![Page 1: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/1.jpg)
Program part oneThursday 14th April, last day
Morning session Chair: Arnold de GrootHeadline: Wire Rope
08:30 Innovative fatigue test methods for the evaluation of wire ropes service life andperformance under heavy duty offshore applications Ronen Ashkenazi
09:15 Non‐destructive testing of large diameter steel wire ropes with intros instruments Dmitry Slesarev
10:00 Coffee / CraneExpo
10:15 Case study on the application of rope installation, examination, maintenance anddiscard criteria for the offshore wind energy sector, Sara Fletcher
10:45 Non ‐ destructive magneto‐inductive rope testing, Olivier Gronau
![Page 2: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/2.jpg)
Wednesday 13th April
Table of Contents, Thursday 14th April
Innovative fatigue test methods for the evaluation of wire ropes service life and performance under heavy duty offshore applications Ronen AshkenaziNon‐destructive testing of large diameter steel wire ropes with intros instruments, Dmitry SlesarevCase study on the application of rope installation, examination, maintenance and discard criteria for the offshore wind energy sector, Sara FletcherNon ‐ destructive magneto‐inductive rope testing, Olivier GronauKeynote speaker by invitation : Mr. Roland Verreet,Lecture: About consultants, test machines and wire rope failures
Page 3
Page 24
Page 42
Page 61Page 91
Innovations in training, risk mitigation through virtual simulation based on lessons learned from Us military & aviation industries, Troy “Korn” KehoeCompetence‐upgrading: inspection and service of cranes and davits, Ian McCurdie, CanceledDesign and implementation of effective simulation‐based training curriculum for offshore lift crew training, Arnold FreeClosing/adjourn Svein Anders Eriksson, Chairman of the organisingcommittee.
Page 93
Page 116
Page 117
Page 146
![Page 3: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/3.jpg)
Speaker
Ronen Ashkenazi, M.R.E. Matron Rope & Wire Rope Engineering LTD, ISR
Lecture: Innovative fatigue test methods for the evaluation of wire ropes service life and performance under heavy duty offshore applications
Background: He is the technical manager and owner of M.R.E Matron Rope & Wire Rope Engineering. He was conducting the Ph. D degree at the Department of Mechanical Engineering Technion – Israel Institute of Technology Technion City –
Haifa: The Mechanical Behavior and Fatigue Life of Wire Ropes
![Page 4: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/4.jpg)
Innovative Fatigue Test Methods for The Evaluation
of Wire Ropes Service Life and Performance Under
Heavy Duty Offshore Applications
Dr . Ronen AshkenaziDr . Ronen Ashkenazi
M.R.E. Matron Rope & Wire Rope Engineering LTD
The 16th North Sea Offshore Crane and Lifting Conference
12th – 14th April 2011
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 5: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/5.jpg)
Contents
1. The need of the end user: comparing between ropes: decision
2. Loading cycle definition
3. Reverse bending with fluctuating dynamic tension
4. Rope degradation process
5. Results and conclusions
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 6: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/6.jpg)
The need for the testing and evaluating rope
performance
In specific high demand applications the rope performance and
service life is a critical parameter and may have a considerable
impact on operation, maintenance and production costs
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 7: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/7.jpg)
The need of the end user:
• Reliable rope:
A rope which will under fair machine and maintenance conditions will
provide reasonable service life
• Detectable predicted and understandable deterioration process with no
surprises (internal breaks, strand contacts )
• Economical Reasonable costs
• Repeatability product performance
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 8: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/8.jpg)
The need of the end user:
• To have a technical based decision with regard to the
selection of the rope type and supplier.
• To reduce risks and potential costs in new rope trials.
