  • Strength. Performance. Passion.

    2012

    Membangun Tuban

    Update Oktober 2014

    Weekly Report, Environment, Sony Susanto, 2012-11-20 2012

  • 2013

    Selamat Datang di Tuban BUMI WALI spirit of harmony

    Plant Preparation, 2013-02-12

    Luas wilayah Kabupaten Tuban

    183.994.562 Ha dg 20

    Kecamatan dan 328

    desa/kelurahan.

    Panjang pantai 65 km

    Ketinggian daratan 5 182 (dpl).

    Beriklim kering 174.298,06 Ha

    (94,73%) 9.696,51 Ha (5,27%)

    cukup basah.

    Jumlah penduduk tahun 2011

    1.124.757 jiwa, kepadatan

    penduduk 611 jiwa/Km2 .

    Pendapatan perkapita tahun

    2011 : Rp. 18.522.248.

    Rata-rata lama sekolah 6,6

    tahun Tuban Kota Wali karena Tuban adalah salah satu kota di Jawa yang menjadi pusat penyebaran

    ajaran Agama Islam

    Beberapa obyek wisata Makam Wali, contohnya Sunan Bonang, Makam Syeh Maulana Ibrahim

    Asmaraqandi (Palang), Sunan Bejagung dll. Tuban juga dikenal sebagai Kota Seribu Goa . Goa

    yang terkenal di Tuban adalah Goa Akbar, Goa Putri Asih.

  • 2013

    Kapasitas dan Lokasi Pabrik

    Dua pabrik terintegrasi dan satu unit penggilingan semen menghasilkan 9.3 mtpa

    semen.

    Dua pabrik terintegrasi sedang dalam proses pembangunan di Tuban, Jawa Timur

    (1.7 mtpa)

    Operasi RMX (1.2 jt m3 thn 2010) dan 2 tambang aggregate (1.8 jt ton di thn 2010)

    Johor Bahru

    Cement Grinding

    1.2 mtpa

    Ciwandan

    Cement Grinding

    0.7 mtpa

    Naragong Plant

    3.9 mtpa clinker

    4.7 mtpa cement

    Tuban Plant

    2

    2.4 mtpa clinker

    3.4 mtpa cement

    Cilacap Plant

    1 kiln line of 8 000 tpd

    2.6 mtpa clinker

    3.1 mtpa cement

    Grinding plant

    Cement plant

    Cement flow

    Clinker flow

    Under construction

    Holcim (Malaysia)

  • 2013

    Strategi Holcim dan Tiga Pilar Dasar

    Menciptakan Nilai Tambah

    Pemikiran

    Strategi

    Tujuan

    Dasar

    Fokus Produk Keragaman

    Geografi

    Manajemen Lokal

    Berstandar Global

    Masyarakat

    Manajemen

    Keuangan

    Inovasi

    Pemasaran

    Pengem-

    bangan

    SDM

    Sustainable

    Environmental

    Performance

    Tanggungjawab

    Sosial

    Perusahaan (CSR)

    Kinerja

    Lingkungan

    Holcim Berkomitmen untuk Pembangunan yang Berkelanjutan (SD)

    Strategi bisnis, mengintegrasikan elemen Ekonomi, Lingkungan dan Sosial

    Ambitious Group- Target Pembangunan Berkelanjutan yang luas .

  • 2013

    Kinerja dan Penghargaan

    Berbagai

    Penghar-

    gaan CSR

    tingkat

    daerah,

    provinsi

    dan

    national.

    Penghar-

    gaan

    Industri

    Hijau 2010

    dan 2011.

    Gold

    Proper

    2010, 2011,

    dan 2012.

    Gold Proper 2010, 2011 dan 2012 Penghargaan Industri

    Hijau 2010 dan 2011

    GOLD Proper from Environment

    Minister Green Industry Award from

    Industrial Minister

    Ozon Award from Environment

    Minister

  • 2013

    Kinerja dan Penghargaan

    Berbagai

    Penghar-

    gaan CSR

    tingkat

    daerah,

    provinsi

    dan

    national.

    Penghar-

    gaan

    Industri

    Hijau 2010

    dan 2011.

    Gold

    Proper

    2010, 2011,

    2012, 2013.

