presentation to the select committee: labour and public enterprise
DESCRIPTION
Presentation to the Select Committee: Labour and Public Enterprise. Consideration of Strategic Plan of the Department of Labour (DoL). 2013.03.20. TABLE OF CONTENTS. INTRODUCTION KEY STRATEGIC OBJECTIVE ACHIEVEMENTS AS AT END OF DECEMBER 2012 (Q3) - PowerPoint PPT PresentationTRANSCRIPT
Presentation to the Select Committee: Labour and Public Enterprise
2013.03.20
Consideration of Strategic Plan of the Department of Labour (DoL)
1
TABLE OF CONTENTS
2
1. INTRODUCTION
2. KEY STRATEGIC OBJECTIVE ACHIEVEMENTS AS AT END OF DECEMBER 2012 (Q3)
3. CHALLENGES FOR NONE ACHIEVEMENT OF SOME INDICATORS
4. BRIEF SUMMARY OF THE DEPARTMENT’S EXPENDITURE FOR 2012/13
5. HOW THE EXPENDITURE HELPED THE DOL TO FULFILL ITS MANDATE
6. KEY ASPECTS OF THE DOL STRATEGIC PLAN FOR 2013/14 APP TO MIDTERM
7. SOME OF THE KEY CHALLENGES FACING THE DOL
1. HOW THE DOL ADDRESSES CHALLENGES FACED
2. THE DOL EXPECTATIONS OF THE SELECT COMMITTEE
1. 1. INTRODUCTION
3
• The Strategic Plan 2012-2017 and Annual Performance Plan 2012/13 were published and tabled in Parliament
• After tabling the Department realised that the 2 documents had short comings and misalignments between the 2 documents
• The Indicators and Strategic Objectives were not fulfilling the SMART principles and in some cases not corresponding
• The Technical Advisory Unit (TAU) of National Treasury was approached for assistance
1. 1. INTRODUCTION - continues
4
• Workshops were held and the different Branches attended the workshops to ensure that all the indicators and strategic objectives are adhering to the SMART principles and that the indicators and the strategic objectives are aligned
• The Erratum for both documents were approved, published and tabled in Parliament (60 copies) on 15 February 2013
• The Strategic Plan 2013-2018 and Annual Performance Plan 2013/14 were further developed in line with the erratum
1. 1. INTRODUCTION - continues
5
• Some of the indicators published in the erratum documents were outdated, not strategic of nature or no longer applicable
• Therefore the Department saw it fit to publish a Strategic Plan 2013-2018 and an Annual Performance Plan 2013/14 that is aligned to the changes in the Strategic Plan
• The next few slides will show the Actual Performance of 2012/13APP (as at 31 December 2012 – Quarter 3), Expenditure for 2013 and the 2013- 2018 Strategic Plan’s objectives and indicators
KEY STRATEGIC OBJECTIVE ACHIEVEMENTS AS AT THE END OF DECEMBER 2012
Based on Quarters 1, 2 and 3 of the Financial Year 2012-13
Note that only selected Note that only selected indicators are reported on.indicators are reported on.
6
7
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (CS)
OUTCOME 12: AN EFFICIENT, EFFECTIVE, AND DEVELOPMENT ORIENTED PUBLIC SERVICE AND AN EMPOWERED AND INCLUSIVE CITIZENSHIP
Strategic Objective 8: Strengthening the institutional capacity of the Department
KEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS
ANNUAL ANNUAL TARGETSTARGETS
PROGRESSPROGRESS
1. Strategic risks monitored in line with risk appetite framework
Provide quarterly strategic risk monitoring reports to the accounting officer
The Strategic risk assessment (risk profile) of the DoL was reviewed and reports prepared, approved by the National Risk Management Committee and the Audit Committee, submitted to the Accounting Officer for approval. The Risk Appetite Framework finalised. The first report (quarterly strategic risk monitoring report) was provided to the Accounting Officer.
