presentation for visit uns holcim
DESCRIPTION
holcim presentationTRANSCRIPT
-
Strength. Performance. Passion.
2012
Membangun Tuban
Update Oktober 2014
Weekly Report, Environment, Sony Susanto, 2012-11-20 2012
-
2013
Selamat Datang di Tuban BUMI WALI spirit of harmony
Plant Preparation, 2013-02-12
Luas wilayah Kabupaten Tuban
183.994.562 Ha dg 20
Kecamatan dan 328
desa/kelurahan.
Panjang pantai 65 km
Ketinggian daratan 5 182 (dpl).
Beriklim kering 174.298,06 Ha
(94,73%) 9.696,51 Ha (5,27%)
cukup basah.
Jumlah penduduk tahun 2011
1.124.757 jiwa, kepadatan
penduduk 611 jiwa/Km2 .
Pendapatan perkapita tahun
2011 : Rp. 18.522.248.
Rata-rata lama sekolah 6,6
tahun Tuban Kota Wali karena Tuban adalah salah satu kota di Jawa yang menjadi pusat penyebaran
ajaran Agama Islam
Beberapa obyek wisata Makam Wali, contohnya Sunan Bonang, Makam Syeh Maulana Ibrahim
Asmaraqandi (Palang), Sunan Bejagung dll. Tuban juga dikenal sebagai Kota Seribu Goa . Goa
yang terkenal di Tuban adalah Goa Akbar, Goa Putri Asih.
-
2013
Kapasitas dan Lokasi Pabrik
Dua pabrik terintegrasi dan satu unit penggilingan semen menghasilkan 9.3 mtpa
semen.
Dua pabrik terintegrasi sedang dalam proses pembangunan di Tuban, Jawa Timur
(1.7 mtpa)
Operasi RMX (1.2 jt m3 thn 2010) dan 2 tambang aggregate (1.8 jt ton di thn 2010)
Johor Bahru
Cement Grinding
1.2 mtpa
Ciwandan
Cement Grinding
0.7 mtpa
Naragong Plant
3.9 mtpa clinker
4.7 mtpa cement
Tuban Plant
2
2.4 mtpa clinker
3.4 mtpa cement
Cilacap Plant
1 kiln line of 8 000 tpd
2.6 mtpa clinker
3.1 mtpa cement
Grinding plant
Cement plant
Cement flow
Clinker flow
Under construction
Holcim (Malaysia)
-
2013
Strategi Holcim dan Tiga Pilar Dasar
Menciptakan Nilai Tambah
Pemikiran
Strategi
Tujuan
Dasar
Fokus Produk Keragaman
Geografi
Manajemen Lokal
Berstandar Global
Masyarakat
Manajemen
Keuangan
Inovasi
Pemasaran
Pengem-
bangan
SDM
Sustainable
Environmental
Performance
Tanggungjawab
Sosial
Perusahaan (CSR)
Kinerja
Lingkungan
Holcim Berkomitmen untuk Pembangunan yang Berkelanjutan (SD)
Strategi bisnis, mengintegrasikan elemen Ekonomi, Lingkungan dan Sosial
Ambitious Group- Target Pembangunan Berkelanjutan yang luas .
-
2013
Kinerja dan Penghargaan
Berbagai
Penghar-
gaan CSR
tingkat
daerah,
provinsi
dan
national.
Penghar-
gaan
Industri
Hijau 2010
dan 2011.
Gold
Proper
2010, 2011,
dan 2012.
Gold Proper 2010, 2011 dan 2012 Penghargaan Industri
Hijau 2010 dan 2011
GOLD Proper from Environment
Minister Green Industry Award from
Industrial Minister
Ozon Award from Environment
Minister
-
2013
Kinerja dan Penghargaan
Berbagai
Penghar-
gaan CSR
tingkat
daerah,
provinsi
dan
national.
Penghar-
gaan
Industri
Hijau 2010
dan 2011.
Gold
Proper
2010, 2011,
2012, 2013.
