Page 1: presentacion - ingles - PAMA proyectos terminados DRP€¦ · DoeRun Peruconstrutedthreeplants(Huaymanta, Chúlec, andFundición) witha total investmentof US$ 7.26 million. Tratamiento

Completed Projecds

Environmental Upgrade Program

Metallurgical Complex of La Oroya

Page 2: presentacion - ingles - PAMA proyectos terminados DRP€¦ · DoeRun Peruconstrutedthreeplants(Huaymanta, Chúlec, andFundición) witha total investmentof US$ 7.26 million. Tratamiento

The stations monitor air quality in the sorroundings of the Metallurgical Complex. This proyectrequired an investment of US 0.63 million and is operational since 1999.

Monitoring stations

Page 3: presentacion - ingles - PAMA proyectos terminados DRP€¦ · DoeRun Peruconstrutedthreeplants(Huaymanta, Chúlec, andFundición) witha total investmentof US$ 7.26 million. Tratamiento

This project eliminated the discharge of copper and lead slag to the Mantaro river. It required an

investment of US$ 9.71 million. Its operational since 2001.

Cu and Pb slag handling

Page 4: presentacion - ingles - PAMA proyectos terminados DRP€¦ · DoeRun Peruconstrutedthreeplants(Huaymanta, Chúlec, andFundición) witha total investmentof US$ 7.26 million. Tratamiento

This project allows the safe storage and handling of arsenic trioxide. To this end, Doe Run Perú invested

US$ 2,42 million. The project is operative since February 2001.

Arsenic Trioxide deposit

Page 5: presentacion - ingles - PAMA proyectos terminados DRP€¦ · DoeRun Peruconstrutedthreeplants(Huaymanta, Chúlec, andFundición) witha total investmentof US$ 7.26 million. Tratamiento

This project eliminated discharges to the Yauli river. The investment required was US$ 3.11 million. It is

operational since December 2003.

Water treatment plant – Copper Refinery

Page 6: presentacion - ingles - PAMA proyectos terminados DRP€¦ · DoeRun Peruconstrutedthreeplants(Huaymanta, Chúlec, andFundición) witha total investmentof US$ 7.26 million. Tratamiento

The objetive of this project is the safe storage and handling of ferrites. An investment of US$ 2,12

million was required. It is operational since November 2002.

Ferrites Deposit

Page 7: presentacion - ingles - PAMA proyectos terminados DRP€¦ · DoeRun Peruconstrutedthreeplants(Huaymanta, Chúlec, andFundición) witha total investmentof US$ 7.26 million. Tratamiento

The objetive of the program is to secure a safe slag deposit. An investment of US$ 1.09 million was

required and is operational since May 2004.

Remediated slag deposit

Page 8: presentacion - ingles - PAMA proyectos terminados DRP€¦ · DoeRun Peruconstrutedthreeplants(Huaymanta, Chúlec, andFundición) witha total investmentof US$ 7.26 million. Tratamiento

Doe Run Peru construted three plants (Huaymanta, Chúlec, and Fundición) with a total investment of

US$ 7.26 million.

Tratamiento de aguas servidas

Page 9: presentacion - ingles - PAMA proyectos terminados DRP€¦ · DoeRun Peruconstrutedthreeplants(Huaymanta, Chúlec, andFundición) witha total investmentof US$ 7.26 million. Tratamiento

With nearly US$ 39 million investment, this plant secures that all industrial effluent discharges comply

with international standards for water used in agriculture.

Industrial WasteWater Plant

Page 10: presentacion - ingles - PAMA proyectos terminados DRP€¦ · DoeRun Peruconstrutedthreeplants(Huaymanta, Chúlec, andFundición) witha total investmentof US$ 7.26 million. Tratamiento

This project required conditioning works in several units of the Central Cottrel and the construction and

installation of new dust collectors.

Dust emission reduction through the stack

Page 11: presentacion - ingles - PAMA proyectos terminados DRP€¦ · DoeRun Peruconstrutedthreeplants(Huaymanta, Chúlec, andFundición) witha total investmentof US$ 7.26 million. Tratamiento

The efforts to control fugitive emissions included sinter plant ventilation, enclosures, anodic residues

ventilation among others.

Fugitive emissions reduction

Page 12: presentacion - ingles - PAMA proyectos terminados DRP€¦ · DoeRun Peruconstrutedthreeplants(Huaymanta, Chúlec, andFundición) witha total investmentof US$ 7.26 million. Tratamiento

In December 2006 Doe Run Peru completed the upgrade and expansion of the Zinc Circuit Sulfuric Acid

Plant.

Zinc Sulfuric Acid Plant Upgrade

Page 13: presentacion - ingles - PAMA proyectos terminados DRP€¦ · DoeRun Peruconstrutedthreeplants(Huaymanta, Chúlec, andFundición) witha total investmentof US$ 7.26 million. Tratamiento

Complementary Projects include pavings, truck washing systems andmany others.

Complementary Projects

Page 14: presentacion - ingles - PAMA proyectos terminados DRP€¦ · DoeRun Peruconstrutedthreeplants(Huaymanta, Chúlec, andFundición) witha total investmentof US$ 7.26 million. Tratamiento

Forestation project

Doe Run Peru has partnered with the surrounding communities in a widespread tree planting projects

resulting in improved environmental conditions..

Page 15: presentacion - ingles - PAMA proyectos terminados DRP€¦ · DoeRun Peruconstrutedthreeplants(Huaymanta, Chúlec, andFundición) witha total investmentof US$ 7.26 million. Tratamiento

Lead Circuit Sulfuric Acid Plant

The new Lead Circuit Sulfuric Acid Plant required an overall investment of US $ 50 million and will make

possible a 50% reduction in SO2 emissions. The new plant was inaugurated September 30, 2008.

Page 16: presentacion - ingles - PAMA proyectos terminados DRP€¦ · DoeRun Peruconstrutedthreeplants(Huaymanta, Chúlec, andFundición) witha total investmentof US$ 7.26 million. Tratamiento

September 30 2008, Doe Run peru also inaugurated a new acid storage and handling terminal with a

30,800 MT capacity.

Acid Storage Terminal

Page 17: presentacion - ingles - PAMA proyectos terminados DRP€¦ · DoeRun Peruconstrutedthreeplants(Huaymanta, Chúlec, andFundición) witha total investmentof US$ 7.26 million. Tratamiento

Trabajos de reforestación

When Doe Run Peru completes its environmental upgrade program in October 2009, total investment is

stemated to reach US$ 400 million.

Page 18: presentacion - ingles - PAMA proyectos terminados DRP€¦ · DoeRun Peruconstrutedthreeplants(Huaymanta, Chúlec, andFundición) witha total investmentof US$ 7.26 million. Tratamiento

In this manner, Doe Run Peru will meet its obligations with the Peruvian State and the people of La

Oroya.