BIKERALEIGH PLAN | UPDATE PRIORITIZATION AND TEN-YEAR PLAN 4-1 This chapter features a brief summary of the prioritization process and the selection of priority projects to focus on over a ten year time frame. These projects are mostly Separated Bikeways and Neighborhood Bikeways that, along with the Capital Area Greenway System, form the All Ages and Abilities network. They are selected based on their prioritization ranking, their ability to connect key destinations and complement existing and programmed facilities, their ability to be built within existing curbs, as well input from the public, city staff, and the project Steering Committee. Maps at the end of this chapter articulate a vision of what bicycle infrastructure is likely to become in the City of Raleigh within the next decade. In addition to the priority projects recommended by this plan, the maps include existing on-street bicycle facilities, bicycle facilities to be provided by currently programmed street projects, the existing network of greenway trails, and the anticipated next phase of greenway trail construction. These also show priorities from the 2016 update that are not able to fit between existing curbs and need additional resources. PRIORITIZATION PROCESS The recommended long-term network described in Chapter 3 was divided into segments and each segment was then ranked by six weighted criteria. The prioritization matrix found in Appendix C provides full results of this exercise. Prioritization and Ten-Year Plan BikeRaleigh Plan Vision: “Raleigh is a place where people of all ages and abilities bicycle comfortably and safely for transportation, fitness, and enjoyment. The BikeRaleigh network is integrated into the transportation system to connect people to where they live, work, play, and learn.” PRIORITIZATION CRITERIA AND WEIGHTING PARK AND GREENWAY ACCESS (6) POPULATION SERVED (4) LEVEL OF REPORTED BIKE CRASHES (4) AREAS CURRENTLY WITH LOW BICYCLE FACILITY SERVICE (3) ACCESS TO DESTINATIONS (3) NEED AND EQUITY (2) *Criteria weights are in parenthesis, with higher numbers representing higher weights.

Upload: others

Post on 06-Mar-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Prioritization and Ten-Year Plan · 2020. 12. 14. · PRIORITIZATION AND TEN-YEAR PLAN 4-1 This chapter features a brief summary of the prioritization process and the selection of

BIKERALEIGH PLAN | UPDATE

PRIORITIZATION AND TEN-YEAR PLAN 4-1

This chapter features a brief summary of the prioritization process and the selection of priority projects to focus on over a ten year time frame. These projects are mostly Separated Bikeways and Neighborhood Bikeways that, along with the Capital Area Greenway System, form the All Ages and Abilities network. They are selected based on their prioritization ranking, their ability to connect key destinations and complement existing and programmed facilities, their ability to be built within existing curbs, as well input from the public, city staff, and the project Steering Committee.

Maps at the end of this chapter articulate a vision of what bicycle infrastructure is likely to become in the City of Raleigh within the next decade. In addition to the priority projects recommended by this plan, the maps include existing on-street bicycle facilities, bicycle facilities to be provided by currently programmed street projects, the existing network of greenway trails, and the anticipated next phase of greenway trail construction. These also show priorities from the 2016 update that are not able to fit between existing curbs and need additional resources.

PRIORITIZATION PROCESSThe recommended long-term network described in Chapter 3 was divided into segments and each segment was then ranked by six weighted criteria. The prioritization matrix found in Appendix C provides full results of this exercise.

Prioritization and Ten-Year PlanBikeRaleigh Plan

Vision: “Raleigh is a

place where people of

all ages and abilities

bicycle comfortably

and safely for

transportation, fitness,

and enjoyment. The

BikeRaleigh network

is integrated into the

transportation system

to connect people to

where they live, work,

play, and learn.”

PRIORITIZATION CRITERIA AND WEIGHTING

PARK AND GREENWAY ACCESS (6)

POPULATION SERVED (4)

LEVEL OF REPORTED BIKE CRASHES (4)

AREAS CURRENTLY WITH LOW BICYCLE FACILITY SERVICE (3)

ACCESS TO DESTINATIONS (3)

NEED AND EQUITY (2)

*Criteria weights are in parenthesis, with higher numbers representing higher weights.

