presentación de powerpoint · 2018-05-14 · michiquillay los calatos cerro corona quellaveco rio...
TRANSCRIPT
República Argentina
Advanced Projects: An Opportunity
1.Legal and Institutional Framework
2.Mining Potential
Agenda
1. Legal and Institutional Framework
Competitiveness
(until December 2015)
Fiscal and tax stability guaranteed for 30 years (from presentation of definitive feasibility study).
VAT refund on exploration. Double deduction of exploration expenses Accelerated amortization of capital investments.
Elimination of export duties. Since 2016= 0% Unified currency exchange rate. Expedited currency accreditation. Access to imports of mining equipments and parts. Free currency flow, without legal banking reserves. VAT refund for mineral export in a timely manner Free transfer of profits abroad Availability of loans in the local market
Competitiveness
(since January 2016)
1. Legal and Institutional framework
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
Value Added Tax Return of favourable Balance VAT over construction investment
Tax credits originated in the purchase, construction, manufacture or importation of fixed assets:
VAT refund after 6 months For goods destined to these activities The term is computed from the investment
Reduction of income tax rates to companies progressively
Income Tax Main modifications year 2018
Year Income tax corporate rate Tax on dividends
Earnings up to 2017 35% 0%
From 01.01.2018 and until 31.12.2019 30% 7%
From 01.01.2020 onwards 25% 13 %
2018
Competitiveness
Competitiveness
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
Argentina is a Federal country formed by 23 provinces:
At a National level:
• Dictate the Mining Code. • Establish civil, commercial, tax, environmental and labor laws nationwide. • Grant tax and fiscal stability to mining projects.
At a Province level: • Grant mining rights requested by individuals (exploration and exploitation), • Grant permits and monitor compliance.
For important minerals such as: gold, silver, copper, lithium, iron, zinc, uranium, among others, mines belong to the discoverer, or who buys them.
Property rights: granted to perpetuity, as long as there is mineral to be extracted. To keep the current concession, an anual fee must be paid, and the committed investment plan must be executed. This is submitted to the granting authority at the time of submitting the request, either to explore the territory or to operate a mine.
1. Legal and Institutional framework
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
2.Mining Potential
• Copper • Gold • Silver • Lithium
Pampa Húmeda and Llanura Chaqueña. Agrobusiness.
Andes Mountains
Pre Andes Mountains
Patagonia
2. Mining Potential
Pampean Ranges
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
2. Mining Potential
Copper and
Competitiveness
A new opportunity...
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
Pachón (San Juan)
Altar (San Juan)
Filo del Sol (San Juan)
Los Azules (San Juan)
Main Projects
Investment required 3,000 M USD
1,590 Mt
Investment required 2,363 M USD
962 Mt
Investment required 1,500 M USD
2,057 Mt
Investment required 792 M USD
373 Mt
M USD: million dollars; Mt: million tonnes. P and P Reserves + M and Ind Resources.
Josemaría (San Juan)
San Jorge (Mendoza)
Taca Taca (Salta)
Agua Rica (Catamarca)
Investment required 370 M USD
194 Mt
Investment required 3,005 M USD
2,165 Mt
Investment required 2,216 M USD
1,110 Mt
Investment required 1,540 M USD
1,109 Mt
Main Projects
M USD: million dollars; Mt: million tonnes. P and P Reserves + M and Ind Resources.
References Copper project
Location of Copper Projects with economic assessment in Argentina
1- Taca Taca
2- Agua Rica
3- Josemaría
(Vicuña-Las Flechas)
4- Filo del Sol
5- Los Azules
6- Altar
7- Pachón
8- San Jorge
8 more advanced projects
(Measured & Indicated Resources, Proven & Probable reserves)
•39.6 millions tonnes of copper
•32.8 millions ounces of gold
•494 millions ounces of silver
•853,300 tonnes of molybdenum
San Juan
La Rioja
Catamarca
Salta
1
2
3
7
4
5
6
8
Mendoza
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
Prospectos de Cu Zona Centro
• * Ore values include Inferred Resources • ** Estimated values based on parameters of Ore Tonnage, type and location of the deposit. • (**) Includes the estimated values.
