preparations for ra and wrc-15

18
International Telecommunication Union Preparations for RA and WRC-15 Regional Forum on Optimization and Efficient Use of Spectrum 13 July 2015 Cancun, Mexico Mario Maniewicz Deputy-Director, Radiocommunication Bureau, ITU

Upload: others

Post on 14-Apr-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Preparations for RA and WRC-15

InternationalTelecommunicationUnion

Preparations forRA and WRC-15

Regional Forum on Optimizationand Efficient Use of Spectrum

13 July 2015Cancun, Mexico

Mario ManiewiczDeputy-Director, Radiocommunication Bureau, ITU

Page 2: Preparations for RA and WRC-15

2Regional Forum on Optimization and Efficient Use of Spectrum - 13 July 2015; Cancun, Mexico

The Role of ITU‐R

Page 3: Preparations for RA and WRC-15

Radiocommunication Sector (ITU‐R)Structure & Activities

CPM: Conference Preparatory MeetingMIFR:  Master International Frequency RegistryRA: Radiocommunication AssemblyRAG: Radiocommunication Advisory GroupRec: ITU‐R Recommendations (international standards,

mandatory if incorporated by reference in RR)

WRCRA

SG-1: Spectrum managementSG-3: Radiowave propagationSG-4: Satellite servicesSG-5: Terrestrial servicesSG-6: Broadcasting serviceSG-7: Science servicesSC: Special Committee RPM

CPM

RoP: Rules of ProcedureRR: Radio Regulations (international treaty)RRB: Radio Regulations BoardSGs: Study GroupsWRC: World Radiocommunication Conference

RR

Rec

RoPHarm.Interf.

Radiocommunication Bureau

SPACE & TERRESTRIAL services

Technical examinations

Draft RofPHarm. Interf.

Director

SSD TSD IAPSGD

MIFRFindings

RRB

RAG

Page 4: Preparations for RA and WRC-15

4Regional Forum on Optimization and Efficient Use of Spectrum - 13 July 2015; Cancun, Mexico

Update the Radio Regulations

• Spectrum allocations• Coordination and notification procedures• Administrative and operational procedures

Adopt ResolutionsHeld every 3-4 years (CS 90)

WRCITURadioRegulations

WRC Purpose

Page 5: Preparations for RA and WRC-15

5Regional Forum on Optimization and Efficient Use of Spectrum - 13 July 2015; Cancun, Mexico

Main steps towards WRC-15From WRC‐12: WRC‐15 Agenda in Resolution807(WRC‐12) 

1st Session Conference Preparatory Meeting: CPM15‐1 held on 20 –21 Feb. 2012; Results in CA/201 of 19.03.12 + Add. 1 of 15.01.13 

Council 2012 Res. 1343: WRC‐15 Agenda, Date & VenuePP‐14 Res. 185: Global Flight Tracking for Civil Aviation

2nd Session Conference Preparatory Meeting CPM15‐2 held on 23 March –2 April 2015; Result: Report of the CPM to WRC‐15

Final meetings of regional groups

RA‐15: 26‐30 Oct. 2015–WRC‐15: 2‐27 Nov. 2015

5

Page 6: Preparations for RA and WRC-15

6Regional Forum on Optimization and Efficient Use of Spectrum - 13 July 2015; Cancun, Mexico

The WRC Process

WRC

Regional preparationResolution 72 (Rev.WRC-07)

ProposalsCoordinated

common proposals Member States

CPM Report

Informal Group(Structure & Chairmanship) Proposals

Director’sReport

Agenda: by previous WRC, finalized by ITU Council + PP-14 Res. 185

RadioRegulations

(CS89)ConferenceSecretariat

(BR & GS)

RA

Final Acts

Page 7: Preparations for RA and WRC-15

7Regional Forum on Optimization and Efficient Use of Spectrum - 13 July 2015; Cancun, Mexico

National / Regional Preparationsa Key element for success

- Harmonization of regional positions- Collaborate in resolving differences in WRC agenda items- Plan for the following WRC

