    Welcome to presentationWelcome to presentationonon

    Road Development:Road Development:

    ByByM.Imtiyaz Ahmed & N.P.SharmaM.Imtiyaz Ahmed & N.P.Sharma

    RITES LTDRITES LTD

  • 8/3/2019 Presentation on Cochin

    2/40

    Study areaStudy area

    ConsistsConsists ofof GCDAGCDA areaarea includingincluding thethe GrooseryGrooseryIslandsIslands

    AreaArea 732 sqkm732 sqkm

    MainMain citycity of of ErnakulamErnakulam alongalong withwith SatelliteSatellitetownstowns ofof ThripunitaraThripunitara inin east,east, AngamalyAngamaly inin thethenorthnorth && AroorAroor inin thethe westwest ..

    Ernakaulam is the second largest in in KeralaErnakaulam is the second largest in in Kerala

    It is the commercial capital &Futuristic cityIt is the commercial capital &Futuristic city

  • 8/3/2019 Presentation on Cochin

    3/40

    Study AreaStudy Area

  • 8/3/2019 Presentation on Cochin

    4/40

    Population ProjectionPopulation Projection

    RegionRegionArea(sq.Area(sq.mts)mts) Population in LakhsPopulation in Lakhs

    YearYear 1991 2001 2011 2021

    GCDA areaGCDA area

    CochinCochin

    CorporationCorporationareaarea

    94.88 5.64 5.96 7.25 8.23

    Other areas ofOther areas of

    GCDAGCDA

    637.23 10.96 12.01 14.53 16.91

  • 8/3/2019 Presentation on Cochin

    5/40

    1500

    2000

    2500

    Population Growth of Kochi city

    0

    500

    1000

    1 2 3 4 5 6 7 8

    YEAR 1961 1971 1981 1991 2001 2011 2021

    POPULATION (LAKHS) 3.38 4.39 5.13 5.64 5.95 7.25 8.23

    1 2 3 4 5 6 7 8

  • 8/3/2019 Presentation on Cochin

    6/40

    259.9

    363.6400

    Growth of Registered vehicles

    126.2

    0

    100

    200Total

    Vehicles

    1992-93 1997-98 2003-04

    Years

  • 8/3/2019 Presentation on Cochin

    7/40

    250

    300

    350

    400

    Two Wheelers

    Autos

    Composition of registered Vehicles

    0

    50

    100

    150200Vehicles

    1992-93 1997-98 2003-04

    Years

    Car/Jeep

    Bus/Minibus

    Goods & Others

    Total Vehicle

    60% are 2 wheelers

  • 8/3/2019 Presentation on Cochin

    8/40

    Mixed Traffic ConditionMixed Traffic Condition

  • 8/3/2019 Presentation on Cochin

    9/40

    Queuing of BusesQueuing of Buses

  • 8/3/2019 Presentation on Cochin

    10/40

    Accident trends in Kochi cityAccident trends in Kochi city

    YearYear Persons KilledPersons Killed Persons injuredPersons injured

    19951995 153153 31043104

    19961996 144144 26712671

    19971997 142142 25322532

    19981998 147147 24452445

    19991999 145145 25432543

    20002000 147147 25442544

    20012001 153153 25982598

    20022002 154154 26122612

  • 8/3/2019 Presentation on Cochin

    11/40

    Distribution of road network by ROWDistribution of road network by ROW

    Right of wayRight of way Length(Km)Length(Km) %% CumulativeCumulative

    30 29.9029.90 6.006.00 100.00100.00

  • 8/3/2019 Presentation on Cochin

    12/40

    Distribution of road network byDistribution of road network by

    carriageway widthcarriageway widthCarriagewayCarriageway

    width(Meters)width(Meters)

    LengthLength

    (Km)(Km)

    %% CumulativeCumulative

    Single laneSingle lane 39.339.3 7.97.9 7.97.9

    Intermediate laneIntermediate lane 92.592.5 18.518.5 26.426.4

    Two laneTwo lane 260.7260.7 52.352.3 78.778.7

    Three laneThree lane 33.933.9 6.86.8 85.585.5

    Four laneFour lane 69.969.9 14.014.0 99.599.5Six laneSix lane 2.92.9 0.50.5 100.00100.00