• To follow on rope quality in supply
• Characterize the specific rope deterioration process• Characterize the specific rope deterioration process
- Core deterioration: internal breaks
- Strand contact breaks
- Diameter reduction during service: abrasion + core radial contraction
- Rope elongation
- outer breaks
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 9: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/9.jpg)
An example of a project:
Comparison between ropes performance for
specific heavy duty grab crane
The application:
A grab crane 45 ton : payload 30 ton
2 sets R & L 38 and 40 mm closing and hoisting ropes IWRC2 sets R & L 38 and 40 mm closing and hoisting ropes IWRC
Drum: One layer
D/d= 40, speed= 3 m’/sec
Working 22 hours a day, 3 shifts
Reasonable service life :
1.5 E 6 Ton 60,000 loading cycles
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 10: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/10.jpg)
M1 M2 M3
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 11: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/11.jpg)
Loading cycle
13 Ton
F
Loading
זמן
0 Ton
4 Ton
Un loading Initial loading
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 12: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/12.jpg)
Loading cycle of the closing ropes
13 Ton
F
Un loading
Loading
Initial loading
Grab closing
5 Ton
Initiation of
bending
Assumption: during closing the closing rope will share: 65% of the load
t
0 Ton
4 Ton
bending
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 13: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/13.jpg)
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 14: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/14.jpg)
3 different segments
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 15: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/15.jpg)
Loading cycle of the closing ropes
Control parameters
1. Initial loading before travelling/bending: closing load
2. Speed
3. Acceleration, deceleration rate
4. Loading rate4. Loading rate
5. Maximal load: 2% accuracy
6. Load after un- loading: empty grab weight
7. Delays at the end of trip
Load control: load cell installed at the rope termination
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 16: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/16.jpg)
1 2 3 4 5
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 17: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/17.jpg)
Test program includes
Compacting level Core construction
A B C
Plastic layer
Lubricant
Diameter 38 mm & 40 mm Initial diameter
M.R.E. MATRON Rope & Wire Rope Engineering LTD
Confidentiality with regard to rope
Supplier and construction
![Page 18: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/18.jpg)
Test program includes:
•Rope were not lubricated during the test:
• Sheaves were re-grooved after each testing
• Similar loading conditions :
Stroke control , speed control , de/acceleration
Load control
Measurements during testing :
• Elongation during cycling
• Broken wires: Visual and MRT
• Diameter
• Deterioration rate along the different rope segments
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 19: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/19.jpg)
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 20: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/20.jpg)
No. of broken
wires over 6d and
30 d
10
12
14
Cycles*10004
2
4
6
8
1
8 6 10 12 14 16 18 20
Rope ARope B
Rope C
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 21: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/21.jpg)
Results and conclusions
3 different ropes were tested under similar loading cycle and conditions
1. Different rope deterioration process and rates were observed
2. Lubricants have a major impact on fatigue life
3. Core structure and plastic layer considerably influence service life
4. A correlation between rope deterioration and elongation was
observed
4. Wire coating and compacting level have considerable impact on
fatigue life of the individual wire: crack initiation process
5. Different elongation rate and levels were observed
6. Good agreement between laboratory tests and filed experience
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 22: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/22.jpg)
• The testing under real application loading is necessary
and provides reliable results with regard to rope
performance under the specific application.
