MINUTES OF THE REGULAR MONTHLY MEETING VIA ZOOMOF THE BOARD OF DIRECTORS
SEAL BEACH MUTUAL ONEJuly 23,2020
The Regular Monthly Meeting of the Board of Directors of Seal Beach Mutual One wascalled to order by President Gambol at 9:03 a.m. on Thursday, July 23, 2020, via Zoomteleconference from several remote locations due to COVID-19 virus restrictions.
ROLL CALL
Present: President Gambol, Vice President Cho, Secretary Brennan,Chief Financial Officer Potterton, Directors: Luther-Stark,Merritt, Tous, Stone, and Barreras(entered meeting at 9:06 a.m.)
GRF Representative:
Guests:
Staff:
GRF Representative Ms. St. Aubin and Ms. Perrotti
Two Mutual One Shareholders
Ms. Hopkins, Mutual Administration Director (left meeting at 9:32 a.m.)Mr. Stolarz, Building Inspector (entered meeting at 9:06 a.m.)Ms. Gamboa, Office SecretaryMs. Barua, Recording Secretary
SHAREHOLDER COMMENTS
One shareholder made a comment.
MINUTES
Following a discussion and upon a MOTION duly made by Secretary Brennan andseconded by Vice President Cho, it was
RESOLVED to approve Regular Meeting Minutes of June 25, 2020 aswritten.
The MOTION passed.
BUILDING INSPECTOR'S REPORT
Inspector Stolarz presented his report (attached).
Following a discussion and upon a MOTION duly made by President Gambol andseconded by Director Barreras, it was
RESOLVED to approve the costs associated with cleaning the overhangand porch ceilings of resident's units of dirt, soot, and perceived mildew.
The MOTION passed unanimously.
BOARD OF DIRECTORS
MUTUAL ONE July 23,2020
Following a discussion and upon a MOTION duly made by Secretary Brennan andseconded by Director Stone, it was
RESOLVED to delay authorizing work to begin with the Fire Avert contractuntil the COVID 19 pandemic abates and electrical service upgrades havebeen made.
The MOTION passed unanimously.
Following a discussion and upon a MOTION duly made by Director Barreras andseconded by Director Luther-Stark, it was
RESOLVED to approve dry rot bids from BA Construction for a labor costof $42.00 an hour, with a not to exceed of $40,000.00. Funds to come fromResen/es.
The MOTION passed with one "no" vote (Stone).
Following a discussion and upon a MOTION duly made by Director Luther-Stark andseconded by Director Barreras, it was
RESOLVED to approve 17 laundry room cork-boards at an estimated costfor material $25.00 each, labor $21.00 each by Service Maintenance. Fundsto come from Operating Service Funds at a total cost not to exceed $850.00.
The MOTION passed unanimously.
Following questions, Mr. Stolarz left the call at 9:55 a.m.
GRF^EPRESENTATIVES' REPORTS
GRF Representatives Perrotti and St. Aubin provided a verbal update.
UNFINISHED BUSINESS
Following a discussion and upon a MOTION duly made by Director Merritt and secondedby CFO Potterton, it was
RESOLVED to approve to amend Policy 7415.01- Patio, Porch and GolfPads on a preliminary basis until the 28-day posting period is completed.The policies will be ratified at the next scheduled meeting and if the Boardreceives no comments.
The MOTION passed unanimously.
BOARD OF DIRECTORS
MUTUAL ONE
NEW BUSINESS
July 23,2020
Following a discussion and upon a MOTION duly made by President Gambol andseconded by Vice President Cho, it was
RESOLVED to acknowledge, per the requirements of the CivilCode Section 5500(a)-(f), a review of the reconciliations of theoperating and reserve accounts, operating revenues andexpenses compared to the current year's budget, statementsprepared by the financial institutions where the mutual has itsoperating and reserve accounts, and income and expensestatement for the Mutual's operating and reserve accounts,the check registers, monthly general ledger and delinquentassessment receivable reports for the months of June 2020.
The MOTION passed with one "no" vote (Stone) and one "abstention" (Barreras).
