![Page 1: Procedures to address safety in land-use planning, including … · 2018-12-14 · o MORTmethod (Management Oversight and Risk Tree) o RENAULT method o INCDPM method Bucureşti Romania](https://reader035.vdocument.in/reader035/viewer/2022081405/5f0952a87e708231d42647e9/html5/thumbnails/1.jpg)
‘Risk assessment at oil terminal in Danube Logistics SRL, as operator of the Giurgiulesti International Free Port
Republic of Moldova’
Svetlana StirbuHealth, Safety and Environment Officer
ICS Danube Logistics SRL, Giurgiulesti International Free Port
UNECE Seminar on Risk Assessment Methodologies Geneva, 4 December 2018
![Page 2: Procedures to address safety in land-use planning, including … · 2018-12-14 · o MORTmethod (Management Oversight and Risk Tree) o RENAULT method o INCDPM method Bucureşti Romania](https://reader035.vdocument.in/reader035/viewer/2022081405/5f0952a87e708231d42647e9/html5/thumbnails/2.jpg)
![Page 3: Procedures to address safety in land-use planning, including … · 2018-12-14 · o MORTmethod (Management Oversight and Risk Tree) o RENAULT method o INCDPM method Bucureşti Romania](https://reader035.vdocument.in/reader035/viewer/2022081405/5f0952a87e708231d42647e9/html5/thumbnails/3.jpg)
The oil terminal consists of : one jetty on the
river Danube, a tank farm
consisting of eight tanks,
truck-loading facilities and, from mid 2012
a mixed-gauge rail loading/unloading facilities.
The total storage capacity of 63,600 cubic meters.
![Page 4: Procedures to address safety in land-use planning, including … · 2018-12-14 · o MORTmethod (Management Oversight and Risk Tree) o RENAULT method o INCDPM method Bucureşti Romania](https://reader035.vdocument.in/reader035/viewer/2022081405/5f0952a87e708231d42647e9/html5/thumbnails/4.jpg)
The laws and regulations concerning occupational safety and health in Republic of Moldova
• Law No. 186-XVI of 10 July 2008 on Occupational Healthand Safety.
The responsability of the employer is to take measures forpreventing its workers from risks.
• Labour Code No. 154-XV of 28 March 2003.• Law No. 140-XV of 10.05.2001 on Labour Inspection.• Act of the Republic of Moldova on Dealing with Harmful
Products and Substances, No. 1236-XIII of July 3, 1997• Act of the Republic of Moldova on Fire Safety, No. 267-XIII
of November 9, 1994• etc. ..
![Page 5: Procedures to address safety in land-use planning, including … · 2018-12-14 · o MORTmethod (Management Oversight and Risk Tree) o RENAULT method o INCDPM method Bucureşti Romania](https://reader035.vdocument.in/reader035/viewer/2022081405/5f0952a87e708231d42647e9/html5/thumbnails/5.jpg)
4 categories (depending on the theoretical model of the work accident genesis):
• Methods such as "Controls and checks"o (check-lists at the company, divisions, work station,
industry level)• Methods based on the Heinrich model
o (check-lists of dangerous conditions and behaviors)• Methods based on systems reliability theory
o Analysis of fault modes and their effects (AMDE)o Deflection Tree Analysis (ADD)o Preliminary Risk Analysis (APR)o HAZOP Method (Hazard Operability)o MOSAR method
• Methods based on ergonomics systemo DSF method (Diagnosis safety form)o DCT method (Diagnostique des conditions du travail)o SDQ method (Safety diagnosis Questionare)o MORT method (Management Oversight and Risk Tree)o RENAULT method o INCDPM method Bucureşti Romaniao Mera method
RISK ASSESSMENT METHODS
STANDARD EN ISO 14121-1: 2007 Establishes the risk assessment principle: identifying the risk factors in the system under consideration and quantifying the size of the risks based on the combination of the severity and frequency of the maximum foreseeable consequence of the risk factor action on the human bodyIt summarizes six risk assessment methods (HAZOP, MOSAR, AMDEC, DELPHI, WHAT IF, APR)
![Page 6: Procedures to address safety in land-use planning, including … · 2018-12-14 · o MORTmethod (Management Oversight and Risk Tree) o RENAULT method o INCDPM method Bucureşti Romania](https://reader035.vdocument.in/reader035/viewer/2022081405/5f0952a87e708231d42647e9/html5/thumbnails/6.jpg)
What kind of risks exist?