• Test must includes all machine/rope interfaces and
dynamics
M.R.E. is focusing on the design of testing rigs to simulate
the real loading conditions:
Deep mining (Koepe & Drum), mooring lines, heavy duty
cranes, high rise elevators, aerospace & space applications
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 23: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/23.jpg)
Testing at the wire level:
Understanding rope mechanics
under the specific loading
Strain and stress measurements
along individual wires during cyclic
Rotation + TT loading
M.R.E. MATRON Rope & Wire Rope Engineering LTD
![Page 24: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/24.jpg)
Speaker
Dmitry Slesarev, INTRON PLUS, RULecture: Non‐destructive testing of large diameter steel wire ropes with Intros
instruments
Background: Dmitry Slesarev, PhD, R&D Director of “INTRON PLUS”, developedseveral diagnostic software systems, also system for wire rope deterioration
assessment
![Page 25: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/25.jpg)
Non-destructive testing of large diameter steel wire ropes with
Intros instruments
Slesarev D., Vorontsov A.INTRON PLUS, Russia
![Page 26: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/26.jpg)
Magnetic non-destructive testing of wire ropes
• Reflected in industrial regulations and codes, for example: BS EN 12927-2004, ASTM 1571, IMCA SEL 023 IMCA M 197
• Large experience for more than 30 years• Conventional applications: mining industry,
ropeways, cranes, cable-stayed structures
![Page 27: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/27.jpg)
Application of magnetic rope testing in lifting facilities
Testing of hoist ropes in the paper mill
![Page 28: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/28.jpg)
Off-shore applications
Oil & Gas platforms Vessel cranes
![Page 29: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/29.jpg)
Off-shore applications
Inspection of off-shore crane rope by Sakhalin
![Page 30: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/30.jpg)
MFL principle of operation
Sensors measure magnetic flux leakage, caused by material discontinuity
![Page 31: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/31.jpg)
LMA and LF charts
Rope chart of some heavy duty shaft rope
![Page 32: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/32.jpg)
Distribution of LMA and LF of the shaft rope during 3 consecutive inspections
![Page 33: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/33.jpg)
Calculation of Rope’s Safety Factor
The calculation is based on:• Rope diameter and construction• Nominal rope load and loading conditions
(tension with/without twisting, bending) • Distribution of LMA and LF over the length
of the rope
![Page 34: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/34.jpg)
Distribution of Safety Factor of the Shaft Rope during 3 Consecutive
Inspections
![Page 35: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/35.jpg)
Degradation of Safety Factor with a Time vs. Loading Cycles
![Page 36: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/36.jpg)
Degradation of Relative Strength with a Time vs. Loading Cycles
![Page 37: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/37.jpg)
Effect of Broken Wire Location on Residual Strength for Different Rope
Constructions
Rotation-resistant multi-strand rope
Non rotation-resistant hoisting rope
![Page 38: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/38.jpg)
Strength loss depending on failure location and operating condition
22.17.910.86.37.3PYTHON 8F7K N 8x25+IWRC(1x7+6x7)
10.63. 28.06.27.0DIEPA 1315 CZ 15x7-6x26/6x7+IWRC(1x25)
Core wires
breaks
Outer wires
breaks
Core wires
breaks
Outer wires
breaks
Tension with RotationTension
Loss of Strength, %
Loss of Metallic Area, %
Rope
ConclusionActual safety factor depends considerably on failurelocation and operation condition of the rope.
![Page 39: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/39.jpg)
Intros magnetic rope testing instruments
MH 6-24 MH 20-40
MH 24-64
MH 60-85 MH 80-120MH 100-150
![Page 40: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/40.jpg)
Intros Instruments for Big Diameter Wire Ropes
0.12Sensitivity limit to an outer broken wire, % (relativeto cross-section area)
2.0Precision of LMA measurement, %
0.2 – 1.5Speed of rope under inspection, m/s
60 – 8580 – 120
100 – 150Range of rope diameters, mm
![Page 41: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/41.jpg)
Thank you!
www.intron-plus.com
![Page 42: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/42.jpg)
Speaker
Sara FletcherBridon International Ltd
Lecture: Case study on the application of rope installation, examination, maintenance and discard criteria for the offshore wind energy sector
Background: Attained Bachelor Degree in Mechanical Engineering in 1993, then joined Bridon during which time has led the Technical Sales function for floating production moorings and deepwater deployment ropes. Currently responsible for
development of rope technology needs for deepwater offshore applications.
![Page 43: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/43.jpg)
Practical Application of Examination, Maintenance & Discard of Wire Rope
16th North Sea Offshore Cranes and Lifting ConferenceStavanger Forum
12th – 14th April 2011
Sara Fletcher – Technical Development Manager Mike Bramley – Service Manager
Bridon International
![Page 44: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/44.jpg)
Agenda
• Wire Rope Integrity• Product Selection for Equipment optimisation• Installation• Examination • Discard• Practical considerations
![Page 45: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/45.jpg)
What is Wire Rope Integrity?