Page 2: Prioritization and Ten-Year Plan · 2020. 12. 14. · PRIORITIZATION AND TEN-YEAR PLAN 4-1 This chapter features a brief summary of the prioritization process and the selection of

BIKERALEIGH PLAN | UPDATE

4-2 PRIORITIZATION AND TEN-YEAR PLAN

Projects in the Ten Year Priority Plan were selected from high-ranking projects by city staff, consultants, and Steering Committee members. Many of these projects implement portions of the recently adopted Downtown Plan or will support the planned bike share system. Some projects implement portions of other plans nearing completion, including the Six Forks Corridor Study, the Southern Gateway Corridor Study, and the Cameron Village - Hillsborough Street Small Area Plans. Some projects also serve newly-acquired Dix park.

There are projects that earn high scores in the prioritization matrix, but for which there is no clear implementation path in the five to ten year time frame. In these cases, this plan recommends that the result be used to inform greenway trail prioritization. The goal is to prioritize greenway trails and off-street connectors serving areas where on-street facilities are not feasible.

The projects in the Ten Year Priority Plan will require significant planning, design, and community involvement in order to fully implement. The BikeRaleigh Plan Update is a big-picture, city-wide plan which cannot precisely determine project alternatives or scope. In some cases, the street alignments or project endpoints are likely to change through the implementation process.

Prioritization Matrix Results

Committee/City Staff/Consultant Input

Ten Year Priority Plan

Detailed Feasibility and Scoping

Neighborhood Involvement

Detailed Design

Construction

Evaluation

BikeR

aleigh

Plan U

pd

ateF

uture Steps fo

r E

ach Pro

ject

Additional details are in Chapter 8 on Future Steps for each project.

Project list above is in no particular priority order.

Table 4.1: Ten year priority list (Greenways)GREENWAY From To Miles

1.77G1 CRABTREE GREENWAY LINDSAY DR DURALAEIGH

1.04G2 LASSITER MILL GAP NORTHAMPTON CURRENT PAVED CRABTREE GREENWAY

0.29G3 ROSENGARTEN TRAIL S SAUNDERS CABARRUS

0.12G4 WALNUT CREEK GREENWAY CENTENNIAL CAMPUS GREENWAY CONNECTION

TRAILWOOD

0.79G5 TRENTON ROAD SIDEPATH REEDY CREEK TRAIL AT UMSTEAD EAST ENTRANCE

I-40 BRIDGE

0.39STRUCTURE 106 REROUTE CAPTIAL CRABTREE GREENWAY

4.4Total

Table 4.1: Ten year priority list (Greenways)GREENWAY From To Miles

1.77G1 CRABTREE GREENWAY LINDSAY DR DURALAEIGH

1.04G2 LASSITER MILL GAP NORTHAMPTON CURRENT PAVED CRABTREE GREENWAY

0.29G3 ROSENGARTEN TRAIL S SAUNDERS CABARRUS

0.12G4 WALNUT CREEK GREENWAY CENTENNIAL CAMPUS GREENWAY CONNECTION

TRAILWOOD

0.79G5 TRENTON ROAD SIDEPATH REEDY CREEK TRAIL AT UMSTEAD EAST ENTRANCE

I-40 BRIDGE

0.39STRUCTURE 106 REROUTE CAPTIAL CRABTREE GREENWAY

4.4Total

Page 3: Prioritization and Ten-Year Plan · 2020. 12. 14. · PRIORITIZATION AND TEN-YEAR PLAN 4-1 This chapter features a brief summary of the prioritization process and the selection of

