presentazione standard di powerpoint - port of · pdf filefsru “toscana” offshore...

Download Presentazione standard di PowerPoint - Port of · PDF fileFSRU “TOSCANA” OFFSHORE FLOATING TERMINAL THE FLOATING TERMINAL The Toscana offshore re-gasification plant comprises an

If you can't read please download the document

Upload: buituyen

Post on 06-Feb-2018

219 views

Category:

Documents


3 download

TRANSCRIPT

  • Consortium:

    GREENCRANESGREEN Technologies and Eco-Efficient Alternatives forCRANES and Operations at Port Container Terminals

    AN OPPORTUNITY FOR STRENGTHENING A

    NEW STRATEGIC APPROACH FOR DEVELOPING

    THE LNG CHAIN IN THE PORT OF LIVORNO

    Francesco Papucci, Livorno Port Authority

    GREENCRANES Coordinator

    Brussels, 15th May 2014

  • Page 2GREENCRANES Final Info Day, Livorno Port Authority presentation

    STATE OF THE ART

    Recognition of:

    Available LNG Infrastructures

    LNG Regulations (Local, National, European, Global)

    LNG TECHNICAL ASSESSMENT

    LNG Bunkering / Refueling facility

    Alternatives assessment

    Best solutions

    STRATEGIC LNG PROJECT

    Stakeholders identification

    Requirements analysis

    Viability analysis

    General LNG project outlining

    THE GREENCRANES PROJECT IN THE PORT OF LIVORNO

    AND MORE

  • Page 3GREENCRANES Final Info Day, Livorno Port Authority presentation

    MARPOL ANNEX VI0.50% (max sulphur % by mass in the Med.)

    FROM: 01.01.2025

    Alt. Fuels InfrastructureDirective (COM 2013/18)LNG refuelling from eachTEN-T Core Network Port

    FROM: ???

    LIVORNO PORT MASTER PLAN

    & Extended Green Port

    FROM: now

    LAWS AND REGULATIONS

    OLT OFFSHORE FACILITY

    FROM: 2014

    LNG RELATEDPROJECTSin progress

    INFRASTRUCTURES

    LNG

    COSTA project MASTER

    PLAN

    FROM: now

    SHIPS & VEHICLES LNG REFUELLING

    STATION

    NEXT STEP!!!

    GREENCRANES

    COSTA

    MONALISA 2.0

    SEATERMINAL ?

  • Page 4GREENCRANES Final Info Day, Livorno Port Authority presentation

    POSITIONING OF THEFSRU TOSCANA OFFSHORE

    FLOATING TERMINAL

    THE FLOATING TERMINAL

    The Toscana offshore re-

    gasification plant comprises

    an LNG carrier that has

    been suitably modified and

    is permanently anchored

    about 22 km offshore

    between Livorno and Pisa.

    The gas will be transferred onshore through a 36 km long pipeline, (29

    km at sea, 5 km in the floodway and 2 km on dry land). The gas

    pipeline will be completely buried at a minimum depth of 2 metres.

  • Page 5GREENCRANES Final Info Day, Livorno Port Authority presentation

    THE OLT TERMINAL AS A BUKERING STATION FOR THE NORTHERN TYRRHENIAN NEEDS?

    Olbia Civitavecchia

    125 km

    135 km

    320 km

    25 km

    50 km

    250 km

  • Page 6GREENCRANES Final Info Day, Livorno Port Authority presentation

    SHIPS

    RTGs

    REACH STACKERS

    TERMINAL TRACTORS

    BUNKERING / REFUELLING IS THE MAIN ISSUE

    LNG VEHICLESBUILDING INDUSTRY

    LNGDISTRIBUTION

    NETWORK

    THE NORTHERN EUROPES SECA EXPERIENCE AS A REFERENCE MODEL

    grows

    IF

    grows

    IF

    PORT AUTHORITIES CAN PLAY A ROLE FOR FOSTERING THE LNG CHAIN GROWTH

  • Page 7GREENCRANES Final Info Day, Livorno Port Authority presentation

    THE LNG PROJECT FOR THE PORT OF LIVORNOOBJECTIVE

    REQUIREMENTS

    BACKGROUND

    Supporting, through using European TEN-T cofinancing resources and public and private

    investments, the industrial development and the actual application of technological andinfrastructural solutions for the provision and the distribution of LNG in the port industry as

    alternative fuel for shipping, goods handling, terminal activities and road transport.