Methods to ensure:• Through life safety of wire rope.• Specification & Installation.• Inspection & Examination.• Post retirement review. • Feedback.• Transparency & clarity of records.
Objective: • Confidence in equipment for reliable operations.
![Page 46: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/46.jpg)
Rope Selection
• Application:– Simple single load case– Multi‐reeved crane– Single fall large capacity crane– Traction winches– Heave compensation
• Requirements:– Load transfer– Tension Fatigue– Bending– Bend Fatigue– Rotation– Flexibility– Etc..
![Page 47: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/47.jpg)
Specification requirements
Rope properties:Rope classification / Construction DiameterLengthTolerancesInternational standard specifications
Installation: Packaging EquipmentTension
Application: SWLTerminationsSheave dimensions & profilesFleet anglesGripping forces
Not a total list!
![Page 48: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/48.jpg)
Installation
• Correct installation of the rope will have a positive effect on wire rope performance
• Poor installation of the rope will have a negative effect on the rope performance.
Grooved drum systems aid good spooling
![Page 49: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/49.jpg)
Installation
• Correct installation of the rope will have a positive effect on wire rope performance
• Apply back tension to the rope during installation:– at least 2% of the Minimum Breaking Load– or up to 25% of working tension (as training load)
• Training of large diameter complex rope constructions:– deploy in deep water – Cycle to remove construction effects
• Training the rope to optimise rope performance• Reflect back to rope selection
– Define dimensional tolerance– Understand compressibility: Axial and radial
![Page 50: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/50.jpg)
Lifetime Integrity Methodology
The following five methodologies can be applied to provide wire rope integrity assurance:
• automatic discard (replacement) after a set period, • thorough examination and inspection;• non‐destructive examination;• destructive tensile testing; and• a range of post‐retirement activities which will provide feed‐back into the
integrity management system.
From IMCA M 194 Guidance on Wire Rope Integrity Management for Vessels in the Offshore Industry
![Page 51: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/51.jpg)
Integrity Methodology ‐ Discard
The following five methodologies can be applied to provide wire rope integrity assurance:
• automatic discard (replacement) after a set period, • thorough examination and inspection;• non‐destructive examination;• destructive tensile testing; and• a range of post‐retirement activities which will provide feed‐back into the
integrity management system.
From IMCA M 194 Guidance on Wire Rope Integrity Management for Vessels in the Offshore Industry
![Page 52: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/52.jpg)
Visual Inspection
![Page 53: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/53.jpg)
Integrity Methodology ‐ Discard
The following five methodologies can be applied to provide wire rope integrity assurance:
• automatic discard (replacement) after a set period, • thorough examination and inspection;• non‐destructive examination;• destructive tensile testing; and• a range of post‐retirement activities which will provide feed‐back into the
integrity management system.
From IMCA M 194 Guidance on Wire Rope Integrity Management for Vessels in the Offshore Industry
![Page 54: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/54.jpg)
NDE
LMA trace, %
171615141312
4.0
3.0
2.0
1.0
0.0
-1.0
-2.0
-3.0
-4.0
LF trace, mV
171615141312
40.0
30.0
20.0
10.0
0.0
-10.0
-20.0
-30.0
-40.0
![Page 55: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/55.jpg)
Integrity Methodology ‐ Discard
The following five methodologies can be applied to provide wire rope integrity assurance:
• automatic discard (replacement) after a set period, • thorough examination and inspection;• non‐destructive examination;• destructive tensile testing; and• a range of post‐retirement activities which will provide feed‐back into the
integrity management system.