BIKERALEIGH PLAN | UPDATE

PRIORITIZATION AND TEN-YEAR PLAN 4-3

Table 4.2: Ten year priority list (Separated Bikeways)SEPARATED From To Miles

0.48FAIRCLOTH HILLSBOROUGH WADE

0.05GARNER ROAD BIKEWAY CONNECTION SAINTS PETERSON

0.35GORMAN LIGON CLARK

0.51S1 SOUTH STATE STREET BIKEWAY PETERSON BUNCHE

0.53S2 DOWNTOWN NORTH-SOUTH GREENWAY CONNECTOR PH2

NORTH PEACE

0.83S3 DOWNTOWN EAST-WEST GREENWAY CONNECTOR

WEST EAST

0.41W MORGAN ST MARYS DAWSON

0.02WADE TO CAPITAL RAMP CROSSING IMPROVEMENT

WEST WADE

0.55WEST STREET NORTH PEACE WADE

Total MilesPercent of Category

3.7316.04%

SIDEPATH UPDATE/REHAB From To Miles2.67AVENT FERRY SIDEPATH REHAB WESTERN LAKE JOHNSON PARK

9.46FALLS OF NEUSE SIDEPATH REHAB OLD WAKE FOREST NEUSE RIVER TRAIL

0.98GLENWOOD SIDEPATH REHAB/IMPROVEMENTS

REMBERT DRIVEWAY JUST WEST OF CREEDMOOR

0.85LYNN SIDEPATH REHAB BROOKEMEADE NORTH HILLS DR

0.14NEWTON RD SIDEPATH SIX FORKS EAST MINE FORK GREENWAY

0.44OLD FALLS CONNECTOR KEITH STORE NC 98

2.13ROCK QUARRY SIDEPATH REHAB MLK EAST OF NEW BIRCH

0.85ROCKY BRANCH SIDEPATH CABARRUS PULLEN

2.01WESTERN BLVD SIDEPATH REHAB GORMAN JONES FRANKLIN

Total MilesPercent of Category

19.5383.96%

23.26Total

Page 4: Prioritization and Ten-Year Plan · 2020. 12. 14. · PRIORITIZATION AND TEN-YEAR PLAN 4-1 This chapter features a brief summary of the prioritization process and the selection of

