WATER TREATMENT
Pretoria City Council Various
Pumpstations
![Page 2: Pretoria Council Various Pumpstations](https://reader036.vdocument.in/reader036/viewer/2022073118/55b3e217bb61ebf6218b4783/html5/thumbnails/2.jpg)
WATER TREATMENT
• In one of the longest ongoing contracts on AGE Engineering's order book, their contract to provide automation packages to Pretoria City Council pump-stations must rate as their longest.
•Started in mid 1995 - whilst still operating as AEG Construction - their brief was to supply an automation system to 5 pumpstations within the greater Pretoria metropole.
• The first one completed was at the Fountains station, followed by Garsfontein, Elardus Park, Klapperkop and finally Mooikloof over a period of four-and-a-half years.
• The project was run out of Pretoria's department of water environment and executed as five separate contracts.
• AGE's brief was to provide the project management, PLC Engineering using Modicon Compact and Micro PLC's, the equipment supply, installation and commissioning. What started out as first-time business for AGE developed into a long-term relationship and resulted in repeat business.
AGE Technologies Contact us 011 869 3925 www.age.co.za