Gold Proper 2010, 2011 dan 2012 Penghargaan Industri
Hijau 2010 dan 2011
Proper
Emas: 4
tahun
berturut
Efisiensi
Energi
dari
Menteri
ESDM
Sustainable
Business
Award 2013
CSR Award
2013 dari
Koran Sindo
50 Besar
Perusahaan
Paling
Berpengaruh
2013
Indonesia
Green
Company
Award
2013 dari
Majalah
SWA
-
2013
Kinerja dan Penghargaan
East Java Investment Award 2013: Best Company
Diterima pada acara: Penganugerahan East Java Investment Award, di
Surabaya, 23 January 2014, oleh Gubernur Jawa Timur
-
2013
Kinerja dan Penghargaan
Diterima pada acara: The 6th Annual Global CSR Summit and
Award, di Bali, 3-4 April 2014.
Global CSR Award: Best Community Program
-
2013
Kinerja & Penghargaan
Diterima pada acara: 3rd
di Surakarta, 16 17 Juni 2014.
Pelaksana CSR Pengembang UMKM Terbaik
-
Strength. Performance. Passion.
2012
Proyek Pembangunan Pabrik Tuban Update Oktober 2014
BoD Meeting, Tuban Project, Ramiro Velasco, 2012-12-14 2012 Holcim Ltd
-
2013
Jetty works in progress
Pictures
11 BoD Meeting, Tuban Project, Ramiro Velasco, 2013-07-22
-
2013 12
Tuban 1 Tuban 2
-
2013
Infrastructure work in progress
Pictures
13 BoD Meeting, Tuban Project, Ramiro Velasco, 2013-05-13
-
2013 14
-
Strength. Performance. Passion.
2012
Management Lingkungan Tuban Plant
PT Holcim Indonesia Tbk, Pabrik Tuban
Plant Preparation, 2013-02-12 2012
Oktober 2014
-
2013
Environmental Policy
Johor Bahru
Cement Grinding
1.2 mtpa
Ciwandan
Cement Grinding
0.7 mtpa
Naragong Plant
tpd and
tpd
3.9 mtpa clinker
4.7 mtpa cement
Tuban Plant
2 tpd
Tbn 1 & 4000 tpd Tbn 2
Total 8000 tpd
3.6 mtpa cement
Cilacap Plant
tpd
2.4 mtpa clinker
2.9 mtpa cement
Grinding plant
Cement plant
Cement flow
Clinker flow
Under construction
Holcim (Malaysia)
Tuban Plant
-
2013
4 Pillars Environmental Roadmap
1. Environmental and Management System
Comply to Legal and Other Compliance
Suitable Environmental Prosedure
System Document
2. Environmental Impact
Waste Management System
Environmental aspect impact for Tuban Plant
Greening and Lanscaping
Housekeeping
Water Management
Environmental Monitoring
3. Resource Utilization
Manage and Monitor Water and Energy Consumption
4. Stakeholder Relation
Environmental Comunication
Environmental Event
-
2013
Environmental Achievement
1. Environmental and
Management System
AMDAL (EIA) (2008,
Adendum 2010 & 2012),
SKKL & Ijin Lingkungan,
HO, Dredging and
dumping permit, SIPA, B3
Temporary Storage
Permit
Environmental Reporting
(RKL-RPL, Weekly,
Monthly, Anualy, ESAP,
Environmental Guideline
Envoy Management
System
Environmental Study
(Biodiversity, Marne base
line and fisheries study,
sea trafict assessment,
conservation area, trafict
asessment study.
Training and
development (Air and
water management
certification, EMS, B3,
Legal and compliance,
Mangrove, Envoy)
SNI Certivication
2. Environmental Impact
Greening and
landscaping at Plant and
Quarry area
Air Ambient, Water,
Noise, Vibration,
Biodiversity, Dust Fall
(Measuring/monitoring by
Holcim and tird party)
Waste Management
(Temporary Storage,
Waste Bin, Signing,
Waste handling)
Housekeeping
(housekeeping contract
with Local Vendor from
ring 1)
Deep Well Fasility &
Monitoring, Hidrometri,
drainage,
STP (sanitary Treatment
Plant)
3. Resource Utilization
Water discharge
monitoring (Deepwell 2,3
&4), Flow meter
Resource utilization
campaign (Water and
Energy consumption)
Ocupancy/mosion
detector for lighting
Temperatur detector for
Air Conditioning.
