SCOPE OF WORK

PRESERVATION FOR STATIC/VESSEL PRESERVATION FOR ROTATING/MACHINERY PRESERVATION FOR MOTOR

Page 4: Preservation for Machinery

PRESERVATION ACTIVITY PRESERVATION FOR STATIC

STATIC EQUIPMENTS WILL BE PRESERVED BY USING VAPOUR PHASE INHIBITORS (VPI) OR NITROGENT PRESSURE .

NITROGENT PRESERVATION SHALL BE APPLIED UNTIL COMPLETION OF PIPE CONNECTION.

Page 5: Preservation for Machinery

PRESERVATION ACTIVITY PRESERVATION FOR ROTATING

1. PUMP AND DRIVE SHAFTS SHALL BE HAND ROTATED ONCE A MONTH USING CORRECT TOOLS SUCH AS STREP WRENCH .

2. LUBE OIL SHALL BE CHANGED BEFORE MECHANICAL RUNNING TEST

3. GREASE SHALL BE ADDED AND DRAIN OUT DURING MECHANICAL RUNNING TEST

Page 6: Preservation for Machinery

PRESERVATION FOR MOTOR INSULATION RESISTANCE VALUES OF

EACH WINDING FOR ALL MOTORS SHALL BE MEASURED AND RECORD AT LEAST PRIOR TO INSTALLATION AND PRIOR TO SOLO RUN/MRT . THE MEASUREMENT SHALL BE RECORDED ONCE A MONTH.

MOTOR SHAFT SHALL BE HAND TURNING ONCE A MONTH

SPACE HEATER FOR MOTOR SHALL BE TURNED ON ALL THE TIME TO WARM THE MOTOR AND AVOID INCREASING HUMIDITY INSIDE THE TERMINAL BLOCK

Page 7: Preservation for Machinery

ORGANIZATION CHART

Page 8: Preservation for Machinery

SCHEDULE AND REPORT FOR PRESERVATION

SCHEDULE FOR PRESERVATION REPORT OF PRESERVATION

- REPORT OF PRESERVATION WILL SUBMITTED ONCE A MONTH