présentation arcadis
DESCRIPTION
Brève présentation d'ARCADIS BelgiumTRANSCRIPT
Imagine the result
Presentation of ARCADIS
Creating Balance
What Keeps You Awake?
Time and Knowledge are ScarceEngineers, environmental experts, permit
experts… of ARCADIS relieve you of
work
The Rules and Regulations are ComplexARCADIS, an expert in environmental
impact reports, building, environmental
and other permits, rules and laws,
procedures…
The Surroundings are Complex
Authorities, local residents,
environmental groups, employees…
ARCADIS has an understanding of the
stakeholders
Energy is Expensive
ARCADIS, Energy Specialist
The Future isValuable
ARCADIS is committed to sustainable
solutions: a win-win situation for your
organisation, for mankind and for the
environment
Crystal-Clear Advice
• Advice on Planning
• Advice on Environmental Economic Planning
• Advice on Sustainability
• Advice on the Environment
• Advice on Soil
• Advice on Energy
• Strategic Advice
• Product Advice (REACH)
• Transaction Advice
• …
We Know Our Way Around
Procedures
• Planning Certificates
• Town & Country Implementation Plan
• Suitable Assessment (impact on nature)
• Mobility Impact Report
• Environment Impact Report
• Environmental Permits
• Urban Development Permits
• Water Test
• …
Guiding Studies
• Feasibility Studies
• Construction Studies
• Energy Studies
• Infrastructure Studies
• Soil Studies
• Water Studies
• Environmental Studies
• Sound Studies
• Product Risk Assessments
• …
Design and Engineering
• All possible structures in all sectors
• Planting of greenery
• Industrial estate
• Wind farms
• Total energy and biomass installations
• Air and water purification plants
• Soil decontamination
• Noise control
• Infrastructure, roads and sewerage
• …
Execution and
Maintenance
• Clear specifications
• Construction supervision
• Budget control
• Multidisciplinary construction managers for
execution monitoring
• Technical or total facility management,
enriched with knowhow from design and
engineering stage
• Decontamination according to GRIP ®
(guaranteed remediation programme)
Legal Monitoring
Various Customers in
Belgium
Imagine
Always being up-to-date with
the latest environmental
legislation
Facing government inspections
free of worries
The Result
No environmental infractions or
violations
• Customer: Industry
• Assignment: monitoring of
environmental legislation,
regular reporting and early
warning system
• Proprietary software
‘ARCALEX’
HAtric Office Building
Hasselt
Imagine
Perfect combination of
economy, ecology and emotion
into one office
The Result
Highly sustainable, energy-
efficient and comfortable office
with striking veiled front façade
• Customer: Reiger II
• Investment: 4 mio €
• Architect: Holistic
Architecture 50|5
• Timing: 2007-2008
• Assignment: consultancy on
sustainable construction and
technical support during
construction
REACH
Implementation
Worldwide
Imagine
To take on the REACH
challenges in an adequate and
cost-effective manner
The Result
Customised REACH solutions
to implement rules and
regulations effectively and to
remain compliant with REACH
in the future
• Customer: from various
sectors
• Assignment: various REACH
Implementation Projects
using our integrated service
related to Global Product
Stewardship
Diverting of the River
Witte Nete
Dessel
Imagine
A natural river with a rich plant
and animal life
The Result
Winding river Witte Nete with
repair of protected habitats;
Inbev-Latour prize
Environment 2007.
• Customer: S.C.R. Sibelco
• Timing: 2005-2008
• Assignment: proposal for
diverting and monitoring of
biological repair
Decontamination
Vilvoorde
Imagine
Residential quarter on healthy
soil
The Result
Decontamination techniques
with innovative injection
techniques ad natural products
(molasses + persulphate)
• Customer: Akzo Nobel
• Timing: trial runs and design
of decontamination project
2006-2007 l launch and
monitoring of
decontamination 2008
• Assignment: environmental
supervision of
decontamination
Beverdonk
Grobbendonk
Imagine
Water-bound industrial estate
of 60 ha with nature design
project as a full component
The Result
CO2-neutral industrial estate
with a container terminal
alongside the Albert Canal
• Customer: nv De
Scheepvaart
• Investment: 3 mio €
• Timing: 2008-ongoing
• Assignment: complete path
from concept, mobility and
environmental impact
assessment, layout and
design to construction
monitoring, project
management and subsidy
supervision
Permit Renewal for
Bekaert
Zwevegem
Imagine
Launch and discussion of
dossiers and studies in
preparation for the application
for an environmental permit.