2. Percentage of finalisation of the fraud cases received and detected
87% of cases received or detected finalised by the year end
57% (7 cases received and 4 finalised) of cases were finalisedOffice Receive
dFinalized
Outstanding
HO 1 1 0Mpumal 2 1 1N. Cape 0 0 0Limpopo 0 0 0N. West 0 0 0E Cape 0 0 0Gauteng 3 2 1F. State 1 0 1KZN 0 0 0W Cape 0 0 0
8
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (CS)
OUTCOME 12: AN EFFICIENT, EFFECTIVE, AND DEVELOPMENT ORIENTED PUBLIC SERVICE AND AN EMPOWERED AND INCLUSIVE CITIZENSHIP
Strategic Objective 8: Strengthening the institutional capacity of the Department
KEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS
ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
3. Pre-employment screening conducted
70% pre-employment screening finalised as per the annual plan
A total of 80.92% of PSC requests were finalized.
Requests received Requests finalized Requests outstanding
Requests received
131 106 (80.92%) 25 (19.08%) 131DetailsName Received Finalized OutstandingHO 24 24 0UIF 06 05 01CC 06 06 0Mpumalanga 10 03 07N. Cape 04 04 0Limpopo 13 13 0N. West 07 06 01E Cape 11 04 07Gauteng 23 20 03F. State 09 07 02KZN 06 04 02W Cape 12 10 02TOTAL 131 106 25
9
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (CS)
OUTCOME 12: AN EFFICIENT, EFFECTIVE, AND DEVELOPMENT ORIENTED PUBLIC SERVICE AND AN EMPOWERED AND INCLUSIVE CITIZENSHIPStrategic Objective 8: Strengthening the institutional capacity of the DepartmentKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS
ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
4. Percentage of Senior Management Service (SMS) staff members vetted in the Department increased
80% of SMS staff in the department vetted
• 11 Z204 forms forwarded to SSA.
• 5 Clearance certificate received from SSA.
• 23 Requests outstanding
5. Percentage of women, youth and people with disability (PwD) employed in line with the EE Plan
40% women employed in Senior Management Service (SMS),
43% youth and
3% people with disability employed in DoL by 31 March 2013
39% of Women employed at SMS level; 35% of Youth employed and 2.7% of PwD’s employed
10
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (CS)
OUTCOME 12: AN EFFICIENT, EFFECTIVE, AND DEVELOPMENT ORIENTED PUBLIC SERVICE AND AN EMPOWERED AND INCLUSIVE CITIZENSHIPStrategic Objective 8: Strengthening the institutional capacity of the DepartmentKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS
ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
6. Fill all vacancies within a specific period of time
Vacancy rate reduced to below 7% by 31 March 2013
7% vacancy rate as at the end of Quarter 2
7. Percentage of staff trained in line with Workplace Skills Plan (WSP)
82% of Department’s staff trained in accordance with approved WSP by 31 March 2013
35% (2 280/6 550) trained
8. Percentage of misconduct cases finalised within a prescribed period of time
75% of misconduct cases finalised in line with applicable prescripts by 31 March 2013
71% (92 of 130) received misconduct cases were finalised against a target of 75%
9. Implementation of the new ICT strategy
50% of strategic plan components implemented
• ICT Strategy developed and approved
• 50% of the ICT Transition completed
10. Exit and services transfer plan developed and implemented
Completion of handover by PPP service provider and close-out of PPP
Exit and Services Transfer milestones achieved and project underway. Target is end November 2012
11
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (IES)
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 2: Promote Equity in the Labour MarketKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS
ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
1. Percentage of employers complying with their EE Plans to reflect demographics of the country in all occupational categories
80% of 240 employers reviewed comply Public Companies (100)Private Companies (200)
181 (60 public and 121 private) employers were reviewed
Table 5: Employers inspected
Prov.