Advanced Stage Copper Projects in Argentina
Source: Own elaboration based on Wood Mackenzie and reports of the Operating Companies. M USD: million dollars; Mt: million tonnes.
Project Ore Tonnage
(Mt) Cu Eq (%)
Metal Content
Investment
required
(M USD) Cu (t) Au (Oz) Ag (Oz) Mo (t)
Taca Taca 2,165 0.52 9,581,000 5,560,000 - 278,957 3,005
Pachón 1,590 0.59 8,752,200 - 109,118,000 185,580 3,000
Altar 2,057 0.39 5,779,700 5,234,000 62,787,000 - 1,500
Agua Rica 1,110 0.70 5,217,600 7,455,000 120,446,000 362,860 2,216
Los Azules 962 0.54 4,617,600 1,700,000 55,700,000 25,900 2,363
Josemaría (Vicuña, Las Flechas) 1,109 0.44 3,416,700 7,850,000 36,110,000 - 1,540
Filo del Sol 373 0.61 1,258,200 3,954,000 109,880,000 - 792
San Jorge 194 0.57 929,900 1,000,354 - - 370
Total 9,561 39,552,900 32,753,354 494,041,000 853,297 14,786
Total (Con Inf.)
16,556 63,515,330 46,212,354 854,897,000 1,406,663 14,786
Copper projects of Central Area
San Juan
Neuquén
Mendoza
Copper projects of North Zone
San Juan
La Rioja
Catamarca
Salta
Jujuy
References - Copper Project without economic evaluation.
1- El Oculto 2- Incahuasi 3- Acay 4- Cerro Juncal 5- Centenario 6- Desierto 7- La Sarita 8- Socompa 9- Llullaillaco 10- Samenta 11-Río Grande 12- Purulla 13- Agua Tapada 14- Las Pampitas 15- Cerro Atajo 16- Bajo San Lucas 17- Filo Colorado 18- Cerro Delta 19- Cerro Verde 20- El Potro 21- La Ortiga 22- El Salado - Llanos Ricos 23- Huachi 24- San Francisco 25- Valle de Chita 26- Rincones de Araya 27- Chasquillar 28- Yunque 29- Cerro Blanco
2
3 7
6 8
9
12
13
14
15
16
17
4 5
18
19
20
22
21
24
25
26
27
28
30- Picos Bayos 31- Universidad 32- Las Choicas 33- El Perdido 34- Elisa 35- Cerro Amarillo 36- El Seguro 37- Campana Mahuida 38- La Voluntad
30
31
32 33
34 35
36
38
29
1
10
23
37
11
References - Copper Project without economic evaluation.
Location of Copper Projects without economic evaluation in Argentina
Source: Own elaboration based on Wood Mackenzie, DNIM and reports of the Operating Companies.
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
2. Mining Potential
Copper: Grade, Reserves and Resources
Argentina Perú Chile
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
Proyecto en Chile
Mina en Chile
Los Pelambres (6.104;0,64)
Los Bronces (5.811;0,45)
El Teniente Andina
Nueva Unión Caserones
Radomiro Tomic
Chuquicamata
Atacama
Relincho
Cerro Casale
Spence
Mina Ministro Hales
Caspiche
Sierra Gorda
Zaldívar
Franke
Salvador
Lomas Bayas
Cerro Colorado
Andacollo
El Abra Gabriela Mistral
Mantos Blancos
La Granja
Cerro Verde
Toromocho
Michiquillay
Los Calatos
Cerro Corona
Quellaveco Rio Blanco
Toquepala
Cuajone
Cotabambas
Constancia Centauro
Zafranal
Tía María
Chapi
Antilla
La Arena
Galeno
Conga
Los Chancas Magistral
Antapaccay
Cañariaco
Haquira
Proyecto en Perú
Mina en Perú
Tonnage (Res+Rec M-I) M t
Agua Rica
Altar
Taca Taca
Josemaría
Los Azules
Campana Mahuida
San Jorge
Río Grande
Cu
Eq
(%
)
Filo del Sol Pachón
Bajo La Alumbrera (2016)
Bajo La Alumbrera pre-producción 1997
Argentinean Mine
Project in Argentina
* Pachón, Agua Rica and Los Azules include Inferred Resources
Escondida (23.984;0,53)
Project in Chile
Chilean Mine
Project in Peru
Peruvian Mine
Advanced-Stage Copper Projects in Argentina (Comparison with Chile and Perú)*
*Comparison is made only with deposits of Porphyry type in Chile and Peru. Source: Own elaboration based on Wood Mackenzie and reports of the Operating Companies.