The Result
A new environmental permit for
20 years
• Customer: Bekaert NV
• Timing: 2008-2009
• Assignment: exemption note,
water test, technical
preliminary studies
(emissions, waste,
wastewater, …), dossier,
negotiation, …
New STEG Plant for
Essent
Genk
Imagine
A new gas-fired power plant
supplying energy to 600,000
families.
The Result
License to Produce
• Customer: Essent (RWE)
• Timing: 2009 - 2014
• Assignment: MER,
environmental permit, energy
study, civil engineering,
urban development permit
Energy Projects
Belgium
Imagine
Lower energy bill and a series
of incentives from the Flemish
Government
The Result
Energy audit resulting in an
energy plan with measures to
enhance energy efficiency
• Customer: Alural, Cargil
Malt, Daf Trucks, Dow,
Plastal, Praxair, Sara Lee, …
• Assignment: draw up energy
plans within the framework of
the Order concerning Energy
Planning and Audit Covenant
Reception Building
Geel
Imagine
Stylish, multifunctional and
energy-efficient reception
building
The Result
Sustainable reception building
with underground energy
recovery using energy poles, a
first in Belgium.
• Customer: Janssen
Pharmaceutica
• Investment: 7,95 mio €
• Architectural firm Van Acker
& Partners
• Timing: 2005-2008
• Assignment: study of founda-
tions and structure, design of
technical installations,
project management
Consultancy on
Sustainable Construction
Zaventem
Imagine
State-of-the-art sustainable
corporate building and
industrial estate
The Result
Using rating tools such as
BREEAM, a sustainable
complex is mapped out and the
additional cost compared to a
traditional design is calculated
• Customer: Toyota Motor
Europe
• Timing: 2006-ongoing
• Assignment: consultancy on
sustainable construction,
facility management
coordination
Residential Care
Centre Ter Bleeke
Malle
Imagine
New residential care centre with
sufficient rest home rooms and
assisted housing places
The Result
60 rest home rooms, 20 assisted
housing places, a services centre
and a large-scale kitchen,
existence of indoor gardens, a
patio and parking places
• Client: OCMW Malle
• Investment: 10,5 mio €
• Timing: 2002 – 2010
• Architect: AMV architects
• Assignment: studies stability
and techniques, work on the
surroundings, EPB and
guidance during the
procurement and execution
Investment Zone
Petroleum South
Antwerp
Imagine
New use for historic
contaminated site of 75 ha
The Result
Decontamination subject to
redevelopment of
contaminated city cancer into
high-quality industrial estate
with space for recreation and a
football stadium
• Customer: PMV, City of
Antwerp, Gemeentelijk
Havenbedrijf, AG Vespa
• Timing: 2008-2009
• Assignment : detailed soil
analysis and soil
decontamination project,
including trial runs
Water Loop Closure
for Energy and Water
Kallo
Imagine
Zero discharge for wastewater
in one of the most modern and
energy-efficient gypsum
cardboard lines in the world.
The Result
Discharge of wastewater
reorganized into reuse of water
and energy. No investment in
water purification, but
substantial annual savings.
• Customer: Saint-Gobain
Gyproc Belgium
• Timing: 2004 – 2006
• Assignment: choice of
concept, guidance of
customer during process
conversion
Shell Service stations
Motorways
BeLux
Imagine
Green and energy-friendly
service station perfectly
integrated into the environment
The Result
Completely redesigned
motorway service station.
Sustainable buildings with
« Excellent » score in Bream
reassessment.
• Customer: Stramoine
• Timing: 2009-ongoing
• Assignment: detail
engineering, design, project
management, EPB
New Production Site
with Office
Zutendaal
Imagine
Production process as a
dominant factor in designing
the plant
The Result
New site for the production of
floor slabs at a carefully
selected location based on
specific parameters.
• Customer: Echo
• Investment: 21 mio €
• Architect: Archiles
• Timing: 2008-2010
• Assignment: location study,
environmental permit path,
construction study, stability,
study techniques, detail
engineering of machinery
New Administrative
Centre
Houthalen-Helchteren
Imagine
New administrative centre that
needs as little energy as possible
and generates that energy
efficiently.