Following a discussion and upon a MOTION duly made by Director Stone andseconded by Director Tous, it was
RESOLVED to require shareholders to pay "upfront" any costs associatedfor "upgrades" to replacement appliances in their units.
The MOTION passed unanimously.
Following a discussion and upon a MOTION duly made by President Gambol andseconded by CFO Potterton, it was
RESOLVED to approve the purchase of a coin/roller machine andsupplies to provide quarters to Mutual 1 residents.
The MOTION passed unanimously.
SECRETARY / CORRESPONDENCE
Secretary Brennan received no correspondence.
CHIEF FINANCIAL OFFICER'S REPORT
The Chief Financial Officer submitted her report (attached).
MUTUAL ADM!NISTRAT!ON DIRECTOR'S REPORT
Recording Secretary Barua gave a verbal update on Annual Elections on behalf of MutualAdministration Director Hopkins.
BOARD OF DIRECTORS
MUTUAL ONE
ANNOUNCEMENTS
July 23,2020
ANNUAL SHAREHOLDER MEETING: Monday, August 10, 2020 10:00 a.m.,Clubhouse 4
COMMITTEE REPORTS
Landscape CommitteeDirector Merritt gave a verbal report
DIRECTORS' COMMENTS
Several Directors made comments.
ADJOURNMENT
President Gambol adjourned the meeting at 10:45 a.m.
EXECUTIVE SESSION SUMMARY
The Board met in Executive Session on July 23, 2020, at 11:02 a.m., and took thefollowing actions:
The Board approved Special Executive Session minutes of June 1 1, 2020 as corrected.1. Legal Matters
a. 6 legal matters were discussed2. Contracts
a. No contracts were discussed.3. Assessments / Delinquencies
a. 15 Delinquent accounts were discussed.4. Disciplinary Hearings
a. 17 Disciplinary hearings were discussed
President Gambol adjourned the meeting at 12:05 p.m.
c ^i-.y.^.^-Attest, J ill Brewfan, SecretarySEAL BEACH MUTUAL ONEag 07/23/2020
MUTUAL : ( 1 ) ONE: (01) ONE
UNIT # DESCRIPTION OF WORKGRF/CITY
PERMIT
PERMIT
ISSUE
COMP.
DATE
CHANGE
ORDERRECENT INSPECTION
2-L WINDOWS B0TH 07/07/20 08/07/20 NO NONE CALIFORNIA DELUXE WINDOWS
4-H BEDROOM REMODEL BOTH 04/25/20 10/25/20 YES 05/27/20 FOOTING NATIONWIDE PAINTING
4-H BEDROOM REMODEL BOTH 04/25/20 10/25/20 YES 06/16/20 FRAMING NATIONWIDE PAINTING
4-H BEDROOM REMODEL BOTH 04/25/20 10/25/20 YES 06/16/20 WIRING NATIONWIDE PAINTING
4-H BEDROOM REMODEL BOTH 04/25/20 10/25/20 YES 06/16/20 TREAT LUMBER NATIONWIDE PAINTING
4-H BEDROOM REMODEL BOTH 04/25/20 10/25/20 YES 06/19/20 INSULATION NATIONWIDE PAINTING
4-H BEDROOM REMODEL BOTH 04/25/20 10/25/20 YES 06/29/20 LATH NATIONWIDE PAINTING
