NCHRP Project 14-20A Final Report
E - 1
A P P E N D I X E
Procedure to Quantify Consequences of Delayed Maintenance of Culverts
FHWA (2012) defines a culvert as a “conduit which conveys stream flow through a roadway embankment or
past some other type of flow obstruction”. Culverts are used (FHWA 2012b):
“Where bridges are not hydraulically required,
Where debris and ice potential are tolerable,
Where more economical than a bridge (including guardrail and safety concerns).”
While bridges are recommended in following situations (FHWA 2012b):
“Where culverts are impractical,
Where more economical than a culvert,
To satisfy land use and access requirement,
To mitigate environmental concerns not satisfied by a culvert,
To avoid floodway encroachments,
To accommodate ice and large debris.”
Culverts can be divided by shape to pipe arch, box (rectangular), circular, and elliptical. Open-bottom culverts
can have a shape of an arch concrete box, metal box, low profile arch, arch, or high profile arch. Materials used
for culverts include reinforced or non-reinforced concrete; aluminum or steel corrugated metal; and high-density
polyethylene (HDPE) or polyvinyl chloride (PVC). Culvert inlet configurations include projecting barrel, cast-
in-place headwalls and wing walls, standard end section, and mitered to slope inlet (FHWA 2012b). Culverts
with span width over 20 ft are considered bridges according to the National Bridge Inspection Standards
(FHWA 2012b) and are typically managed by the bridge or structures division of the agency responsible for the
National Bridge Inventory.
Culverts in poor condition are a hazard and can cause potholes or total collapse and failure of pavement which
present safety risks as well as traffic disruption and time delays from road closures. Maintenance deferral can
result in culvert failures, increased cost for rehabilitation which leads to unplanned financial burden. Public
safety and risk reduction are priorities in culvert management, followed by preservation activities to reduce life-
cycle costs (Markow 2007). The process to quantify the consequences of delayed maintenance of culverts is
shown in Figure E-1.
NCHRP Project 14-20A Final Report
E - 2
Figure E-1. Procedure to quantify the consequences of delayed maintenance of culverts.
E.1 Step 1: Define the Culvert System Preservation Policy
E.1.1 Identify the Types of Maintenance
The first step is to determine what maintenance activities should be included in the preservation program for
culverts. This is complicated by the fact that the term “maintenance” or “repair” is often defined differently by
the agencies. Common maintenance or preservation terms for culverts, in the context of this research, are
defined as follows.
Emergency maintenance is defined as activities for unforeseen events that affect culvert performance (Najafi
et al. 2008).
Preventive maintenance activities aim to prevent more serious problems in the future (Najafi et al. 2008).
“Typical activities include joint sealing, concrete patching, mortar repair, invert paving, scour prevention, and
ditch cleaning and repair” (FHWA 1995).
Routine maintenance is defined as activities that are pre-scheduled with the objective to maintain the culvert
in working conditions by addressing deterioration issues. The entire drainage structure is inspected during the
scheduled maintenance to define maintenance activities. Routine maintenance include work such as cleaning,
debris removal, and realignment. ”If the routine maintenance activities are not enough to solve a problem in a
culvert and replacement is not a feasible option, then some of the repair techniques should be employed” (Najafi
et al. 2008).
Rehabilitation restores culvert condition to its initial state and renews culvert service life (Wyant 2002 and
Najafi et al. 2008). Rehabilitation methods include “repair of basically sound endwalls and wing walls, invert
paving, repair of scour, slope stabilization, steambed paving, addition of an apron or cut-off wall, improving the
inlet configuration to enhance culvert performance, or installing debris collectors” (FHWA 1995b), slip lining,
cured-in-place pipes, and pipe bursting (Najafi et al. 2008).
Replacement means replacing an existing culvert with a new one, usually by cutting it open on using a
trenchless method (Wagener and Leagjeld 2014).
Scenario 1.
All Needs
(Baseline Scenario)
Future Budget Needs:
- Maintenance and Rehabilitation Costs
- Backlog Costs
- Culvert Sustainability Index
Culvert Condition
Culvert System Value
Step 3: Conduct Delayed
Maintenance Scenarios Analyses
Step 2: Determine Maintenance
and Budget Needs
Step 1: Define the Culvert
Preservation Policy
Scenario 2.
Do Nothing
Scenario 3.
Maintenance Treatments are
Delayed by Certain Number
of Years
Scenario 4.
Budget-Driven with Limited
Funds
1.1: Identify the Types of Maintenance
1.2: Establish Target Objectives for the Culvert System
1.3: Formulate Decision Criteria for Culvert Maintenance Activities
2.1: Assess the Culver System Condition
3.1: Formulate Delayed Culvert Maintenance Scenarios
3.2: Perform the Delayed Maintenance Scenarios Analyses
3.3: Determine the Impact and Report the Consequences of
Delayed Maintenance
2.2: Select Performance Models to Forecast the Culvert System Condition
2.3: Perform the Needs Analysis
NCHRP Project 14-20A Final Report
E - 3
Table E-1 shows the preservation categories, objectives, and work options.
Table E-1. Preservation categories and work options.
Category Objective Work Options
Routine Maintenance
To keep a culvert in a uniform and safe condition by repairing specific defects as they occur.
Debris & sediment removal
Thawing frozen culverts
Preventive Maintenance
A more extensive strategy than routine maintenance intended to arrest light deterioration and prevent progressive deterioration.