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
Tonnage (Res+Rec M-I) M t
Agua Rica
Altar
Taca Taca
Josemaría
Los Azules
Campana Mahuida
San Jorge
Río Grande Cu
Eq
(%
)
Filo del Sol
Pachón
Caspiche
Cerro Casale
Relincho Nueva Unión
Tía María
Chapi
Antilla
Cañariaco
Cotabambas
Galeno
Centauro
Zafranal
Haquira
Los Chancas
Conga
Magistral
Michiquillay
Rio Blanco
Los Calatos
Quellaveco La Granja
Bajo La Alumbrera pre-producción 1997
Project in Chile
Project in Peru
Argentinean Mine
Project in Argentina
Projects vs Projects
Advanced-Stage Copper Projects in Argentina (Comparison with Chile and Perú)*
Source: Own elaboration based on Wood Mackenzie and reports of the Operating Companies.
* Pachón, Agua Rica and Los Azules include Inferred Resources
*Comparison is made only with deposits of Porphyry type in Chile and Peru.
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
Project with equivalent copper grade and Tonnage based on Reserves and Resources Measured, Indicated and Inferred.
Project with equivalent copper grade and Tonnage based on Reserves and Measured and Indicated Resources
Agua Rica
Josemaría
Los Azules
San Jorge
Tonnage Mt
Cu
Eq
(%
)
Campana Mahuida
Río Grande Filo del Sol
Pachón
Taca Taca
Altar
Agua Rica
Josemaría
Altar
Chita
Cerro Blanco
Pachón
Taca Taca Los Azules
Advanced Projects of Argentina - Potential including Inferred Resources
Source: Own elaboration based on Wood Mackenzie and reports of the Operating Companies.
4000
4200
4400
4600
4800
5000
5200
5400
5600
5800
2.000 2.001 2.002 2.003 2.004 2.005 2.006 2.007 2.008 2.009 2.010 2.011 2.012 2.013 2.014 2.015 2.016
Cu
t (
x1.0
00
)
Year
Production Capacity Chile
Cen
tin
ela
(El
Tes
oro
)
Ata
cam
a
La C
asca
da
+ O
jos
de
l Sal
ado
Man
tos
de
la L
un
a
Spe
nce
Fran
ke
Am
p A
nd
aco
llo +
Am
p C
enti
ne
la
(Esp
eran
za)
+ Tr
es V
alle
s
Am
p L
os
Bro
nce
s
Cas
ero
nes
An
tuco
ya +
Sie
rra
Go
rda
Gab
riel
a M
istr
al
5.5 Mt Cu
+ 1,250,000 t Cu
Adds 8,570 M USD in annual exports *
*Price Cu: 6,852 USD/t = 3.11 USD/lb
Copper Installed Capacity Chile 2000-2016
Source: Own elaboration based on Wood Mackenzie.
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
300
500
700
900
1100
1300
1500
1700
1900
2.000 2.001 2.002 2.003 2.004 2.005 2.006 2.007 2.008 2.009 2.010 2.011 2.012 2.013 2.014 2.015 2.016
Cu
t (
x1.0
00
)
Year
Production Capacity Peru
An
tam
ina
Cer
ro L
ind
o +
Co
lqu
ijirc
a +
Am
p C
erro
Ver
de
Cer
ro C
oro
na
An
tap
acca
y
Co
nst
anci
a
Am
p C
erro
Ver
de
+ La
s B
amb
as
Toro
mo
cho
1.8 Mt Cu
+ 1,370,000 t Cu Adds 9,360 M USD in annual exports *
Copper Installed Capacity Peru 2000-2016
*Price Cu: 6,852 USD/t = 3.11 USD/lb Source: Own elaboration based on Wood Mackenzie.
