Integrating human factors within MAE control measures: Error and ALARP in offshore petroleum activities Joelle Mitchell APPEA HSE Conference, Perth, September 2015

Upload: others

Post on 06-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

Integrating human factors within MAE control measures: Error and ALARP in offshore petroleum activities

Joelle Mitchell APPEA HSE Conference, Perth, September 2015

Page 2: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

• Humans interact with control measures • Error can be a barrier-defeating factor • Error risk can be addressed through adapted

traditional risk management approaches

2 A433199 08/09/2015

Human Factors and MAEs

Page 3: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

3 A433199 08/09/2015

Reducing error risk

Error Prevention

Error Management

Page 4: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

4 A433199 08/09/2015

Typical approach Hazard

Hazard

Hazard

Hazard

Hazard

Consequence

Consequence

Consequence

Consequence

Consequence

EVENTPrevention Controls

Mitigation Controls

Elimination Prevention Reduction Mitigation

Training & competency Error

Page 5: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

5 A433199 08/09/2015

A more accurate approach

Control

Control

Control

Control

Control

Control

Control

Control

Control

Control

Control

! Error

! Error

! Error

Page 6: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

6 A433199 08/09/2015

A deeper exploration

Performance shaping factor

Performance shaping factor

Performance shaping factor

Performance shaping factor

Performance shaping factor

Prevention Controls

Mitigation ControlsERROR

Control measure failure

Page 7: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

• March 23, 2005 – Isomerization unit start-up – Operators overfilled the

raffinate splitter tower – Pressure relief devices activated – Flammable liquid spurted from

a blowdown stack – No flare installed – Ignition, explosion and fire – 15 deaths, 180 injuries

7 A433199 08/09/2015

Example – Texas City Refinery

Page 8: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

8 A433199 08/09/2015

Error analysis

Knowledge-based mistake

Incorrect knowledge

Fatigue

Misleading HMI

Poor handover

Insufficient personnel

Control measure

failure

Overfilling tower

Page 9: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

Possible controls

9 A433199 08/09/2015

Tower overfillTower Overfill

Knowledge-based mistake

Incorrect knowledge

Fatigue

Misleading HMI

Poor handover

Insufficient personnel

Training

Simulation

Drills FRMS

HF in design Maintenance

Procedure

Comms conventions

Planning rules

Risk indicators

HF in design

Maintenance

Error training Drills Trip

Page 10: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

Benefits of error analysis

• Classify potential high-risk errors • Identify critical PSFs • Develop targeted control measures • Focus on prevention and mitigation • Facilitate risk reduction to ALARP

10 A433199 08/09/2015

Page 11: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

Which errors?

• “Critical human tasks” • Activities people are expected to perform:

– as barriers against an incident – to prevent incident escalation – to support or maintain barriers during an incident

• OGP (2011). Human factors engineering in projects.

11 A433199 08/09/2015

Page 12: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

Identify critical human

tasks

Identify error potential

Identify PSFs Evaluate existing controls

Develop additional controls

12 A433199 08/09/2015

A suggested process

Page 13: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

• Tasks where:

– a procedure is a single point failure – people interact with control measures – error can lead to barrier failure – barrier failure can lead to MAE

13 A433199 08/09/2015

Identify critical human tasks

Identify critical human tasks

Identify error potential

Identify PSFs Evaluate existing controls

Develop additional controls

Page 14: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

• Task analysis can help – What errors are possible?

– Classify errors by a taxonomy

– What are the potential consequences?

– What are the high-risk potential errors?

14 A433199 08/09/2015

Identify error potential

Identify critical human tasks

Identify error potential

Identify PSFs Evaluate existing controls

Develop additional controls

Page 15: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

• People-level – Knowledge, skills, experiences – Health

• Job-level – Procedures – Equipment – Supervision

• Organisation-level – Culture & climate – Corporate strategy

15 A433199 08/09/2015

Identify PSFs

Identify critical human tasks

Identify error potential

Identify PSFs Evaluate existing controls

Develop additional controls

Page 16: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

• Prevention controls?

• Mitigation controls?

• Is error risk ALARP?

16 A433199 08/09/2015

Evaluate existing controls

Identify critical human tasks

Identify error potential

Identify PSFs Evaluate existing controls

Develop additional controls

Page 17: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

• Layered defences targeting error: – Eliminate the opportunity – Prevent the error – Reduce the impact – error

identification and recovery – Mitigate the consequences

17 A433199 08/09/2015

Develop additional controls

Identify critical human tasks

Identify error potential

Identify PSFs Evaluate existing controls

Develop additional controls

Page 18: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

Where to start?

• Evidence of uncontrolled error: – Events and dangerous occurrences – Existing controls have failed to mitigate error risk

• Performance-shaping factors: – Latent conditions – Broader implications

18 A433199 08/09/2015

Page 19: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

• Human error can facilitate barrier failure • Error is most significant within

critical human tasks • Layered defences can reduce error risk • Effective risk reduction includes:

– error prevention – error mitigation

19 A433199 08/09/2015

Summary

Page 20: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

20 A433199 08/09/2015

Online resources

www.nopsema.gov.au

Page 21: Presentation - Integrating human factors within MAE ... · • March 23, 2005 – Isomerization unit start-up – Operators overfilled the raffinate splitter tower – Pressure relief

Questions