We are ... a technical entity of BASF Antwerpen N.V.,branch of BASF SE
BASF Feluy
BASF Antwerpen NV
FELUY
E54
E19
E19
E411
E42
E42
11/16/11 INTERNAL 6
BASF, Feluy site in a few words ...
History of the site : End of 60s:
creation of an industrial business park in Feluy Goal : diversification of the industrial activities in Wallonia. Location : near the Bruxelles –Charleroi canal, E19 highway
and railways
Building of a Chevron Oil Belgium S.A. refinery, operated 10 years, stopped following the 2nd oil crash
Acquisition of the site end of the 80s by SISAS (Italy) : Start of the chemical activities of Pantochim SA 1989. Expansion of the chemical activities in the 90s. 1996 : creation of Neochim SA in partnership with the Italian
company Spiga for the production of Glycerine. End of 90s : financial troubles of the SISAS Group.
Acquisition by BASF of Feluy site on 13th of July 2001.
11/16/11 INTERNAL 7
BASF on the Feluy site
2000 years : Progressive adaptation of the site to BASF procedures (working
permit), installations modifications, investments,…
2005: Ceased production chains of plasticizers et derivatives Butanediols (economic reasons).
2006: Transformation of an esterification unit for the production of biodiesel by Neochim SA, Belgian branch of SPIGA company (Italy)
2007: Restart of an additional reactor and increase of the production of anhydrous maleic.
October 2009 :
BASF announces the stop of its activities on Feluy site following the economic crisis
11/16/11 INTERNAL 10
BASF, Feluy siteoffers ...
Logistics access : highway, railway and fluvial access, as well as loading / unloading docks
Infrastructures and networks : roads and pipeways connecting the different areas for the products and the “utilities”.
Important connection with national networks : Azote, Hydrogene, Oxygene, Natural Gas, HT Electricity.
Production of ”utilities”, sewage treatment plant, cooling tower
Large utilitarian network built through the site : fumes, condensate, compressed air, demineralized water, drinking water, well water, decarbonated water, cooling water, electrical substation,…
Control room.
Available parks with storage tanks
Diverse buildings (lab, storehouse, cafetaria, administrative buildings, maintenance building,…).
Vacant or available areas (partially set up).
11/16/11 INTERNAL 11
Access - Logistics.
Access et logistics : Easy highway access +
centralized area with a lot of truck loading docks
Products supply buildings Railway access + (2 tracks / 2*
~12 wagons) with possible pipeway connection
Fluvial access (1350 T size) + 2 loading / unloading docks with pipeway connection
Pipeway (1.8 kms) with several products lines available
11/16/11 INTERNAL 12
Access - Logistics : highway, railway and fluvial access as well as loading / unloading docks
BOATACCESS
PRODUCTSSTORAGE
TRUCKSLOADING
TRUCKSACCESS
TRAINACCESS
11/16/11 INTERNAL 13
Infrastructure and networks.
Infrastructure and networks : Road connecting the different areas Different access points to the site Electric distribution network with a substation Pipeway covering the access to practically the whole site and
having a great deal of available piplines for chemical activities Possibility to re-use partially existing connections (unit in the
process of desmantling)
11/16/11 INTERNAL 14
Infrastrucuture and networks : road and pipeway connecting the different accesses for the products and the utilities
ACCESS
ACCESS
ACCESS
11/16/11 INTERNAL 15
Connection with national networks
Products supplied by Air Liquide by pipeline: Oxygen : capacity ~16000 Nm3/h – 6 bars Hydrogen : capacity ~20000 Nm3/h – 70 bars Nitrogen : capacity ~4500 Nm3/h – 15 bars
Natural gas supply – Connection with Fluxys network : Capacity : ~12000 Nm3/h – 15 bars 2 pressure-reducing stations :15 bars => 3 bars
Electricity supply – Connection with the HT Elia network : Capacity : ~ 40 MVAR 2 transformators : 150 kV => 15 kV et 75 kV => 15 KV
11/16/11 INTERNAL 16
Important connection with some national networks: Nitrogen, Hydrogen, Oxygen, Naturel Gaz, HT electricity
AZOTE
OXYGENEHYDROGENE
ELECTRICITY
NATURAL GAS
11/16/11 INTERNAL 17
Production of ”utilities”.
Production of available utilities: Demineralized water (120 m3/h) Decarbonated water (250 m3/h) Depressurized water (boiler supply) (220 m3/h – 70 bars) Fumes and condensates salvage Compressed air (5500 Nm3/h) Cooling water (12000 m3/h) Well water (150 m3/h) …
N.B.: necessity to reinvest in the production of steam and the storage of condensates
11/16/11 INTERNAL 18
Waste water treatment.
Water treatment: Underground sewage network. Aerial sewage network (inox) et neutralization of acid waters. Possibility of oxygen injections Mud filtering Drying and storage of the muds …
N.B.: necessity to adapt the treatment of waste water to upstream processes and to reinvest in certain equipments according to the future configuration of the site.
11/16/11 INTERNAL 24
Available parks of storage tanks and partially converted areas for production.
Tanks park zone 05.12 : ~1450 m3 – 6 tanks
Tanks park zone 05.11 : ~4100 m3 – 18 tanks
Tanks park zone 15.06 : 3500 m3 – 2 tanks inox
Storage sphere zone 30.00 : ~3700 m3 – 2 sphères
Zone of production 12.00 : ~7700 m2
Zone of production 11.00 : ~6000 m2
11/16/11 INTERNAL 25
Diverse buildings (laboratory, storehouses, cafetaria, administrative buildings, maintenance building,…).
11/16/11 INTERNAL 26
Diverse buildings (lab, storehouse, cafetaria, administrative buildings, maintenance building,…).
Laboratory : ~600 m2
Storehouse and maintenance hall : ~13500 m2
Administrative building: ~600 m2 – 2 floors
Other storehouses : ~1800 m2
Products storehouse loading area : ~2700 m2