Annual Target (Public companies)
Actual inspected(Public companies)
Annual Target (Private )
Actual inspected(Private companies)
EC 16 0 9 0FS 17 18 17 12GP 25 8 30 37KZN 17 1 35 13LP 16 9 6 8MP 6 4 11 13NC 3 1 7 7NW 10 12 6 6WC 6 7 20 25NATIONAL 116 60 138 121
12
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (IES)
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 3: Protecting Vulnerable WorkersKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS
ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
1. 80% of workplaces inspected and audited (targeting problematic sectors1 complying with labour legislation within 90 days of inspection or audit
80% of 87 795 workplaces inspected / audited comply
32 838 workplaces against a target of 33 917 (as at end of September 2012) were inspected/audited; and 59% (19 501) complied
Table 6: Number of workplaces inspected (targeting problematic sectors) in Wholesale and Retail Sector
Prov. Target Actual inspected No. compliedCompliance level
EC 865 1278 767 60%FS 309 475 429 90%GP 1947 1379 1039 75%KZN 1207 2141 1063 50%LP 1568 1102 642 58%MP 701 730 587 80%NC 0 153 116 76%NW 223 376 300 80%WC 672 1151 0 0%NATIONAL 7492 8785 5243 60%
13
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (IES)
Table 7: Number of workplaces inspected (targeting problematic sectors) in Hospitality Sector
Prov.) Target Actual No. compliedCompliance Level
EC 683 589 426 72%FS 412 293 252 86%GP 300 333 230 69%KZN 804 738 426 58%LP 271 389 207 53%MP 291 277 184 66%NC 173 305 236 77%NW 329 354 204 58%WC 462 940 277 29%NATIONAL 3 725 4 218 2 442 58%Table 8: Number of workplaces inspected (targeting problematic sectors) in Agriculture and Forestry Sector
Prov.) Target Actual No. compliedCompliance Level
EC 1094 959 696 73%FS 1182 1078 893 83%GP 80 79 70 89%KZN 1208 418 332 79%LP 252 345 243 70%MP 332 309 194 63%NC 0 324 296 91%NW 306 389 325 84%WC 441 964 247 26%NATIONAL 4 895 4 865 3 296 68%
14
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (IES)
Table 9: Number of workplaces inspected (targeting problematic sectors) in Iron and Steel Sector
Prov.) Target Actual No. compliedCompliance Level
EC 50 0 0 0%FS 31 25 22 88%GP 1517 159 80 50%KZN 1882 379 246 65%LP 41 46 23 50%MP 160 209 169 81%NC 78 44 21 48%NW 274 0 0 0%WC 488 41 0 0%NATIONAL 4 521 903 388 43%Table 10: Number of workplaces inspected (targeting problematic sectors) in Private Security Sector
Prov.) Target Actual No. compliedCompliance Level
EC 130 791 506 64%FS 20 183 161 88%GP 800 1323 1013 77%KZN 603 189 127 67%LP 79 180 0 0%MP 58 113 78 69%NC 32 139 122 88%NW 103 172 150 87%WC 230 916 19 2%NATIONAL 2055 4006 2182 54%
15
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (IES)
Table 11: Number of workplaces inspected (targeting problematic sectors) in Domestic Sector
Prov.) Target Actual No. compliedCompliance Level
EC 327 491 330 67%FS 284 460 440 96%GP 1200 1110 620 56%KZN 201 1741 1398 80%LP 489 1333 957 72%MP 506 601 548 91%NC 471 556 537 97%NW 348 550 421 77%WC 210 1000 150 15%NATIONAL 4054 6732 4592 68%Table 12: Number of workplaces inspected (targeting problematic sectors) in Chemical Sector
Prov.) Target Actual No. compliedCompliance Level
EC 5 0 0 0%FS 31 22 9 41%GP 720 119 60 50%KZN 82 1181 862 73%LP 6 2 1 50%MP 15 20 19 95%NC 434 95 0 0%NW 127 0 0 0%WC 418 0 0 0%NATIONAL 1 838 1 439 489 34%
16
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (IES)
Table 13: Number of workplaces inspected (targeting problematic sectors) in Construction Sector
Prov.) Target Actual No. compliedCompliance Level
EC 205 0 0 0%FS 91 75 59 79%GP 958 834 142 17%KZN 1057 63 50 80%LP 113 196 33 17%MP 255 294 259 88%NC 0 63 51 81%NW 462 98 53 54%WC 607 267 0 0%NATIONAL 3 748 1 890 869 46%