    Gold Proper 2010, 2011 dan 2012 Penghargaan Industri

    Hijau 2010 dan 2011

    Proper

    Emas: 4

    tahun

    berturut

    Efisiensi

    Energi

    dari

    Menteri

    ESDM

    Sustainable

    Business

    Award 2013

    CSR Award

    2013 dari

    Koran Sindo

    50 Besar

    Perusahaan

    Paling

    Berpengaruh

    2013

    Indonesia

    Green

    Company

    Award

    2013 dari

    Majalah

    SWA

  • 2013

    Kinerja dan Penghargaan

    East Java Investment Award 2013: Best Company

    Diterima pada acara: Penganugerahan East Java Investment Award, di

    Surabaya, 23 January 2014, oleh Gubernur Jawa Timur

  • 2013

    Kinerja dan Penghargaan

    Diterima pada acara: The 6th Annual Global CSR Summit and

    Award, di Bali, 3-4 April 2014.

    Global CSR Award: Best Community Program

  • 2013

    Kinerja & Penghargaan

    Diterima pada acara: 3rd

    di Surakarta, 16 17 Juni 2014.

    Pelaksana CSR Pengembang UMKM Terbaik

  • Strength. Performance. Passion.

    2012

    Proyek Pembangunan Pabrik Tuban Update Oktober 2014

    BoD Meeting, Tuban Project, Ramiro Velasco, 2012-12-14 2012 Holcim Ltd

  • 2013

    Jetty works in progress

    Pictures

    11 BoD Meeting, Tuban Project, Ramiro Velasco, 2013-07-22

  • 2013 12

    Tuban 1 Tuban 2

  • 2013

    Infrastructure work in progress

    Pictures

    13 BoD Meeting, Tuban Project, Ramiro Velasco, 2013-05-13

  • 2013 14

  • Strength. Performance. Passion.

    2012

    Management Lingkungan Tuban Plant

    PT Holcim Indonesia Tbk, Pabrik Tuban

    Plant Preparation, 2013-02-12 2012

    Oktober 2014

    [email protected]

  • 2013

    Environmental Policy

    Johor Bahru

    Cement Grinding

    1.2 mtpa

    Ciwandan

    Cement Grinding

    0.7 mtpa

    Naragong Plant

    tpd and

    tpd

    3.9 mtpa clinker

    4.7 mtpa cement

    Tuban Plant

    2 tpd

    Tbn 1 & 4000 tpd Tbn 2

    Total 8000 tpd

    3.6 mtpa cement

    Cilacap Plant

    tpd

    2.4 mtpa clinker

    2.9 mtpa cement

    Grinding plant

    Cement plant

    Cement flow

    Clinker flow

    Under construction

    Holcim (Malaysia)

    Tuban Plant

  • 2013

    4 Pillars Environmental Roadmap

    1. Environmental and Management System

    Comply to Legal and Other Compliance

    Suitable Environmental Prosedure

    System Document

    2. Environmental Impact

    Waste Management System

    Environmental aspect impact for Tuban Plant

    Greening and Lanscaping

    Housekeeping

    Water Management

    Environmental Monitoring

    3. Resource Utilization

    Manage and Monitor Water and Energy Consumption

    4. Stakeholder Relation

    Environmental Comunication

    Environmental Event

  • 2013

    Environmental Achievement

    1. Environmental and

    Management System

    AMDAL (EIA) (2008,

    Adendum 2010 & 2012),

    SKKL & Ijin Lingkungan,

    HO, Dredging and

    dumping permit, SIPA, B3

    Temporary Storage

    Permit

    Environmental Reporting

    (RKL-RPL, Weekly,

    Monthly, Anualy, ESAP,

    Environmental Guideline

    Envoy Management

    System

    Environmental Study

    (Biodiversity, Marne base

    line and fisheries study,

    sea trafict assessment,

    conservation area, trafict

    asessment study.

    Training and

    development (Air and

    water management

    certification, EMS, B3,

    Legal and compliance,

    Mangrove, Envoy)

    SNI Certivication

    2. Environmental Impact

    Greening and

    landscaping at Plant and

    Quarry area

    Air Ambient, Water,

    Noise, Vibration,

    Biodiversity, Dust Fall

    (Measuring/monitoring by

    Holcim and tird party)

    Waste Management

    (Temporary Storage,

    Waste Bin, Signing,

    Waste handling)

    Housekeeping

    (housekeeping contract

    with Local Vendor from

    ring 1)

    Deep Well Fasility &

    Monitoring, Hidrometri,

    drainage,

    STP (sanitary Treatment

    Plant)

    3. Resource Utilization

    Water discharge

    monitoring (Deepwell 2,3

    &4), Flow meter

    Resource utilization

    campaign (Water and

    Energy consumption)

    Ocupancy/mosion

    detector for lighting

    Temperatur detector for

    Air Conditioning.