From IMCA M 194 Guidance on Wire Rope Integrity Management for Vessels in the Offshore Industry
![Page 56: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/56.jpg)
Integrity Methodology ‐ Discard
The following five methodologies can be applied to provide wire rope integrity assurance:
• automatic discard (replacement) after a set period, • thorough examination and inspection;• non‐destructive examination;• destructive tensile testing; and• a range of post‐retirement activities which will provide feed‐back into the
integrity management system.
From IMCA M 194 Guidance on Wire Rope Integrity Management for Vessels in the Offshore Industry
![Page 57: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/57.jpg)
Integrity Methodology ‐ Discard
The following five methodologies can be applied to provide wire rope integrity assurance:
• automatic discard (replacement) after a set period, • thorough examination and inspection;• non‐destructive examination;• destructive tensile testing; and• a range of post‐retirement activities which will provide feed‐back into the
integrity management system.
From IMCA M 194 Guidance on Wire Rope Integrity Management for Vessels in the Offshore Industry
![Page 58: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/58.jpg)
Discard
• International Standard ISO 4309• Considers the application:
– Bend fatigue driven– Surface contact damage
• Considers the rope construction• Training & Competence
![Page 59: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/59.jpg)
Risk Management
• Single Broken Wire:– Probability = high– Impact = low
• Broken rope – Probability = low– Impact = high
Rope integrity = Confidence in equipment for reliable operations.
Risk = probability x impact
• Multiple Broken Wires in a similar location:– Make probability of identification – high– Repair / Replace– Prevent– Make probability of it becoming a failure = low
• Maintenance & competence = reduction in Risk
![Page 60: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/60.jpg)
Summary
• Rope Integrity Management is Risk Management• Increased Competence & Maintenance reduces risk.• Use all the tools practically available. • Feed back !• Objective to ensure confidence in rope & equipment for
reliable, safe, economic operations.
Thank you
[email protected]@bridon.com
![Page 61: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/61.jpg)
Speaker
Olivier Gronau, Rope Testing Centre‐DMT GmbH & Co. KG, DE
Lecture: Non – destructive magneto‐inductive rope testing
Background: Studies at the “Otto‐von‐Guericke‐University” in Magdeburg.Final degree in 1986 as a Dipl.‐Ing. for materials engineering and testing.Since 2000 a personal accredited expert for the German mining industry.
Present position as the head of the accredited laboratory for non‐destructive and destructive testing ‐rope testing centre‐ in Bochum, Germany
![Page 62: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/62.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 1
Non-Destructive Magneto-Inductive Rope TestingOlivier Gronau & Michael LeeskerDMT GmbH & Co. KG
DMT-Prüflaboratorium für Zerstörungsfreie und Zerstörende Prüfung -Seilprüfstelle-(DMT Testing Laboratory for Non-Destructive and Destructive Testing -Rope Testing Centre-)
Breaking Load Reduction as a Function of the Damaged Outer Wires
0
2
4
6
8
10
12
14
16
0 5 10 15 20 25 30 35 40
Breaking Load Reduction [%]
Num
ber o
f Dam
aged
Out
er W
ires
per S
tran
d(w
ithin
Tra
nsve
rse
Mic
rose
ctio
n)
15 % LMA12 % LMA10 % LMA 8 % LMA
![Page 63: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/63.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 2
Non-Destructive Magneto-Inductive Rope Testing
Agenda
NDT Techniques for Rope Inspection
History of MRT-Systems
Data Collection and Graphical Representation
Interpretation of MRT Results
Examples of MRT within the Offshore Industry
Conclusion
![Page 64: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/64.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 3
NDT Techniques for Rope Inspection
Visual Testing Magneto-InductiveTesting
Ultrasonic &Magnetic Particle Testing
• coating condition• corrosion and wear• broken or cracked outer wires • mechanical distortions or damages
• broken and/or cracked outer andinner wires (LF)
• loss of metallic cross section area(LMA)
• wire breaks/cracks and corrosion at the outer layer of fully-locked ropes and parallel wire bundles
• wear and cracks within the anchorages, such as bolts and latches
• damages of all wires within the critical area at the sockets of parallel wire bundles
+ Haptic Testing
![Page 65: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/65.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 4
Non-Destructive Magneto-Inductive Rope Testing
Agenda
NDT Techniques for Rope Inspection
History of MRT-Systems
Data Collection and Graphical Representation
Interpretation of MRT Results
Examples of MRT within the Offshore Industry
Conclusion
![Page 66: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/66.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 5
History of MRT-Systems
The -Rope Test Centre- was founded in Bochum in 1903 as a part of the "Westfälische Berggewerkschaftskasse".