Joint sealing
Concrete patching
Mortar repair
Invert paving
Scour prevention
Ditch cleaning & repair
Rehabilitation
Takes maximum advantage of the remaining unstable structure in a culvert to build a reconditioned culvert.
Repair of basically sound endwalls & wingwalls
Invert paving
Repair of scour
Slope stabilization
Streambed paving
Addition of apron of cutoff wall
Improving inlet configuration
Installing debris collector
Upgrade to Equal Replacement
Upgrade to provide service that is equal to that by a new structure.
Addition, repair or replacement of appurtenant structures
Lining of the barrel
Provision of safety grates or safety barriers
Replacement Provide a completely new culvert with a new service life.
Can be accompanied by:
Realignment
Hydraulic structural and safety improvements
Change in culvert shape or material
Source: FHWA 1995
MnDOT uses the term repair to define a work activity that restores the structural condition. Repairs are
defined and listed from the most used to the least used in Figure E-2.
NCHRP Project 14-20A Final Report
E - 4
Source: MnDOT 2015a
Figure E-2. Example of culvert repairs.
Repair Made List for 2015 Culvert
Cost
List order is based on: 1) Most likely repair type 2) Repair types that are similar 3) More important 4) Last resort and unlikely items towards bottom of list
Repair Made: Description of Repair Made:
Trench New Pipe Install a new pipe by trenching through the road, then fill and compact the trench and maybe pave the road. May include pipe removal. Repaired Length = length of new pipe.
Slipline Slide a pipe-like liner into the culvert and grout the space around it, may install new aprons. Repaired Length = length of slip liner.
Replace Aprons Remove old aprons and place new ones, and maybe replace a few pipe sections. Repaired Length = 0 (if aprons only) or the length of the pipe sections that are reset or replaced.
Reset Remove aprons and maybe pipe sections, fill and compact bedding, and re-attach the same aprons and add ties. May install new pipe sections with Reset. Repaired Length = 0 (if aprons only) or the length of the pipe sections that are reset or replaced.
Extension Lengthen the existing pipe by adding pipe sections and reset or replace aprons, fill and compact and sometimes pave. Repaired Length = length of pipe sections added.
Joint Repair Apply internal joint bands or joint filler to pipe joints, may include filling voids in road bed. Repaired Length = 0 but record number of joints fixed in the Comments.
Hole Repair Patch isolated holes in pipe and may also include filling voids in road bed. Repaired Length = length.
Paved Invert Fix the bottom of pipe by pouring, troweling or covering the invert with concrete or other material, usually in a larger metal pipe. May also include filling voids in road bed. Repaired Length = length of paved invert.
Fill Voids Repair voids in the road bed, outside of the pipe, with grout, lightweight cellular grout or chemical expanding foam grout, hot mix, millings or other fill. Repaired Length = estimate the length of void filled along the pipe.
Cleaning* Remove dirt or debris from inside a pipe or within 5 feet of an apron. Minor cleaning is 4 hours or less of labor. Major cleaning includes more than 4 hours labor or the use of a jetter for cleaning. Repaired Length = length of pipe cleaned.
Ditch Cleaning* Remove dirt or debris from a ditch. Repaired Length = length of ditch cleaned.
Ice Removal* Remove ice to prevent ice or water on roadway. Repaired Length = length of removed ice.
Beavers* Remove or discourage beavers or beaver dams or other critters. Includes exploding dams and trapping contracts. Repaired Length = 0
Abandon Only Plug and abandon existing pipe but NOT install a pipe at same location. Repaired Length = 0
Remove Only Remove existing pipe but NOT install a pipe at same location. Includes road repair.
Other If the repair is not listed, use “Other” and describe the repair in the comments. Repaired Length = length of pipe repaired.
None* If it’s not a repair and not on the list but important enough to record, then use ”None” and describe the task in comments. Repaired Length is probably 0. Use “None” as Repair Made for Pipe Videos.
Notes: *Cleaning-related items and None (not a repair) on the Repair Made list are optional to record in the Culvert Cost app. Each District can choose whether or not to record Cleaning, Ditch Cleaning, Ice Removal, Beavers and None.
1) Repairs of Culverts are required to be entered in the Culvert Cost app. 2) A Culvert has 2 open ends and carries water under a roadway embankment. 3) “Culvert” does NOT include storm drain, flumes, draintile, ditches, ponds, erosion, or infiltration areas.
4) Cleaning is included as part of many Repair Made types
NCHRP Project 14-20A Final Report
E - 5
As the above example illustrates, a wide number of treatments may be performed on culverts. However, it
may be difficult to predict exactly what work activities may be needed in the future given information on the
current condition of a culvert. The culvert model presented in this report considers two basic work activities for
the preservation of the system: maintenance, which may include a variety of routine and preventive maintenance
activities; and rehabilitation/replacement, which includes the rehabilitation and replacement work options
described in Table E-1. A basic policy is to perform maintenance on a culvert when it is in good or fair overall
condition, and either rehabilitate or replace culverts if they are in poor condition.
E.1.2 Establish Performance Objectives for the Culvert System
In this step the agency should select the set of performance measures that will be used to analyze the effects
of delaying maintenance. Culvert performance depends mainly on the type of culvert, material, size, and length.
In selecting culvert performance measures it is important to consider the main factor categories that contribute to
culvert performance, such as structural condition, hydraulic condition, durability, environmental and site factors,
and joint performance. Table E-2 shows the culvert performance categories with their corresponding data and
contributing factors.
Table E-2. Culvert performance categories and important contributing factors.