17
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (IES)
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 3: Protecting Vulnerable Workers
KEY PERFORMANCE INDICATORSKEY PERFORMANCE INDICATORS ANNUAL ANNUAL TARGETSTARGETS
PROGRESSPROGRESS
2. Percentage of labour complaints resolved within a specified number of days of receipt at Registration Services
Settle 70% of received complaints within14 days
Of the 55 484 complaints received, 65% (35 884), against the target of 70%, settlement level was realised within 14 days
Table 14: Complaints management
Prov. TargetNumber received Number settled
Settlement rate (%)
EC 70% 4081 2381 58%FS 70% 2876 2086 73%GP 70% 22649 15258 67%KZN 70% 5746 4370 76%LP 70% 4366 2233 51%MP 70% 6416 4919 77%NC 70% 1397 941 67%NW 70% 2684 1464 55%WC 70% 4332 2232 52%NATIONAL 70% 55 484 35 884 65%
18
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (IES)
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 5: Strengthening Social ProtectionKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS
ANNUAL ANNUAL TARGETSTARGETS
PROGRESSPROGRESS
1. 200 workplaces inspected in WC (100) and KZN (100) to reduce exposure, to silica dust, by 2%
200 workplaces inspected
63 (all in the Western Cape)
workplaces were inspected
2. Percentage reduction in noise induced hearing loss (NIHL) in the Iron and Steel industry
Conduct base line study on the extent of noise induced hearing loss in the Iron and Steel Industry
Research in progress
3. OHS Act repealed and its regulations amended
Complete the consultation process OHS Bill finalised and promulgatedSubmit the Bill to Cabinet and Nedlac
Currently the OHS Act has been referred to state legal advisors
19
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (PES)
OUTCOME 4: Improve the quality and accessibility of labour market services to contribute to decent employment through inclusive economic growthDoL Strategic Objective 1: Contribution to decent employment creation
KEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS
ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
1. Employment Services Legislation, regulations and guidelines in place
Employment Services Act, regulations and guidelines in place (Private Employment Agencies and Career Guidance)
NEDLAC negotiations concluded. Bill tabled to Cabinet and is now in parliament
2. Increase Number of work seeker registered in different categories
450 000 reporting work-seekers registered on the system
A total of 427 349 work-seekers was registered on the system.
Table 1: Job-seekers Registered on the system
Prov.Target as at 31 Dec 2012
Actual Number Registered as at 31 Dec 2012 Variance
EC 44250 50248 5998FS 27375 30176 2801GP 61250 108645 47395KZN 71250 83086 11836LP 24000 43639 19639MP 27375 36463 9088NC 13875 12608 -275NW 24000 14548 -9452WC 44250 47936 3686NATIONAL 337625 427349 91266
20
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (PES)
OUTCOME 4: Improve the quality and accessibility of labour market services to contribute to decent employment through inclusive economic growthDoL Strategic Objective 1: Contribution to decent employment creationKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS
ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
3. Percentage of work-seekers registered on the system provided with career counselling and employability enhancement
60% of work-seekers registering on the system are profiled within 60 days of registration
94% (196 438 of 207 950 ) of work-seekers against a target of 60% of 450000 was profiled within 60 days of registration.
