Presentation By:
Dr. Saroj Adhikari
(Project Director)
VISION LUMBINI
GoN/Ministry of Energy/DoED Granted Survey License to Vision Lumbini in Baisakh,2074 B.S.
Latitude:2831‘27''N to 2833’17''N
Longitude: 8421‘20'' E to 8423‘55''E
LOCATION MAP
SETI NADI
HYDROELECT
RIC PROJECT
Project Area
28⁰18’40”,28⁰22’12”83⁰57’15”,83⁰58’30”
Kathmandu-Pokhara: 200 km
Pokhara- Ghachowk: 22 km
Ghachok-Headworks: 3 km
Headworks Layout
VISION LUMBINI
Crest Elevation of Weir : 1281.00 amsl
Length of Weir : 40 m
Height of Weir : 5 m - river bed (4m fd.)
Type of Weir : Concrete Gravity Weir
Undersluice : 1 no. with radial gates
Undersluice Opening (WXH) : 2.5 * 3 m
Floor elevation : 1279.00 amsl
Spillway Type : Ogee Shape Free Flow
VISION LUMBINI
Headwork area
Powerhouse area
VISION LUMBINI
Project Location• District Kaski• Gaunpalika Machhapuchhre (HW to PS)
Survey License Area• Latitude 28° 22' 12" - 28° 18' 40" N• Longitude 83° 58' 30" - 83° 57' 15" E
General• Gross Head / Net Head 187 / 165.57 m• Installed Capacity 25 MW (Optimized)• Average Annual Energy 147,135,135 KWh
VISION LUMBINI
Hydrology
• Catchment area 254 km2
• Mean Annual Discharge 29.69 m3/s• Design flood 1000 Yrs.• Design discharge (Q40) 18.03 m3/s• Riparian Release 0.517 m3/s• Design Flood Discharge 745.05 m3/s• Average Annual Precipitation 3436 mm
VISION LUMBINI
Diversion Weir“As above”
Intake Structure / Gravel Trap• Type of Intake Orifice Side Intake• No. of Opening 3• Size of Intake (W x H) 3 * 2.5 m• Intake Sill Level 1280.00 amsl• Gravel Trap (L x W X Depth) 11 * 8 * 2.5 m• Particle Size to be Trapped 4 mm• Flushing Channel 1.5 * 1.5 m
VISION LUMBINI
Approach Canal• Type Box Canal• No. of Canal 1• Length 650 m• Size (W x B) 3.0 x 3.0 m
Desanding Basin / Desander• Type Concrete / Three Bay• Diamension (L x B x H) 48 * 6 * 6.4 m• Inlet Transition Length 17 m• Particle Size to be Settled 2 mm
VISION LUMBINI
Headarace Pipe• Type Circular• Internal Diameter 2.7 m• Length 5606.0 m• Steel Thickness / Lining 10 - 24 mm• No. of Anchor Blocks 69
Surge Tank / Forebay• Type Sub-surface, Concrete• Effective Depth 36.0 m• Diameter (or Size) 8.0 m• Up surge Level 1285.0 amsl• Down surge Level 1258.0 amsl• Normal Operational Level 1268.0 amsl
VISION LUMBINI
Steel Penstock Pipe• Type High Strength Steel• Internal Diameter 2.5 m• Length 621.0 m• Steel Thickness 24 - 26 mm• No. of Anchor Blocks 6• No. of Saddle Supports 92
Powerhouse• Type Sub-Surface• Size (L x W x H) 28 * 16 * 16 m• Turbine Axis Level 1094.0 amsl• Turbine Type / No. Vertical Francis / 2 no.s• Turbine Capacity / Unit 13.16 (efficiency 90%)
VISION LUMBINI
Tailrace• Type Concrete Box Canal• Tailrace Length 400 m• Size (W x D) 3.0 * 3.0 m • Tailrace Water Level 1093.50 amsl
Transmission Line• Voltage Level 132 KV• TL Length 6 km• Interconnection Point NEA Lahachowk S.S.
Road / Access Accessible by Blacktop & Earthen RoadProject Cost Estimate NRs. 5,097,747,205.49Construction Period 2.5 – 3 Years
Desander
Desander Area
Powerhouse Area
Penstock Pipe
VISION LUMBINI
▪ Weir Site : Pokhara Formation : Deposit consisting of moderately cemented silty and sandy gravels of limestone, schist, gneiss and granite.
▪ Headrace Pipe: Pokhara Formation
▪ Penstock Pipe: Talkot Formation: Calcareous & cemented silt to boulder sized conglomerate consisting of limestone
▪ Surge Tank : Slate and Phyllite ( Benighat Formation)
▪ Powerhouse: Pokhara Formation
Geology of the Project Area
VISION LUMBINI
VISION LUMBINI
Powerhouse
TL Length
6 KMNEA-SS
❖ Catchment Area on Headworks 253 Km^2❖ 100 Years Flood 670.55 m3/sec❖ Total Design Discharge of the project 18.03 m3/sec
❖ Generation Capacity of the project 25 MW (Optimized)
❖ Annual Energy Generation 147 GWh
❖ Annual Price of Energy in First Year NRs. 85 + Crore
❖ Annual Price of Energy in Eighth Year NRs. 102 +Crore
❖ Preliminary Estimated Cost of the Project NRs. +/- 500 Crore
❖ Payback Period 6 to 8 Years
❖ Return on Equity (RoE) Above 20 %
VISION LUMBINI
Planning by EIA team during the Scoping visit
➢First Phase of EIA: To carry out the scoping so
as to brief the local about the project
➢A 15 days Public Notice Published and Provided
to concern people and the public places like
schools, health posts, municipality offices, youth
clubs, etc.