Category Important Data or Factor
Structural condition
Joint failure1
Cracking1
Invert corrosion or loss1
Concrete wall and slab deterioration1
Undermining1
Scour damage1
Settlement1
Sagging1
Rusting1
Deflection1
Misalignment1
Seam defects1
Residual structural capacity6
Resulting safety factor6
Hydraulic condition
Hydraulic adequacy6
Debris or sediment accumulation2
Loss of hydraulic capacity1
Siltation1
Loss of cross sections1
Scour damage1
Undermining1
Inadequate capacity1
Erosion1
Insufficient opening1
Change in drainage area1
NCHRP Project 14-20A Final Report
E - 6
Table E-2. Culvert performance categories and important contributing factors. (Continued)
Category Important Data or Factor
Durability factors Corrosion
1, 5, Erosion
1, Abrasion
5
Service life3
Environmental and site factors
Scaling1
Delamination1
Spalling1
Efflorescence1
Honeycombs1
Popouts1
Joint performance for pipe culverts
Deflection4
Rotation4
Displacement4
Strain4
Joint separation, perpendicular separation4
Source: Najafi et al. 20081, Markow 2007
2, Wachs and Heimsath 2015
3, Sheldon et al. 2015
4, FHWA 1995
5, Wagener and
Leagjeld 20146
Structural condition is related to the ability of the culvert to withstand the pressure of the surrounding soil
and loads acting on the material. Potential material and structural deterioration presents a safety hazard to the
public travelling on the roadway. Structural issues include joint failures, development of cracks, invert corrosion
or loss, deterioration of concrete walls and slabs, undermining, scour damage, settlement, sagging, rusting,
deflection, misalignment and seam effects can cause loss of structural integrity (Wagener and Leagjeld 2014,
Najafi et al. 2008).
Hydraulic performance is considered during the design phase with factors such as “headwater depth, tailwater
depth, inlet geometry, slope, and roughness of culvert barrel” (Najafi et al. 2008). Inadequate hydraulic capacity
either due to under-design or to debris accumulation and deterioration leads to flooding which is potentially a
safety hazard. Hydraulic condition can change as a result of changes in “land use, drainage area, or
precipitation” (Wagener and Leagjeld 2014) but also due to debris or sediment accumulation, loss of hydraulic
capacity, siltation or loss of cross sections, scour damage, undermining, inadequate capacity, erosion,
insufficient opening, or change in drainage area (Najafi et al. 2008).
Durability related issues with corrosion, erosion, and abrasion “are the most common cause for the
replacement of pipe culverts” (FHWA 1995). Factors that influence the culvert durability include chemical and
electrochemical corrosion, pH, soil resistivity, chlorides, abrasion, debris, bed load, and erosion (Najafi et al.
2008, Mitchell et al. 2005). Deterioration caused by environmental and site factors include scaling,
delamination, spalling, efflorescence, honeycombs and popouts (Najafi et al. 2008). Joint performance for pipe
culverts includes any deflection, rotation, displacement, strain, joint separation and perpendicular separation
issues (Sheldon et al. 2015). Condition metrics can include percent of channel free of obstruction, condition of
the grates, concrete crack severity, and untreated exposed steel (FDOT 2015).
The targets set clearly depend largely upon what performance measures are established. Common culvert
performance measures for this purpose are shown in Table E-3. Note that culverts with an opening of 20 feet or
greater are included in the National Bridge Inventory (NBI). For culverts in the NBI, agencies must report a
culvert rating summarizing the overall condition of the culvert. This rating is specified on the same 0-9 scale
used for measuring deck, superstructure, and substructure conditions for bridges. DOTs typically use this rating
to summarize culvert conditions, even for culverts with an opening less than 20 feet. The culvert model in this
study predicts this rating, but it can often be mapped to other measures of overall structural condition, such as
the FHWA FLH Condition Rating and other ratings listed in Table E-3.
NCHRP Project 14-20A Final Report
E - 7
Table E-3. Examples of common performance measures for culverts.
Performance Measure Description Source
NBI Culvert Rating 0-9 rating similar to the deck, superstructure and substructure ratings for bridges
(FHWA 2015)
FHWA FLH Condition Rating Good, fair, poor, critical, unknown (Hunt et al. 2010)
HydInfra Condition Rating 1 = like new, 2 = fair, 3 = poor, 4 = very poor, 0 = can’t be rated
(Wagener and Leagjeld 2014)
NYSDOT Condition Rating
1 = totally deteriorated, 3 = serious deterioration, 5 = minor deterioration, 7 = new condition, 8= not applicable, 9 = condition/existence unknown. Ratings of 2, 4, 6 are used to shade between 1 and 2, 3 and 5, 5 and 7
(NYSDOT 2006)
Ohio DOT Condition Rating Excellent, good, fair, poor, failure/critical. Culvert performance zones: satisfactory, monitored, and critical
(Najafi et al. 2008)
Western Transportation Institute Rating System
0-1-2 rating system for degree of scour, failure, corrosion, inverts, joint separation, and damage ranging from 0 (no issue), 1 (minor issue), to 2 (major issue)
(Wall 2013)
The following are examples of target performance measures for culverts:
Percent of culverts in good, fair, and poor condition (Venner 2014)
Culvert age and remaining service life (Venner 2014)
Culvert condition by material (aluminum, corrugated metal pipe, reinforced concrete pipe, various plastic)
(Vermont Agency of Transportation 2011)
Culvert condition by route (Vermont Agency of Transportation 2011)
Condition by year constructed (Vermont Agency of Transportation 2011)
E.1.3 Formulate Decision Criteria for Culvert Maintenance Activities
This step involves determining the decision criteria to trigger culvert maintenance activities. The decision
criteria could be based on the culvert condition, remaining service life, and costs. Later in the process it will be
necessary to further determine the impact of maintenance on the culvert condition, remaining service life, and
the set of future maintenance activities. Table E-4 shows and example of decision criteria for maintenance
activities.
