Presented to:
By:
Date:
Federal AviationAdministration
OSWG
Mark Patterson, FAA, AFS-470
18 March 2015
Data Link Communications
AC 120-70C and A056 operational authorization update
Federal AviationAdministration
Overview
• U.S. domestic data comm program update
• AC 120-70C
• 8900.A056 Notice and A056 templates
• Upcoming work
2
Federal AviationAdministration
CY 14 16 18 20 22 24 26 28 30
Segment 1 Phase 1- Tower Service Departure Clearances (DCL)
Avionics
Services Strategy
DepartureClearance
Ground SystemFuture Air Navigation System (FANS)
FANS 1/A transitioning to ATN
Aeronautical Telecommunications Network (ATN)
IOC
IOC
IOC
Federal AviationAdministration
CY 14 16 18 20 22 24 26 28 30
Segment 1 Phase 1- Tower Service
Segment 1 Phase 2- En Route Services
Departure Clearances (DCL)
Avionics
Initial En Route Services
Initial En Route Services
Follow- On En Route ServicesFollow- On En Route Services
Transfer of CommunicationsInitial Check-InAltitudes / Altimeter SettingsGo Button / Airborne ReroutesPilot Initiated DownlinksController Initiated Routes (Limited)Direct-to-Fix (Limited)Crossing Restrictions (Limited)
Advisory Messages (Limited)Holding Instructions (Limited)Speed and Headings Beacon CodesStuck MicrophoneTailored Arrivals (Limited)
Services Strategy
TFM Data Comm
Data Comm RoutineCommunications
Reroutes
DepartureClearance
Ground SystemFuture Air Navigation System (FANS)
FANS 1/A over VDL-2 transitioning to ATN
Aeronautical Telecommunications Network (ATN)
Tailored Arrivals
Data Comm RoutineCommunications
Segment 2- Advanced Services
Full tailored arrivals, holding instructions, advisory messages4D TrajectoriesD-TAXI
IOC
IOC
IOC
Federal AviationAdministration
U.S. domestic CPDLC-DCL trials - overview
• Started in 2012 @ KMEM
• Two locations: – KMEM – 40-80 ops / day
– KEWR – 60 ops / day (~10% of all departures)
• Participants– Part 121: FEDEX, UPS, UAL
– Part 129: Operators: BAW, SAS (pending CAA approval)
• FANS 1/A (CPDLC) and not PDC (ACARS)– Initial and revised departure clearances
• Required equipage– FANS 1/A (CPDLC)
– VDL M0/A
• Continue until 1Q 2016
5
Federal AviationAdministration
CPDLC-DCL - waterfall schedule (as of 29 Jan 2015)
6
Site Name Site ID
ARTCC ID
IOC1 Site Name Site ID ARTCC ID
IOC Site Name Site ID
ARTCC ID
IOC Site Name Site ID
ARTCC ID
IOC
KS 1: Salt Lake City SLC ZLC 06/10/15 New Orleans MSY ZHU 01/25/16 Louisville SDF ZID 02/15/16 Newark EWR ZNY 02/15/16Boise (Non-DCL) BOI ZLC 06/10/15 Austin AUS ZHU 02/08/16 Indianapolis IND ZID 02/29/16 J F Kennedy JFK ZNY 02/29/16KS 2: Houston Intcl IAH ZHU 07/16/15 San Antonio SAT ZHU 02/22/16 Cincinnati CVG ZID 03/14/16 La Guardia LGA ZNY 03/14/16
KS 3: Houston Hbby HOU ZHU 08/13/15 Los Angeles LAX ZLA 03/14/16 Fort Columbus (Non-DCL)
CMH ZID 03/14/16 Teterboro TEB ZNY 03/28/16
NAP – NAP Intgr Compl NA ZLC/ZTL
09/18/15 Las Vegas LAS ZLA 03/28/16 Memphis MEM ZME 04/04/16 Westchester HPN ZNY 04/11/16IOA Compl 11/16/15 San Diego SAN ZLA 04/11/16 Nashville BNA ZME 04/18/16 Philadelphia PHL ZNY 04/25/16In-Service Decision 12/09/15 John Wayne SNA ZLA 04/25/16 Adams Field (Non-DCL) LIT ZME 04/18/16 Boston BOS ZBW 05/16/16