Table 2: Job-seekers Registered on the system assessed and profiled
Prov.Actual Registered
Target to have been Profiled by 31 Dec 2012
Actual Number Profiled % Profiled
EC 50248 22050 22508 102%FS 30176 20025 17994 90%GP 108645 51800 56584 109%KZN 83086 20025 27494 137%LP 43639 22050 19323 88%MP 36463 22050 18813 85%NC 12608 15975 5307 33%NW 14548 20025 9376 47%WC 47936 13950 19039 136%NATIONAL 427 349 207 950 196 438 94%
21
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (PES)
OUTCOME 4: Improve the quality and accessibility of labour market services to contribute to decent employment through inclusive economic growthDoL Strategic Objective 1: Contribution to decent employment creationKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS
ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
4. Increase number of work-seekers placed/referred to opportunities and other services
18 000 work-seekers placed; 72 000 work-seekers referred
A total of 10 429 (79% of the target) work-seekers was placed; and a total of 278 998 (517% of the target) was referred.
Table 3: Job-seekers placed/referred to opportunities
Prov.
Target to have been placed by 31 Dec 2012 Actual placed
Target to have been referred by 31 Dec 2012
Actual referred
EC 2145 1258 8580 25061FS 1065 512 4260 20700GP 2200 3227 10115 90547KZN 2010 1158 8040 74013LP 1470 597 5880 41543MP 1335 2021 5340 7742NC 660 561 3720 2378NW 930 595 2640 5865WC 1335 500 5340 11149NATIONAL 13 150 10 429 53 915 278 998
22
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (PES)
OUTCOME 4: Improve the quality and accessibility of labour market services to contribute to decent employment through inclusive economic growthDoL Strategic Objective 1: Contribution to decent employment creationKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS
ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
5. Increase number of employers registering vacancies on ESSA per annum
Increase from 2000 to 3000 companies register vacancies on ESSA by end of March 2013
1 924 companies registered vacancies on ESSA
Table 4: Employers registering vacancies on ESSA
Prov.
Expected target to register as at 31 Dec 2012 Actual Registered Variance
EC 67 112 23FS 60 138 46GP 143 551 276KZN 120 170 34LP 82 251 -3MP 75 196 63NC 38 117 1NW 53 130 11WC 113 259 56NATIONAL 751 1 924 507
23
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (LP & IR)
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 2: Promote Equity in the Labour MarketKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS
ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
1. BCEA amended NEDLAC engagement finalized on the EEA Amendments by November 2012
NEDLAC engagements on EE Amendment Bill finalized in July 2012. Bill approved by Cabinet in September 2012 for tabling in Parliament.
2. Code of Good Practice and Technical Assistanceguidelines on HIV and AIDS reviewed and Amended andamended
HIV and AIDS Code and technical assistance guidelines amended by June 2012
• HIV & Code gazetted on 15 June 2012• HIV TAG amendments signed off on 27
June 2012 by CEE.
14 EE awareness workshops conducted in all provinces to publicise the HIV & AIDS Code & TAGs and promote 2012 EE Online reporting.
3. Income Differentials assessed to determine race and gender disparities in Salaries
30 Income Differentials assessed to determine race and gender disparities in salaries by March 2013
14 Income differentials assessed and DG Recommendations tabled with the CEOs of companies.
24
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (LP & IR)
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 3: Protecting Vulnerable WorkersKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS
ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
1. Review existing sectoral determinations
Publish an amended SD with minimum wages for one sector by June 2012.
• An amended Hospitality SD published in GG No 35460 on the 22/06/12.
• An amended Private Security SD published in GG No 35646 on the 31/08/12.
• An amended Taxi Sector SD published in GG No 35462 on the 22/6/12 and currently conducting information sessions on the research report.
• An amended Civil Engineering SD published in GG No 35658 on the 4/9/12.
25
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (LP & IR)
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 3: Protecting Vulnerable WorkersKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS
ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
2. Investigate new areas for setting sectoral determinations
Investigate possibility of sectoral determinations for 2 new sectors
Report on the investigation into the Private Security Medical Aid has been finalised and submitted to the ECC for its deliberations.