Table E-4. Examples of decision criteria for maintenance activities.
Decision Criterion Based on
Culvert condition
Maintenance (clearing, cleaning) and Repair actions
(repair) (Hunt et al. 2010)
NBI condition rating (e.g., perform maintenance for an NBI
rating of 4 to 6 and replace if less than 4)
Distresses with action options (Najafi et al. 2008)
Remaining service life Statistical formula
Software (e.g. Pontis)
Intervention cost
NCHRP Project 14-20A Final Report
E - 8
E.2 Step 2: Determine Maintenance and Budget Needs for the Culvert
System
E.2.1 Assess the Culvert System Condition
To evaluate the culvert condition, the following types of inspections are recommended in the Ohio
Department of Transportation Culvert Management Manual (ODOT 2014):
Inventory inspections that are conducted upon construction.
Routine inspections that are performed regularly to identify any physical of functional changes.
Damage inspections that are performed on culverts with known defects after major floods and storms to
identify any damage that would require load restrictions or road closures.
Interim inspections that are conducted upon expert decision to perform an inspection on culverts that have
known defects.
Storm sewer inspections that can be either inventory or routine checks on storm sewers.
The FHWA report Culvert Assessment and Decision-Making Procedures Manual for Federal Lands Highway
(FLH) defines five condition categories for culverts ranging from good, fair, poor, critical, and unknown as
shown in Table E-5 (Hunt et al. 2010). The report also includes a description of these conditions for elements of
concrete and reinforced concrete pipe, corrugated metal pipe, plastic pipe, timber, masonry, and appurtenances.
Figure E-3 shows an example of a culvert assessment form developed by FHWA in the Culvert Assessment and
Decision-Making Procedures Manual (Hunt et al. 2010).
Table E-5. FHWA Federal Lands Highway (FLH) culvert condition rating codes.
Condition Description
Good Like new, with little or no deterioration, structurally sounds and functionally adequate.
Fair Some deterioration, but structurally sound and functionally adequate.
Poor Significant deterioration and/or functional inadequacy requiring repair action that should, if possible, be incorporated into the planned roadway project.
Critical Very poor conditions that indicate possible imminent failure that could threaten public safety, requiring immediate repair action.
Unknown All or part of the culvert is inaccessible for assessment or a rating cannot be assigned.
Source: Hunt et al. 2010
Culverts with an opening of 20 feet or greater are included in the National Bridge Inventory (NBI). For these
culverts, the overall condition is characterized on the 0 to 9 scale described previously for inspecting bridge
decks, superstructures and substructures. This rating scale is more detailed than that shown Figure E-3, and it is
typically used only for characterizing the overall rating of a culvert, not individual elements or components.
The culvert model developed as part of this study utilizes this rating. A culvert is deemed to be in good
condition if it has a rating of 7, 8 or 9 on this scale; in fair condition if it has a rating of 5 or 6; or in poor
condition if it has a rating of 4 or less.
NCHRP Project 14-20A Final Report
E - 9
Source: Hunt et al. 2010
Figure E-3. Example of a culvert assessment form.
NCHRP Project 14-20A Final Report
E - 10
Remaining Life
Remaining life is also an important factor in culvert maintenance decisions. There are several perspectives of
asset life (Ford et al. 2012):
Physical life is defined as “the period of time in which the asset is physically standing.”
Functional life is defined as “the period of time in which the asset satisfies all of its functional requirements.”
Service life is defined as “the period of time in which the asset is providing the intended type of service.”
Economic life is defined as “the period of time in which it is economically optimal to keep the asset in
service rather than retiring or replacing it.”
Actual life is defined as “the known value of physical, functional, service, or economic life after the asset has
actually been retired or replaced.”
Estimated life is defined as “a forecast of future physical, functional, service, or economic life, which is
prepared before the actual life is known.”
Target life is defined as “the desired economic life that serves as a basis for planning.”
Design life is defined as “a specific type of estimated life and target life that entails a forecast and target for
economic life established when the facility is designed.”
Figure E-4 shows examples of anticipated physical life, actual physical life and functional life with respect to
reconstruction.
Source: NCHRP Report 713 – Ford et al. 2012
Figure E-4. Physical and functional life.
The median life expectancy for culverts ranges between 30 to 50 years, depending on the culvert shape and
material, as Table E-6 shows.
NCHRP Project 14-20A Final Report
E - 11
Table E-6. Culvert life expectancy.
Component and Material No. of Responses Minimum
(Years)
Maximum
(Years)
Mean
(Years)
Median
(Years)
Mode
(Years)
Pipes
Concrete 13 30 100 60.4 50 50
Corrugated meta 16 10 60 37.3 35 50
Asphalt coated corrugated metal 5 10 75 43 50 50
Small diameter plastic 7 10 75 50 50 50
High-density Polyethylene 1 - - 50 - -
Box Culverts
Reinforced concrete 15 30 100 63.3 50 50
Timber 3 10 50 30 30 -
Precast reinforced concrete 1 - - 50 - -
Polyvinyl chloride 1 - - 30 - -
Aluminum alloy 1 - - 50 - -
Source: NCHRP Synthesis 371 – Markow 2007
Culvert service life is affected by several “factors related to the pipe and its placement, the drainage water it
carries, and the soil that surrounds it” (Markow 2007). However, in this study, the culvert model defines culvert
life in a straightforward manner, as the time required for the NBI culvert rating drops from a value of 9 to 3,
similar to the approach described in NCHRP Report 713.