Electromagnetic Testing since 1931 Test Set-Up:
- 2 DC coils á 1600 windings- 1 measuring coil á 100 windings
- Galvanometer with optics for the enlargement of the pointer deflection
Practical Application:- constant velocity of the rope- inspection time approx. 6 hours per rope
A. Otto: Elektromagnetisches Verfahren zur Prüfung von Drahtseilen;
Glückauf 69 (1933), S. 471 - 475
![Page 67: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/67.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 6
Replacement of DC coils by yoke coils
Use of a flying spot line recorder
- D. van der Velden und H. T. VossenEin Gerät zum Prüfen von Drahtseilen auf elektromagnetischem WegeGlückauf 92 (1956) S. 792 bis 794
Use of differential coils
Use of a distance counter
Velocity independent signal amplitude
- H. GrupeEntwicklung einer Einrichtung zur Prüfung von Förderseilen nach demmagnetinduktiven VerfahrenForschungsberichte des Landes Nordrhein-Westfalen Nr. 954, 1961
History of MRT-Systems
![Page 68: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/68.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 7
History of MRT-Systems
Replacement of the yoke coils by permanent magnets (middle of the 60s)
![Page 69: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/69.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 8
History of MRT-Systems
Replacement of the yoke coils by permanent magnets (middle of the 60s)
Measuring of the loss of metallic cross section area (middle of the 80s)
Use of rare earth magnets (beginning of the 90s)
Visual rope diameter measuring for research purposes
Industry PC based data acquisition device (middle of the 90s)
- Digital signal records on PCMCIA memory card
Use of Hall effect sensors (end of the 90s)
For ropes of parallel strands a new rope testing instrument is developed in a joint venture with the EMPA* at the moment
![Page 70: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/70.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 9
Non-Destructive Magneto-Inductive Rope Testing
Agenda
NDT Techniques for Rope Inspection
History of MRT-Systems
Data Collection and Graphical Representation
Interpretation of MRT Results
Examples of MRT within the Offshore Industry
Conclusion
![Page 71: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/71.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 10
Data Collection and Graphical Representation
Quantitative determination of wire breaks Qualitative determination of corrosion and/or
abrasion
![Page 72: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/72.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 11
Data Collection and Graphical Representation
Original trace of wire breaks Software for determination ofwire break density
![Page 73: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/73.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 12
Data Collection and Graphical Representation
Wire Break Density of a 52 mm Rope (6x35 WV)
0
2
4
6
8
10
12
14
16
10 60 110 160 210 260 310 360 410 460 510 560 610 660 710 760 810 860 910
Rope Length above the Cage [m]
Max
. Mire
Bre
ak D
ensi
ty w
ithin
th
e R
efer
ence
Len
gth
of 1
,56
m
test date: 24.02.2005test date: 25.05.2005test date: 08.08.2005
![Page 74: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/74.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 13
Data Collection and Graphical Representation
Quantitative determination of corrosion and/or abrasion
Qualitative determination of wire breaks, partly also quantitative at outer wire breaks
![Page 75: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/75.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 14
Data Collection and Graphical Representation
Original trace of heavy corrosion Software for determination of LMA
![Page 76: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/76.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 15
Data Collection and Graphical Representation
LMA-Test Results on a 3-Layer Flat Strand Rope
0
2
4
6
8
10
12
14
0 200 400 600 800 1000 1200
Rope Length above the Eastern Skip [m]
LMA
[%]
.