The result
This sustainable building houses
the local authority services, a
police office, a public social
welfare centre, a day-care centre,
a library and an office area for
third parties
• Customer: AGB Houthalen-
Helchteren
• Investment: 50 mio €
• Architect: Holistic Architecture
50|5
• Timing: 2009-2012
• Assignment: study of stability &
techniques, consultancy on
sustainable construction
Town Square, Library
and Underground Car-
Park Genk
Imagine
A place where living, relaxing,
shopping and experiencing
culture can be easily combined
The Result
A single large promenade area
from town hall to the Grand
Square connects the two parts
of town.
• Customer: Flemish
Government
• Investment: 10,4 mio €
• Architect: a2o-architecten
• Timing: 1998-2006
• Assignment: complete
project
Business Centre for
the Space Industry
Transinne
Imagine
Ecology and distinct
architecture brought together
into one building
The Result
New ecological business
centre made of solid wood with
a façade of photovoltaic panels
• Customer: Idelux
• Investment: 4 mio €
• Architect: Philippe Samyn
and Partners
• Timing: 2008-2009
• Assignment : study of
(sustainable) techniques,
stability, HVAC, electricity,
sanitary facilities
Partnership
Belgium
Imagine
Autonomous working out of
various paths by experienced
partner
The Result
From network modifications
and expansions for high-
voltage substations to cable
paths, everything is worked out
according to the customer’s
standards
• Customer: Elia Engineering
• Timing: framework
agreement
• Assignment: autonomous
working out of various
assignments from rough
draft to construction
monitoring
Headquarters ‘in Steel’
Alongside the River
Meuse
Liège
Imagine
Representative head office for
a steel conglomerate
The Result
Energy-efficient office block,
including a restaurant with
maximum use of steel
• Customer: ArcelorMittal
• Investment: 8,34 mio €
• Architect: Art and Build
• Timing: 2007-2008
• Assignment: study of stability
and techniques (HVAC,
electricity, sanitary facilities,
IT, lifts)
2 Production Plants
India and China
Imagine
Construction of plants
worldwide using Belgian
technology
The Result
2 new fully integrated
production plants for
gearboxes and drives for wind
turbines
• Customer: Hansen
Transmissions
• Timing: 2007-2010
• Assignment: engineering
techniques, implementation
of Belgian technology and
processes in Asian climate,
on-site project monitoring
New Laundry
Lokeren
Imagine
State-of-the-art industrial
laundry with distribution unit
The Result
Ideally situated building
complex which is perfectly
resistant against high humidity.
• Customer: Initial Textile
Services
• Timing: 2005-2007
• Assignment: design,
application for permit,
monitoring and full project
management
KBC Consolidation of 22 Existing Data
Centres in a Twin Data Centre
in Hungary
• Surface Area
• 2 x 2,000 m² net
• 2 x 5,000 m² gross
• TIER 3 classification
• 750 W/m² (> up to 1,500 W/m²)
• Investment: 50 mio €
• In association with local
partners
• Timing: Operational end of 2011
• Services by ARCADIS:
• Location study
• Programme definition
• Project management
• Coordination of local
partners
• Detailed Engineering
• Construction management
• Coordination of completion
Galeries de la Toison
d’Or
Brussels
Imagine
Revaluation of an old
showpiece – Brussels
shopping mall with existing
infrastructure
The Result
Modern shopping mall, with a
total shop surface area of
nearly 15,000 m².
