Page 1: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

Presentation By:

Dr. Saroj Adhikari

(Project Director)

Page 2: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as
Page 3: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as
Page 4: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

GoN/Ministry of Energy/DoED Granted Survey License to Vision Lumbini in Baisakh,2074 B.S.

Page 5: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

Latitude:2831‘27''N to 2833’17''N

Longitude: 8421‘20'' E to 8423‘55''E

LOCATION MAP

SETI NADI

HYDROELECT

RIC PROJECT

Project Area

28⁰18’40”,28⁰22’12”83⁰57’15”,83⁰58’30”

Kathmandu-Pokhara: 200 km

Pokhara- Ghachowk: 22 km

Ghachok-Headworks: 3 km

Page 6: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

Headworks Layout

Page 7: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Crest Elevation of Weir : 1281.00 amsl

Length of Weir : 40 m

Height of Weir : 5 m - river bed (4m fd.)

Type of Weir : Concrete Gravity Weir

Undersluice : 1 no. with radial gates

Undersluice Opening (WXH) : 2.5 * 3 m

Floor elevation : 1279.00 amsl

Spillway Type : Ogee Shape Free Flow

Page 8: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Headwork area

Powerhouse area

Page 9: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Project Location• District Kaski• Gaunpalika Machhapuchhre (HW to PS)

Survey License Area• Latitude 28° 22' 12" - 28° 18' 40" N• Longitude 83° 58' 30" - 83° 57' 15" E

General• Gross Head / Net Head 187 / 165.57 m• Installed Capacity 25 MW (Optimized)• Average Annual Energy 147,135,135 KWh

Page 10: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Hydrology

• Catchment area 254 km2

• Mean Annual Discharge 29.69 m3/s• Design flood 1000 Yrs.• Design discharge (Q40) 18.03 m3/s• Riparian Release 0.517 m3/s• Design Flood Discharge 745.05 m3/s• Average Annual Precipitation 3436 mm

Page 11: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Diversion Weir“As above”

Intake Structure / Gravel Trap• Type of Intake Orifice Side Intake• No. of Opening 3• Size of Intake (W x H) 3 * 2.5 m• Intake Sill Level 1280.00 amsl• Gravel Trap (L x W X Depth) 11 * 8 * 2.5 m• Particle Size to be Trapped 4 mm• Flushing Channel 1.5 * 1.5 m

Page 12: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Approach Canal• Type Box Canal• No. of Canal 1• Length 650 m• Size (W x B) 3.0 x 3.0 m

Desanding Basin / Desander• Type Concrete / Three Bay• Diamension (L x B x H) 48 * 6 * 6.4 m• Inlet Transition Length 17 m• Particle Size to be Settled 2 mm

Page 13: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Headarace Pipe• Type Circular• Internal Diameter 2.7 m• Length 5606.0 m• Steel Thickness / Lining 10 - 24 mm• No. of Anchor Blocks 69

Surge Tank / Forebay• Type Sub-surface, Concrete• Effective Depth 36.0 m• Diameter (or Size) 8.0 m• Up surge Level 1285.0 amsl• Down surge Level 1258.0 amsl• Normal Operational Level 1268.0 amsl

Page 14: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Steel Penstock Pipe• Type High Strength Steel• Internal Diameter 2.5 m• Length 621.0 m• Steel Thickness 24 - 26 mm• No. of Anchor Blocks 6• No. of Saddle Supports 92

Powerhouse• Type Sub-Surface• Size (L x W x H) 28 * 16 * 16 m• Turbine Axis Level 1094.0 amsl• Turbine Type / No. Vertical Francis / 2 no.s• Turbine Capacity / Unit 13.16 (efficiency 90%)

Page 15: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Tailrace• Type Concrete Box Canal• Tailrace Length 400 m• Size (W x D) 3.0 * 3.0 m • Tailrace Water Level 1093.50 amsl

Transmission Line• Voltage Level 132 KV• TL Length 6 km• Interconnection Point NEA Lahachowk S.S.

Road / Access Accessible by Blacktop & Earthen RoadProject Cost Estimate NRs. 5,097,747,205.49Construction Period 2.5 – 3 Years

Page 16: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

Desander

Desander Area

Page 17: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

Powerhouse Area

Penstock Pipe

Page 18: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

▪ Weir Site : Pokhara Formation : Deposit consisting of moderately cemented silty and sandy gravels of limestone, schist, gneiss and granite.

▪ Headrace Pipe: Pokhara Formation

▪ Penstock Pipe: Talkot Formation: Calcareous & cemented silt to boulder sized conglomerate consisting of limestone

▪ Surge Tank : Slate and Phyllite ( Benighat Formation)

▪ Powerhouse: Pokhara Formation

Page 19: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

Geology of the Project Area

Page 20: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Page 21: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Powerhouse

TL Length

6 KMNEA-SS

Page 22: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

❖ Catchment Area on Headworks 253 Km^2❖ 100 Years Flood 670.55 m3/sec❖ Total Design Discharge of the project 18.03 m3/sec

❖ Generation Capacity of the project 25 MW (Optimized)

❖ Annual Energy Generation 147 GWh

❖ Annual Price of Energy in First Year NRs. 85 + Crore

❖ Annual Price of Energy in Eighth Year NRs. 102 +Crore

❖ Preliminary Estimated Cost of the Project NRs. +/- 500 Crore

❖ Payback Period 6 to 8 Years

❖ Return on Equity (RoE) Above 20 %

Page 23: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Planning by EIA team during the Scoping visit

➢First Phase of EIA: To carry out the scoping so

as to brief the local about the project

➢A 15 days Public Notice Published and Provided

to concern people and the public places like

schools, health posts, municipality offices, youth

clubs, etc.