test date: 14.08.2004
test date: 06.02.2005
test date: 26.06.2005
![Page 77: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/77.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 16
Non-Destructive Magneto-Inductive Rope Testing
Agenda
NDT Techniques for Rope Inspection
History of MRT-Systems
Data Collection and Graphical Representation
Interpretation of MRT Results
Examples of MRT within the Offshore Industry
Conclusion
![Page 78: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/78.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 17
Interpretation of MRT Results
Discard criteria are defined in different standards (DIN 15020 / ISO 4309)
Number and nature of broken wires
Rate of increase of wire breaks
Localized grouping of wire breaks
…
…
Reduction of rope diameter
External and internal wear / corrosion
…
…
![Page 79: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/79.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 18
Interpretation of MRT Results
0
0,2
0,4
0,6
0,8
1
1,2
1,4
1,6
1,8
0 50 100 150 200 250 300 350 400 450 500
Gap between wire ends [mm]
LMA
[%]
Coil-SensorHall-Sensor
![Page 80: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/80.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 19
Interpretation of MRT Results
LMA trace, %
1716151413
1,0
0,0
-1,0
-2,0
-3,0
-4,0
-5,0
Calibration Signals
LF-Coil 1
LF-Coil 2
LF-Coil 1 + Coil 2
LMA
+
-
Coil-Sensor Hall-Sensor
![Page 81: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/81.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 20
Interpretation of MRT Results
centre and acceleration areaof a rope
![Page 82: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/82.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 21
Interpretation of MRT Results
Breaking Load Reduction as a Function of the Damaged Outer Wires
0
2
4
6
8
10
12
14
16
0 5 10 15 20 25 30 35 40
Breaking Load Reduction [%]
Num
ber o
f Dam
aged
Out
er W
ires
per S
tran
d(w
ithin
Tra
nsve
rse
Mic
rose
ctio
n)
15 % LMA12 % LMA10 % LMA 8 % LMA
![Page 83: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/83.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 22
Non-Destructive Magneto-Inductive Rope Testing
Agenda
NDT Techniques for Rope Inspection
History of MRT-Systems
Data Collection and Graphical Representation
Interpretation of MRT Results
Examples of MRT within the Offshore Industry
Conclusion
![Page 84: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/84.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 23
Examples of MRT within the Offshore Industry
During the production
![Page 85: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/85.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 24
Examples of MRT within the Offshore Industry
During the installation on site
![Page 86: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/86.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 25
Examples of MRT within the Offshore Industry
During the service inspection
![Page 87: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/87.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 26
Non-Destructive Magneto-Inductive Rope Testing
Agenda
NDT Techniques for Rope Inspection
History of MRT-Systems
Data Collection and Graphical Representation
Interpretation of MRT Results
Examples of MRT within the Offshore Industry
Conclusion
![Page 88: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/88.jpg)
www.dmt.deApril 14th 2011 | The 16th NSOCLC in Stavanger 2011 | Slide 27
Conclusion
MRT is an additional tool for rope testing
Inner damages can be determined quantitatively
MRT + VT are necessary for the determination of the
deterioration
Information about service time and periodic MRT are
required for a lifetime assessment
![Page 89: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/89.jpg)
www.dmt.deApril 2010 | Vorlagen Präsentationsfolien | Folie 28
We Look Forward to Your Questions!