• Customer: the Gillion family
• Investment: 25 mio €
• Assignment: coordination of
renovation works, advice on
sustainable techniques
NV Kanaalkom
Housing and Shopping
Complex
• Construction Programme:
• 330 housing units
• Commercial space –
33,000 m²
• Catering industry – 5,000
m²
• Offices and services –
9,000 m²
• Underground car-park -
2,600 spots
• Architect: De Gregorio
• Investment: 145 mio €
• Timing:
• Building permit: Q4 2010
• Execution: 2012– 2014
• Assignment ARCADIS:
• Study of stability
• Study of techniques
• Consultancy on
sustainable construction
Distribution Centre
Ghlin Baudour
• Construction Programme:
• Offices – 4,500 m²
• Warehouse – 37,000 m²
• Investment: 50 mio €
• Timing: 2009-2011
• Assignment ARCADIS:
• Environmental studies
• Study of stability
• Study of techniques
• LEED certification
• Consultancy on
sustainable construction
• Infrastructure
Upgrading to Model
Site
Forest (Brussels)
Imagine
Model site in terms of
architecture, techniques and
facilities
The Result
Optimal project team
comprising Audi facility
engineering and ARCADIS
site-based team
• Customer: Audi
• Timing: 2007-2010
• Assignment: project
coordination and facility
engineering of construction,
offices and techniques
(electricity, automation,
HVAC…)
Various Office and
Corporate Buildings
Brussels, Flanders
and Wallonia
Imagine
Your architectural projects in
accordance with the latest
techniques, trends and
legislation in external hands
The Result
The ARCADIS team of
programme and project
managers perform various
investments and renovations
• Customer: BNP Paribas
Fortis
• Timing: 2001 until 2013
• Assignment: project
management for architecture
and techniques from study to
completion
Product Development,
Production, Support
Zedelgem
Imagine
Optimal project team
comprising engineering CNH
and ARCADIS site-based team
The Result
Continuous product renewal
and equipment modifications,
to optimise the performance of
harvesting machines
• Customer: CNH (New
Holland)
• Assignment: mechanical
engineering (product
engineering) of agricultural
machinery
Management Solution
for Energy and the
Environment
Various locations in
Belgium
Imagine
Collaboration based on
‘shared benefits’
The Result
ARCADIS helps come up with
strategic solutions regarding
cost structures and business
processes in terms of
procurement, document
management, logistics and
maintenance.
• Customer: Electrabel
• Timing: 80-ongoing
• Assignment: engineering
studies, drawing
assignments, mechanical,
electrical, architectural and
piping assignments
Demolition from Start
to Finish
Antwerp
Imagine
Clean area in the Antwerp
harbour which can be used
again in the future
The Result
Successful demolition of 4
buildings contaminated with
asbestos up to 1 m-mv, taking
into account soil
decontamination works at the
site
• Customer: Borealis
• Timing: 2006-2007
• Assignment: specifications
for tender and public tender,
project management during
design, execution and
reporting
ARCADIS Foreign References
Production Site for
Tyres to be Used in
the Mining Industry
Brazil
Imagine
New overseas production plant
The Result
Completion within a strict time
period and budget thanks to
international collaboration
• Customer: Michelin
• Timing: 2005-2007
• Investment: 75 mio €
• Assignment: complete
engineering and project
management during design
and execution
Past Model Spare
Parts Plant
Valentines
Imagine
Specialised production unit for
metal spare parts of Yards
The Result
Built in record time thanks to
smooth collaboration with
French colleagues.
• Customer: Toyota
• Timing: 2004-2006
• Investment: 22 mio €
• Assignment: complete
engineering and project
management during design
and execution
Facts & Figures
2011Unification
ARCADIS Belgium nv/sa
2009Merge of the
Walloon companies in ARCADIS Engineering & Consulting sa
Reinforced position through acquisitions
2008
VDS, Haaltert
2008
Merge of the
Flemish companies
in ARCADIS
Belgium nv
1995
Integration with
ARCADIS
1991
D’Hoore Soft,
Ghent
1990
Weribo,
Heist-op-den-Berg
1983
Puls, Geel
1981
Establishment of
Gedas
2007
Aeolus, Diest l
environmental
branch of Fugro,
Mechelen
2006Ingénieurs bct, Liège and
Bastogne l Ecolas, Antwerp and Ghent l Euras, Ghent
2005
SWK, Ghent l
Constructor,
Antwerp l CW,
Ostend
2003
Fally-D.-J.,
Charleroi l Domus
Nitida, Turnhout
2000
Enviras
1998
Lapere, Kortrijk l
Starke Diekstra,
Sint-Niklaas
…
A solid partner with
healthy growth
Top 3 in Belgium for consultancy and
engineering
Annual revenues in millions € People (FTE)
Organisation
Strong local presence• Brussels
• Antwerp
• Ghent
• Hasselt
• Charleroi
• Liège
Global network based on
strong home market
positions
• 19.000 people strong and € 2,3 billion in annual
revenues
• Global network for consistent quality to
multinational clients in Europe, The United
States, South America and Asia
• Quoted on Euronext
Juridical structure ARCADIS Belgium
Holding nv
Flanders
Wallonia
Brussels
ARCADIS Belgium nv/sa
Our values and pillars
• Three core values:
integrity, entrepreneurship and agility
• Three pillars:
Focus on clients Focus on
our people
Operational
excellence
p r o f e s s i o n a l i s m
Imagine the result