BIKERALEIGH PLAN | UPDATE

4-4 PRIORITIZATION AND TEN-YEAR PLAN

WALNUTCREEK

GREENWAY

NRT D

ETOU

RCO

NNEC

TION

HARDIMONT

TRAWICK

ASHECROSSINGAT WESTERN

EDWARDS MILL

S8 SA

INT

MARY

S WAD

ECR

OSSIN

G

RIDG

E ROA

D GA

P

S6 AT

LANT

IC AV

E

GRAY

LYN

FAIRVIEW

FAIRV

IEW-CA

PITAL

ACCE

SSRO

AD

WALN

UT CR

EEK

AT JO

NES

FRAN

KLIN

-440

B1 GR

EEN R

OAD B

IKE L

ANES

LAKE W

HEELER

AT CA

ROLIN

APIN

ES

LANE LANE ST

POOLE ROADRESURFACING

S5 NORTHBOUNDARY

STREET

G2 LASSITER MILL GAP

U-4437 GRADE

SEPARATION OF

NCRR & BLUE RIDGE

B-513

0 AVE

NTFER

RY BR

IDGE

BLUE

RIDG

E ROA

DPE

D BR

IDGE

OVER

WAD

E AVE

CAROLINAPINES

G1 CRABTREE GREENWAY

EDWAR

DS MILL

EBEN

EZER

CHUR

CHNO

RTH C

ONNE

CTOR

G5 TREN

TON

ROAD

SIDEPA

TH

S6 AT

LANT

ICAV

ENUE

IMPR

OVEM

ENTS

CAROLINA PINESIMPROVEMENTS

EBEN

EZER

CHUR

CH

BARW

ELL RO

AD W

IDENIN

G

OLD WAKE

FOREST ROAD

IMPROVEMENT PROJ

POOLE ROAD WIDENING

N8 MARSH CREEK-TRAWICK

STREET IMPROVEMENTS

TRYON ROAD PART C

YONKERS ROAD CIP

S7-SI

X FOR

KS

WEST

GARN

ER RO

ADBI

KEWA

YCO

NNEC

TION

S3 DOWNTOWNEAST-WEST GREENWAY

CONNECTOR

FALLS OF NEUSE

SIDEPATH REHAB

G4 WALNUT

CREEK

GREENWAY

ROCK QUARRYSIDEPATH

REHAB

NEWTON RDSIDEPATH

G2 LA

SSITE

RMI

LL GA

P

G3 ROSENGARTENGREENWAY TRAIL

FALL

S OF N

EUSE

SIDEP

ATH

REHA

BSTR

UCTU

RE10

6 RER

OUTE

G2 LASSITERMILL GAP

GORM

AN

WMORGAN

OLD FA

LLSCO

NNECT

OR

FAIRC

LOTH

FALLS OF NEUSE

SIDEPATH REHAB

S1 SOUTH

STATE STREET

BIKEWAY

G1 CRABTREE GREENWAY

WEST

STRE

ETNO

RTH

AVENT FERRY

SIDEPATH

REHAB

G5 TR

ENTO

NRO

AD SI

DEPA

TH

ROCKYBRANCHSIDEPATH

LYNN SIDEPATH REHAB

GLENWOOD SIDEPATH

REHAB/IMPROVEMENTS

FALL

S OF N

EUSE

SIDEPA

TH RE

HAB

WESTERN BLVDSIDEPATH REHAB

City of Raleigh, State of North Carolina DOT, Esri, HERE, Garmin, SafeGraph, METI/NASA, USGS, EPA, NPS, USDA

¯

4Miles

2020 BikeRaleigh Prioity UpdatesProjects for Implementation in the Next DecadePlan2020

GREENWAYSEPARATED<all other values>

Existing and Planned Bicycle FacilitiesSTATUS

Facility is Complete and Meets Plan SpecFacility Exists but Does Not Conform To Plan10 YEAR PRIORITY PROJECTS AND UPGRADESAll Other Values5 YEAR PRIORITY-CURRENT CAPITAL PROJECTS

Generated by City of Raleigh Transportation Planning on 11/4/2020

Map 4.1: Ten Year Priority Plan: Separated Bikeways + Greenways

Page 5: Prioritization and Ten-Year Plan · 2020. 12. 14. · PRIORITIZATION AND TEN-YEAR PLAN 4-1 This chapter features a brief summary of the prioritization process and the selection of

BIKERALEIGH PLAN | UPDATE

PRIORITIZATION AND TEN-YEAR PLAN 4-5

TABLE 4.3: Ten Year Priority List (Conventional Bike Lanes)BIKE LANE From To Miles

0.35AVENT FERRY CLIMING LANE END B-5130 OLD AVENT FERRY

1.43B1 GREEN ROAD BIKE LANES NEW HOPE CHRUCH SPRING FOREST

0.33B2 LINEBERRY JOANNE LAKE WHEELER

0.73B6 WHITAKER MILL BIKE LANES REAVES WAKE FOREST ROAD

0.27BUCK JONES CLIMBING LANE FARM GATE RD I-40

0.08BUCK JONES INTERIM INTERSECTION JONES FRANKLIN XEBEC WAY

0.66DUNN RD FALLS OF NEUSE FALLS RIVER AVE

0.21FAIRVIEW AYCOCK CAPITAL

0.42HARDIMONT NORTH HILLS SIX FORKS

0.09HOKE ST BLOODWORTH PERSON

1.28MILBURNIE RALEIGH SHANTA

0.37PLEASANT VALLEY DURALEIGH GLENWOOD

0.15RALEIGH BLVD GAP NEW BERN AVE POOLE RD

0.13RIDGE ROAD GAP PHYLLIS WADE

0.38S5 JOHNSON ST HARRINGTON WEST

0.12S8 SAINT MARYS WADE CROSSING NICHOLS WADE

0.13SHANTA DR MILBURNIE NEW BERN AVE

0.13WALNUT CREEK AT ELIZA POOL PARK WATER WORKS GILBERT

0.15WALNUT CREEK ON ROAD CONNECTION AT POOL PARK

S WILMINGTON WATER WORKS

7.41Total

Page 6: Prioritization and Ten-Year Plan · 2020. 12. 14. · PRIORITIZATION AND TEN-YEAR PLAN 4-1 This chapter features a brief summary of the prioritization process and the selection of