    TotalTotal 100.0100.0 100.0100.0

  • 8/3/2019 Presentation on Cochin

    13/40

    33%

    27%

    10%

    5%

    25%

    2 Whealer Cars Cycles Buses 3 Whealers

    Composition of Traffic at Dalimukku Junction

    36%

    26%1%

    14%

    21%2%

    2 Whealer Cars Cycles Buses 3 Whealers LMV

    Composition of Traffic at Kacheripadi Junction

  • 8/3/2019 Presentation on Cochin

    14/40

    3%

    37%12%

    15%

    Composition of Traffic at NH By-pass Junction

    1%

    11%

    21%

    2 Whealer Cars Cycles Buses 3 Whealers LMV Trucks

  • 8/3/2019 Presentation on Cochin

    15/40

    Distribution of Journey speed by roadDistribution of Journey speed by road

    lengthlength

    Sl. No.Sl. No.

    JourneyJourney

    speedspeed(kmph)(kmph)

    RoadRoad

    lengthlength(Kms)(Kms) %% CumulativeCumulative

    11 40 83.283.2 16.616.6 100.0100.0

  • 8/3/2019 Presentation on Cochin

    16/40

    Distribution of trips by modeDistribution of trips by mode

    ModeMode TripsTrips PercentagePercentage

    BusBus 969403969403 72.3572.35

    Car/jeepCar/jeep 5421554215 4.054.05

    Two wheelerTwo wheeler 8022180221 5.995.99

    AutoAuto 6374263742 4.794.79CycleCycle 3367433674 2.512.51

    FerryFerry 130629130629 9.759.75

    TrainTrain 79387938 0.590.59

    TotalTotal

    vehicular tripsvehicular trips

    13398221339822 100.00100.00

  • 8/3/2019 Presentation on Cochin

    17/40

    ProblemsProblems

    V/c Ratios on major roads>1V/c Ratios on major roads>1 Absence of road markings and signsAbsence of road markings and signs

    On street parking reduce road widthOn street parking reduce road width

    Inadequate foot pathsInadequate foot paths OnlyOnly twotwo NorthNorth SouthSouth linkslinks (Baneerjee(Baneerjee roadroad andand SS AA

    roadroad ))

    um er o eve ross ngs cause ott enec sum er o eve ross ngs cause ott enec s Number of missing links make trip detourNumber of missing links make trip detour

    Bus routing zigBus routing zig--zag and circuitouszag and circuitous

    Intercity private buses originate in M.G.road causingIntercity private buses originate in M.G.road causingtraffic jamstraffic jams

    Road network hierarchy not followedRoad network hierarchy not followed

    Poor geometrics at intersectionsPoor geometrics at intersections

  • 8/3/2019 Presentation on Cochin

    18/40

    New Developments in KochiNew Developments in Kochi

    ICT terminalICT terminal

    LNG re gasificationLNG re gasification

    International Bunkering TerminalInternational Bunkering Terminal

    Internat ona ru se term naInternat ona ru se term na Port based Economic zonePort based Economic zone

    Smart(Dubai) citySmart(Dubai) city

    Fashion cityFashion city

  • 8/3/2019 Presentation on Cochin

    19/40

    Short Term MeasuresShort Term Measures

    ProvisionProvision ofof RoadRoad lanelane markings,markings, zebrazebracrossingcrossing andand stopstop lineline atat intersectionintersection

    ReflectiveReflective typetype signage'ssignage's atat appropriateappropriatelocationslocations asas perper IRCIRC normsnorms

    FreeFree leftleft turnsturns atat majormajor intersectionsintersections Proper geometrics at junctionsProper geometrics at junctions

    InstallationInstallation ofof traffictraffic signalsignal wherewhere

    warrantedwarranted

  • 8/3/2019 Presentation on Cochin

    20/40

    CBD Area ImprovementCBD Area Improvement

    Ban of goods vehicles in Peak periods ie. 8Ban of goods vehicles in Peak periods ie. 8am to 12 noon and 5 pm to 8 pmam to 12 noon and 5 pm to 8 pm

