present value of total net benefit ($m) for potential run

1
Legend Net_Benefit_Milion_Dollars <0 0 - 20 21 - 100 101 - 1000 >1000 Transmission Line Park_polygon Baisn 0 300 600 150 Kilometers Present Value of Total Net Benefit ($M) for Potential Run-of-River Projects in B.C. with a very High Cost in National Parks (interest rate = 6%, and life cycle = 35 years) ´ Source: Ministry of Environment, BC Hydro, Canmap Environment Canada (Water Survey of Canada)

Upload: others

Post on 11-Feb-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

LegendNet_Benefit_Milion_Dollars

<00 - 2021 - 100101 - 1000>1000Transmission LinePark_polygonBaisn

0 300 600150 Kilometers

Present Value of Total Net Benefit ($M) for Potential Run-of-River Projects in B.C. with a very High Cost in National Parks

(interest rate = 6%, and life cycle = 35 years)

´

Source: Ministry of Environment, BC Hydro, CanmapEnvironment Canada (Water Survey of Canada)