Yellowstone ACC Rebundle Project Presented at the ACC Users Group Annual Conference San Diego, CA – September 22 – 25, 2014 By: 1 GEA Heat Exchangers, Inc. National Steel Erection, Inc. Titan Fabricators, Inc.

Upload: dokhanh

Post on 13-Mar-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

Yellowstone ACC Rebundle ProjectPresented at the ACC Users Group Annual Conference

San Diego, CA – September 22 – 25, 2014

By:

1

GEA Heat Exchangers, Inc. 

National Steel Erection, Inc.

Titan Fabricators, Inc.

Page 2: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

2

YELLOWSTONE POWER PLANT AIR COOLED

CONDENSER

Owner: Yellowstone Energy Limited Partnership (YELP) & Billings Generation Inc.

Operator: Rosebud Operating Services, Inc.

Owner’s Engineer: Burns Engineering Services, Inc.

Original ACC OEM: Zurn Balcke-Durr

Page 3: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

Yellowstone Power Plant Air Cooled Condenser

Located in Billings, Montana,

70 MW (Gross) Cogeneration Plant, Petroleum Coke Fired,

Process Steam Supplied to the Exxon-Mobil Refinery,

Air Cooled Condenser, 10 Fan Cells with 26’ Diameter Fans,

3 Row Galvanized Steel Elliptical Fin Tube Heat Exchangers,

Commissioned in 1995.

3

Page 4: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

4

2011 YELP Presentation at the ACCUG Conference Noted:

• Frozen Tube Damage• Debris Trapped Behind Support Beams• Tube Holes at Tube/Header Connections• Severe Debris Build Up on Tube Fins• Debris consists of Cottonwood Tree Pollen,

Coke, Dust, and Flyash

Frozen Tube Damage

Page 5: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

5

2011 YELP Presentation at the ACCUG Conference Noted:

• Frozen Tube Damage• Debris Trapped Behind Support Beams• Tube Holes at Tube/Header Connections• Severe Debris Build Up on Tube Fins• Debris consists of Cottonwood Tree Pollen,

Coke, Dust, and Flyash

Corrosion Build-up Behind Support Beam

Page 6: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

6

2011 YELP Presentation at the ACCUG Conference Noted:

• Frozen Tube Damage• Debris Trapped Behind Support Beams• Tube Holes at Tube/Header Connections• Severe Debris Build Up on Tube Fins• Debris consists of Cottonwood Tree Pollen,

Coke, Dust, and Flyash

Tube Holes at Tube/Header Connections

Page 7: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

7

2011 YELP Presentation at the ACCUG Conference Noted:

• Frozen Tube Damage• Debris Trapped Behind Support Beams• Tube Holes at Tube/Header Connections• Severe Debris Build Up on Tube Fins• Debris consists of Cottonwood Tree Pollen,

Coke, Dust, and Flyash

Severe Debris Build Up on Tube Fins

Page 8: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

8

YELP Rebundle Project Technical Requirements:

Single Row Finned Tube Heat Exchanger Design

New Design to be Compatible with Existing ACC Geometry & Equip

Operable with Proven Freeze Protection System to -30°F

Page 9: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

ALEX® Heat Exchanger Bundles: Single Row, Carbon Steel, Aluminum Fin

PRESENTED AT THE AIR COOLED CONDENSER USERS GROUP ANNUAL CONFERENCE ‐ SAN DIEGO, CALIFORNIA ‐ SEPTEMBER 22‐25, 2014 9

• Manufactured Exclusively in GEA Owned and Controlled Factories

• Lightweight Heat Exchanger with High Structural Rigidity

• Factory Vacuum Test Performed on Entire Bundle; not Individual Tubes

• Straight-through Fins Offer Superior Cleanability(high pressure water spray)

Page 10: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

Freeze Protection Improvements:

PRESENTED AT THE AIR COOLED CONDENSER USERS GROUP ANNUAL CONFERENCE ‐ SAN DIEGO, CALIFORNIA ‐ SEPTEMBER 22‐25, 201410

• Single row tube design inherently more freeze resistant than multi-row tube designs.

• Prior to rebundle, no control logic was being utilized contributing to the widespread freeze damage.

• Control logic to prevent freezing of the ACC down to -30°F.

• This logic has proven successful in numerous ACC installations around the world including Canada, Alaska and Siberia.

Page 11: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

ALEX® Heat Exchanger Bundles Delivered And Preassembled Into Four Bundle Subassemblies.

PRESENTED AT THE AIR COOLED CONDENSER USERS GROUP ANNUAL CONFERENCE ‐ SAN DIEGO, CALIFORNIA ‐ SEPTEMBER 22‐25, 2014 11

Page 12: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

12

ALEX® Finned Tube Heat Exchanger Bundles were

preassembled and stored on a temporary frame, sized to the actual

ACC Dimensions.

Page 13: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

13

Pre-Outage activities were utilized where possible to reduce outage duration.

Page 14: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

14

First Steam Riser Duct Elbow being removed.

Page 15: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

15

Existing Finned Tube Heat Exchanger bundles being removed.

Page 16: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

16

The existing Fan Deck was modified and new slide bars were installed. New cell partition walls were installed to accommodate the

revised bundle pitch angle.

Page 17: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

17

The new ALEX® Fin Tubed Heat Exchanger Bundles installed.

Page 18: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

18

Air Removal Pipe headers welded to the Dephlegmator cells.

Page 19: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

19

New Steam Distribution Duct sections.

Page 20: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

20

Wind wall installation.

Page 21: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

21

The existing Steam Distribution Duct Elbow was reused with new

Expansion Joints.

Page 22: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

22

The newly rebundled YELP ACC awaiting the final piece of wind

wall metal siding.

Page 23: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

23

Rebundle Project Results

ZBD Original Pre Outage Rebundle Post OutageDesign Test 4/15/14 Guarantee/ Performance

Comparable* Test 9/15/14

Turbine Exhaust Steam Flow (Lbs/Hr) 463,700 480,570 523,677/481,800

Dry Bulb Temperature 83°F 52.5°F 83°F

Turbine Back Pressure (Inches HgA) 7.5 6.45 8.41/7.5

ACC Thermal Performance 100% 65% ** 100%/103.8%*** 109.3%****

* Comparable value selected at same ambient temperature and turbine backpressure. Under similar ambient conditions andbackpressure, the rebundled ACC has a calculated design improvement in steam flow of ~3.8%

** Not a Code Test, Estimated Performance based on Data from Plant Instrumentation and the ZBD Original Design Performance Curves

*** Rebundle Design Heat Load Capacity exceeds the Original OEM Design by 3.8 %

**** ACC performs 9.3% above the design, in terms of steam flow admittance

Page 24: Presented at the ACC Users Group Annual Conference …acc-usersgroup.org/wp-content/...Retubing...29-14.pdf · Presented at the ACC Users Group Annual Conference San Diego, ... ALEX®

24

Preassembly & Installation Duration - 3 months All Material Delivery and Installation on Schedule Effort Completed on Budget Zero Recordable Incidents New ALEX® Design Provides More Generating Capacity for Life of

the Plant ACC Performance Test Result: 109.3 % of Current Contract Guarantee