E.2.2 Select Performance Models to Forecast the Culvert System Condition
The culvert system performance can be modeled based on culvert’s condition, age, or combination of both. A
condition-based approach requires periodical condition assessment to develop deterioration models, while an
age-based approach estimates the remaining life from historical records of construction. A hybrid approach is
recommended to update the performance deterioration curve after each inspection. As a reference, Table E-7
shows examples of performance models used to forecast culvert condition (Ford et al. 2012).
NCHRP Project 14-20A Final Report
E - 12
Table E-7. Examples of culvert performance models to forecast condition.
Model Example
Linear regression – deterministic or probabilistic
𝐺𝑅 = 17.57 − 0.04(𝐴𝐺) − 1.23 (𝑝𝐻) − 2.01(𝐴𝐵)
where: GR = General Rating AG = Age
AB = abrasiveness pH = potential of hydrogen
Log-linear regression -
deterministic or probabilistic No example is available
Exponential regression – deterministic or probabilistic
No example is available
Normal distribution – deterministic or probabilistic
No example is available
Markovian distribution – deterministic or probabilistic
See description in the next section
Weibull survival distribution – deterministic or probabilistic
𝑆(𝑡) = 𝐸𝑋𝑃 [−1 ∗ (𝑡 − 𝛾
𝛼) ^𝛽]
where: 𝛼 = scaling factor
𝛽 = shape factor 𝛾 = location factor
t = age in years S (t) = survivor probability
Culvert deterioration model from condition data
In this study, culvert deterioration is modeled through specifying the probability of transitioning from one
condition to another each year by using a Markovian distribution. Table E-8 specifies the default deterioration
probability parameters. These probabilities were matched empirically to the estimates of culvert life from the
NCHRP Report 713 in combination with analysis results of state-level NBI data.
Table E-8. Example of culvert rating deterioration probabilities by rating.
Rating Deterioration Probability
0 0.0%
1 5.0%
2 10.0%
3 6.3%
4 4.8%
5 4.8%
6 7.0%
7 10.0%
8 9.0%
9 50.0%
NCHRP Project 14-20A Final Report
E - 13
Figure E-5 shows the corresponding average rating over time using the probabilities in Table E-8. A culvert
with a rating of 9 quickly deteriorates to 8, it deteriorates linearly afterwards, reaching a value of 3 at
approximately 75 years. Theoretically, the culvert reaches the value of 1.0 approximately at year 120, although
in the practice replacement is performed earlier.
Figure E-5. Predicted culvert rating condition over time.
E.2.3 Perform the Needs Analysis
The culvert model identifies maintenance and budget needs based on condition. Maintenance activities are set
for each condition level with their costs, effect, and priority. The data required for the needs analysis are shown
in Figure E-6 and include:
Culvert inventory with condition rating (on a scale 0 to 9)
Deterioration probability for each condition rating
Effect of maintenance work on culvert condition
Cost of culvert maintenance work
Culverts in the
network
Condition rating
based on
inspection
Expected condition
improvement after
treatment
Cost of culvert
maintenance work
Deterioration
probability
Figure E-6. Data required for the culvert needs analysis.
NCHRP Project 14-20A Final Report
E - 14
In the culvert model, the condition rating values are predicted taking into account needed work relative to
deferring work. The specified budget is allocated in order of priority. Default priorities for maintenance
activities at each condition level are established through a Markov modeling approach, with the probability of
transition from one condition rating to another determined empirically to match the estimated times to a rating
of 3, 4 and 5 published for culverts in NCHRP Report 713. The defaults in the model are to perform
maintenance work when the culvert rating is 4 or 5 and replace a culvert with a rating of 3 or less. When no
work is performed on a culvert, its deterioration is predicted probabilistically using the values specified in Table
E-8. The process followed by the model for each year of an analysis is as follows:
The needed work is established for each culvert based on its rating and the cost of this work is
calculated. For this example, culvert replacement was estimated to cost $180 per square meter of
roadway area, and maintenance was projected to cost $30 per square meter.
A priority is assigned to each recommended action. Highest priority was assigned to maintenance
work, followed by rehab/replacement of culverts in poor condition.
The future condition of the culvert in the next year is predicted if work is performed and if it is
deferred. Maintenance work was assumed to raise the rating of the culvert to a value of 7, while
rehab or replacement was assumed to restore it to a value of 9.
Funds are allocated in priority order until the budget is spent, or until insufficient funds remain to
perform the next recommended action.
The culvert rating for the next year is calculated based on whether or not work is projected to occur.
The outputs from one year serve as the inputs to the next year’s calculations.
Note that the model can easily be reconfigured to use different treatments, different condition ratings, or
remaining service life as an alternative approach.
E.3 Step 3: Conduct Delayed Culvert Maintenance Scenario Analysis
E.3.1 Formulate Delayed Culvert Maintenance Scenarios
The key elements, performance models, brief description of the set of scenarios, expected results for culvert
maintenance are presented in Table E-9.
Table E-9. Key elements to analyze delayed maintenance scenarios for culverts.
