PRELIMINARY DRAINAGE REPORT FOR
ADOBE VIEW NORTH SUBDIVISION
PRESENTED TO:
The City of Fruita
PREPARED FOR:
Adobe View Development Company LLC. P.O. Box 903
Rangely, CO 81648
PREPARED BY:
Rolland Consulting Engineers LLC 405 Ridges Blvd. Suite A
Grand Junction, CO 81507
April 26, 2016
TABLE OF CONTENTS
I. SITE LOCATION AND DESCRIPTION II. MAJOR BASIN DESCRIPTION III. EXISTING SITE DESCRIPTION AND SOIL GROUP IV. PROPOSED SITE DESCRIPTION V. EXISTING DRAINAGE CONDITIONS
• On-site Flows
• Off-site Flows
• Runoff Calculations
VI. PROPOSED DRAINAGE CONDITIONS
• General Discussion
• Drainage Fee Calculation
• Off-Site Flows and System Impact
• Operation and Maintenance
VII. DESIGN CRITERIA
• General Considerations
• Hydrology
VIII. CONCLUSIONS
APPENDICES A. CALCULATIONS
• RATIONAL METHOD RUNOFF (EXISTING & PROPOSED)
• PIPE, INLET AND STREET CAPACITIES
B. SUPPORTING INFORMATION
• RATIONAL METHOD RUNOFF COEFFICIENTS TABLE
• IDF DATA FOR USE IN THE GRAND VALLEY
FIGURES MAJOR DRAINAGE BASIN MAP ENCLOSURES FINAL DRAINAGE PLAN
CERTIFICATION STATEMENT
This Drainage Report has been prepared under my direct supervision. _______________________ Kent Shaffer, P.E.
I. SITE LOCATION AND DESCRIPTION The project site is located in the SE¼ NE¼ Section 20 T1N, R2W, of the Ute Meridian also known as 965 18 Road in Fruita, Colorado. The proposed project is a 34 lot, residential single family home, subdivision on an approximate 12.05-acre parcel. The lots will be approximately 1/4 to 1/3 acre in size. The proposed project will be named Adobe View North Subdivision.
II. MAJOR BASIN DESCRIPTION The site lies within a 1700 acre basin of the of the Murray drain system (approximately 3,000 ft upstream from the Colorado River) that is the jurisdiction of the Grand Valley Drainage District. (See major drainage basin map). The site is not within a defined 100-year floodplain. Drainage characteristics within the major drainage basin will remain unchanged.
III. EXISTING SITE DESCRIPTION AND SOIL GROUP The site currently consists of a mostly vacant lot with one residential structure and a few small
out buildings. Previously the site was in irrigated agricultural use. According to the ASoil Survey, Grand Junction Area, Colorado, United States department of Agriculture, Soil Conservation Service, issued in November, 1955", the soil type for this site is Sagers Silty Clay Loam (0-2 percent slopes. An SCS Hydrologic Soil Group B was used for run off calculations.
MAJOR DRAINAGE BASIN MAP
V. PROPOSED SITE DESCRIPTION Initial improvements will include: asphalt roadway with concrete curb and gutter. For proposed run-off calculation purposes, it is estimated that approximately 20 percent of each lot area will be impervious in the fully developed condition. The on-site developed surface treatments (and their approximate size) will consist of the items listed below.
