proposed Human Settlement Project represents an undesirable pattern of densification and social integration, by attempting to develop onto an established, functional recreational parks and open space. This is known as “Town-Cramming”.
• It is important that densification happens according to an overall framework that seeks to optimize public transportation and access to business and community facilities and is not “willy-nilly” directed at any piece of open space wherever it may be located in an ad-hoc and opportunistic fashion, see Fig. 2.8.2.
• This kind of approach is likely to have an unnecessarily negative impact on people’s perceptions of property values and create needless resistance to densification.
• Therefore, it is important, that where possible, the public open space is retained in some form and new development faces onto it.
Figure 2.8.2 Avoid "Town-Cramming"
Figure 2.8.3 Preserve well located open spaces
![Page 25: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/25.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 25
FUTURE PLANS OF OTHER SECTOR DEPARTMENTS 2.9
• The following table indicates the future plans of other sector departments proposed in the various settlements as contained in the IDP 2013-2014.
• The IDP 2013-2014 proposed the upgrading of sanitation infrastructure to the value of R 18.9m and bulk water infrastructure to the value of R26.7m, respectively, a portion of which will be attributed to the Komani Park CRU human settlement project.
No. Project Government Dep./ Other Ilinge in
form
al s
ettle
ment
Unifo
und 7
50
Ezib
ele
ni I
nfo
rmal S
ettle
ment 20
0
Tyld
en 3
00
Ekuphum
leni I
nfo
rmal S
ettle
ments
Zola
Village 7
00
Machib
ini V
illage
Kom
ani P
ark
Zingquth
u V
illage
Kam
ast
one
Yonda
Mchew
ula
Village
Budget '13/'14 Budget '14/'151 Bulk services CHDM R 500 000 R 4000 0002 Sanitation CHDM R 12 000 000 R 6 900 0003 Bucket Eradication CHDM4 Bulk Water Backlog CHDM R 17 700 000 R 9 000 0005 Sewerage Treatment Plant CHDM6 Multi Purpose Sports Centre MIG7 Equipping and Repairing of boreholes OPEX8 Electricty Connection Eskom9 Flood Damages Project DR&PW
10 Construction of Sport Field MIG11 Construction of Community Hall MIG12 Upgrading of Roads MIG13 Greening and Beautification project DoEA
Future Plans of other Sector Departments for Lukhanji Municipality 2013/2014 & 2014/2015
![Page 26: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/26.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 26
APPROVAL BY COUNCIL 2.10
• The Council Resolution is awaited for this project.
![Page 27: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/27.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 27
SUMMARY AND RECOMMENDATIONS 2.11
2.11.1 SUMMARY
• The site was inspected on 25/10/2013 and the conclusions below ground-truthed.
• There are adequate engineering services. (K&T to confirm)
• There are no environmental concerns affecting the proposed Human Settlement Project. It should not trigger an EIA.
• A detailed geo-technical site visit inspection and, if necessary, survey will be required prior to the project commencing.
• The waiting list has been requested from the municipality and is still awaited from this project.
• The sites are not in close proximity to facilities. Reliable public transport is a requirement to support the Human Settlement Project.
• The Human Settlement Project is not line with the SDF.
• In general the project represents an undesirable pattern of densification and social integration.
• The Council Resolution is still awaited from the municipality.
2.11.2 RECOMMENDATIONS
• This project is not feasible.
• In light of this assessment it is recommended that the award of subsidies cannot proceed in Komani Park and that an alternative site, that is in close proximity to public transport and work opportunities, be earmarked.
• Erf 13120, Victoria Grounds, is located just east of The Mall, Queenstown, abutting the N6 main route on the east entrance of Queenstown.
• The property is owned by the Housing Development Agency, see Annexure 1b, and is more suitable for the purposes of the CRU project.
• It is approximately 1.3km from the CBD.
• The site is better suited for this kind of project as it is also close to public transport and services.
![Page 28: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/28.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 28
![Page 29: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/29.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 29
ANNEXURE 1: OWNERSHIP PRINTOUT
![Page 30: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/30.jpg)
![Page 31: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/31.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 31
ANNEXURE 2: TITLE DEED
![Page 32: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/32.jpg)
![Page 33: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/33.jpg)
KOMANI PARK CRU FEASIBILITY STUDYCNdV africa (Pty) Ltd 22 April 2023
page 33
ANNEXURE 3: SURVEYOR GENERAL DIAGRAM
![Page 34: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/34.jpg)
![Page 35: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/35.jpg)
![Page 36: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/36.jpg)
![Page 37: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/37.jpg)
![Page 38: PRELIMINARY DRAFT not for circulation](https://reader035.vdocument.in/reader035/viewer/2022062809/568159d7550346895dc7244f/html5/thumbnails/38.jpg)