Presented by: Terence Parker

Presenting to: ParEquity

April 2016

Page 2: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua

Construction Industry Under Scrutiny

• Kolkata Overpass collapse (India)

• TB Joshua Church collapse (Nigeria)

• SA incidents

– M1 Grayston Drive structure collapse (M&R)

– Tongaat Mall

– Christiaan Barnard Hospital fatality

Page 3: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua

Kolkata Overpass Collapse 31 March 2016: 27 dead, >80 injured

Page 4: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua

SCOAN Guesthouse, Lagos, Nigeria 12 Sep 2014: 115 dead

Page 5: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua

M1 Grayston Bridge Collapse 14 Oct 2015: 2 dead, 19 injured

Page 6: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua

Tongaat Mall Structure Collapse

Page 7: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua
Page 8: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua

Christiaan Barnard Hospital Construction 6 August 2015: 1 dead

Page 9: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua

Construction Regulations 2014

• Published on 7 February 2014 by Labour Minister Mildred Oliphant

• It is the duty of the client (a person for whom construction work is being performed) to perform a Baseline Risk Assessment

– Identify the major occupational health and safety risks, as well as establish priorities and a program for future risk control for a construction work project

• Health and safety requirements can therefore be clearly specified for the project (H&S Spec)

• Contractor Health & Safety Plans can be developed to incorporate all high risks identified for project activities

Page 10: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua

Duties of Client (S5(1))

a) Prepare a baseline risk assessment for an intended construction work project

b) Prepare a suitable, sufficiently documented and coherent site specific health & safety specification for the intended construction work based on the baseline risk assessment contemplated in (a)

c) Provide the designer with the health & safety specification contemplated in paragraph (b)

d) Ensure that the designer takes the prepared health & safety specification into consideration during the design stage

e) Ensure that the designer carries out all responsibilities contemplated in regulation 6

f) Include the health & safety specification in the tender documents

g) Ensure that potential principal contractors submitting tenders have made adequate provision for the cost of health & safety measures

l) Discuss & negotiate with the Principal Contractor the contents of the Principal Contractor’s health & safety plan (7(1)), & must thereafter finally approve that plan for implementation

Page 11: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua

Duties of Client (S5(2))

Where a client requires additional work to be performed as a result of a design change or an error in construction due to the actions of the clients, the client must ensure that sufficient safety information and appropriate additional resources are available to execute the required work safely

Page 12: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua

Duties of Designer (S6(1))

a) Ensure that the applicable safety standards incorporated into these Regulations under section 44 of the Act are complied with in the design

b) Take into consideration the health & safety specification submitted by the client

c) Before the contract is put out to tender, make available in a report to the client –

i. All relevant health & safety information about the design of the relevant structure that may affect the pricing of the construction work

ii. The geotechnical-science aspects, where appropriate; and

iii. The loading that the structure is designed to withstand

d) Inform the client in writing of any known or anticipated dangers or hazards relating to the construction work, and make available all relevant information required for the safe execution of the work upon being designed or when the design is subsequently altered

Page 13: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua

Duties of Designer (S6(1)) (contd)

e) Refrain from including anything in the design of the structure necessitating the use of dangerous procedures or materials hazardous to the health & safety of persons, which can be avoided by modifying the design or by substituting materials

f) Take into account the hazards relating to any subsequent maintenance of the relevant structure and must make provision in the design for that work to be performed to minimise the risk

Page 14: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua

Duties of Principal Contractor S7(1)

a) Provide & demonstrate to the client a suitable, sufficiently documented and coherent site specific health & safety plan, based on the client’s documented health & safety specifications contemplated in regulation 5(1)(b), which plan must be applied from the date of commencement of and for the duration of the construction work and which must be reviewed and updated by the principal contractor as work progresses

b) Open & keep on site a health & safety file, which must include all documentation required in terms of the Act & these Regulations, which must be made available on request to an inspector, the client, the client’s agent or a contractor

Page 15: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua

Risk Management Processes

Page 16: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua

TLP RMC Qualifications • TLP Risk Management Consulting (RMC) was started in 2007 after Terence

Parker identified an opportunity to provide a unique service to “create value by managing risk”

• Terence Parker is a graduate chemical engineer (UCT 1987) who carried out different roles in the petrochemical industry over 20 years

• He is a Visiting Lecturer at Wits University (CSMI), certified in TapRooT ® Root Cause Analysis, AngloAmerican Operational Risk Management Process (ORMP) implementation, Global Minerals Industry Risk Management (G-MIRM) Process and Incident Command System (ICS)

• Terence Parker is a Specialist Member of the International Institute of Risk & Safety Management (SIIRSM) & a Professional Member of Institute of Operational Risk (IOR)

• TLP RMC provides risk management services to diverse clients by facilitating risk assessments, developing risk registers, investigating major incidents, risk assessment training & coaching in risk management leadership

• TLP RMC completed BASELINE RISK ASSESSMENTS for Platinum Process Plant (Concentrator), Underground Gold Mine, Open Cast Diamond Mine, Major Mining Construction Project

Page 17: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua

Construction Risk Management

• H&S Plan

• Safe Work Practices

• Compliance w/ OHaSA, Regulations,

• Inherently Safe Design

• Baseline RA

• H&S Spec

Client Designer

Contractor Regulators

Page 18: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua

TLP RMC OFFER

• Baseline Risk Assessment using Best Practice (ISO 31000)

– Scoping

– Process Map

– Baseline WRAC

– Prioritised Risk Management (PRISM) Tool

– H&S Specification

• Input to Safe Design & Contractor H&S Plan

Page 19: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua

Other TLP RMC Services

• Issue-based Risk Assessments (HAZOP, Bowtie Analysis, FMEA)

• Optimising Compliance & Critical Control Management

• Hazard Identification Risk Assessment & Control (HIRAC) Training & Skills Development

• Major Hazard Management Planning (incl Emergency Response Plans)

• Environmental Management Planning

• Incident Investigation (Root Cause Analysis)

• Risk Management Coaching & Mentoring

Page 20: Presented by: Terence Parker - TLPtlpconsulting.co.za/wp-content/uploads/2016/04/TLP-RMC... · Construction Industry Under Scrutiny •Kolkata Overpass collapse (India) •TB Joshua

TLP Risk Management Consulting

• Principal Consultant: Terence Parker

• Telephone (SA): 079 102 3316

• Tel (International): +27 79 102 3316

• Email:

[email protected]

[email protected]

• Web: www.tlpconsulting.co.za