$ Building/driveway 1.81 Acres
$ Asphalt/Concrete 2.23 Acres
• Landscaping/Gravel 7.25 Acres
• Bare/ Undisturbed 0.76 Acres 12.05 Acres
V. EXISTING DRAINAGE CONDITIONS On-Site Flows
The site is considered to be one basin that drains from northeast to southwest at an average slope of 0.5 to 1 percent. The Murray Drain flows south along the west site boundary. Site drainage is channeled to the west along the south boundary line to the open Murray drain. Roadside drainage along the west side of Pine Street (east site boundary) generally flows on-site and joins on-site flow to the west. Off-Site Flows
There is a lot line Drain Ditch along the north boundary that intercepts drainage flowing towards the site from the north and channels it west to the Murray Drain. The Raley Drain ditch generally runs near the south boundary of the site and joins the Murray Drain near the SW corner of the site. There is some contributing sheet flow from the lots of Adobe View Subdivision south of the site. Other off-site drainage from the east of the site, primarily River Glen Estates Subdivision, enters the Raley Drain from a pipe crossing under Pine Street. Runoff Calculations
The hydrology and runoff calculations for the existing conditions are presented in spreadsheet format in Appendix A.
VI. PROPOSED DRAINAGE CONDITIONS
General Discussion
The general drainage pattern from east to west is maintained in the proposed drainage basin. Developed Basin A surface runoff will be conveyed to the southwest corner of the site via concrete roadway gutters. Drainage will enter storm drain inlets near the SW corner of the site and be piped into the Murray Drain.
Drainage Fee Calculation
The option of a drainage fee payment in lieu of detention has been selected. The fee calculation method is found in the SWMM section 403.4:
$ FEE = B(CD – CH)A0.7
B=$17,058,
Runoff coefficients CD and CH are derived from Table 701 and 702 and figure 703
17,058 (0.52 – 0.35)(12.05) 0.7 = $16,560.29
Off-Site Flows and System Impact
Off-site flow will remain unchanged in the proposed drainage condition. The Raley drain ditch has been piped as a part of the previous Adobe View Subdivision development.
Operation and Maintenance
The piped portion of the proposed drainage system will be located in right-of-way areas to be dedicated to the City of Fruita.
VII. DESIGN CRITERIA General Considerations The 2 year and 100 year runoff rates were calculated for this project using the Rational Formula Method as described in the Mesa County Storm water Management Manual (SWMM) dated January 2008.
The spreadsheet presented in appendix A, lists all parameters for the runoff calculation and detention area sizing. All variables were selected from tools contained in the SWMM and are referenced in Appendix A. No previous drainage studies are known to have been performed for the site