    Nala in the market rd to be covered byNala in the market rd to be covered by

    slab for LCV parkingslab for LCV parking Shifting Parcel wholesale market behindShifting Parcel wholesale market behind

    the stadiumthe stadium

  • 8/3/2019 Presentation on Cochin

    21/40

    Railway station areaRailway station area

    Encroachments along station rd to beEncroachments along station rd to beremoved and footpath of 2m to beremoved and footpath of 2m to beprovidedprovided

    Rearrangement of circulating area in southRearrangement of circulating area in southStationStation

    Commissioning of the northen entry toCommissioning of the northen entry to

    South StationSouth Station

  • 8/3/2019 Presentation on Cochin

    22/40

    Haphazard Parking along M G RoadHaphazard Parking along M G Road

  • 8/3/2019 Presentation on Cochin

    23/40

    On Street Parking along M G RoadOn Street Parking along M G Road

  • 8/3/2019 Presentation on Cochin

    24/40

    Haphazard Parking on BroadwayHaphazard Parking on Broadway

  • 8/3/2019 Presentation on Cochin

    25/40

    On Street Parking at High CourtOn Street Parking at High Court

  • 8/3/2019 Presentation on Cochin

    26/40

    Parking ManagementParking Management

    On street parking to be chargedOn street parking to be charged

    Long term Short termLong term Short term

    rr -- --2 wheeler2 wheeler Rs 10/Rs 10/-- Rs 5/Rs 5/--

    The above money collected can be usedThe above money collected can be usedfor maintaining the road furniturefor maintaining the road furniture

  • 8/3/2019 Presentation on Cochin

    27/40

    Off Street ParkingOff Street Parking

    Parking demandParking demand

    M.G roadM.G road 400 ECU400 ECUShanmugam roadShanmugam road 1250 ECU1250 ECU

    --

    LocationsLocations

    -- Exhibition groundExhibition ground

    -- Maharaja CollegeMaharaja College-- Stadium on Edapally road(At grade)Stadium on Edapally road(At grade)

    N Li k V I l dN Li k V I l d

  • 8/3/2019 Presentation on Cochin

    28/40

    New Link to Vypeen IslandsNew Link to Vypeen Islands

    R d id i l

  • 8/3/2019 Presentation on Cochin

    29/40

    Road widening proposals

    S.No. Name Length ExistingLanes ProposedLanes Cost *(Km) (Rs. InLakhs)

    1 Edakochi Road (from Thopumpady toAroor)

    10 2 4 1050

    2 Coastal (Beach) Road connecting

    P.T.Jacob Road

    - Towards junction to Petta 4 1-1.5 2 250

    - Towards Alle e 21 1 2 1470

    3 Tripunithura Road- Vytilla junction to Petta 3 2 4 350

    - Petta to S.N. Junction 1 2 4 155

    - S.N.Junction to Anchuvilakku 1 2 4 140

    4 Vaikom Road

    - Tripunithura Anchuvilakku Jn. 2 2 4 280

    To Police Station Jn.

    5 Tripunithura-Kothamangalam

    Road (Anchuvilakku Jn. To ROB) 1 2 4 140

  • 8/3/2019 Presentation on Cochin

    30/40

    Road Widening proposals

    S.No Name Length ExistingLanes

    Proposed Lanes

    Cost *

    (Km) (Rs. In

    Lakhs)6 Kochi-Madurai NH upto

    Tripunithura4 2 4 240

    7 M.C.Road An amal PBR 15 38021 6 3150Stretch

    8 Pullepady Thammanam Road(with ROB)

    3 1 4 525

    9 Widening of Karshaka Roadlinking eastern side of therailway station

    1 2 4 140

    10 Mathai Manjooran Road fromBannerjee Road

    1 2 3 105

    11 Palarivattom Road linking St.Maritan church to Plarivattam jn

    0 2 4 35

  • 8/3/2019 Presentation on Cochin

    31/40

    S.No Name Lengt

    h

    Existin

    g Lanes

    Propose

    d Lanes

    Cost *

    (Km) (Rs. InLakhs)

    Road Widening proposals

    . .