Optimalization for LCD
monitor for all PC in Plant
4. Stakeholder Relation
Environmental
Sosialization, induction,
toolbox meeting
World Environmental
Day, Exhebition,
Housekeping Day,
Proklim
Colaboration
Environmental Program
with Stakeholder
(Govemnet, NGO,
Community etc)
-
2013
Update Permit
Tuban Construction Plan
AMDAL Adendum 2012 (Tuban 2)
SKKL & Environmental Permit
Recom IMB
HO
B3 Temp. Storage Permit
Fly Ash for BP Permit
SNI Certivication
2008 2010 2011 2012 2013 2014
Pre-Construction Construction Operational
AMDAL 2008
AMDAL Adendum 2010
Location Permit
Construction Permit
SIPA
IUP
IPLC
BBMA Permit
Jetty Operational
Permit
Tuban Construction Progress
Compliance and Regulation monitoring
-
2013
Greening and Plantation (Plant Site Area)
Total number of plantation/greening
22564 Trees with the specification
(Trembesi, mahoni, sengon buto,
akasia, etc) and (Manggo, Matoa,
nangka, dll). Total area that has been
planted is 20 ha
NO Greening Area Greening Green BeltConservation
ForestEdu-Forest Nursery CompostingBotanical gardenMini Zoo
1 Area A
2 Area B
3 Area C
4 Area D
5 Area E
6 Area F
7 Area G
8 Area H
-
2013 21 Weekly Report, Environment, Sony Susanto, 2012-11-20
Greening and Plantation (Jetty Area)
I II III IV I II III IV I II III IV I II III IV
1 Greening 0,8 500
Cemara Laut, Acacia,
Embo, Waru, Mahoni,
Mangga
2 Landscaping 0,4Grass, Flowers, Palm,
Cemara udang
2016 2017 Item of
Greening/Landscaping
2014 2015TreesArea (Ha)ActivityNO
Trees or plantation must
be considering to Jetty
area condition. Tipe of
trees/plantation: Cemera
Laut, Ketapang, Waru,
Embo, Glodogan and
palm.
-
2013
Greening and Plantation Quarry Area
Limestone area
2013 4 2500Trembesi, Mangga, Nagka,
Mahoni, Akasia dll
2014 1,8 1000Trembesi, Mangga, Nagka,
Mahoni, Akasia dll
2015 1,5 800Trembesi, Mangga, Nagka,
Mahoni, Akasia dll
2016 1,3 700Trembesi, Mangga, Nagka,
Mahoni, Akasia dll
Item of TreesYear Land Area (Ha) Trees
Clay area
-
2013 23 Weekly Report, Environment, Sony Susanto, 2012-11-20
Gardening Plan and Activity
1 2
3
7 5 6
8
9 10 1
1 12
13
14
15
4
Gardening Plant Site
Area A Gardenin
g Area Greening Area Water Pond Area
Gardening Plant Site
Area C Gardenin
g Area Greening Area
Water Pond Area
Area Resapan
1
2
3
3
3
4
4
4
5
5
4
-
2013
Metoda Penanaman/Reklamasi
1 M 1 M 3 M 3 M
Trembesi Matoa Gayam
Sto
ne
Wa
ll Next Plan
NO Item Volume Unit
A Material Cost
1 Tanaman (2-2.5 m)
a. Trembesi 100 pcs
b. Matoa 100 pcs
c. Gayam 100 pcs
2 Ajir (2 m) 600 pcs
3 Fertilizer (Begining) 40 bag
4 Fertilizer for Tretment & Maintenance
(2 times during 3 month)
150 kg
B Planting & Maintenance service
1 Hole for planting 300 hole
2 Planting Cost 300 trees
3 Fertilizing & Maintenance for 6 month 300 trees
4 Watering for 6 month 150 days
Area for Reclamation
Matoa Gayam Trembesi
4 M
4 M
3 M 3 M
Matoa Trembesi Gayam
-
2013
Pre-Konstruksi
Konstruksi
Operasional
Pengawasan Batas Ambang Udara,
Air, Kebisingan, Getaran, Debu, Lalu
Lintas, Keanekaragaman dan
Pengelolaan Limbah.
