Research Forest Dr at Grogans Mill Rd Intersection Improvement Alternatives

Upload: others

Post on 19-Oct-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentation Underpass Research Forest at Grogans Milldestinyhosted.com/montgdocs/2018/CCREG/20180925_1210/11879… · 25.09.2018  · Underpass – 4. Single intersection – 5

Research Forest Dr at Grogans Mill RdIntersection Improvement Alternatives

Page 2: Presentation Underpass Research Forest at Grogans Milldestinyhosted.com/montgdocs/2018/CCREG/20180925_1210/11879… · 25.09.2018  · Underpass – 4. Single intersection – 5

Level of Service (LOS)

• Level of Service Criteria

Acceptable

Optimal

Not Acceptable

Level of

Service

Delay

(sec)Description

A <10sec Free-flow traffic

B 10-20sec Reasonable free-flow

C 20-35sec Stable flow

D 35-55sec Approaching unstable flow

E 55-85 sec Unstable flow

F >85 sec Highly congested traffic conditions

Page 3: Presentation Underpass Research Forest at Grogans Milldestinyhosted.com/montgdocs/2018/CCREG/20180925_1210/11879… · 25.09.2018  · Underpass – 4. Single intersection – 5

Existing Conditions

Existing (2018): The existing lane geometry with

• Level of Service AM/PM Peak

Level of

service

D/B

Level of

service

B/D

Level of

service

C/B

Level of

service

D/F

Level of

service

C/D

Level of

service

C/D

Page 4: Presentation Underpass Research Forest at Grogans Milldestinyhosted.com/montgdocs/2018/CCREG/20180925_1210/11879… · 25.09.2018  · Underpass – 4. Single intersection – 5

Background

• Evaluation of existing roadway characteristics, including lane configuration and intersection geometry.

• Evaluation of existing and projected daily traffic, and peak-hour turning movement volumes.

• Evaluation included HGAC projections projected volumes highlight the need for improvement

Research Forest at Grogans Mill

Intersection Average Daily Traffic (ADT)

HGAC Projected Volumes

Year 2018 Year 2022 Year 2040

62,450 78,300 117,500

Lake Woodlands at Grogans Mill

Intersection Average Daily Traffic (ADT)

HGAC Projected Volumes

Year 2018 Year 2022 Year 2040

52,000 102,200 125,500

Page 5: Presentation Underpass Research Forest at Grogans Milldestinyhosted.com/montgdocs/2018/CCREG/20180925_1210/11879… · 25.09.2018  · Underpass – 4. Single intersection – 5

Alternatives

• Evaluation of the improvements through the intersections for seven alternatives:

– 1. No Build

– 2. At-grade widening

– 3. Underpass

– 4. Single intersection

– 5. Roundabouts (2 lane, 3 lane)

– 6. Grogans Mill Grade-separation and Direct connectors

– 7. Direct connectors

– 8. Single Point Urban Intersection (SPUI)

• Design Year 2022

Page 6: Presentation Underpass Research Forest at Grogans Milldestinyhosted.com/montgdocs/2018/CCREG/20180925_1210/11879… · 25.09.2018  · Underpass – 4. Single intersection – 5

No-Build

No-Build (2022): The existing lane geometry

• The Level of Service condition justifies the underpass at both locations

Level of

service

D/D

Level of

service

C/E

Level of

service

C/C

Level of

service

E/F

Level of

service

F/F

Level of

service

E/F

Page 7: Presentation Underpass Research Forest at Grogans Milldestinyhosted.com/montgdocs/2018/CCREG/20180925_1210/11879… · 25.09.2018  · Underpass – 4. Single intersection – 5

Alternatives

At-Grade Widening:

• Research Forest Dr and Grogans Mill Rd

• Lake Woodlands at Grogans Mill Rd

• Level of Service AM/PM Peak

• Design year 2022

Level of

service

D/B

Level of

service

B/D

Level of

service

D/F

Level of

service

C/C

Level of

service

C/E

Level of

service

C/E

* $2 Million Throw Away Cost for

future Underpass at both locations

Page 8: Presentation Underpass Research Forest at Grogans Milldestinyhosted.com/montgdocs/2018/CCREG/20180925_1210/11879… · 25.09.2018  · Underpass – 4. Single intersection – 5