    Palarivattom / Vytilla Road(Convent Road)

    14 Widening of NH 47, NH 49A andNH 17 upto 4 lane & reservationof land for 6 lane within GCDAArea

    NH 47NH 17NH 49 A

    1018

    21.5-2

    444

    20002800

    15 Aluva Parur Road- Aluva-Parur

    - Parur-Cherai

    14

    4

    2

    2

    4

    4

    1960

    560

    P d d /Mi i

  • 8/3/2019 Presentation on Cochin

    32/40

    Proposed new roads/Missing

    linksS.No. Name Length

    (Km)Proposed

    LanesCost*

    (Rs. InLakhs)

    1 Kumbalangi Ezhupunna Bridge 0.6 4 1500

    2 Vaduthla-Perndoor-Edappally Bridge 1 4 2400

    4 Bhramapuram Bridge 0.8 4 1900

    5 Widening of North ROB or alternate ROBat level Crossing

    0.6 4 900

    6 Widening of South ROB or alternate ROB

    at Level Crossing

    0.6 4 900

    7 Bridge from Maradu to Thripunithuraalong Kochi Madura Highway

    0.8 4 1900

    8 Reconstruction of Chittor Vaduthalabridge

    0.8 4 1900

    9 Bund road Connecting NH By-pass toThevera Road

    3.5 4 1500

  • 8/3/2019 Presentation on Cochin

    33/40

    Edapally JunctionEdapally Junction

    V tilla J nctionV tilla J nction

  • 8/3/2019 Presentation on Cochin

    34/40

    Vytilla JunctionVytilla Junction

  • 8/3/2019 Presentation on Cochin

    35/40

    Proposed grade SeparatorsProposed grade Separators

    S.No. Name Length(Km) ProposedLanes Cost*(Rs. InLakhs)

    **

    2 Edapally junction 1 6 1600

  • 8/3/2019 Presentation on Cochin

    36/40

    Environmental ImpactEnvironmental Impact

    KochiKochi possesposses naturalnatural backwatersbackwaters consideredconsidered totobebe thethe bestbest inin thethe worldworld

    ItIt isis notnot onlyonly aa scenicscenic beautybeauty butbut alsoalso attractattract

    largelarge numbernumber ofof touriststourists.. ThusThus backback waterswaters shouldshould notnot bebe disturbeddisturbed

    /reclaimed/reclaimed ,, otherother--wisewise itit willwill bebe anan

    environmentalenvironmental disasterdisaster

    B P ki G h B idB P ki G h B id

  • 8/3/2019 Presentation on Cochin

    37/40

    Bus Parking near Gooshree BridgeBus Parking near Gooshree Bridge

  • 8/3/2019 Presentation on Cochin

    38/40

    TerminalsTerminals

    TheThe interinter--citycity busbus terminalterminal atat RajajiRajaji roadroad toto bebeshiftedshifted toto ByeBye passpass

    FullFull fledgedfledged trucktruck terminalterminal toto bebe developeddeveloped

    beyondbeyond KallamessaryKallamessary ProvisionProvision ofof BusBus terminalterminal forfor privateprivate intercityintercity

    busesbuses nearnear KallorKallor

    BusBus terminalterminal atat NorthernNorthern endend ofof marinemarine drivedrive

  • 8/3/2019 Presentation on Cochin

    39/40

    Additional Projects in view ofAdditional Projects in view of

    Vallarpadam PortVallarpadam Port

    AA newnew 44 lanelane roadroad toto bebe constructedconstructed connectingconnectingNorthenNorthen endend ofof MarineMarine drivedrive toNHtoNH 4747

    RailwayRailway lineline toto bebe extendedextended toto PortPort asas DoubleDouble

    lineline toto catercater toto passengerpassenger traffictraffic alsoalso SuitableSuitable massmass transporttransport systemsystem toto connectconnect city,city,

    portport andand thethe SmartSmart citycity inin thethe northnorth..