Data Performance
Models Maintenance Scenarios
Length of Analysis: 20 years Results
Culvert inventory with condition assessment NBI data for all 50 states NBI data on bridge-length culverts
Probabilistic Markov Models
1. All Needs 2. Do Nothing 3. Delayed maintenance:
Maintenance treatments are delayed by a certain number of years. a. 5-year cyclical delay b. Maintenance treatments are deferred
but rehabilitation/ replacement treatments are performed.
4. Budget-driven with limited funds a. 50 percent of Annual Baseline Budget b. 25 percent of Annual Baseline Budget
Analytical Tools NBIAS Spreadsheet based model to forecast the culvert condition. Reports
Impact on condition due to
delayed maintenance
Agency costs of performing
deferred work
Agency cost of
emergency/reactive
maintenance
NCHRP Project 14-20A Final Report
E - 15
E.3.2 Perform the Delayed Maintenance Scenario Analysis
Scenario 1: All Needs. This scenario approximates the current practices of a DOT of a western state included
in the research as a case study. In this case, maintenance work is performed on a culvert if it has a rating of 4 or
5. This work is estimated to cost $30 per square foot of area. Performing maintenance work restores the rating
to 7. If the condition slips to 3 or less then the culvert is rehabilitated or replaced at a cost of $180 per square
foot and the rating is restored to 9. The cost is doubled for a culvert with a rating of 0 under the assumption that
work is performed on an emergency basis in this case. Relative priorities for performing maintenance work are
determined by modeling a culvert using a Markov decision model similar to that implemented in the Pontis
BMS, and replacement work is prioritized on a worst first basis. The annual budget is set to $3 million per year
for the 1,200 culverts in the inventory, which is not sufficient to cover all needs in the first year, but does allow
for addressing all the preservation needs over time.
Scenario 2: Do Nothing. This is a scenario in which no work is performed, illustrating how the culverts in the
inventory deteriorate over time without maintenance.
Scenario 3.a: Delayed Preservation Scenario. In this scenario, maintenance is delayed for a period of 5 years,
and no rehabilitation or replacement work is performed. After the period of deferral all needed work is
performed.
Scenario 3.b: Delayed Maintenance. In this scenario, the policy is modified to allow for rehabilitation and
replacement work but deferring the maintenance work.
Scenario 4: Budget-driven with limited funds. In this scenario, the baseline budget is reduced: to a) 50
percent, b) 25 percent of the baseline budget in Scenario 1. However, for these scenarios, the amount spent is
always lower than the budget, as funds remain unspent if the cost of a needed action is greater than the available
funding. Table E-10 notes actual projected spending in each case.
Table E-10 details the results of all of the scenarios. This table shows the total costs over a 20-year analysis
period, and total costs discounted at a rate of 7 percent. Also shown, the backlog costs (unmet need) at the end
of the analysis period, percent of culverts in poor condition, and average rating.
Table E-10. Summary of the scenario analysis results for culverts.
1 At the end of year 20.
E.3.3 Determine the Impact of Delayed Maintenance and Report the
Consequences
To quantify the consequences of delayed maintenance, the results of delayed maintenance scenarios are
compared to the baseline scenario from the needs analysis. Six scenarios, defined in Table E-10, are selected to
show the consequences of delayed maintenance.
Consequences on the Culvert System Condition
NCHRP Project 14-20A Final Report
E - 16
The current condition of the culvert system is shown in Figure E-7, where 44.86 percent of culverts are in
good condition, 51.22 percent in fair condition, and 3.92 percent in poor condition.
Figure E-7. Culvert system condition at the beginning of the analysis.
Figure E-8 shows the condition at the end of the 20-year analysis period. Scenario 1, where all needs are
addressed results in 38.09 percent of culverts in good condition, 61.91 percent in fair condition, and 0 percent in
poor condition. On the other hand, Scenario 2 where no funding is allocated, results are 5.68 percent in good,
68.95 percent in fair and 25.37 percent in poor condition. Scenario 3.a represents a delay of any activities
between years 1 and 5, while in years 6 to 20 all needs are addressed, which results in identical condition as
Scenario 1 at the of the analysis period. Scenarios 3.b and 4.b, with rehabilitation and replacement, and 25
percent of baseline budget respectively, have similar results where about 70 percent of culverts end up in fair
position, and the rest of culverts in poor and good condition. Scenario 4.a with 50 percent of baseline budget
results in 29.38 percent in good, 69.45 percent in fair and 1.17 percent in poor condition.
Figure E-8. Culverts’ condition categories at the end of the analysis period, year 20.
NCHRP Project 14-20A Final Report
E - 17
Figure E-8. Culverts’ condition categories at the end of the analysis period, year 20 (Continued).
Figure E-9 shows the condition at the critical year, which is the year with the worst condition during the
analysis period. For Scenario 1, all needs, the worst condition is in year 1, where 3.7 percent of culverts are in
poor condition and 54.0 percent in fair condition. Scenarios 2, 3.b, and 4.b reach the worst condition at the end
of the analysis period. Scenario 2, do nothing, reaches a maximum of 25.4 percent of poor culverts, Scenario
3.b, Rehabilitation/Replacement, reaches 16.4 percent of culverts in poor condition, and Scenario 4.b, 25 percent
of baseline budget, reaches 10.6 percent of culverts in poor condition. Scenario 3.a, delayed maintenance by 5
years, reaches the worst condition at the end of year 5, where 7.6 percent of culverts are in poor condition and
64.3 percent in fair condition. Scenario 4.a, 50 percent of baseline budget, reaches the worst condition in year 2,
with 1.2 percent of culverts in poor condition and 69.4 percent in fair condition.
