procedure for experiments @ 12 gev

7
Patrizia Rossi Hall A Collaboration Meeting- December 10, 2012 Procedure for Experiments @ 12 GeV

Upload: elsie

Post on 05-Jan-2016

39 views

Category:

Documents


0 download

DESCRIPTION

Procedure for Experiments @ 12 GeV. READINESS REVIEW PROCESS. Jefferson Lab is revisiting the experimental readiness review process in preparation of the 12-GeV startup. That means: Partly correcting the Experiment Readiness Review web pages - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Procedure for Experiments  @ 12  GeV

Patrizia Rossi Hall A Collaboration Meeting- December 10, 2012

Procedure for Experiments @ 12 GeV

Page 2: Procedure for Experiments  @ 12  GeV

Patrizia Rossi Hall A Collaboration Meeting- December 10, 2012

• Jefferson Lab is revisiting the experimental readiness review process in preparation of the 12-GeV startup.

• That means: Partly correcting the Experiment Readiness Review

web pages Folding in feedback from the management self-

assessment for "Installation of New Equipment Involving Multiple Groups”

• The document, expected to be released soon, will give the guidance for running experiments in the 12 GeV era.

Page 3: Procedure for Experiments  @ 12  GeV

Patrizia Rossi Hall A Collaboration Meeting- December 10, 2012

DECOMMISSIONING

• Submitting Proposals PAC&TAC• Director’s Decision

PROPOSAL PHASE

• Exp. Description and Requirements

• Exp. Readiness Review Calendar

PRELIMINARY PLANNING PHASE

DESIGN PHASE

• PESAD, specific equipment reviews• Complete Conceptual Designs &

“1st” Readiness Review

CONSTRUCTION PHASE• Fabrication of the equipment• Test of the individual elements of

the equipment (OSP/TOSP)

SCHEDULING OF EXPERIMENT by JLab

EQUIPMENT INSTALLATION

RUN THE EXPERIMENT

“Final” readiness review• Final ESAD & RSAD• COO• Safety Checklist• Experimental Procedures

• Construction near-completed, designs frozen

• Exp. Operation Envelop (EOE) • “2nd” Readiness Review before

scheduling request submission

Page 4: Procedure for Experiments  @ 12  GeV

Patrizia Rossi Hall A Collaboration Meeting- December 10, 2012 4

By the Spokespersons

Page 5: Procedure for Experiments  @ 12  GeV

Patrizia Rossi Hall A Collaboration Meeting- December 10, 2012

By the DSO

Page 6: Procedure for Experiments  @ 12  GeV

Patrizia Rossi Hall A Collaboration Meeting- December 10, 2012

Ex. DVCS Exp.

X

X

X

Page 7: Procedure for Experiments  @ 12  GeV

Patrizia Rossi Hall A Collaboration Meeting- December 10, 2012

Ex. Tritium Exp.

X

X

X

Tritium Target