BIKERALEIGH PLAN | UPDATE

4-6 PRIORITIZATION AND TEN-YEAR PLAN

FAYETT

EVILLE

RD

STRUC

TURE

106 R

EROU

TE

YONK

ERS

ROAD

CIP

NRT D

ETOU

RCO

NNEC

TION

TRAWICK

ASHE CROSSINGAT WESTERN

EDWARDS MILL

G4 WALNUT

CREEK

GREENWAY

S6 AT

LANT

IC AV

E

G3 ROSENGARTENGREENWAY TRAIL

GRAY

LYN

WALN

UT CR

EEK

AT JO

NES

FRAN

KLIN

-440

LAKE W

HEELER

AT CA

ROLIN

APIN

ES

G2 LASSITER MILL GAP

LANE

POOLE ROADRESURFACING

GORM

AN

U-4437 GRADE

SEPARATION OF

NCRR & BLUE RIDGE

B-5130 AVENT

FERRY BRIDGE

G1 CRABTREE GREENWAY

OLD FA

LLSCO

NNECT

OR

BLUE

RIDG

E ROA

DPE

D BR

IDGE

OVE

RWA

DE AV

E

CAROLINAPINES

EDWAR

DS MILL

EBEN

EZER

CHUR

CHNO

RTH C

ONNE

CTOR

G5 TR

ENTO

NRO

AD SI

DEPAT

H S6 AT

LANT

ICAV

ENUE

IMPR

OVEM

ENTS

CAROLINA PINESIMPROVEMENTS

EBEN

EZER

CHUR

CH

BARW

ELL RO

AD W

IDENIN

G

OLD WAKE

FOREST ROAD

IMPROVEMENT PROJ

POOLE ROAD WIDENING

B1 G

REEN

ROAD BIKE

LANE

S

N8 MARSH CREEK-TRAWICK

STREET IMPROVEMENTS

TRYON ROAD PART C

YONKERS ROAD CIP

S7-SI

X FOR

KS

HARDIMONT

N4 INGRAM DR

POWELL

INTERIMBUCK JONESINTERIM

INTERSECTION

HOKE ST

S5 JOHNSON ST

S8 SA

INT

MARY

S WAD

ECR

OSSIN

G

WALNUT CREEK

AT ELIZA

POOL PARK

MILBURNIESHANTA DR

RIDG

E ROA

D GA

P N6 CROSSTOWNBIKEWAY EAST

RALE

IGH

BLVD

GAP

NORTHBROOK DR

BERYL INTERIM

LITTLE JOHN

ROAD UPGRADE

FAIRVIEW

FAIRV

IEW-CA

PITAL

ACCE

SS RO

AD

HUTTONLIGONSHARROWS

BUCK JONES

CLIMBIN

G LANE

LANE ST

MAYWOODEAST

N1 HADLEYBIKEWAY

B2 LINEBERRY

N4HU

NTLE

IGH

S5 NORTHBOUNDARY

STREET

LLL CONNECTOR

AVEN

T FER

RYCL

IMIN

G LA

NE

PLEASANTVALLEY

HARDIMONT

PETERSON STREET

NEIGHBORHOODBIKEWAY

STONYBROOK

NEIGHBORHOOD

BIKEWAY

N1 DA

NDRID

GEBIK

EWAYN2 SIERRA

DUNN RD

B6 WHITAKERMILL BIKE

LANES

ROSE

LANE

NEIG

HBOR

HOOD

BIKE

WAY

B1 GR

EEN R

OAD B

IKE L

ANES

WHITE

OAK

N6 WESTERNHALF CROSSTOWN

BIKEWAY

City of Raleigh, State of North Carolina DOT, Esri, HERE, Garmin, SafeGraph, METI/NASA, USGS, EPA, NPS, USDA

¯

4.5Miles

Generated by City of Raleigh Transportation Planning on 11/5/2020

2020 BikeRaleigh Priority Updates10 YEAR In mixed trafficPlan2020

CONVENTIONAL BIKE LANENEIGHBORHOOD BIKEWAY

Existing and Planned Bicycle FacilitiesOther Existing and Planned Bike Facilities

Facility is Complete and Meets Plan SpecFacility Exists but Does Not Conform To Plan10 YEAR PRIORITY PROJECTS AND UPGRADES5 YEAR PRIORITY-CURRENT CAPITAL PROJECTS<all other values>

Map 4.2: Ten Year Priority Plan: Bicycle Lanes + Neighborhood Bikeways

Page 7: Prioritization and Ten-Year Plan · 2020. 12. 14. · PRIORITIZATION AND TEN-YEAR PLAN 4-1 This chapter features a brief summary of the prioritization process and the selection of

BIKERALEIGH PLAN | UPDATE

PRIORITIZATION AND TEN-YEAR PLAN 4-7

Table 4.4: Ten year priority list (Neighborhood Bikeways)NEIGHBORHOOD BIKEWAY From To Miles

