    MECHANISM DESIGN II (BE2_WILDFIRE3)

    F r o T i m e , I n c . C o p y r i g h t 2 0 0 9 - D o N o t D u p l i c a t e w w w . F r o T i m e . c o m Page 5

    Tutorial Lesson 2 - Connection Joints

    ** In this exercise, you will create the above Engine mechanism assembly. This assembly contains

    multiple components with multiple joint connections. To begin, you will need to create a new assembly

    and assemble the Block_Bottom part. **

    FILE Menu: #New, #Assembly, , #OK INSERT Menu: #Component, #Assemble OPEN Dialog Box: Name: , #Open Make sure Coordinate systems are turned on

  • 8/3/2019 Pro-E Engine Tutorial

    2/5

    MECHANISM DESIGN II (BE2_WILDFIRE3)

    F r o T i m e , I n c . C o p y r i g h t 2 0 0 9 - D o N o t D u p l i c a t e w w w . F r o T i m e . c o m Page 6

    DASHBOARD: #Placement, Constraint Type: #Coord Sys, (CSO), (ASM_DEF_CSYS),#Green Check

    ** The next component to be assembled is the Crank Shaft. Since the Block_Bottom is our ground, the

    remaining components in this assembly will have joint connections. The Crank Shaft will utilize a Pin

    connection with the Block_Bottom. **

    INSERT Menu: #Component, #Assemble

    OPEN Dialog Box: Name: , #Open DASHBOARD: Constraints Pull Down: #Pin, #Placement, (Select Axis A-1 of Crank_Shaft),

    (Select Axis A-1 of Block_Bottom), (Select DTM5 of Crank_Shaft), (Select DTM3 of

    Block_Bottom), #Green Check

    ** The following 2 images display the proper references for the Pin joint creation: **

  • 8/3/2019 Pro-E Engine Tutorial

    3/5

    MECHANISM DESIGN II (BE2_WILDFIRE3)

    F r o T i m e , I n c . C o p y r i g h t 2 0 0 9 - D o N o t D u p l i c a t e w w w . F r o T i m e . c o m Page 7

  • 8/3/2019 Pro-E Engine Tutorial

    4/5

    MECHANISM DESIGN II (BE2_WILDFIRE3)

    F r o T i m e , I n c . C o p y r i g h t 2 0 0 9 - D o N o t D u p l i c a t e w w w . F r o T i m e . c o m Page 8

    ** Once completed, the Crank_Shaft will only be allowed to rotate about Axis A-1. Your assembly should

    look like the following image. **

  • 8/3/2019 Pro-E Engine Tutorial

    5/5

    MECHANISM DESIGN II (BE2_WILDFIRE3)

    F r o T i m e , I n c . C o p y r i g h t 2 0 0 9 - D o N o t D u p l i c a t e w w w . F r o T i m e . c o m Page 9

    ** The next component to assemble is the Connecting Rod. This component will also use a Pin joint. **

    INSERT Menu: #Component, #Assemble OPEN Dialog Box: Name: , #Open DASHBOARD: Constraints Pull Down: #Pin, #Placement, (Select Axis A-16 of

    connecting_rod), (Select Axis A-3 of Crank_Shaft), (Select FRONT Datum of

    connecting_rod), (Select DTM5 of Crank_Shaft), #Green Check

    ** The following 2 images display the proper references for the Pin joint creation: **