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
0
1,000
2,000
3,000
4,000
5,000
6,000
2.000 2.001 2.002 2.003 2.004 2.005 2.006 2.007 2.008 2.009 2.010 2.011 2.012 2.013 2.014 2.015 2.016
Cu
t (
x1.0
00
)
Year
Chile Perú ArgCopper
Installed Capacity 2000-2016 Chile-Peru - Vs Argentina´s Production
Source: Own elaboration based on Wood Mackenzie.
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
2. Mining Potential
Copper: Investments and Costs
Argentina Perú Chile
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
20 23 37 47 26 35 25 72 77 43 63 72 77 189 133 103 10
1,310
512 146 86 189
512 788 692 834
636
1,573
3,737
5,110 4,881
5,694
4,899
1,581
933
1,377 1,223
1,020
1,656
2,295 2,239
2,701
4,553 4,651
6,145
7,330
8,894
11,981
10,521
5,094
4,377
0
2,000
4,000
6,000
8,000
10,000
12,000
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Investments in copper mines Period 2000 – 2016 (M USD) (new operations, sustaining and expansions)
Argentina - Perú - Chile
Total Argentina Total Perú Total ChileArgentina Perú Chile
Total Argentina
Total Perú
Total Chile
33,179
1,054
76,992
Source: Own elaboration based on Wood Mackenzie and D.N. de Inversiones Mineras. M USD: million dollars
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
Source: Own elaboration based on Wood Mackenzie.
Subsecretaría de Desarrollo Minero Dirección Nacional de Promoción Minera
NORMAL COST excl Interest (c/lb) (C3-Interest)
[CELLRANGE] [VALOR DE Y]
[CELLRANGE] [VALOR DE Y]
[CELLRANGE] [VALOR DE Y] [CELLRANGE]
[VALOR DE Y]
[CELLRANGE] [VALOR DE Y]
[CELLRANGE] [VALOR DE Y]
[CELLRANGE] [VALOR DE Y]
[CELLRANGE] [VALOR DE Y]
[CELLRANGE] [VALOR DE Y] [CELLRANGE]
[VALOR DE Y]
[CELLRANGE] [VALOR DE Y]
[CELLRANGE] [VALOR DE Y]
[CELLRANGE] [VALOR DE Y]
[CELLRANGE] [VALOR DE Y]
[CELLRANGE] [VALOR DE Y]
[CELLRANGE] [VALOR DE Y]
[CELLRANGE] [VALOR DE Y]
[CELLRANGE] [VALOR DE Y]
[CELLRANGE] [VALOR DE Y]
[CELLRANGE] [VALOR DE Y]
[CELLRANGE] [VALOR DE Y]
[CELLRANGE] [VALOR DE Y]
0.0
50.0
100.0
150.0
200.0
250.0
300.0
350.0
400.0
450.0
0.00 0.20 0.40 0.60 0.80 1.00 1.20
Chile
Perú
Argentina
Centauro 388.4
Haquira 211.8
Cotabambas 209.3
Cañariaco 203.6
Zafranal 200.5
Relincho 246.0
Nueva Unión 210.4
Tía María 186.6 Santo Domingo
151.1
Constelación 149.9
La Granja 188.1
Caspiche 138.7 Taca Taca
163.0
Galeno 138.9
Cerro Casale 129.2
Magistral 116.2
Michiquillay 108.7
Agua Rica 149.8
Pachón 147.0
Los Chancas 154.3
Pukkaqaqa 175.5
Los Calatos 178.1
Cu Eq (%)
(c/l
b)
(C3
-In
tere
st)
* Pachón, Agua Rica and Los Azules with Inferred Resources
Tonnage (Res+Rec M-I) M t
Agua Rica
Altar
Taca Taca
Josemaría
Los Azules
Campana Mahuida
San Jorge
Río Grande
Cu
Eq
(%
)
Filo del Sol
Pachón Antilla
Centauro
Zafranal
Tía María
Chapi
Cañariaco
Cotabambas
Haquira
Galeno
Conga
Los Chancas
Magistral
Michiquillay
Rio Blanco
Los Calatos
Caspiche
Cerro Casale
Relincho
Quellaveco
Nueva Unión
La Granja
Bajo La Alumbrera pre-producción 1997
Project in Chile
Project in Peru
Project in Argentina
Projects vs Projects
Against that we compete (only at the regional level and without considering possible extensions of existing operations)
Source: Own elaboration based on Wood Mackenzie and reports of the Operating Companies.