4-H BEDROOM REMODEL BOTH 04/25/20 10/25/20 YES 06/29/20 DRYWALL NATIONWIDE PAINTING
4-H BEDROOM REMODEL BOTH 04/25/20 10/25/20 YES 07/10/20 BROWN COAT NATIONWIDE PAINTING
5-G BLOCK WALL GRF 01/24/20 02/24/20 YES 06/22/20 FINAL MJ JURADO
6-C KITCHEN & BATH SKYLIGHTS BOTH 06/29/20 07/15/20 NO 07/08/20 FINAL OGAN CONSTRUCTION
6-L HEAT PUMP BOTH 05/20/20 06/20/20 NO 06/19/20 FINAL
8-K WINDOW / DOOR BOTH 05/04/20 07/31/20 NO 06/26/20 FINAL MP CONSTRUCTION
9-D SCREEN ROOM BOTH 07/01/20 08/25/20 NO NONE NATIONWIDE PAINTING
9-I ROOF ENCLOSURE BOTH 04/14/20 06/30/20 NO NONE BRUNO H. ALVAREZ CONTRACTOR
9-G CENTRAL AIR BOTH 07/08/20 10/08/20 NO NONE GREENWOOD
11-A SHOWER CUT DOWN BOTH 07/20/20 08/20/20 NO NONE NUKOTE
11-J RECESS LIGHTS BOTH 06/18/20 06/23/20 NO 06/29/20 FINAL OGAN CONSTRUCTION
17-D SHOWER CUT DOWN BOTH 07/06/20 08/06/20 NO NONE NU-KOTE
19-H WASH / DRYER / PANEL BOTH 07/01/20 07/24/20 NO 07/10/20 PLUMBING OGAN CONSTRUCTION
19-H WASH / DRYER / PANEL BOTH 07/01/20 07/24/20 NO 07/10/20 WIRING OGAN CONSTRUCTION
19-H WASH / DRYER / PANEL BOTH 07/01/20 07/24/20 NO 07/10/20 FRAMING OGAN CONSTRUCTION
19-H WASH / DRYER / PANEL BOTH 07/01/20 07/24/20 NO 07/10/20 INSULATION OGAN CONSTRUCTION
25-B HEAT PUMP BOTH 06/10/20 09/10/20 NO NONE GREENWOOD
ALPINE HEATING/AIR CONDITIONING
INSPECTOR MONTHLY MUTUAL REPORT
INSPECTOR : RICH STOLARZ
MUTUAL BOARD MEETING DATE:
PERMIT ACTIVITY
CONTRACTOR / COMMENTS
July 23, 2020
1 of 8
MUTUAL : ( 1 ) ONE: (01) ONE
INSPECTOR MONTHLY MUTUAL REPORT
INSPECTOR : RICH STOLARZ
MUTUAL BOARD MEETING DATE: July 23, 2020
25-E SHOWER REFINISH GRF 04/02/20 05/02/20 NO NONE NUKOTE
25-K WINDOW'S / DOOR BOTH 05/26/20 06/30/20 YES 06/17/20 FRAMING JOHN M. BERGKVIST
25-K WINDOW'S / DOOR BOTH 05/26/20 06/30/20 YES 06/17/20 WIRING JOHN M. BERGKVIST
25-K WINDOW'S / DOOR BOTH 05/26/20 06/30/20 YES 06/18/20 DRYWALL JOHN M. BERGKVIST
25-K WINDOW'S / DOOR BOTH 05/26/20 06/30/20 YES 06/18/20 LATH JOHN M. BERGKVIST
25-K FLOORING GRF 03/06/20 05/06/20 NO 07/13/20 FINAL BIXBY CARPET & FLOORING
28-K CABINETS / FLOORS BOTH 06/03/20 06/30/20 NO 07/13/20 FINAL
28-K PANEL/ COUNTER/ MICRO BOTH 07/01/20 07/15/20 NO 07/13/20 FINAL OGAN CONSTRUCTION
28-K HEAT PUMP BOTH 07/08/20 08/08/20 NO NONE HEATWAVE A/C
29-G TUBE/SHOWER REMODEL BOTH 06/08/20 07/08/20 NO 07/01/20 FINAL OGAN CONSTRUCTION
30-L FLOORING GRF 07/20/20 08/20/20 NO NONE KARY'S CARPET
31-E COUNTER TOPS / WASHER BOTH 05/26/20 07/31/20 NO 07/07/20 FINAL MP CONSTRUCTION