NCHRP Project 14-20A Final Report
E - 18
Figure E-9. Culvert’s condition categories at the critical year.
Figures E-10 and E-11 show the condition rating and category over the 20-year analysis period for all the
scenarios. Scenario 1, all needs, maintains the average condition rating between 6.3 and 6.4. Scenario 2, do
nothing, continually deteriorates until reaching condition rating of 4.9. Scenario 3.a, delayed maintenance by 5
years, reaches condition rating 5.9 at the end of year 5, but starting year 6 the condition improves to match the
results in Scenario 1. Scenario 3.b and Scenario 4.b result in continually deteriorating condition and in the last
year of analysis the condition rating reaches 5.42 and 5.46 respectively. Scenario 4.a, 50 percent of baseline
budget, maintains the condition rating at or above 6.0.
NCHRP Project 14-20A Final Report
E - 19
Figure E-10. Percentage of culverts by condition category over the analysis period.
Figure E-11 shows the percent of culverts over time in good, fair and poor condition. Scenario 1, all needs,
shows increasing percentage of good and fair condition. Scenario 2, do nothing, results in decreasing share of
culverts in good condition while the percentage in poor condition increases. Scenario 3.a, delayed maintenance
by 5 years, shows deteriorating condition in the first 5 years and then for years 6-10 the same condition as in
Scenario 1. Scenario 3.b, Rehabilitation/Replacement, results in similar condition as Scenario 2, but with more
culverts in fair condition. Scenario 4.a, 50 percent of baseline budget, looks similar to Scenario 1, but with more
culverts in poor condition and less in good condition.
NCHRP Project 14-20A Final Report
E - 20
Figure E-11. Culvert condition rating over time, 20 years.
NCHRP Project 14-20A Final Report
E - 21
Figure E-11. Culvert condition rating over time, 20 years. (Continued)
Consequences on the Culvert System Remaining Life
NCHRP Project 14-20A Final Report
E - 22
Figure E-12 shows the average remaining service life during the analysis period. The maximum expected
service life of a culvert is assumed to be 68 years based on historical records. Scenario 1, all needs, maintains
the average culvert system remaining life between 47 and 49 years. In Scenario 2, do nothing, the remaining life
continuously decreases from 47 years in the first year to 29 years at the end of the analysis period. Scenario 3.a
shows a delayed maintenance first 5 years and then a recovery up to the levels of Scenario 1. Scenario 3.b,
rehabilitation and replacement, has a similar remaining life trend as Scenario 4.b, 20 percent of funding needs,
with an average remaining life around 37 years at the end of the analysis period. Scenario 4.a, 50 percent of
funding needs, maintains the average culvert system remaining life around 45 years during the entire analysis
period.
Figure E-12. Remaining service life over the analysis period for each scenario.
Consequences on Future Budget Needs
Figures E-13 to E-15 show examples of budget needs for Scenario 1 and Scenario 2. Figure E-13 shows the
predicted budget needs (cost of performing recommended work) and spending for Scenario 1, which best
represents the current agency practice. The initial budget need is approximately $12 million, but it is lowered as
work is performed over time. After year 6, the available budget is sufficient to cover the preservation needs.
The total allocated budget or agency costs is $45.2 million over a 20-year period.
NCHRP Project 14-20A Final Report
E - 23
Figure E-13. Cost of performing work by year, Scenario 1.
Figure E-14 shows the culvert system condition for Scenario 1, illustrating steady maintenance of initial
conditions over time.
Figure E-14. Percentage of culverts by condition category, Scenario 1.
Figure E-15 shows the predicted needs and spending funds for Scenario 2, in which no work is performed.
Backlog costs climb to $57.8 million by the end of the analysis period.
NCHRP Project 14-20A Final Report
E - 24
Figure E-15. Costs of performing work by year, Scenario 2.
Figure E-16 shows conditions over this period, illustrating steady decline condition trend over time. The
average condition declines from 6.2 to 4.9 over 20 years.
Figure E-16. Percentage of culverts by condition category, Scenario 2.
Figure E-17 shows the unfunded backlog for all the scenarios. Scenario 1, all needs, shows decreasing
backlog overtime and there is no more unfunded backlog by year 7. In Scenario 2, do nothing, the backlog
gradually increases to $58 million. Scenario 3.a, delayed maintenance by 5 years, shows backlog only during the
5 years when maintenance is delayed, with the highest backlog of $19 million at the end of this period. Scenario
3.b, rehabilitation/replacement, shows increasing backlog up to $29 million in year 20. Scenario 4.a, 50 percent
of baseline budget, maintains a backlog below $20 million. Backlog in Scenario 4.b, 25 percent of baseline
budget, reaches over $30 million in the last four years of the analysis.
NCHRP Project 14-20A Final Report
E - 25
Figure E-17. Unfunded backlog for each scenario over the analysis period.
NCHRP Project 14-20A Final Report
E - 26
Figure E-17. Unfunded backlog for each scenario over the analysis period. (Continued)
NCHRP Project 14-20A Final Report
E - 27
Figure E-18 shows the culvert system value together with the sustainability ratio over the analysis period of
20 years. Scenario 1, all needs, maintains the system value above $319 million. Scenario 2, do nothing, results in
decreasing system value down to $188 million. Scenario 3.a, delayed maintenance by 5 years, shows the lowest
culvert system value of $284 at year 5 and then increases to recover the levels of Scenario 1. Scenario 3.b,
Rehabilitation/Replacement, results in decreasing the system value down to $235 million. Scenario 4.a, 50
percent of the baseline budget; and Scenario 4.b, 25 percent of the baseline budget, result in system values of
$291 million and $240 million, respectively.