Pengawasan Batas Amabang Udara,
Air, Kebisingan, Lalu Lintas dan
Keanekaragaman.
Pemantauan Kualitas Lingkungan
Pengawasan Batas Ambang Udara,
Air, Kebisingan, Getaran, Debu, Lalu
Lintas, Keanekaragaman dan
Pengelolaan Limbah, Pengawasan
Tumpukan Emisi.
Data dasar
Kualitas
Lingkungan
Selama
Konstruksi
Kualitas
Lingkungan
Selama
Operasional
Activity Environmental measuring and
monitoring Monitoring Target
-
2013
Pemantauan Lingkungan
Hasil pengukuran dan pemantauan (Ambang Batas Udara, Kebisingan, Air dan Getaran) di lokasi
pabrik, Tambang, Pelabuhan dan sekitarnya, masih di bawah ambang batas (Peraturan
Lingkungan). Usaha untuk mengurangi dampak lingkungan antara lain penyiraman, penghijauan,
kebersihan, batas kecepatan kendaraan, dll.
1. Pemantauan Batas Ambang Udara
2. Pemantauan Kualitas Air
3. Pemantauan Kebisingan
4. Pemantauan Getaran
5. Pengelolaan Limbah
6. Keanekaragaman hayati
7. Getaran Kejut
NO Pemantauan Lokasi PemantauanRencana
Pemantauan
1 Kualitas Ambang
Batas Udara
Tambang dan Sekitarnya
1x/3 bulan
2 Kualitas Air Kolam Resapan dan Dam Sawir1x/3 bulan
3 Kebisingan Tambang dan Sekitarnya 1x/3 bulan
4 Getaran Tambang dan Sekitarnya 1x/3 bulan
5 Keanekaragaman Area Konservasi 1x/3 bulan
6 Getaran Kejut Area Peledakan 1x/3 bulan
-
2013
Ambien Dust and Dust Fall Monitoring Map
Cross Road
Merkawang
Office
Quarry
Jetty Area
Access
Road
Mesjid Al
Qubro
Sawir
Filage
Balai Desa
Nggaji
Plant
Site
SFO
Pemantauan kualitas udara ambient
Hasil pemantauan udara ambien di area Quarry dan
sekitarnya menunjukan nilai debu (TSP), PM 10, dan
PM2,5 masih dibawah ambang batas baku mutu
lingkungan. Upaya pengelolaan lingkungan yang
dilakukan antara lain penyiraman jalan, penghijauan,
housekeeping, pembatasan kecepatan kendaraan
operasional
-
2013
Pemantauan air laut
13 km
Dumping Location
Jetty area
Dredging Location
0
2
4
6
1 2 3 4 5 6 7
NT
U
Kekeruhan
Kekeruhn
Baku Mutu
0
5
10
15
20
25
1 2 3 4 5 6 7
mg
/L
BOD
BOD
Baku Mutu
Sea water condition surrounding jetty area is high turbidity and TSS. It is
shown from sea water quality monitoring before and until construction,
because mostly of sea water condition surrounding jetty area are sandy
condition, high cedimentation and hight waves from ocean.
-
2013
Pemantauan kebisingan
North
East 1 2
3 4
5 6 7 8
9
10
Note :
1. Gate 1
2. Gate 2
3. Gate 3
4. Gate 4
5. Cement Cylo
6. Clinkler
7. Preheater
8. Sawir
9. Mliwang
10. Merkawang
Noise Monitoring Location
Noise Monitoring Picture
-
2013
Pemantauan Getaran
Gambar Pemantauan Getaran
Lokasi Pemantauan Getaran (Area PelSus)