3. Civil society strengthened
10 civil society organisations involved in the world of work funded
FEDUSA, NACTU, South African Labour Bulletin, DITSELA were visited.
26
2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (LP & IR)
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 6: Promoting Sound Labour RelationsKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS
ANNUAL ANNUAL TARGETSTARGETS
PROGRESSPROGRESS
1. Extend collective agreements within 60 days
Extend collective agreements within 60 days
Extensions of 9 Bargaining Council agreements to non-parties promulgated. Average turnaround time was 62 days
2. Register new labour organisations within 90 days
Decision to register new labour organizations taken within 90 days of receipt of competent applications
29 applications dealt with: • 5 approved • 24 refusedAverage turnaround time was 83 days
3 . CHALLENGES FOR NONE ACHIEVEMENT OF SOME INDICATORS
27
KEY STRATEGIC OBJECTIVE
AREA OF CONCERN REASON FOR MAJOR VARIANCE
CORRECTIVE ACTION
Contribute to employment creation
Work-seekers placed Low skills level of registered work-seekers and insufficient opportunities
Explore alternative schemes and aggressive marketing
Existing PEAs registered No legislative enforcement mechanisms
ES Bill has enforcement provision and penalties
Learners with disabilities recruited for training to the SEF Centre of Excellence pilot project
Insufficient funding and institution not accredited
Review the programme
Jobs saved Delays in UIF funding transfer
Conclude an agreement with UIF Board
Promote equity in the Labour Market
NEDLAC engagement finalized on the EEA Amendments by November 2012
Delays in finalisation of Nedlac engagements on the EE Amendment Bill
FINANCES
28
4 . BRIEF SUMMARY OF THE DEPARTMENT’S EXPENDITURE FOR 2012/13
29
• As at 31 January 2013, the Department had defrayed expenditure to the value of R1, 772 billion against its adjusted budget of R2, 139 billion.
• This represents an expenditure level of 82.8 % against a time expiration of 83%.
30
VOTE 17: LABOUR
PROGRAMME ADJUSTED ACTUALBUDGET EXPENDITURE REMAINING
2012/2013 31-Jan-13 BUDGETR'000 R'000
Administration 764 585 556 273 208 312 73% 27%Inspection & Enforcement Services 400 376 328 341 72 035 82% 18%Public Employment Services 334 331 286 973 47 358 86% 14%Labour Policy & Industrial Relations 640 274 600 004 40 270 94% 6%
TOTAL 2 139 566 1 771 591 367 975 83% 17%
EXPENDITURE AS A %
REMAINING BUDGET AS
%
-
100 000
200 000
300 000
400 000
500 000
600 000
700 000
800 000
900 000
ADJUSTED
ACTUALEXPENDITURE
EXPENDITURE PER MAIN DIVISION OF THE VOTE
31
VOTE 17: LABOUR
ADJUSTED ACTUALECONOMIC CLASSIFICATION BUDGET EXPENDITURE REMAINING
2012/2013 31-Jan-13 BUDGETR'000 R'000
Current Payments 1 446 710 1 035 080 411 630 72% 28% Compensation of Employees 847 541 685 864 161 677 81% 19% Goods and Services 599 143 349 196 249 947 58% 42% Interest and rent on land 26 20 6 77% 23% Financial transactions in assets and liabilities - - - 0% 0% Unauthorised Expenditure - - - 0% 0%Transfers and subsidies to: 656 369 650 313 6 056 99% 1% Provinces and municipalities 88 163 (75) 185% -85% Departmental agencies and accounts 554 053 549 162 4 891 99% 1% Universities and Technikons - - - 0% 0% Foreign governments & international organisations 12 722 13 692 (970) 0% 0% Public corporations & private enterprises - - - 0% 0% Non-profit institutions 88 711 85 313 3 398 0% 0% Households 795 1 983 (1 188) 249% -149%Payments for capital assets 36 487 86 198 (49 711) 236% -136% Buildings & other fixed structures 3 416 6 470 (3 054) 189% -89% Machinery and equipment 33 071 79 728 (46 657) 241% -141% Cultivated assets - - - 0% 0% Software and other intangible assets - - - 0% 0% land and subsoil assets - - - 0% 0%
TOTAL 2 139 566 1 771 591 367 975 83% 17%
EXPENDITURE AS A %
REMAINING BUDGET AS
%
EXPENDITURE PER ECONOMIC CLASSIFICATION
5 . HOW THE EXPENDITURE HELPED THE DOL TO FULFILL ITS MANDATE
32
• As can be noted from the performance information preceding the financial information, financial resources have been utilised in line with the Department’s mandate.