Figure E-18. Culvert system value and sustainability ratio over the analysis period.
NCHRP Project 14-20A Final Report
E - 28
Figure E-18. Culvert system value and sustainability ratio over the analysis period (continued).
NCHRP Project 14-20A Final Report
E - 29
E.4 Summary
The scenario results clearly demonstrate the effects of delaying needed maintenance to culverts. Delaying
maintenance results in increased backlog costs over time and increased numbers of culverts in poor conditions.
Specific results for the case study include the following:
A 5-year deferral in Scenario 3.a slightly reduces the allocated budget or agency costs, but results in an
increase in the percent of culverts in poor condition to 7.65 and 5.92 condition rating at the end of the deferral
period. The culvert system value also reduced to $284 million, and the remaining life to 43.8 years at the end
of the 5-year deferral period.
Scenario 3.b, in which maintenance activities are not performed, but poor culverts are still replaced,
demonstrates that not performing maintenance reduces the agency costs at front by $18.0 million, but at the
cost of worse conditions, and significant backlog costs. In this case, 16 percent of the culvert system is in
poor condition, and the average condition rating is 5.4 at the end of 20 years. Also, the backlog cost is $29.2
million. In Scenario 3.b, the system value decreased to $235 million, and also the remaining life decreased to
36.8 years.
Scenario 4.a, in which the budget is reduced 50 percent, the culvert system value decreased to $291 million
and the remaining service life reached 44.7 years at the end of year 20. The backlog costs is $ 13.5 M and the
condition rating 5.98.
Scenario 4b, in which the budget is reduced to 25 percent, illustrates that a budget cut reduces spending, at
the cost of worsened condition and even greater backlog in needs over time. In Scenario 4.b, the backlog
costs is $ 35.5 M and the condition rating 5.46 at the end of year 20. The culvert system value decreased to
$240 million, and also the remaining service life is reduced to 37.4 years at the end of 20 years.
NCHRP Project 14-20A Final Report
E - 30
References
Florida Department of Transportation (FDOT). 2015. Florida Department of Transportation Maintenance Rating Program
Handbook.
Federal Highway Administration (FHWA). 1995. Culvert Repair Practices Manual – Volume 1& 2. FHWA – RD – 94 –
096 & FHWA – RD – 95 –089, Federal Highway Administration, Washington, DC.
Federal Highway Administration (FHWA). 2012. Hydraulic Design of Highway Culverts. 3rd Edition. Publication No.
FHWA-HIF-12-026.
Ford, KM., M.H.R. Arman, S. Labi, K.C. Sinha, P.D. Thompson, A.M. Shirole, Z. Li. 2012. Estimating Life Expectancies
of Highway Assets. NCHRP Report 713, Volume 1&2.
Hunt, J.H., S.M. Zerges, B.C.Roberts, and B. Bergendahl. (2010). Culvert Assessment and Decision-Making Procedures
Manual For Federal Lands Highway. FHWA-CFL/TD-10-005.
Markow, M.J. 2007. Managing Selected Transportation Assets: Signals, Lighting, Signs, Pavement Markings, Culverts, and
Sidewalks A Synthesis of Highway Practice. NCHRP Synthesis 371.
Mitchell, G.F., T. Masada, S. Sargand, B. Tarawneh, K. Stewart, S. Mapel, and J. Roberts (2005). Risk Assessment and
Update of Inspection Procedures for Culverts. FHWA/OH-2005/002.
Minnesota Department of Transportation (MnDOT). 2015. Repair Made, Culvert Cost and Hydinfra Spring 2015 Training.
http://www.dot.state.mn.us/bridge/hydraulics/culvertcost/Repair%20Made%20Examples.pdf
Najafi, M., S. Salem, D. Bhattachar, B. Salman, R. Patil. 2008. An Asset Management Approach for Drainage
Infrastructure and Culverts. Project 06-08.Midwest Regional University Transportation Center.
New York State Department of Transportation (NYSDOT). 2006. Culvert Inventory and Inspection Manual.
Ohio Department of Transportation (ODOT). 2014. Culvert Management Manual. Ohio Department of Transportation.
Sheldon, T., H. Sezen, I.A. Moore. 2015. Joint Response of Existing Pipe Culverts under Surface Live Loads. ASCE J.
Perform. Constr. Facil. 2015.29.
Venner, M. 2014. Culvert and Storm Drain Management Case Study: Vermont, Oregon, Ohio, and Los Angeles County.
Sponsored by FHWA.
Vermont Agency of Transportation. 2011. Statewide Small Culvert Inventory: 2010 End of Year Report.
Wagener, B.D. and E.E. Leagjeld. 2014. Culvert Repair Best Practices, Specifications and Special Provisions – Best
Practices Guidelines. MN/RC 2014-01.
Wall, T.A. 2013. A Risk-based Assessment Tool to Prioritize Roadway Culvert Assets for Climate Change Adaptation
Planning. Dissertation. Georgia Institute of Technology.
Wyant, D.C. 2002. Assessment and Rehabilitation of Existing Culverts, A Synthesis of Highway Practice. NCHRP
Synthesis 303.