Alternatives

Underpass: existing lanes at-grade, plus the underpass with 6 lanes

• Level of Service AM/PM peak

• Design year 2022

• Four intersection reconfigured to two intersections

Level of

service

B/B

Level of

service

B/B

Level of

service

A/A

Page 9: Presentation Underpass Research Forest at Grogans Milldestinyhosted.com/montgdocs/2018/CCREG/20180925_1210/11879… · 25.09.2018  · Underpass – 4. Single intersection – 5

Scenario

Intersection Approach

Level of Service PM Peak Cost

(Approx.)

NW NE SW SE

Existing

(2018)

Research Forest at Grogans Mill B D B F-

Lake Woodlands at Grogans Mill D D

No-Build

(2022)

Research Forest at Grogans Mill D E C F-

Lake Woodlands at Grogans Mill F F

At-grade

widening

(2022)

Research Forest at Grogans Mill B D C F $4 million

Lake Woodlands at Grogans Mill E E $4 million

Underpass (2022)

Recommended

Intersection B B$24 million

Underpass Lanes A A

Single Intersection (2022) F $5 million

2-Lane Roundabout (2022) F F F F $4 million

3-Lane Roundabout (2022) F C F F $4 million

Overpass with Direct Connectors (2022) A D C D $40 million

Direct Connectors (2022) B E C C $30 million

SPUI (2022) B A $50 million

Level-of-Service and Cost Comparison

Page 10: Presentation Underpass Research Forest at Grogans Milldestinyhosted.com/montgdocs/2018/CCREG/20180925_1210/11879… · 25.09.2018  · Underpass – 4. Single intersection – 5

Recommended Underpass Alternative

Page 11: Presentation Underpass Research Forest at Grogans Milldestinyhosted.com/montgdocs/2018/CCREG/20180925_1210/11879… · 25.09.2018  · Underpass – 4. Single intersection – 5

Underpass Benefit/Cost Analysis

Delay

Benefit Safety Benefit

Emissions

Benefit

Construction

CostBenefit/Cost

6.0 28.2 0.07 24.06 1.42

Multimodal Level of Service

No-Build LOS Build LOS

Bicycle E/F* E/E*

Pedestrian E C

Bus C/F* C/C*

* Operational LOS

Page 12: Presentation Underpass Research Forest at Grogans Milldestinyhosted.com/montgdocs/2018/CCREG/20180925_1210/11879… · 25.09.2018  · Underpass – 4. Single intersection – 5

Underpass Cost Estimate ($ Million)

Cost Items Total Federal Local Match

Construction Cost $17.56 $14.04 $3.52

Utility Relocation Cost $0.87 - $0.87

TxDOT Fee $2.40 $ 1.83 $0.57

Design Fee $1.84 - $1.84

Inflation Cost (3 years) $1.39 $0.97 $0.42

Total Cost $24.06 $16.84 $7.22

Page 13: Presentation Underpass Research Forest at Grogans Milldestinyhosted.com/montgdocs/2018/CCREG/20180925_1210/11879… · 25.09.2018  · Underpass – 4. Single intersection – 5

Regional Connectivity

• IH 45 at Research Forest/TaminaRoad

• Tamina Road Widening

• David Memorial Extension

Page 14: Presentation Underpass Research Forest at Grogans Milldestinyhosted.com/montgdocs/2018/CCREG/20180925_1210/11879… · 25.09.2018  · Underpass – 4. Single intersection – 5

Regional Connectivity

Page 15: Presentation Underpass Research Forest at Grogans Milldestinyhosted.com/montgdocs/2018/CCREG/20180925_1210/11879… · 25.09.2018  · Underpass – 4. Single intersection – 5

Support Letters and Resolutions

1. WRUD- HGAC Resolution

2. Montgomery County Precinct 3 Letter

3. City of Shenandoah Resolution

4. Woodlands Area Chamber of Commerce Resolution