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
2. Mining Potential
Gold
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
• 8 mines in production
• 2 mines under construction
• 10 projects from advanced exploration to feasibility
• 17 intermediate exploration projects without definition of resources
• 181 projects in early-stage exploration phase.
• 12 more advanced projects (From
Feasibility to advanced exploratión)
(Measured & Indicated Resources , Proven & Probable reserves)
•31.6 millions ounces of gold
•917 millions ounces of silver
Gold Projects (gold; gold & silver)
Estimated
investment in 12 projects: 2.604
MUSD
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
PROJECT Ore Tonnage
(Mt) Au Eq (g/t)
Metal Content CAPEX
(M USD) Au (Oz) Ag (Oz) Cu (t) Pb (t) Zn (t)
Lama Pascua* 434.5 2.34 21,347,000 736,464,000 362,345 0 0 1,200
Lindero 199.8 0.75 3,783,000 0 120,140 0 0 166
Suyai (Esquel) 4.7 15.3 2,286,000 3,523,000 0 0 0 220
Cerro Moro 5.3 10.32 953,000 61,036,000 0 0 0 265
Don Sixto (La Cabeza) 20.5 1.48 925,000 3,862,591 0 0 0 70
Diablillos 27.7 2.04 757,000 81,300,000 0 0 0 400
Calcatreu 8 2.97 676,000 6,600,000 0 0 0 66
Taguas 2 7.71 397,000 0 20,800 0 0 0
Arizaro 13.4 0.71 205,000 0 21,306 0 0 0
La Josefina 6.5 0.92 156,019 2,757,087 0 0 0 150
Pingüino 6.3 2.79 116,800 20,877,000 0 33,900 48,300 25
Andacollo 0.2 9.24 33,700 948,000 0 0 0 42
Totals 734.6 31,635,519 917,367,678 524,591 33,900 48,300 2,604
* Total resources of the binational project
Gold Projects (gold; gold & silver)
M USD: million dollars; Mt: million tonnes.
Source: Own elaboration based on Wood Mackenzie and reports of the Operating Companies.
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
2. Mining Potential
Silver
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
• 5 mines in production
• 6 projects from advanced exploration to feasibility with definition of resources
•6 more advanced projects • (Measured & Indicated Resources , Proven &
Probable reserves)
•897 millions ounces of silver
• 68,000 ounces of gold
• 1,730,000 tonnes of lead
• 232,500 tonnes of zinc
Silver Projects (silver; silver lead zinc; silver & gold)
Joaquín
Estimated investment in 6 projects: 1,291
MUSD
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
PROJECT Ore Tonnage
Ag Eq (g/t) Metal Content
CAPEX (M USD)
(M Ton.) Ag (Oz) Au (Oz) Cu (t) Pb (t) Zn (t)
Navidad 155.2 170.30 632,300,000 0 71,320 1,326,180 0 760
Chinchillas 41.0 191.08 153,880,000 0 0 403,836 232,459 81
Joaquín 15.7 138.32 65,200,000 61,100 0 0 0 250
El Quevar 7.1 141.00 32,000,000 0 0 0 0 200
Virginia 1.2 310.00 11,927,000 0 0 0 0 0
Lejano 0.6 122.16 1,952,000 7,000 0 0 0 0
Totals 220.8 897,259,000 68,100 71,320 1,730,016 232,459 1,291
Silver Projects (silver; silver lead zinc; silver & gold)
M USD: million dollars; Mt: million tonnes.