• Through a process of close scrutiny and monitoring (IYM reports), the Department has ensured that financial resources have been directed towards the achievement of service delivery objectives.
• During the Adjustment Budget process, areas of under expenditure were identified and financial resources were redirected to those areas of critical need. (eg: R11 million redirected to the SEF to address the serious cash-flow situation impacting on the delivery of goods.)
2013/14 ANNUAL PERFORMANCE PLAN
Based on 2013-18 Strategic Plan
33
6 . KEY ASPECTS OF THE DOL STRATEGIC PLAN FOR 2013/14 APP TO MIDTERM - Administration
34
Strategic Objective Objective Statement
Baseline Performance Indicator
1 Organisational Strategic plan and Annual Performance Plan approved
To manage and facilitate the development of organisational Strategic plan and Annual Performance Plan as per prescripts and guidelines
1 Strategic plan and 1 Annual Performance Plan
1.1 Strategic Plan and Annual Performance Plan approved and tabled as per prescribed timeframes
2 Organisational performance monitored and evaluated against the approved Strategic Plan and Annual Performance Plan
To manage and facilitate the development of organisational performance information reports
1 Annual report and 4 organisational performance information reports
2.1 Number of performance information reports approved within 60 days after quarter end/year end
6 . KEY ASPECTS OF THE DOL STRATEGIC PLAN FOR 2013/14 APP TO MIDTERM - Administration
35
Strategic Objective Objective Statement
Baseline Performance Indicator
3 Service Delivery Improvement Plan approved as per prescribed timeframes
To manage and facilitate the development of Service Delivery Improvement Plan
1 Service Delivery Improvement Plan
3.1 Submit reviewed and approved Service Delivery Improvement Plan to Department of Public Service and Administration (DPSA) as per prescribed timeframes
4 Annual audit plan, including ad hoc investigations executed
Conduct a risk-based internal audit and timely reporting
88% (33 planned vs. 29 actuals) of final reports were issued as per timeframes indicated in the approved annual audit plan
4.1 Percentage of final reports issued as per timeframes indicated in the approved annual audit plan
6 . KEY ASPECTS OF THE DOL STRATEGIC PLAN FOR 2013/14 APP TO MIDTERM – Inspections and
Enforcement Services
36
Strategic Objective
Objective Statement
Baseline Performance Indicator
1.
Ensure promotion of Employment Equity in the labour market
Ensure transformation of the labour market by inspecting workplaces (JSE listed and designated employers) in order to achieve compliance with Employment Equity legislation
65 JSE workplaces inspected
218 Designated workplaces inspected
9 940 Procedural inspections conducted
1.1 Number of (a) Public Companies and (b) Private Companies reviewed for compliance with employment equity legislation per annum
New Indicator Percentage of non-compliant workplaces of those inspected dealt with in terms of the enforcement regime link to the EEA
6 . KEY ASPECTS OF THE DOL STRATEGIC PLAN FOR 2013/14 APP TO MIDTERM – Inspections and
Enforcement Services
37
Strategic Objective
Objective Statement Baseline Performance Indicator
2.