Public Notification

➢Records of

Public Deed

of Enquiry:

Collected

Page 24: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Public Consultations➢Public Consultations

Meetings - done

➢ Information on Present

Environmental and

Sociological Condition

were gathered

Page 25: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Public views were gathered as

➢ People were excited about the project.

➢ People have positive thinking about

the project - from NTNC staff to

municipality personnel; from teachers

to local resident, from health personal

to local politician.

➢ People would like to support the

project.

➢ Project has less issues and less

environmental/social impacts – “so

the project is a go ahead”.

Progress:

1. Scoping Document and

ToR prepared &

submitted to Govt.

2. Draft EIA Prepared too…

Page 26: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Appointment of Nil Tara W&E for the Preparation of Feasibility / Detailed

Project Report - DPR- in 27th May 2017 (Jestha 13, 2074)

Site Visit by Niltara Team / Hydropower Experts (Done)

Conduction of Topographical Field Survey (Done)

Preparation of Topographical Survey Report (Done)

Preparation of Desk Study on Geology & Hydrology (Done)

Geological Survey/Mapping (Done)

Hydrological Study (Done)

Project Definition Report (Done)

*Feasibility Study Report – 25 MW Capacity (Done)

*PPA - Energy Table Locked for 147,135,135 KWh (Done)

(Dry: 46,160,019 KWh, Wet: 100,975,116 KWh)….

Page 27: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Page 28: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Appointment of EHS International for the conduction of study and

preparation of Environmental Impact Assessment (EIA) Report

(Bhadra-2074 / Done)

Publication of EIA-Scoping Notice in the National Daily Newspaper by

EHS (Done)

Conduction of EIA-Scoping site visit by E&S experts, notice pasting at

local level & collection of deeds, held consultation meeting (incl. FGD)

with project stakeholders (Done)

*Preparation/Submission of EIA-Scoping & ToR Report to DoED (Done)

*Preparation of Draft EIA Report (Done)

Page 29: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

S.N. Title/Position Professional’s Name Contact No.

1. Technical / E&S Director Dr. Saroj Adhikari 9813108996

2. Sr. Hydropower/Design Engineer Buddha Krishna Manandhar 9851114854

3. Sr. Engineering Geologist Jayandra Man Tamrakar 9841232821

4. Sr. Hydrologist Sarad Bhakta Manandhar 9841263968

5. Survey Engineer Niroj Karmacharya 9841107962

6. Hydraulic Engineer/ Structure Engineer

Subarna Lal Shrestha 01-4251506

7. Electrical Engineer Purna Gopal Ranjit 01-4251506

8. Mechanical Engineer Madhu Ram Byanjankar 01-4251506

9. Quantity and Cost Estimate / Construction Planner

Bharat Niure 9843311216

10. Field Geologist Toya Nath Ghimire 9851231132

11. Economist / Financial Analysist C.A. Narayan Kadel 9849753693

Page 30: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

S.N. Title/Position Professional’s Name Contact No.

12. EIA Team Leader / Botanist Dr. Jyoti P. Gajurel 9841428732

13. Sociologist Prakash Ghimire 9851149216

14. Environmentalist Dipendra Pokharel 9841419290

15. Community Consultations/Liaison Samriddha K.C. 9851125341

16.

17.

Local Liaison + Tech. / E&S Coordination

PPA Coordinator + Gov. / Local Liaison +Sr. Hydropower Expert / Motivator

Lal Bahadur Dhami

Ganesh K. Shrestha

9851018901

9813656443

Page 31: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Project’s GIS Study by NEA (On Progress...)

Scoping/ ToR + EIA Report Approval (On progress…)

Project DPR (On Progress…)

Initiate Land Acquisition + Start Pre-Construction Activity

===================****=======================

❖ Apply/Acquire Construction / Gen. License from DoED

❖ Do Detail Design, Tender & take Project into Construction

Page 32: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as
Page 33: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Good Project Location with Motor-able RoadTechnically Sound Peaking Run-of-River Hydropower Project…Snow-fed: Stable and Predictable Flows…Minimal Environmental & Social Impact….Feasibility/DPR and EIA by Well Experienced Team..Good Project Leadership with Proven Track Record...Good Government, Political and Local support….Solid and/or Good Financial Returns….Financing Institutions have shown Great Interest in the project, as the Project is “viable/feasible”…

Page 34: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as
Page 35: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as
Page 36: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Page 37: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Page 38: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Page 39: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI

Page 40: Presentation By: Dr. Saroj Adhikari (Project Director)visionlumbini.org.np/pdfuploads/Seti_Nadi_Butwal_Dr... · 2018. 4. 15. · First Phase of EIA: To carry out the scoping so as

VISION LUMBINI