Page 8: Preparations for RA and WRC-15

8Regional Forum on Optimization and Efficient Use of Spectrum - 13 July 2015; Cancun, Mexico

Topics on WRC-15 Agenda

Mobile Broadband(IMT < 6GHz,

UHF band,PPDR)

Amateur radiofor emergency@ 5 MHz

Climatemonitoring

Weather forecast

Space Research

UTCleapsecond

Aeronautical(UAS in FSS, WAIC)

Maritime (AIS, UHF On-board Coms)

Automotive Radar(RLS@78Ghz)

Satellite allocations(FSS @ 10-17 GHzFSS&MMSS @ 7/8GHzMSS @ 22-26GHz)

Regulatory(Sat. regulations,harmonization of spectrum use, etc.)

Page 9: Preparations for RA and WRC-15

9Regional Forum on Optimization and Efficient Use of Spectrum - 13 July 2015; Cancun, Mexico

1.6

1.3

1.5

1.4

1.11

1.12

1.7

1.8

1.9.1

1.10

1.9.2

Use of 700 MHz band

Broadband PPDR

Amateur @ 5 MHz

UAS / FSS

FSS @ 10-17 GHz

MSS FL @ 5GHz

ESVs @ 5 & 14 GHz

FSS @ 7/8GHz

MMSS @ 7/8GHz

MSS @ 22-26GHz

EESS @ 7-8GHzEESS +600MHz @ 9GHz

Mobile Broadband & IMT1.1

1.2

WRC-15 Agenda items

1.15

1.13

7*

1.18*

1.16

1.17

1.14

SRS @ 400MHz

UTC – Leap second

MMSUHF on-board coms

AIS for maritimeAeronautical

WAICAutomotive radar

RLS @78 GHz

Satellites regulation

8RR Art. 5 (country footnotes) spectrum use harmonization

BR Director’s Report to WRC-15 with someissues from WRC resolutions, e.g.: Coord-Arc, MSS @ 406Mhz, nano/pico-sat., etc.

9

Page 10: Preparations for RA and WRC-15

Regional Forum on Optimization and Efficient Use of Spectrum - 13 July 2015; Cancun, Mexico

WP 4A

9.1.4*

1.6

9.1.6WP 1B

WP 4C

9.1.2*

WP 5A1.3

WP 5B1.5

1.41.15

WP 7B

1.11

1.13

9.1.8

WP 7C

1.12

SC

7*

9.1.7

9.1.3* 9.1.5*

1.7

1.8

1.9.1

1.10

1.9.2

9.1.1

1.18*

1.16

1.17

WP 7A 1.14

* Relevant part

ResponsibleITU-R Groups

WRC-15 Agenda items & Resp. Groups

2, 4, 10

CPM15-2

UASFSS @ 10-17 GHz

SRS @ 400MHz

UTC

RR proceduresfor Satellite filings

Issues for the BRDir.’s Report (9)

1.1

1.2 JTG 4-5-6-7

WRC-158Art. 5 (country)

footnotes 3, 5, 6, 9

Page 11: Preparations for RA and WRC-15

Regional Forum on Optimization and Efficient Use of Spectrum - 13 July 2015; Cancun, Mexico

9.1.4Res.67

9.1.2Res.7569.1.3Res.11

9.1.1Res.205 MSS in the band 406-406.1 MHz

Issues under Agenda item 9.1

CA Reduction & technical criteria (RR Nos. 9.41 & 9.7)

Satellite orb. & frequency spectrum to deliver International Public Telecommunication Services in developing countriesUpdating & rearrangement of the RR (excepting several Art.)

9.1.6Res.957

9.1.8Res.757

9.1.7Res.647

9.1.5Res.154

Existing & future operation of FSS ES @ 3.4-4.2 GHz, as an aid to safe operation of aircraft and reliable distribution of meteorological information in some Reg. 1 countriesReview def. of fixed service, fixed station & mobile station

SM guidelines for emergency & disaster relief radiocom.