    Optimalization for LCD

    monitor for all PC in Plant

    4. Stakeholder Relation

    Environmental

    Sosialization, induction,

    toolbox meeting

    World Environmental

    Day, Exhebition,

    Housekeping Day,

    Proklim

    Colaboration

    Environmental Program

    with Stakeholder

    (Govemnet, NGO,

    Community etc)

  • 2013

    Update Permit

    Tuban Construction Plan

    AMDAL Adendum 2012 (Tuban 2)

    SKKL & Environmental Permit

    Recom IMB

    HO

    B3 Temp. Storage Permit

    Fly Ash for BP Permit

    SNI Certivication

    2008 2010 2011 2012 2013 2014

    Pre-Construction Construction Operational

    AMDAL 2008

    AMDAL Adendum 2010

    Location Permit

    Construction Permit

    SIPA

    IUP

    IPLC

    BBMA Permit

    Jetty Operational

    Permit

    Tuban Construction Progress

    Compliance and Regulation monitoring

  • 2013

    Greening and Plantation (Plant Site Area)

    Total number of plantation/greening

    22564 Trees with the specification

    (Trembesi, mahoni, sengon buto,

    akasia, etc) and (Manggo, Matoa,

    nangka, dll). Total area that has been

    planted is 20 ha

    NO Greening Area Greening Green BeltConservation

    ForestEdu-Forest Nursery CompostingBotanical gardenMini Zoo

    1 Area A

    2 Area B

    3 Area C

    4 Area D

    5 Area E

    6 Area F

    7 Area G

    8 Area H

  • 2013 21 Weekly Report, Environment, Sony Susanto, 2012-11-20

    Greening and Plantation (Jetty Area)

    I II III IV I II III IV I II III IV I II III IV

    1 Greening 0,8 500

    Cemara Laut, Acacia,

    Embo, Waru, Mahoni,

    Mangga

    2 Landscaping 0,4Grass, Flowers, Palm,

    Cemara udang

    2016 2017 Item of

    Greening/Landscaping

    2014 2015TreesArea (Ha)ActivityNO

    Trees or plantation must

    be considering to Jetty

    area condition. Tipe of

    trees/plantation: Cemera

    Laut, Ketapang, Waru,

    Embo, Glodogan and

    palm.

  • 2013

    Greening and Plantation Quarry Area

    Limestone area

    2013 4 2500Trembesi, Mangga, Nagka,

    Mahoni, Akasia dll

    2014 1,8 1000Trembesi, Mangga, Nagka,

    Mahoni, Akasia dll

    2015 1,5 800Trembesi, Mangga, Nagka,

    Mahoni, Akasia dll

    2016 1,3 700Trembesi, Mangga, Nagka,

    Mahoni, Akasia dll

    Item of TreesYear Land Area (Ha) Trees

    Clay area

  • 2013 23 Weekly Report, Environment, Sony Susanto, 2012-11-20

    Gardening Plan and Activity

    1 2

    3

    7 5 6

    8

    9 10 1

    1 12

    13

    14

    15

    4

    Gardening Plant Site

    Area A Gardenin

    g Area Greening Area Water Pond Area

    Gardening Plant Site

    Area C Gardenin

    g Area Greening Area

    Water Pond Area

    Area Resapan

    1

    2

    3

    3

    3

    4

    4

    4

    5

    5

    4

  • 2013

    Metoda Penanaman/Reklamasi

    1 M 1 M 3 M 3 M

    Trembesi Matoa Gayam

    Sto

    ne

    Wa

    ll Next Plan

    NO Item Volume Unit

    A Material Cost

    1 Tanaman (2-2.5 m)

    a. Trembesi 100 pcs

    b. Matoa 100 pcs

    c. Gayam 100 pcs

    2 Ajir (2 m) 600 pcs

    3 Fertilizer (Begining) 40 bag

    4 Fertilizer for Tretment & Maintenance

    (2 times during 3 month)

    150 kg

    B Planting & Maintenance service

    1 Hole for planting 300 hole

    2 Planting Cost 300 trees

    3 Fertilizing & Maintenance for 6 month 300 trees

    4 Watering for 6 month 150 days

    Area for Reclamation

    Matoa Gayam Trembesi

    4 M

    4 M

    3 M 3 M

    Matoa Trembesi Gayam

  • 2013

    Pre-Konstruksi

    Konstruksi

    Operasional

    Pengawasan Batas Ambang Udara,

    Air, Kebisingan, Getaran, Debu, Lalu

    Lintas, Keanekaragaman dan

    Pengelolaan Limbah.