Reduction in worker vulnerability through improved compliance and enforcement
Ensure Decent Work principles are adhered to by reducing worker vulnerability through improved compliance and enforcement
172 300 workplaces inspected
2.1 Number of workplaces inspected per year to determine compliance levels
123 81 non-complying workplaces of those inspected were dealt with
2.2 Percentage of non-complying workplaces inspected dealt with in terms of the relevant labour legislation per year
4 seminars 2.3 Number of
advocacy and educational seminars conducted in identified sectors to enhance compliance with labour legislation per year
6 . KEY ASPECTS OF THE DOL STRATEGIC PLAN FOR 2013/14 APP TO MIDTERM – Public Employment
Services
38
Strategic Objective
Objective Statement
Baseline Performance Indicator
1.
Employment Services legislation, related regulations and guidelines in place
Develop and implement Employment Services Legislation, regulations & guidelines
New indicator 1.1. Percentage of work completed on the Employment Services Bill and its regulations and guidelines
2. PES initiatives and interventions communicated through various media channels
Communicate PES initiatives and interventions through various channels
4 National exhibitions on PES and 99 Provincial Advocacy campaigns were held
2.1. Number of PES Advocacy campaigns conducted
3. Work-seekers registered on the system
Register work seekers on ESSA for opportunities
553 883 work seekers registered on ESSA
3.1. Number of work-seekers registered on ESSA system per year
6 . KEY ASPECTS OF THE DOL STRATEGIC PLAN FOR 2013/14 APP TO MIDTERM – Public Employment
Services
39
Strategic Objective
Objective Statement
Baseline Performance Indicator
4.
Registered Work-seekers provided with employment counselling , placement or referral, to registered opportunities & other services
Provide career counselling and employability enhancement to work seekers
222 956 work seekers were provided with career information and counselling
4.1 Percentage of work-seekers registered provided with employment counselling
Place and refer work seekers to opportunities
96 505 placed and referred
4.2 Number of work-seekers placed in registered employment opportunities4.3 Number of work-seekers referred to registered opportunities4.4 Number of work-seekers referred to other services
6 . KEY ASPECTS OF THE DOL STRATEGIC PLAN FOR 2013/14 APP TO MIDTERM – Labour Policy and
Industrial Relations
40
Strategic Objective Objective Statement
Baseline Performance Indicator
1.
Employment Equity in the labour market ensured
Establish legislative framework to promote employment equity
Employment
Equity Act,
1998
1.1 Employment Equity Act (EEA) regulations amended in line with the amended Act.
New Indicator 1.2 Annual Employment Equity Report published and launched
58 of Income
Differentials
assessed
1.3 Number of Income Differentials assessed to determine race and gender disparities in salaries per year.
6 . KEY ASPECTS OF THE DOL STRATEGIC PLAN FOR 2013/14 APP TO MIDTERM – Labour Policy and
Industrial Relations
41
Strategic Objective
Objective Statement
Baseline Performance Indicator
2.
Basic Conditions of Employment in the labour market ensured
Establish the legislative framework to establish basic conditions of employment
Bill consulted and submitted to Parliament
2.1 BCEA regulations finalised in line with the amended Act by end of September.
1 Child labour programme every 5 years
2.2 One Child Labour Program of Action implemented
3
Sectoral determinations published for residual and emerging vulnerable workers
Review existing sectoral determinations
6 Sectoral determinations
3.1 Number of existing Sectoral Determinations reviewed
Investigate possibility of setting a Welfare sectoral determination
3.2 Number of new emerging sectors Investigated for sectoral determination
4 Civil society organisations that protect vulnerable workers funded
Monitor Civil Society Organisations functions
10 civil society organisations funded
4.1 Number of Civil society organizations involved in the world of work funded and monitored per year
8 . SOME OF THE KEY CHALLENGES FACING THE DOL
42
8 . HOW THE DOL ADDRESSES CHALLENGES FACED
43
9 . THE DOL EXPECTATIONS OF THE SELECT COMMITTEE
44
Thank You…
45