    Integration and upwards scalability of each initiative and project adopted: short term and/or less

    complex solutions must guarantee the possibility of their integration and usability also in the framework of long term or higher complexity solutions.

    GREENCRANES project: Consumption analysis of Port Container Terminals; Analysis of Eco-Efficient

    alternatives; Development of prototypes of dual fuel Diesel/LNG Reachstacker (Port of Livorno) and Termnal Tractors (Port of Valencia)

    SEATERMINALS project (TEN-T Annual Call 2013, Priority 2 Decarbonisation or reduction of

    environmental costs): Exploitation of the solutions developed in the previous project; Development of a Dual Fuel RTG; Adoption of a LNG Mobile Refueling Unit.

    Italian national level proposal under the Multi Annual C.E.F. call.

  • Page 8GREENCRANES Final Info Day, Livorno Port Authority presentation

    STEP 0 LNG Mobile Refueling Unit

    STEP 1 Set up of a LNG Onshore storage and first level distribution facility

    STEP 2 1st Upgrade of the Onshore Storage and Distribution facility

    STEP 3 2nd Upgrade of the Onshore Storage and Distribution facility

    STEP 4 LNG Bunkering Vessel

    THE LNG PROJECT FOR THE PORT OF LIVORNO

    AS PART OF THE WIDER NATIONAL LNG PROJECT

  • Page 9GREENCRANES Final Info Day, Livorno Port Authority presentation

    STEP 1 STEP 2 STEP 3 STEP 4

    SETUP OF A LNG STORAGE AND FIRST LEVEL DISTRIBUTION FACILITY

    Onshore, quayside modular storage facility Upgradable storage capacity upon growing needs LNG Refueling of the Mobile Refueling Unit (STEP 0) LNG distribution for heavy vehicles (reachstackers, tractors, trucks)

    Expected Users: Port Terminals and, through using the Mobile RefuelingUnit, logistics companies (port, freight villages and more) with part of their heavy vehicles fleet fueled with LNG.

  • Page 10GREENCRANES Final Info Day, Livorno Port Authority presentation

    STEP 1 STEP 2 STEP 3 STEP 4

    1st UPGRADE OF THE ONSHORE STORAGE AND DISTRIBUTION FACILITY

    Upgrading of the STEP 1 facility storage capacity foraddressing the needs of refueling LNG tugs and/or bunkervessels

    Expected Users:STEP 1 users + operators of tug and/or bunkering services withpart of their vessels fleet fueled with LNG.

    +

  • Page 11GREENCRANES Final Info Day, Livorno Port Authority presentation

    STEP 1 STEP 2 STEP 3 STEP 4

    2nd UPGRADE OF THE ONSHORE STORAGE AND DISTRIBUTION FACILITY

    Upgrading of the STEP 2 facility storage capacity foraddressing the refueling needs of LNG fueled ferries

    Expected Users:STEP 2 users + shipping companies operating regular ferryservices with part of their vessels fleet fueled with LNG.

    + +

  • Page 12GREENCRANES Final Info Day, Livorno Port Authority presentation

    STEP 1 STEP 2 STEP 3 STEP 4

    LNG BUNKERING VESSEL - Building of a new vessel or refitting of an existing one for :

    Ship-to-ship bunkering of LNG fueled ships

    Shuttle between the OLT regasification terminal and the onshorestorage facility (STEP 1-3) for LNG provisioning

    LNG transportation and distribution towards other destinations (i.e. other Northern Tyrrhenian ports, island, coastal industrial districts)

    Expected Users: STEP 3 users + shipping companies + other ports LNG storage facilities + coastal industrial districts.

    + + +

  • LIVORNO PORT AUTHORITY

    ACKNOWLEDGEMENTS

    Livorno Port Authoritys Development & Innovation Department

    The GREENCRANES Consortium

    The COSTA Project

    OLT Offshore LNG Toscana, www.oltoffshore.it

    SOFTEC srl, www.softec-impianti.it

    Francesco PAPUCCI

    Research, Innovation & Technologies

    Livorno Port Authority

    [email protected]