Bob Hope BUR ZLA 05/09/16 Denver DEN ZDV 05/09/16 Providence PVD ZBW 05/31/16Ontario ONT ZLA 05/23/16 Atlanta ATL ZTL 05/23/16 Bradley BDL ZBW 06/14/16San Francisco SFO ZOA 06/14/16 Charlotte CLT ZTL 06/07/16 Albany (Non-DCL) ALB ZBW 06/14/16Oakland OAK ZOA 06/28/16 Piedmont (Non-DCL) GSO ZTL 06/07/16 Detroit DTW ZOB 07/06/16
1 IOC Dates apply only to the DCL Sites. San Jose SJC ZOA 07/13/16 Jacksonville JAX ZJX 06/28/16 Cleveland CLE ZOB 07/20/16The Non-DCL sites do not have an IOC because Sacramento SMF ZOA 07/27/16 Orlando MCO ZJX 07/13/16 Pittsburgh PIT ZOB 08/03/16they will only be upgrading to a new CHI. Reno (Non-DCL) RNO ZOA 07/27/16 Miami MIA ZMA 08/03/16 Buffalo (Non-DCL) BUF ZOB 08/03/16
Phoenix PHX ZAB 08/17/16 Ft Lauderdale FLL ZMA 08/17/16 Balt/Wash BWI ZDC 08/24/16Albuquerque ABQ ZAB 08/31/16 Tampa TPA ZMA 08/31/16 Dulles IAD ZDC 09/08/16El Paso (Non-DCL) ELP ZAB 08/31/16 Palm Beach PBI ZMA 09/15/16 Reagan DCA ZDC 09/22/16Seattle SEA ZSE 09/22/16 Luis Munos Marin (Non-
DCL)SJU ZMA 09/15/16 Raleigh/Durham RDU ZDC 10/06/16
Portland (Non-DCL) PDX ZSE 09/22/16 St Louis STL ZKC 10/06/16 Andrews (Non-DCL) ADW ZDC 10/06/16Dallas Love DAL ZFW 10/13/16 Kansas City MCI ZKC 10/20/16 Chicago Midway MDW ZAU 10/27/16
Dallas FTW DFW ZFW 10/27/16 Tulsa (Non-DCL) TUL ZKC 10/27/16 Chicago O’Hare ORD ZAU 11/10/16Will Rogers (Non-DCL) OKC ZFW 10/27/16 Minn-St Paul MSP ZMP 11/10/16 General Mitchell (Non-
DCL)MKE ZAU 11/10/16
Honolulu (Non-DCL) HNL 11/03/16 Eppley Field (Non-DCL) OMA ZMP 11/10/16Anchorage (Non-DCL) ANC 11/10/16
Key Sites Group A Group B Group C
Federal AviationAdministration
Questions?
7
Federal AviationAdministration
AC 120-70C – current status
Feb ‘14 - briefed AC 120-70B & A056 template revision project
AFS-470 / DCIT / PARC CWG collaborated to produce a limited-scope revision:
– New format (ICAO) and editorial changes– Domestic CPDLC DCL and European Link 2000+ added– Updates event reporting to reflect GOLD – Minor changes to authorization process (roles & responsibilities)
Highlight - Part 91 operators will not be required to have operational authorization (A056) for U.S. CPDLC-DCL
8
DCIT – Data Comm Implementation TeamPARC CWG – Performance-based Aviation Rulemaking Committee Comm Working GroupGOLD – Global Operational Data Link DocumentCPDLC – Controller Pilot Data Link Communication
Federal AviationAdministration
AC 120-70C - current Status
Posted for public comment on March 17, 2015– 30-day comment period – Due April 16, 2015 (no time extensions)– Comments out-of-scope will be held for next revision
Parallel AFS formal coordination began– 30-day comment period– Comments out-of-scope will be held for next revision
After 30-day window– Immediately adjudicate comments– AFS-400 approves adjudication – To tech writers for publication
Review current version of draft AC 120-70C (if desired)
9
Federal AviationAdministration
Questions?