Regulatory aspects for nano- and picosatellites

Page 12: Preparations for RA and WRC-15

9.2.2

9.2.1 Defining radio stations operating in the MetAids

Issues under Agenda item 9.2

Clarification of the use of deep space allocations in regard to certain provisions of the Radio Regulations

On-going studies:

• ITU-R WP 5B on aspects related to the aeronautical mobile service &

radiodetermination service

• ITU-R WP 4C on aspects related to the mobile-satellite service &

radiodetermination-satellite service

+ PP-14 Res. 185: Global flight tracking (GFT) for civil aviation

Regional Forum on Optimization and Efficient Use of Spectrum - 13 July 2015; Cancun, Mexico

Page 13: Preparations for RA and WRC-15

Summary of CPM Report Preparation

WP 4A

9.1.4

1.6

9.1.6

WRC-15 (agenda items, incl. issues under AI 9.1)

CPM15-2

CPM ManagementTeam Meeting

WP 1B

WP 4C

9.1.2

WP 5A 1.3

WP 5B 1.5

1.4

1.15

WP 7B 1.11 1.13 9.1.8

WP 7C 1.12

JTG 4-5-6-7

SC 7

Chapter 1(draft texts)Chapter 2

(draft texts)Chapter 3(draft texts)Chapter 4

(draft texts)Chapter 5(draft texts)Chapter 6

(draft texts)

SC

Responsible ITU-R Groups

1.1 1.2

Draft CPM Report

9.1.7

9.1.3 9.1.5Regulatory and procedural aspects

1.7 1.8 1.9.1

1.101.9.2 9.1.1

1.18*

1.16 1.17 1.18*

WP 7A 1.14* Relevant part

2CPM15-2

4 10 GFT

9.2.1 9.2.2 9.2 RR No.5.526

CPMReport

toWRC-15

Chapter 1Chapter 2

Chapter 3Chapter 4

Chapter 5Chapter 6Annex 1

Page 14: Preparations for RA and WRC-15

WRC-15 Documents & Proposals

Page 15: Preparations for RA and WRC-15

www.itu.int/go/ra-15

RA-15 Web Page

Appointment of Chairmen and Vice-Chairmen (SGs, CPM, etc.) RA-15 preparatory work Contribution deadline: 12 Oct’15

Page 16: Preparations for RA and WRC-15

1st WS,4-5 Dec.

2013

• Scheduled few months prior to WRC-15Presentation of the CPM & Dir. Reports to WRC-15Presentation and review of the regional groups’ draft

views, positions and common proposals

ITU Inter-regional Workshopson WRC-15 Preparation

• Scheduled halfway through the preparatory cyclePresentation and review of the on-going preparatory

studies of the ITU-R responsible groups for CPM-15Presentation of the preliminary views,

draft priorities and positions of the regional groupsOnline archives of video presentations and documents

ITU-R Meetings schedule at www.itu.int/en/events/Pages/Calendar-Events.aspx?sector=ITU-R

• Scheduled few months prior to CPM15-2Presentation of the Draft CPM Report to WRC-15

(explanation of the draft Methods to satisfy the WRC-15 Agenda items)Presentation and review of the regional groups’ draft

views, positions and common proposalsOnline archives of video presentations and documents

3rd WS,1-3 Sep.

2015

2nd WS,12-13 Nov. 2014

Page 17: Preparations for RA and WRC-15

WRC-15-IRWSP-15* Presentation and explanation of the com

mon view

s, positions and/or proposals on thetopics on the W

RC-15 agenda from the regional groups, w

ith references to the relevant parts of the CPM

Report to WRC-15 and to positions of other organizations. The order of

presentations is indicative at this stage and may be subsequently m

odified as appropriate

Page 18: Preparations for RA and WRC-15

18Regional Forum on Optimization and Efficient Use of Spectrum - 13 July 2015; Cancun, Mexico

RA-15: www.itu.int/go/ra-15

RA-15, Geneva from 26-30 October 2015

WRC-15: www.itu.int/go/wrc-15

WRC-15, Geneva from 2-27 November 2015