31-H HEAT PUMP BOTH 05/20/20 07/20/20 NO 07/08/20 FINAL HOT TECH CONTRACTOR
33-D STACKED STONE & GATE GRF 05/22/20 07/31/20 NO NONE LOS AL BUILDERS
34-A REMODEL BOTH 02/15/20 09/15/20 NO 07/13/20 DRYWALL NATIONWIDE PAINTING
34-A REMODEL BOTH 02/15/20 09/15/20 NO 07/07/20 INSULATION NATIONWIDE PAINTING
34-A REMODEL BOTH 02/15/20 09/15/20 NO 06/30/20 WIRING NATIONWIDE PAINTING
34-A REMODEL BOTH 02/15/20 09/15/20 NO 06/30/20 PLUMBING NATIONWIDE PAINTING
34-A REMODEL BOTH 02/15/20 09/15/20 NO 06/30/20 GROUND NATIONWIDE PAINTING
34-A REMODEL BOTH 02/15/20 09/15/20 NO 06/30/20 FRAMING NATIONWIDE PAINTING
34-E HEAT PUMP BOTH 07/20/20 10/20/20 NO NONE GREENWOOD
36-C FLOORING GRF 06/01/20 08/01/20 NO NONE NATIONWIDE PAINTING
38-J HEAT PUMP BOTH 05/05/20 08/05/20 NO 07/14/20 FINAL GREENWOOD
40-H COUNTER TOP BOTH 06/04/20 07/30/20 NO 07/07/20 FINAL MP CONSTRUCTION
41-I GCFI OUTLET BOTH 07/17/20 07/23/20 NO NONE OGAN CONSTRUCTION
42-J HEAT PUMP BOTH 05/21/20 06/21/20 NO NONE GREENWOOD
44-D FLOORING GRF 07/18/20 08/18/20 NO NONE KARY'S CARPET
46-D FLOORING GRF 07/15/20 08/15/20 NO NONE KARY'S CARPET
FLAMINGO CABINET DOOR CO.
2 of 8
MUTUAL : ( 1 ) ONE: (01) ONE
INSPECTOR MONTHLY MUTUAL REPORT
INSPECTOR : RICH STOLARZ
MUTUAL BOARD MEETING DATE: July 23, 2020
46-I SHOWER CUT DOWN BOTH 03/02/20 04/02/20 NO NONE NUKOTE
47-G GATE GRF 06/25/20 07/30/20 NO NONE IMAGINATION UNLIMITED
48-F CARPORT CABINET GRF 04/10/20 05/10/20 NO NONE J&J HANDYMAN
48-I SHOWER CUT DOWN BOTH 03/02/20 04/02/20 NO NONE NUKOTE
49-L FLOORING GRF 07/05/20 08/05/20 NO NONE KARY'S CARPETS
55-I DECO BLOCK / GATE GRF 05/05/20 05/20/20 NO 07/15/20 FINAL OGAN CONSTRUCTION
56-I KITCHEN BACKSPLASH GRF 11/15/19 12/28/19 YES 06/19/20 FINAL M&M CONSTRUCTION
61-E WINDOW'S / DOOR BOTH 04/01/20 05/29/20 NO 07/15/20 FINAL JOHN M. BERGKVIST
63-L SKYLIGHT DOME BOTH 06/30/20 07/30/20 NO NONE M&M CONSTRUCTION
UNIT # NMI PLI NBO FI FCOEI ROF
5-F 02/27/20
7-D 06/03/20 07/07/20 07/07/20 07/21/20
8-A 05/01/20
11-D 06/02/20
13-L 12/18/19 06/10/20 06/12/20 06/26/20 06/30/20
14-I 04/15/20
16-A 02/25/20
16-W 04/03/20
19-D 02/25/19
19-H 03/30/20 06/05/20 06/12/20 06/26/20 07/15/20
21-A 02/21/20
21-F 06/11/20 06/16/20 06/30/20 07/08/20
ESCROW ACTIVITY
DOCUMENTS/COMMENTS
3 of 8
MUTUAL : ( 1 ) ONE: (01) ONE
INSPECTOR MONTHLY MUTUAL REPORT
INSPECTOR : RICH STOLARZ
MUTUAL BOARD MEETING DATE: July 23, 2020
21-H 06/26/20 07/14/20 07/14/20 07/28/20