1.41BERYL INTERIM HILLSBOROUGH POWELL

0.22FAIRVIEW-CAPITAL ACCESS ROAD CAPITAL FAIRVIEW

0.26HUTTON LIGON SHARROWS NCSU BOUNDARY BLUE RIDGE

0.28LANE ST WILMINGTON BLOODWORTH

0.72LITTLE JOHN ROAD UPGRADE DEAD END LITTLE JOHN CARLISLE

0.68LEESVILLE LAKE LYNN CONNECTOR LEESVILLE RD LAKE LYNN GREENWAY

0.31MAYWOOD EAST S SAUNDERS FAYETTEVILLE

0.56N1 DANDRIDGE BIKEWAY BUNCHE CROSS LINK

0.31N1 HADLEY BIKEWAY DANDRIDGE CROSS LINK

0.27N13 JOHNSON ST ST MARYS CLARK

1.3N2 SIERRA LINEBERRY CAROLINA PINES

0.33N4 HUNTLEIGH INGRAM NEW HOPE CHURCH

0.51N4 INGRAM DR ATLANTIC BRENTWOOD

2.08N6 CROSSTOWN BIKEWAY EAST WHITAKER MILL OBERLIN

1.78N6 WESTERN HALF CROSSTOWN BIKEWAY RIDGE OBERLIN

0.31N7 BLOODWORTH-SAINTS NBHD BIKEWAY HOKE GARNER RD

1.01NORTHBROOK DR NORTH HILLS SIX FORKS

0.4PETERSON STREET NEIGHBORHOOD BIKEWAY GARNER RD S. STATE

0.28POWELL INTERIM BERYL WESTERN

0.83ROSE LANE NEIGHBORHOOD BIKEWAY POOLE WALNUT CREEK GREENWAY

0.33S5 NORTH BOUNDARY STREET PERSON ST WATAUGA

0.51STONYBROOK NEIGHBORHOOD BIKEWAY BRENTWOOD TRAWICK

0.24WATAUGA ST NEIGHBORHOOD BIKEWAY OAKWOOD BOUNDARY

1.34WHITE OAK LASSITER MILL OXFORD16.27Total

Page 8: Prioritization and Ten-Year Plan · 2020. 12. 14. · PRIORITIZATION AND TEN-YEAR PLAN 4-1 This chapter features a brief summary of the prioritization process and the selection of

BIKERALEIGH PLAN | UPDATE

4-8 PRIORITIZATION AND TEN-YEAR PLAN

TEN YEAR PRIORITY PLAN The maps on the following pages feature the top 29 priority projects, which are a combination of separated bikeways, neighborhood bikeways, bicycle lanes and greenway trails. Additional facilities will also be implemented as opportunities arise, such as a resurfacing project or major roadway project. The maps also include existing and programmed facilities.

TABLE 4-4: TEN YEAR PRIORITY PLAN (SHOWN IN MILES)

Facility Type Existing Facilities

Programmed Projects

Priority Projects

Total Network

Paved Greenway Trail

107 3 0 110

Separated Bikeway

21 10 13 45

Neighborhood Bikeway

0 N/A 43 43

Main Street Bikeway and Sharrows

27 1 N/A 28

Bicycle Lane, including climbing lanes

32 11 9 52

Total 187 25 65 278

Page 9: Prioritization and Ten-Year Plan · 2020. 12. 14. · PRIORITIZATION AND TEN-YEAR PLAN 4-1 This chapter features a brief summary of the prioritization process and the selection of

BIKERALEIGH PLAN | UPDATE

PRIORITIZATION AND TEN-YEAR PLAN 4-9

Map key of the seven sector maps detailing the Ten Year Priority Plan on pages 4-9 through 4-15.

NORTH SECTOR(PAGE 4-14)

NORTH EAST

SECTOR(PAGE 4-15)

EAST SECTOR(PAGE 4-10)

SOUTHEAST SECTOR(PAGE 4-11)

SOUTHWEST SECTOR(PAGE 4-12)

NORTH WEST

SECTOR(PAGE 4-13)

DOWNTOWN ZOOM

(PAGE 4-9)

MAP KEY FOR THE FOLLOWING PAGES