presented by gene cable, pe, fpe dave dagenais, bs, sashe, chfm, chsp friday, march 19, 2010

23
Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Upload: lee-harmon

Post on 20-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Presented byGene Cable, PE, FPE

Dave Dagenais, BS, SASHE, CHFM, CHSPFriday, March 19, 2010

Page 2: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

NFPA Process(Document Cycle)Proposal period

NFPA generates a Report On ProposalComment period

NFPA generates a Report on CommentsNotice of Intent to Make A Motion

NFPA publishes the NITMAMsAnnual meeting with Technical Session

Membership Votes

Page 3: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

NFPA 101 and NFPA 99 (cycle)Specific Opportunities to Influence Code 1. *Anyone can submit proposals 2. Proposal Closing Date was – 7/31/20093. Technical Committees met December, 2009(Report on Proposals posted – 6/25/2010)

4. *Anyone can submit comments 5. Comment Closing Date – 9/3/2010 6. Technical Committees meet late fall 2010(Report on Comments posted – 2/25/2011

7. Notice of Intent to Make A Motion8. NITMAM closing date – 4/8/2011(NITMAM posting date – 5/2/2011)

9. *NFPA Conference with Technical Session June 2011 10. Technical Committees vote on “Floor” Changes

Page 4: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Let’s Make Code!!1. We will review hot topics (pros & cons)2. You can vote on the forms (forms provided)3. We will tally votes and report on

website/Newsletter4. We will submit comments on behalf of NEHES5. We will present the outcomes of those comments

at the next Spring Seminar

We also highly recommend you submit comments independently if you are interested.

Page 5: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Proposed Changes to NFPA 101 Need your opinionProposal # 1: Door locking for security

reasons, “remote” control of locks be defined as from within the locked space.

Page 6: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Proposal # 2: Retroactive sprinkler protection required for all health care occupancies.

Proposed Changes to NFPA 101 Need your opinion

Page 7: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Proposal # 3 (same): For New, prohibit all openings between floors, except for full atrium with smoke removal systems.

Proposed Changes to NFPA 101 Need your opinion

Page 8: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Proposal # 3: For New, prohibit all openings between floors, except for full atrium with smoke removal systems.

Proposed Changes to NFPA 101 Need your opinion

Page 9: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Proposed Changes to NFPA 101 Need your opinion

Proposal # 4: This proposal would require that inpatient hospices shall be treated as nursing homes.

Page 10: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Major Changes to NFPA 99Scope

Establish criteria to minimize:The hazards of fire, Explosion, and

ElectricityBecomes a code

Not retroactive (however there are some requirements for existing)

Deletes laboratory requirementsDeletes Annexes B, D, & EDeletes Occupancy Chapters

Page 11: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Major Changes to NFPA 99 New Chapter 4 on Risk New Chapter 7: Information Technology

and Communication Systems New Chapter 8: Plumbing New Chapter 9: Heating New Chapter 13: Security New Chapter 15: Fire Protection unique

to Health Care Facilities

Page 12: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Proposed Changes to NFPA 99 Need your opinion

Proposal # 5: Change the term “Wet Location” to “Wet Procedure Location” throughout the document

Page 13: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Proposed Changes to NFPA 99 Need your opinion

Proposal # 6: Includes all operating rooms as wet procedure locations (unless risk assessment is done)

Page 14: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Proposed Changes to NFPA 99 Need your opinion

Proposal # 7: Permits isolated power or ground-faults in operating rooms

Page 15: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Proposed Changes to NFPA 99 Need your opinionProposal # 8: Overcurrent protection devices

must be accessible to authorized personnel only and not permitted in public access spaces

Page 16: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Proposed Changes to NFPA 99 Need your opinionProposal # 9: Increases number of

receptaclesGeneral Care – From 4 to 8Critical Care – From 6 to 14Operating Rooms – New requirement of 36

Page 17: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Proposed Changes to NFPA 99 Need your opinion

Proposal # 10: Monthly Generator Testing - 10 second transfer not required (Annual Confirmation)

Page 18: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Proposed Changes to NFPA 99 Need your opinionProposal # 11: In existing facilities with

no separate grounding conductor – annual test requirement

Page 19: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Proposed Changes to NFPA 99 Need your opinion

Proposal # 12: Add testing and inspection requirements on existing non-stationary medical booms

Page 20: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Proposed Changes to NFPA 99 Need your opinionProposal # 13: Permit the use of medical air

for non-patient purposes (scope cleaning, decontamination, laser plume, etc.)

Page 21: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Proposal # 14: For New, Fire alarm system notification signals must identify zone in alarm

Proposed Changes to NFPA 99 Need your opinion

Page 22: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Proposal # 15: For New, exempt sprinklers in < 24 sq ft patient room built in closets

Proposed Changes to NFPA 99 Need your opinion

Page 23: Presented by Gene Cable, PE, FPE Dave Dagenais, BS, SASHE, CHFM, CHSP Friday, March 19, 2010

Dave Dagenais, BS, SASHE, CHFM, CHSP(603) 740-2474

[email protected]

Eugene A. Cable, P.E., FPE(518) 794-7237

[email protected]