presentation by jose sanchez - baixardoc.com

10
New for MineSight Economic Planner Presentation by Jose Sanchez

Upload: others

Post on 16-Oct-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentation by Jose Sanchez - baixardoc.com

New for MineSight

Economic Planner Presentation by Jose Sanchez

Page 2: Presentation by Jose Sanchez - baixardoc.com

Workshop overview

MSEP enhancements

MSEP workflow

Analyzing MSEP results

Page 3: Presentation by Jose Sanchez - baixardoc.com

Workshop overview

MSEP enhancements

MSEP workflow

Analyzing MSEP results

Page 4: Presentation by Jose Sanchez - baixardoc.com

MSEP enhancements

Expanded GSF

200 pits!

Design

Series/AutoP/Starter pit

MSVALP

Series/Worst Scheduling

Page 5: Presentation by Jose Sanchez - baixardoc.com

MSEP expanded GSF

200 pits!

•No need for multiple GSF files

• Easily create GSF using procedure p60110.dat

• Support for old GSF files

Additional items

•More TOPO items TOPO1-TOPO5

•More Area items AREA1-AREA5

•More slope estimate items

Complex slopes

• Continues to support current slopes

• Soon to allow more slope detail

Page 6: Presentation by Jose Sanchez - baixardoc.com

MSOPIT–Creating a series of pits

OP

TIO

NS

Multi-Run using BASE option

BASE option for selected areas

MULTP – limit pushback size

MULTV – vary value

MULTZ – vary bottom elevation

AUTOP – pushbacks limited by face angle

BASE - option with vary prices feature

Starter pit for AUTOP and MULTP options

Design a series of pits

• Determine the ultimate pit limit

• Develop phases for scheduling

Page 7: Presentation by Jose Sanchez - baixardoc.com

BASE option with vary price feature

Page 8: Presentation by Jose Sanchez - baixardoc.com

Scheduling with economic sequential pits

THE “GAP”

Page 9: Presentation by Jose Sanchez - baixardoc.com

360 degree mining

Scheduling with economic sequential pits

Page 10: Presentation by Jose Sanchez - baixardoc.com

Create pits in a preferred direction

Create a series of non-concentric pit shells

Targets high grade material

Honors maximum mining width

Fixes the ‘gap’ issue

AutoP – More realistic phase design