Public Notification
➢Records of
Public Deed
of Enquiry:
Collected
VISION LUMBINI
Public Consultations➢Public Consultations
Meetings - done
➢ Information on Present
Environmental and
Sociological Condition
were gathered
VISION LUMBINI
Public views were gathered as
➢ People were excited about the project.
➢ People have positive thinking about
the project - from NTNC staff to
municipality personnel; from teachers
to local resident, from health personal
to local politician.
➢ People would like to support the
project.
➢ Project has less issues and less
environmental/social impacts – “so
the project is a go ahead”.
Progress:
1. Scoping Document and
ToR prepared &
submitted to Govt.
2. Draft EIA Prepared too…
VISION LUMBINI
Appointment of Nil Tara W&E for the Preparation of Feasibility / Detailed
Project Report - DPR- in 27th May 2017 (Jestha 13, 2074)
Site Visit by Niltara Team / Hydropower Experts (Done)
Conduction of Topographical Field Survey (Done)
Preparation of Topographical Survey Report (Done)
Preparation of Desk Study on Geology & Hydrology (Done)
Geological Survey/Mapping (Done)
Hydrological Study (Done)
Project Definition Report (Done)
*Feasibility Study Report – 25 MW Capacity (Done)
*PPA - Energy Table Locked for 147,135,135 KWh (Done)
(Dry: 46,160,019 KWh, Wet: 100,975,116 KWh)….
VISION LUMBINI
VISION LUMBINI
Appointment of EHS International for the conduction of study and
preparation of Environmental Impact Assessment (EIA) Report
(Bhadra-2074 / Done)
Publication of EIA-Scoping Notice in the National Daily Newspaper by
EHS (Done)
Conduction of EIA-Scoping site visit by E&S experts, notice pasting at
local level & collection of deeds, held consultation meeting (incl. FGD)
with project stakeholders (Done)
*Preparation/Submission of EIA-Scoping & ToR Report to DoED (Done)
*Preparation of Draft EIA Report (Done)
VISION LUMBINI
S.N. Title/Position Professional’s Name Contact No.
1. Technical / E&S Director Dr. Saroj Adhikari 9813108996
2. Sr. Hydropower/Design Engineer Buddha Krishna Manandhar 9851114854
3. Sr. Engineering Geologist Jayandra Man Tamrakar 9841232821
4. Sr. Hydrologist Sarad Bhakta Manandhar 9841263968
5. Survey Engineer Niroj Karmacharya 9841107962
6. Hydraulic Engineer/ Structure Engineer
Subarna Lal Shrestha 01-4251506
7. Electrical Engineer Purna Gopal Ranjit 01-4251506
8. Mechanical Engineer Madhu Ram Byanjankar 01-4251506
9. Quantity and Cost Estimate / Construction Planner
Bharat Niure 9843311216
10. Field Geologist Toya Nath Ghimire 9851231132
11. Economist / Financial Analysist C.A. Narayan Kadel 9849753693
VISION LUMBINI
S.N. Title/Position Professional’s Name Contact No.
12. EIA Team Leader / Botanist Dr. Jyoti P. Gajurel 9841428732
13. Sociologist Prakash Ghimire 9851149216
14. Environmentalist Dipendra Pokharel 9841419290
15. Community Consultations/Liaison Samriddha K.C. 9851125341
16.
17.
Local Liaison + Tech. / E&S Coordination
PPA Coordinator + Gov. / Local Liaison +Sr. Hydropower Expert / Motivator
Lal Bahadur Dhami
Ganesh K. Shrestha
9851018901
9813656443
VISION LUMBINI
Project’s GIS Study by NEA (On Progress...)
Scoping/ ToR + EIA Report Approval (On progress…)
Project DPR (On Progress…)
Initiate Land Acquisition + Start Pre-Construction Activity
===================****=======================
❖ Apply/Acquire Construction / Gen. License from DoED
❖ Do Detail Design, Tender & take Project into Construction
VISION LUMBINI
Good Project Location with Motor-able RoadTechnically Sound Peaking Run-of-River Hydropower Project…Snow-fed: Stable and Predictable Flows…Minimal Environmental & Social Impact….Feasibility/DPR and EIA by Well Experienced Team..Good Project Leadership with Proven Track Record...Good Government, Political and Local support….Solid and/or Good Financial Returns….Financing Institutions have shown Great Interest in the project, as the Project is “viable/feasible”…