22-H 03/31/20 06/29/20 07/09/20 07/23/20
23-H 01/22/20
23-K 03/23/20
25-L 03/23/20
28-H 06/26/20
32-K 07/22/19
36-H 04/23/19
37-L 05/06/19
40-B 11/22/19
42-B 05/13/20 06/17/20 06/22/20 07/06/20
44-I 03/31/20
47-D 10/03/19
49-L 12/09/20
54-A 06/15/20
61-J 07/10/20
62-A 10/04/19
65-C 03/25/19
66-L 07/09/20
69-B 07/10/20
70-E 03/30/20
70-F 02/27/20 05/22/20 05/22/20 06/05/20 07/10/20
NMI = New Member Inspection PLI = Pre-Listing Inspection NBO = New Buyer Orientation
FI = Final Inspection FCOEI = Final COE Inspection ROF = Release of Funds
CONTRACTS AND PROJECTS
4 of 8
MUTUAL : ( 1 ) ONE: (01) ONE
INSPECTOR MONTHLY MUTUAL REPORT
INSPECTOR : RICH STOLARZ
MUTUAL BOARD MEETING DATE: July 23, 2020
23-K - VIDEO NBO PREP
23-K - VIDEO NBO PREP
61-E - WINDOW AND DOOR - SIGNED OFF
55-I - DECO BLOCK AND GATE - SIGNED OFF
DISCUSS & VOTE TO APPROVE - MUTUAL DRY ROT BIDS
EMPIRE PIPE CLEANING 11/30/2022 SEWER CLEANING
83
MUTUAL & SHAREHOLDER REQUEST
A-1 TOTAL SERVICE PLUMBING SEWER PIPE RELINING
SOUTHERN PROPERTY FIRE PROTECTION - FIRE EXTINGUISHER CERTIFICATION GOOD THROUGH 12/20/2020
WASHERS & DRYERS
INNOVATIVE CLEANING SERVICES
J&J LANDSCAPING GOOD THROUGH 11/30/2021
FENN GOOD THROUGH 5/31/2022
BRIGHTVIEW GOOD THROUGH 11/30/2021 TREE ARBORIST
LANDSCAPING
WASH GOOD THROUGH 11/21/2022
TERMITES, PEST AND GOPHERS
LAUNDRY ROOM TWICE A MONTH
CONTRACTOR PROJECTS
SITE VISITS
PROPOSAL FROM MJ JURADO TO ENLARGE TRASH ENCLOSURE AT CARPORT 17 - $5,500.00
DISCUSS & APPROVE 17 LAUNDRY ROOM CORKBOARDS - ESTIMATE MATERIAL $25 EA - ESTIMATE LABOR $21 EA
54-G - PATIO CEILING DIRTY - WORK ORDER
31-E - CHECKED SHOWER REFINISHING WORK
17-G - BIRDS IN ATTIC - NO HOLES
21-H - ESCROW INSPECTION
38-I - HEAT PUMP - SIGNED OFF
10-H - HOSE BIBB LEAKS - WORK ORDER
5 of 8
MUTUAL : ( 1 ) ONE: (01) ONE
INSPECTOR MONTHLY MUTUAL REPORT
INSPECTOR : RICH STOLARZ
MUTUAL BOARD MEETING DATE: July 23, 2020
21-F - REFRIGERATOR ESCROW WORK
19-H - REMODEL INSPECTION - SIGNED OFF
13-L - STOP WORK ORDER
61-J - PRELISTING INSPECTION
69-B - PRELISTING INSPECTION
42-B - CHECKED WINDOWS
17-D - CHECKED SHOWER REPAIR
22-H - ESCROW INSPECTION
21-H - NEW BUYER ORIENTATION
44-D - GARBAGE DISPOSAL - WORK ORDER
10-H - WINDOW SCREEN - WORK ORDER
4-H - STUCCO INSPECTION - SIGNED OFF
66-L - PRELISTING INSPECTION
40-H - CONTERTOP PERMIT - SIGNED OFF
10 - H - CHECKED SCREEN
42-B - OPEN DOOR FOR PAINTER
34-A - INSULATION INSPECTION - SIGNED OFF
6-C - SKYLIGHT INSPECTION - SIGNED OFF