VIII. CONCLUSIONS The runoff calculations for the Adobe View North Subdivision are according to the SWMM. No additional off-site flow will enter the site. The flow path for the developed condition is similar to the existing condition. Release of developed flow will discharge into the Murray Drain undetained. The drainage fee in lieu of detention is the preferred option for this development. C:\PROJECTS\A6216\A6216DRN1.doc
APPENDIX A
RATIONAL METHOD RUNOFF CALCULATIONS
PIPE, INLET AND STREET CAPACITY CALCULATIONS
RO
LL
AN
D E
NG
INE
ER
ING
AD
OB
E V
IEW
NO
RT
H S
UB
DIV
ISIO
N
BY
: K
en
t S
ha
ffe
rR
AT
ION
AL
ME
TH
OD
RU
NO
FF
CA
LC
UL
AT
ION
S0
8-M
ay-0
8
BA
SIN
DE
SIG
NA
TIO
N
TO
TA
L
BA
SIN
AR
EA
C
CA
LC
UL
AT
ION
Tc C
AL
CU
LA
TIO
NIN
TE
NS
ITY
RU
NO
FF
AN
D S
TO
RM
(Acre
s)
C1
A1
C2
A2
Co
mp
osite
CT
oT
sT
ch
an
Tc
iQ
Ba
re G
rou
nd
/
La
nd
sca
pe
Bld
g,C
on
c,
& P
vm
tO
ve
rla
nd
Flo
w L
en
gth
(L in
Fe
et)
Ave
rag
e %
Slo
pe
Ove
rla
nd
Flo
w (
S)
To
(Min
ute
s)
Co
nce
ntr
ate
d
Le
ng
th
(Fe
et)
Co
nce
ntr
ate
d
Ve
locity (
F/S
)T
s
(Min
ute
s)
Ch
an
ne
l
Le
ng
th
(Fe
et)
Ch
an
ne
l
Ve
locity (
F/S
)
Tch
an
(Min
ute
s)
(Min
ute
s)
(In
ch
es/H
ou
r)(C
FS
)
His
tori
c F
low
s
Ba
sin
A
2 Y
R1
1.8
8
0.3
21
1.7
6
0.9
30
.12
0.3
33
00
0.8
26
.01
28
01
.00
21
.34
7.3
0.4
51
.74
10
0 Y
R1
1.8
8
0.3
81
1.7
60
.95
0.1
20
.39
30
00
.82
4.0
12
80
1.0
02
1.3
45
.31
.82
8.3
4
De
ve
lop
ed
Flo
ws
Ba
sin
A1
2 Y
R4
.47
0
.29
4.4
70
.29
18
31
.01
9.7
90
01
.21
2.5
32
.20
.52
0.6
7
10
0 Y
R4
.47
0
.52
4.4
70
.52
18
31
.01
4.1
90
01
.21
2.5
26
.62
.29
5.3
1
Ba
sin
A2
2 Y
R5
.25
0
.29
5.2
50
.29
18
31
.01
9.7
91
11
.21
2.7
32
.40
.52
0.7
9
10
0 Y
R5
.25
0
.52
5.2
50
.52
18
31
.01
4.1
91
11
.21
2.7
26
.82
.28
6.2
2
Ba
sin
A3
2 Y
R1
.17
0
.29
1.1
70
.29
11
51
.01
5.6
78
01
.21
0.8
26
.50
.58
0.2
0
10
0 Y
R1
.17
0
.52
1.1
70
.52
11
51
.01
1.2
78
01
.21
0.8
22
.02
.54
1.5
4
Ba
sin
A4
2 Y
R0
.76
0
.29
0.7
60
.29
65
1.0
11
.83
00
1.2
4.2
15
.90
.76
0.1
7
10
0 Y
R0
.76
0
.52
0.7
60
.52
65
1.0
8.4
30
01
.24
.21
2.6
3.3
41
.32
Ba
sin
A5
2 Y
R0
.24
0
.29
0.2
40
.29
10
02
.01
1.6
11
.60
.88
0.0
6
10
0 Y
R0
.24
0
.52
0.2
40
.52
10
02
.08
.38
.33
.94
0.4
9
Fo
rmu
las:
Q =
CiA
C =
Ra
tio
na
l m
eth
od
ru
no
ff c
oe
ffic
ien
t, d
ime
nsio
nle
ss (
Ta
ble
70
1,7
02
,70
3)
i =
ra
infa
ll in
ten
sity in
in
ch
es/h
ou
r (f
orm
ula
se
ctio
n 6
04
)
Tc =
Ove
rla
nd
Flo
w (
To
) +
Sh
allo
w C
on
ce
ntr
ate
d F
low
(T
s)
+ C
ha
nn
el F
low
(T
ch
an
)
To
= 1
.8(1
.1-C
)L0
.5/S
0.3
3
L=
Le
ng
th o
f flo
w p
lan
e (
30
0' m
axim
um
)
S =
Ave
rag
e p
erc
en
t slo
pe
of
the
ove
rla
nd
pla
ne
Ts =
Ls/V
s
Ls =
Le
ng
th o
f flo
w in
co
nce
ntr
ate
d a
rea
Vs =
Ve
locity in
co
nce
ntr
ate
d a
rea
(fig
ure
"E
-3")
Tch
an
is
ba
se
d o
n s
ep
ara
te c
ha
nn
el ca
lcu
latio
ns
AL
L R
EF
ER
EN
CE
S R
EF
ER
TO
TH
E
ME
SA
CO
UN
TY
ST
OR
MW
AT
ER
MA
NA
GE
ME
NT
MA
NU
AL
MA
RC
H 2
00
6
^
APPENDIX B
SUPPORTING INFORMATION