Railway Rehabilitation Project in Cambodia
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
Railway Rehabilitation Project in Cambodia
1- Southern Line : Phnom Penh – Sihanouk Ville 264 km
2- Construction of Sihanouk Ville Container Railway Terminal
3- 48 km Missing Link from SISOPHON – POIPET
(6km from Pk 380+000 to Cambodia-Thai Border)
4- Northern Line : Phnom Penh – SISOPHON 338 km
5- SAMRONG area Development and Green Trade Warehouse, (KM6)
Contents
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
1- PHNOM PENH – SIHANOUK VILLE 264 km
The constriction was completed in 2013, Speed design 50 Km/h, 20T
axle load, Concrete Sleeper, Rail P 43, Single Track Meter gauge (1000mm).
Railway Rehabilitation Project
Flush-butt welding of rails
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
2- Construction of Sihanouk Ville Container Railway Terminal
-Contractor : SINOHYDRO CORPORATION
-Notice to Proceed : 5 June 2013
-Contract Period : 365 days
-Construction was completed: 10, 2014
-Contract Value : USD 3,7 Million
-Construction size : 4ha
Railway Rehabilitation Project
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
Railway Rehabilitation Project 2- Construction of Sihanouk Ville Container Railway Terminal
Installation of interlocking concrete block
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
Railway Rehabilitation Project 3- 48km Missing Link from SISOPHON – POIPET
(6km, from Pk 380+000 to Cambodia-Thai Border)
Rebuilding 48 km Missing Link from SISOPHON – POIPET, this section was completed in April 2012 for 42km.
The remaining section 6km close to the border railway bridge has not completed yet.
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
3- 48km Missing Link from SISOPHON – POIPET
(6km, from Pk 380+000 to Cambodia-Thai Border)
Railway Rehabilitation Project
The remaining section 6km closed to the border of the railway bridge will start the construction in January 2015 -PC sleepers are stocked at PK 42nd -Rail BS 80 are stocked at POIPET Station
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
Railway Rehabilitation Project 3- 48km Missing Link from SISOPHON – POIPET
(6km, from Pk 380+000 to Cambodia-Thai Border)
- On 25 July 2014, the Royal Government of Cambodia and Royal Government of Thailand started to construct a railway bridge at border in the total length of 43m.
- Contractor : Italian-Thai Development Public Company Limited - Consultant for the Construction : The State of Railway Thailand - The Project will be completed in April 2015
Ground Breaking Ceremony of the new railway border bridge
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
4- Northern Line : Phnom Penh – SISOPHON 338 km
Railway Rehabilitation Project
-The existing of northern line Phnom Penh Station – SISOPHON 338km this section was completed in September 2012 for 23km, from PK 9+400 to Batdeung Station.
- The section Batdeung Station – SISOPHON 315km has not completedyet and The government is looking for additional funds.
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
Railway Rehabilitation Project 5- SAMRONG area development and Green Trade Warehouse, (KM6)
These development s are under consideration for future construction due to the resettlement issues
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
Railway Rehabilitation Project
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
Railway Rehabilitation Project