44-D - PIPE CORRODED BY TOILET - WORK ORDER
14-K - CRACK IN SHOWER - WORK ORDER
14-I - FINAL ESCROW INSPECTION
25-K - FLOORING INSPECTION - SIGNED OFF
28-K - KITCHEN AND BATHROOM CABINET INSPECTION - SIGNED OFF
28-K - MICROWAVE AND ELECTRICAL INSPECTION - SIGNED OFF
21-F - SKYLIGHT AND HEAT PUMP CHECK FROM ESCROW
34-A - DRYWALL INSPECTION - SIGNED OFF
25-K - WANTS TO PAINT EXTERIOR ENTRY DOOR - INSPECTED WITH DIRECTOR
42-B - HOSE BIBB LEAKS - WORK ORDER
6 of 8
MUTUAL : ( 1 ) ONE: (01) ONE
INSPECTOR MONTHLY MUTUAL REPORT
INSPECTOR : RICH STOLARZ
MUTUAL BOARD MEETING DATE: July 23, 2020
11-J - LIGHTING INSPECTION - SIGNED OFF
42-B - DISCUSSED ESCROW WITH MEMBER
CARPORT 2 - MEET MAINTENANCE ELECTRICAL WORK
8-K - DOOR BELL INSPECTION - SIGNED OFF
21-H - PRELISTING INSPECTION
28-H - PRELISTING INSPECTION
42-B - DISCUSSED ESCROW WITH MEMBER
4-H - DRYWALL / LATH INSPECTION - SIGNED OFF
53-I - UNOCCUPIED UNIT INSPECTION
6-H - SKYLIGHT AND AC QUESTIONS
8-B - INSPECT COUNTER TOP DAMAGE
57-B - STAINED PATIO CARPET - DIRECTOR CHECKED
34-A - PLUMBING, ELECTRICAL, FRAMING INSPECTION - SIGNED OFF
49-L - FINAL ESCROW INSPECTION
44-A - HEAT PUMP INSPECTION
8-B - INSPECT COUNTER TOP WITH DIRECTOR
7-D - NEW BUYER ORIENATION - ESCROW INSPECTION
19-H - CHECK ESCROW WORK COMPLETION - NEEDS PAINT
19-H - OPEN DOOR FOR PAINTER
CARPORT 4, SPACE 8 - CUT CABLE
42-B - DISCUSSED ESCROW WITH MEMBER
14-I - ESCROW INSPECTION
7-D - VIDEO NBO PREP
29-G - SHOWER REMODEL - SIGNED OFF
42-B - FINAL ESCROW INSPECTION
21-F - ESCROW WORK ISSUES - SELLER
31-E - COUNTER AND WASHER DRYER INSPECTION - SIGNED OFF
21-F - ESCROW MEET SELLER
7 of 8
MUTUAL : ( 1 ) ONE: (01) ONE
INSPECTOR MONTHLY MUTUAL REPORT
INSPECTOR : RICH STOLARZ
MUTUAL BOARD MEETING DATE: July 23, 2020
21-F - ESCROW INSPECTION - STOP WORK ORDER - INSPECTION ON HOLD
30-J - WATER DAMAGE CLEAN UP- TALKED TO SHAREHOLDER - CHECKED UNIT
42-B - ESCROW INSPECTION
49-L - ESCROW INSPECTION
5-G - BLOCK WALL INSPECTION - SIGNED OFF
35-H - STONE WALL INSPECTION - SIGNED OFF
4-H - INSULATION INSPECTION - SIGNED OFF
6-L - HEAT PUMP INSPECTION - SIGN OFF
49-L - NEW BUYER ORIENTATION
30-J - CHECKED UNIT FOR WATER DAMAGE, CAUSED BY BIDET ON TOILET
INSPECTED CONCRETE WITH DIRECTOR
CHECKED A1 WORK PROGRESS
CARPORT 8, SPACE 39 - BROKEN HINGE - WORK ORDER
LAUNDRY 11 - CLOTHES LINES - WORK ORDER
42-K - CONCRETE CRACK STUCCO WALL - WORK ORDER
8-K - DOOR INSPECTION
CHECKED LAUNDRY COUNTER TOP SIZE & CORKBOARDS
8 of 8