• Real risk - the one transformed into an accident or occupational disease (resulting from statistics)
• Potential risk - one that can cause an accident or can lead to a professional illness
• Assumed risk - the one remaining after all known measures
![Page 7: Procedures to address safety in land-use planning, including … · 2018-12-14 · o MORTmethod (Management Oversight and Risk Tree) o RENAULT method o INCDPM method Bucureşti Romania](https://reader035.vdocument.in/reader035/viewer/2022081405/5f0952a87e708231d42647e9/html5/thumbnails/7.jpg)
2.Visit to the working placeto identifydangers
3. The evaluationGravity ofthe danger
4. The evaluationof the probability that danger might happen
5. Combining valuesof gravity + probabilityto evaluateRISK
1.To establishthe Team for evaluation
Risk assessment procedure
![Page 8: Procedures to address safety in land-use planning, including … · 2018-12-14 · o MORTmethod (Management Oversight and Risk Tree) o RENAULT method o INCDPM method Bucureşti Romania](https://reader035.vdocument.in/reader035/viewer/2022081405/5f0952a87e708231d42647e9/html5/thumbnails/8.jpg)
7. Prioritiesidentification
8. ImplementationControls Hierarchycontrols.
9. Information of the workers
10. Monitoringand review
6. Ccomparisonsof the Risk Rate With a criteria
![Page 9: Procedures to address safety in land-use planning, including … · 2018-12-14 · o MORTmethod (Management Oversight and Risk Tree) o RENAULT method o INCDPM method Bucureşti Romania](https://reader035.vdocument.in/reader035/viewer/2022081405/5f0952a87e708231d42647e9/html5/thumbnails/9.jpg)
• DL developed the HAZID document for an oil terminal - presenting significant hazards associated with operational activities - based on different scenarios of possible accidents.
• For the existing and expected port instalations assessed by an HAZID team, led by the Germanischer Lloyd Industrial Services GmbH, Buseness Segment Oil and Gas, 77 diferent scenarios were analised with final identification of:
• 29 scenario’s with a reducedrisk level (green color)
• 48 scenario’s with a medium level of risks (yellow color )
• no scenario with high level of risk (red color)
![Page 10: Procedures to address safety in land-use planning, including … · 2018-12-14 · o MORTmethod (Management Oversight and Risk Tree) o RENAULT method o INCDPM method Bucureşti Romania](https://reader035.vdocument.in/reader035/viewer/2022081405/5f0952a87e708231d42647e9/html5/thumbnails/10.jpg)
• Development of safety fiches for each working place, separate tasks, and for each position, Oil Terminal Risks Register
• Development of safety documentation• Evaluation of risks - individual risks, collective and/or group risks• It is a systematic review of the risks associated with all components of the
work process:o executorowork taskowork equipmentowork environment
• The review responds to: which risks do exist at the work place• which risks can be eliminated• what preventive and protective measures must be taken to control the risks
that can not be eliminated (assumed)
![Page 11: Procedures to address safety in land-use planning, including … · 2018-12-14 · o MORTmethod (Management Oversight and Risk Tree) o RENAULT method o INCDPM method Bucureşti Romania](https://reader035.vdocument.in/reader035/viewer/2022081405/5f0952a87e708231d42647e9/html5/thumbnails/11.jpg)
When THE RISK ASSESSMENT IS COMPLETED
• EVALUATION FILE - EXAMPLE
UNIT: ..............SECTION: ............. EVALUATION FILE a
WORKING POINTNUMBER OF PERSONS EXPOSED: ...EXPOSURE DURATION: ..............
WORKING POINT: EVALUATION TEAM________
THE LABOR COMPONENT
RISK FACTORS
IDENTIFIED
THE RISK FACTOR MANIFEST FORM
(description, parameters)
THE PREVIOUS-
FREE MAXIMUM CONCEPT
THE GRAVI
TYCLASS
CLASS OF
FREQUENCY
RISK LEVEL
0 1 2 3 4 5 6
![Page 12: Procedures to address safety in land-use planning, including … · 2018-12-14 · o MORTmethod (Management Oversight and Risk Tree) o RENAULT method o INCDPM method Bucureşti Romania](https://reader035.vdocument.in/reader035/viewer/2022081405/5f0952a87e708231d42647e9/html5/thumbnails/12.jpg)
Consideration of NATECH risks at Giurgiulesti oil terminal - Earthquakes
![Page 13: Procedures to address safety in land-use planning, including … · 2018-12-14 · o MORTmethod (Management Oversight and Risk Tree) o RENAULT method o INCDPM method Bucureşti Romania](https://reader035.vdocument.in/reader035/viewer/2022081405/5f0952a87e708231d42647e9/html5/thumbnails/13.jpg)
Thank you foryour kind attention www.gifp.md
If you don't invest in risk management, it doesn't matter what business you're in,it's a risky business.