Source: Own elaboration based on reports of the Operating Companies.
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
Cu 40 Mt
Au 64.5 M Oz
Ag 2,308 M Oz
Mo 0.85 Mt
M Oz: millones de onzas; Mt: millones de toneladas. * Con Recursos Inferidos de proyectos cupríferos.
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
64 Mt*
78 M Oz*
2,670 M Oz*
1.4 Mt*
26 Advanced Stage Projects
2. Mining Potential
Lithium
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
Lithium projects in 23 salars: 2 mines in Production. (both in expansion) 2 mines under Construction
2017 10 projects from Feasibility to
Advanced Exploration > 40 projects in Early-Stage
Exploration phase. (6 prospect in exploration in
pegmatitas).
• 10 More Advanced Projects (Measured & Indicated Resources , Proven & Probable reserves)
41,229,072 t LCE
(Inferred Resources)
16,438,546 t LCE
Advanced Lithium Projects in Salars Estimated investment in
mines and projects: 4,384
MUSD
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
Name of Salar Project/Mine Company Projected Capacity
2022 Reserves ( t LCE)
Resources Meas+Ind ( t LCE)
Inferred Resources ( t LCE)
CAPEX (M USD)
Salinas Grandes Cangrejillos/Salinas Grandes South American Salars S.A. / Orocobre Limited JV
Toyota Tsusho Corp 20,000 239,000 0
Salar de Olaroz Salar de Olaroz Orocobre S.A., Toyota Tsusho, JEMSE / Sales de Jujuy 35,000 6,440,830 160
Salar de Caucharí
Caucharí-Olaroz Lithium Americas + JEMSE + SQM/Minera EXAR S.A. 50,000 1,500,000 11,752,000 691
Cauchari Advantage Lithium (50-75%)+Orocobre Limited/South
American Salars S.A. 470,000 0
Salar del Rincón Salar del Rincón ENIRGI Group Corporation/ADY Resources Ltd 50,000 1,200,000 3,500,000 4,800,000 720
Pozuelos Salar de Pozuelos Lithea Inc. / POSCO + Lithea 25,000 500
Salar de Ratones Salar de Centenario Ratones Eramet / Eramine Sudamérica S.A. 20,000 900,000 380
Salar de Diablillos Sal de Los Ángeles Lithium-X Energy Corp.(80%) - Aberdeen International
Inc. (20%) / Potasio y Litio Argentina S.A. 15,000 1,037,000 1,007,000 144
Salar del Hombre Muerto
Mina Fénix FMC Lithium Corporation / Minera del Altiplano 40,000 1,200,000 300
Sal de Vida Galaxy Resources Limited 25,000 1,139,000 5,670,000 1,562,000 370
Gallego Project Everlight Resources 16,000 91,000 120
Laguna Tres Quebradas
Tres Quebradas (3Q) Neo Lithium Ltd. + POCML 3 inc. / Liex S.A 35,000 714,242 1,339,546 589
Salar de Pastos Grandes
Pastos Grandes Proyecto Pastos Grandes S.A. / Millennial Lithium 25,000 2,131,000 878,000 410
Salar Llullaillaco Mariana I, II, III International Lithium JV con Jiangxi Ganfeng Lithium Co.
Ltd/ Litio Minera Argentina 1,248,000 618,000 0
Totals 356,000 5,039,000 36,190,072 16,438,546 4,384
Advanced Lithium Projects in Salars
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
Argentine talent is also another attraction, with more than 120,000 young universities graduates and 400,000 technology students with high potential.
Mining Culture: Argentina has engineers, geologists, economists, workers, technicians and other highly qualified professionals to carry out large scale mining projects
Universities: Argentinian universities are listed within the best in the region.
Human Capital + natural resources make Argentina an excellent opportunity for anyone who decides to invest in the Mining Industry.
Dirección Nacional de Promoción Minera
Subsecretaría de Desarrollo Minero
Talent
Altar – San Juan
Los Azules - San Juan
Agua Rica- Catamarca