presentation basf feluy june 2010 eng

28
11/16/11 INTERNAL 1 BASF Feluy Welcome Welcome

Upload: vyceslav12

Post on 13-Jul-2015

264 views

Category:

Technology


8 download

TRANSCRIPT

11/16/11 INTERNAL 1

BASF Feluy

WelcomeWelcome

11/16/11 INTERNAL 2

We are ... a technical entity of BASF Antwerpen N.V.,branch of BASF SE

BASF Feluy

BASF Antwerpen NV

FELUY

E54

E19

E19

E411

E42

E42

11/16/11 INTERNAL 3

Location in the business park of Feluy ...

BASF Feluy

11/16/11 INTERNAL 4

11/16/11 INTERNAL 5

The site drawing of BASF Feluy ...

11/16/11 INTERNAL 6

BASF, Feluy site in a few words ...

History of the site : End of 60s:

creation of an industrial business park in Feluy Goal : diversification of the industrial activities in Wallonia. Location : near the Bruxelles –Charleroi canal, E19 highway

and railways

Building of a Chevron Oil Belgium S.A. refinery, operated 10 years, stopped following the 2nd oil crash

Acquisition of the site end of the 80s by SISAS (Italy) : Start of the chemical activities of Pantochim SA 1989. Expansion of the chemical activities in the 90s. 1996 : creation of Neochim SA in partnership with the Italian

company Spiga for the production of Glycerine. End of 90s : financial troubles of the SISAS Group.

Acquisition by BASF of Feluy site on 13th of July 2001.

11/16/11 INTERNAL 7

BASF on the Feluy site

2000 years : Progressive adaptation of the site to BASF procedures (working

permit), installations modifications, investments,…

2005: Ceased production chains of plasticizers et derivatives Butanediols (economic reasons).

2006: Transformation of an esterification unit for the production of biodiesel by Neochim SA, Belgian branch of SPIGA company (Italy)

2007: Restart of an additional reactor and increase of the production of anhydrous maleic.

October 2009 :

BASF announces the stop of its activities on Feluy site following the economic crisis

11/16/11 INTERNAL 8

BASF, Feluy site...July 2010, Neochim activity

11/16/11 INTERNAL 9

BASF, Feluy site...June 2010, unit in the process of shutting down

11/16/11 INTERNAL 10

BASF, Feluy siteoffers ...

Logistics access : highway, railway and fluvial access, as well as loading / unloading docks

Infrastructures and networks : roads and pipeways connecting the different areas for the products and the “utilities”.

Important connection with national networks : Azote, Hydrogene, Oxygene, Natural Gas, HT Electricity.

Production of ”utilities”, sewage treatment plant, cooling tower

Large utilitarian network built through the site : fumes, condensate, compressed air, demineralized water, drinking water, well water, decarbonated water, cooling water, electrical substation,…

Control room.

Available parks with storage tanks

Diverse buildings (lab, storehouse, cafetaria, administrative buildings, maintenance building,…).

Vacant or available areas (partially set up).

11/16/11 INTERNAL 11

Access - Logistics.

Access et logistics : Easy highway access +

centralized area with a lot of truck loading docks

Products supply buildings Railway access + (2 tracks / 2*

~12 wagons) with possible pipeway connection

Fluvial access (1350 T size) + 2 loading / unloading docks with pipeway connection

Pipeway (1.8 kms) with several products lines available

11/16/11 INTERNAL 12

Access - Logistics : highway, railway and fluvial access as well as loading / unloading docks

BOATACCESS

PRODUCTSSTORAGE

TRUCKSLOADING

TRUCKSACCESS

TRAINACCESS

11/16/11 INTERNAL 13

Infrastructure and networks.

Infrastructure and networks : Road connecting the different areas Different access points to the site Electric distribution network with a substation Pipeway covering the access to practically the whole site and

having a great deal of available piplines for chemical activities Possibility to re-use partially existing connections (unit in the

process of desmantling)

11/16/11 INTERNAL 14

Infrastrucuture and networks : road and pipeway connecting the different accesses for the products and the utilities

ACCESS

ACCESS

ACCESS

11/16/11 INTERNAL 15

Connection with national networks

Products supplied by Air Liquide by pipeline: Oxygen : capacity ~16000 Nm3/h – 6 bars Hydrogen : capacity ~20000 Nm3/h – 70 bars Nitrogen : capacity ~4500 Nm3/h – 15 bars

Natural gas supply – Connection with Fluxys network : Capacity : ~12000 Nm3/h – 15 bars 2 pressure-reducing stations :15 bars => 3 bars

Electricity supply – Connection with the HT Elia network : Capacity : ~ 40 MVAR 2 transformators : 150 kV => 15 kV et 75 kV => 15 KV

11/16/11 INTERNAL 16

Important connection with some national networks: Nitrogen, Hydrogen, Oxygen, Naturel Gaz, HT electricity

AZOTE

OXYGENEHYDROGENE

ELECTRICITY

NATURAL GAS

11/16/11 INTERNAL 17

Production of ”utilities”.

Production of available utilities: Demineralized water (120 m3/h) Decarbonated water (250 m3/h) Depressurized water (boiler supply) (220 m3/h – 70 bars) Fumes and condensates salvage Compressed air (5500 Nm3/h) Cooling water (12000 m3/h) Well water (150 m3/h) …

N.B.: necessity to reinvest in the production of steam and the storage of condensates

11/16/11 INTERNAL 18

Waste water treatment.

Water treatment: Underground sewage network. Aerial sewage network (inox) et neutralization of acid waters. Possibility of oxygen injections Mud filtering Drying and storage of the muds …

N.B.: necessity to adapt the treatment of waste water to upstream processes and to reinvest in certain equipments according to the future configuration of the site.

11/16/11 INTERNAL 19

Waste water treament.

11/16/11 INTERNAL 20

Production of ”utilities” and treatment of polluted water.

11/16/11 INTERNAL 21

Control room.

11/16/11 INTERNAL 22

Available parks for storage tanks.

11/16/11 INTERNAL 23

Available parks of storage tanks and buildings.

11/16/11 INTERNAL 24

Available parks of storage tanks and partially converted areas for production.

Tanks park zone 05.12 : ~1450 m3 – 6 tanks

Tanks park zone 05.11 : ~4100 m3 – 18 tanks

Tanks park zone 15.06 : 3500 m3 – 2 tanks inox

Storage sphere zone 30.00 : ~3700 m3 – 2 sphères

Zone of production 12.00 : ~7700 m2

Zone of production 11.00 : ~6000 m2

11/16/11 INTERNAL 25

Diverse buildings (laboratory, storehouses, cafetaria, administrative buildings, maintenance building,…).

11/16/11 INTERNAL 26

Diverse buildings (lab, storehouse, cafetaria, administrative buildings, maintenance building,…).

Laboratory : ~600 m2

Storehouse and maintenance hall : ~13500 m2

Administrative building: ~600 m2 – 2 floors

Other storehouses : ~1800 m2

Products storehouse loading area : ~2700 m2

11/16/11 INTERNAL 27

Thanks for your attention.Thanks for your attention.

11/16/11 INTERNAL 28

Thanks for your visit.Feluy by night.