    Pengawasan Batas Amabang Udara,

    Air, Kebisingan, Lalu Lintas dan

    Keanekaragaman.

    Pemantauan Kualitas Lingkungan

    Pengawasan Batas Ambang Udara,

    Air, Kebisingan, Getaran, Debu, Lalu

    Lintas, Keanekaragaman dan

    Pengelolaan Limbah, Pengawasan

    Tumpukan Emisi.

    Data dasar

    Kualitas

    Lingkungan

    Selama

    Konstruksi

    Kualitas

    Lingkungan

    Selama

    Operasional

    Activity Environmental measuring and

    monitoring Monitoring Target

  • 2013

    Pemantauan Lingkungan

    Hasil pengukuran dan pemantauan (Ambang Batas Udara, Kebisingan, Air dan Getaran) di lokasi

    pabrik, Tambang, Pelabuhan dan sekitarnya, masih di bawah ambang batas (Peraturan

    Lingkungan). Usaha untuk mengurangi dampak lingkungan antara lain penyiraman, penghijauan,

    kebersihan, batas kecepatan kendaraan, dll.

    1. Pemantauan Batas Ambang Udara

    2. Pemantauan Kualitas Air

    3. Pemantauan Kebisingan

    4. Pemantauan Getaran

    5. Pengelolaan Limbah

    6. Keanekaragaman hayati

    7. Getaran Kejut

    NO Pemantauan Lokasi PemantauanRencana

    Pemantauan

    1 Kualitas Ambang

    Batas Udara

    Tambang dan Sekitarnya

    1x/3 bulan

    2 Kualitas Air Kolam Resapan dan Dam Sawir1x/3 bulan

    3 Kebisingan Tambang dan Sekitarnya 1x/3 bulan

    4 Getaran Tambang dan Sekitarnya 1x/3 bulan

    5 Keanekaragaman Area Konservasi 1x/3 bulan

    6 Getaran Kejut Area Peledakan 1x/3 bulan

  • 2013

    Ambien Dust and Dust Fall Monitoring Map

    Cross Road

    Merkawang

    Office

    Quarry

    Jetty Area

    Access

    Road

    Mesjid Al

    Qubro

    Sawir

    Filage

    Balai Desa

    Nggaji

    Plant

    Site

    SFO

    Pemantauan kualitas udara ambient

    Hasil pemantauan udara ambien di area Quarry dan

    sekitarnya menunjukan nilai debu (TSP), PM 10, dan

    PM2,5 masih dibawah ambang batas baku mutu

    lingkungan. Upaya pengelolaan lingkungan yang

    dilakukan antara lain penyiraman jalan, penghijauan,

    housekeeping, pembatasan kecepatan kendaraan

    operasional

  • 2013

    Pemantauan air laut

    13 km

    Dumping Location

    Jetty area

    Dredging Location

    0

    2

    4

    6

    1 2 3 4 5 6 7

    NT

    U

    Kekeruhan

    Kekeruhn

    Baku Mutu

    0

    5

    10

    15

    20

    25

    1 2 3 4 5 6 7

    mg

    /L

    BOD

    BOD

    Baku Mutu

    Sea water condition surrounding jetty area is high turbidity and TSS. It is

    shown from sea water quality monitoring before and until construction,

    because mostly of sea water condition surrounding jetty area are sandy

    condition, high cedimentation and hight waves from ocean.

  • 2013

    Pemantauan kebisingan

    North

    East 1 2

    3 4

    5 6 7 8

    9

    10

    Note :

    1. Gate 1

    2. Gate 2

    3. Gate 3

    4. Gate 4

    5. Cement Cylo

    6. Clinkler

    7. Preheater

    8. Sawir

    9. Mliwang

    10. Merkawang

    Noise Monitoring Location

    Noise Monitoring Picture

  • 2013

    Pemantauan Getaran

    Gambar Pemantauan Getaran

    Lokasi Pemantauan Getaran (Area PelSus)