10
Federal AviationAdministration
A056 templates - current Status
Operational Authorization (OpSpec / Mspec / LOA) A056 & Notice•Entered into AFS formal coordination on March 17, 2015
Highlights•Deleted the requirement for aircraft to be equipped with an approved collision avoidance system that is on and operating •Part 91 - references related to data comm operation within the U.S. has been deleted. Operators will not need operational authorization for U.S. domestic CPDLC-DCL
Review Notice and draft templates
11
Federal AviationAdministration
Part 129
Part 129 will not require a separate A056– CAA approval / authorization will be annotated on A003
Review draft A003 template
12
Federal AviationAdministration
Take aways…
Do not wait for the revised AC before submitting data link authorization applications.
– Applications being submitted (or already in approval process) referencing AC 120-70B will still be processed
– Delaying applications will cause delays in receiving authorization (and inability to participate in DCL ops at IOC)
Operators with existing A056 – Prepare your training and crew procedure documentation now so you
can respond quickly when the Notice is published
13
Federal AviationAdministration
Next steps
AC 90-[datacomm] project
Includes:AC 120-70C incorporatedNew guidance
- PBCS- FANS / ATN B1 / B2 (as available)- Post-implementation monitoring- Compliance determination- Streamlined application process for Part 91
OpSpec / MSpec / LOA template updates Additional guidance / training material as necessary
14
Federal AviationAdministration
Questions?
15
Federal AviationAdministration
Back-up slides
16
Federal AviationAdministration
U.S. domestic DCL trials - specifics
• Uses a stand-alone DCL Trials Automation Platform System (DTAP).
• Processes participating operators initial / revised DCL aircraft clearances independent of the current FAA Terminal Data Link Services (TDLS) system.
• Interfaces with the Tower ARTCC Host ATM Data Distribution System (HADDS) interface to receive NAS flight data.
• The ATC Clearance Delivery position hosts a dedicated DTAP DCL display and user interface.
17
Federal AviationAdministration
U.S. domestic DCL trials - specifics
• Participating FANS1A / FANS1A+ equipped aircraft log into the DTAP via CPDLC.
• Once the link is established, the flight deck requests and receives its initial departure clearance and any revisions to that clearance using CPDLC.
18
Federal AviationAdministration
Operator timelines
19
3/1/2015 8/11/2015
4/1/2015 5/1/2015 6/1/2015 7/1/2015 8/1/2015
Operators with Existing A056 & DCL Trials Participant
3/1/2015 8/11/2015
4/1/2015 5/1/2015 6/1/2015 7/1/2015 8/1/2015
Operators without Existing A056
3/11/2015 - 5/10/2015Draft CPDLC DCL Bulletin (Training)
5/16/2015 - 6/15/2015Notice Approval Window (30d)
Submission of Updated A056 TemplateSubmission of CPDLC DCL Bulletin
5/16/2015 - 6/15/2015Notice Approval Window (30d)
Submission of Updated A056 TemplateSubmission of CPDLC DCL Bulletin
5/15/2015A056 Template Notice Issued
3/11/2015 - 4/14/2015Submit Initial Training Plan, Draft Bulletin, Etc.
4/20/2015 - 5/14/2015Update Existing Training Plan,
Draft Bulletin, Etc. 5/15/2015A056 Template Notice Issued
4/16/2015Initial A056 Application Submit
3/1/2015 8/11/2015
4/1/2015 5/1/2015 6/1/2015 7/1/2015 8/1/2015
International Operators
6/15/2015OpSpec Issued for CPDLC DCL
6/15/2015OpSpec Issued for CPDLC DCL
6/14/2015SLC "File and Fly"
6/14/2015SLC "File and Fly"
8/4/2015HOU "File and Fly"
8/4/2015HOU "File and Fly"
7/28/2015IAH "File and Fly"
7/28/2015IAH "File and Fly"
3/11/2015 - 8/9/2015Local CAA Approval + Coordination with US FAA POI (A003) [Ongoing]