Your Contact Person:
Olivier GronauMining Service / -Rope Testing Centre-
DMT GmbH & Co. KGDinnendahlstrasse 9D-44809 Bochum, GermanyPhone +49 234 957 157-52Fax +49 234 957 157-50Mobile +49 170 5657 [email protected]
Member of TÜV NORD Group
![Page 90: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/90.jpg)
Program part twoThursday 14th April, last day
Wire Rope continuous Chair: Chair: Arnold de Groot
11:15 – 12:15 NB see time change
Keynote speaker by invitation :Mr. Roland VerreetLecture: About consultants, test machines and wire rope failures
12:15‐ 13:00 Lunch
![Page 91: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/91.jpg)
Speaker
Roland Verreet, Wire rope Technology Aachen
Lecture: About consultants, test machines and wire rope failures
Background: Diploma engineer University of Aachen, Germany. Working in the wire rope industry since 36 years and 26 years as a self‐employed consultant
![Page 92: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/92.jpg)
Program part threeThursday 14th April, last day
Afternoon session Chair: Kevin MurdochHeadline: Human Factors and Training
13:00 Innovations in training, risk mitigation through virtual simulation based onlessons learned from Us military & aviation industries, Troy “Korn” Kehoe
13:45 Competence‐upgrading: inspection and service of cranes and davits, Ian McCurdie
14:15 Design and implementation of effective simulation‐based training curriculum for offshore lift crew training, Arnold Free
15:00 Closing/adjourn Svein Anders Eriksson, Chairman of the organising committee.
15:30 Bus to the airport
![Page 93: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/93.jpg)
Speaker
Troy Kehoe, Check 6, USLecture: Innovations in training, risk mitigation through virtual simulation based on
lessons learned from US military & aviation industries
Background: He is an engineering graduate of the University of Southern California with an advanced degree in Aviation Safety. He has proudly served in the United States Marine Corps as a combat AV‐8B Harrier pilot, flew internationally for American Airlines, and served on the pilot training team for Lockheed Martin’s Joint
Strike Fighter Program.
![Page 94: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/94.jpg)
Innovations in Training
![Page 95: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/95.jpg)
![Page 96: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/96.jpg)
“Try not to have a good time…this is supposed to be educational”
Charles Schulz
![Page 97: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/97.jpg)
The Check 6 Culture Next Generation Training Challenges F22 Lessons Learned Instructional Systems Design Gaming Evolution Human “Innovations”◦ Human Factors◦ CRM◦ Checklist Discipline◦ Leadership
![Page 98: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/98.jpg)
“Check6”isatermfighterpilotsusetodescribecheckingyourwingman’smostvulnerablelocation,wheretheycannotsee…behindtheiraircraft…theirsixo'clock.A
culturedefinedby:
LeadershipTeamworkPerformance
SafetyTraining
![Page 99: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/99.jpg)
Thesametechniquesthatallowhumanstomasterthisenvironment….…
……Definitivelyallowthemasteringofyourenvironment.
![Page 100: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/100.jpg)
• CombatSeasonedFighterPilots• TOPGUNTrained• SpecialForcesOperative• TrainingSystemsDevelopmentExperts• DiverseCorporateExperience• OilPatchExperience• DynamicSpeakers
![Page 101: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/101.jpg)
Chico, TX
• AV‐8BHarrierPilot• AviationSafetyOfficer•MAWTSGraduate• F‐35TrainingSystems&SimulatorTestPilot• AmericanAirlinesPilot• UniversityofSouthernCalifornia
Troy“Korn”Kehoe
![Page 102: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/102.jpg)
• TechnologicalAdvances• CrewTurnoverRate• ThroughputRequirements• DefiningProficiency• DecayAnalysis(Currency)• EmergencyProcedures• InitialTrainingvs.ContinuationTraining
• HumanFactors• DiverseEducationalDemographic
• Multi‐CulturalTraining
![Page 103: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/103.jpg)
![Page 104: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/104.jpg)
![Page 105: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/105.jpg)
TrainingTask List
Conditions
Standards of Performance
Decay Analysis Currency Initial
TrainingRecurrent Training
Continuation Training
Media Analysis
What media will achieve
LO?
Do we need Simulation?
Level of Fidelity
Proficiency Metrics
![Page 106: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/106.jpg)
![Page 107: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/107.jpg)
Immersive Environments are important!◦ Conditions and Standards define Simulation
Requirements Higher Frequency Training = Portable◦ Remote Training at the work site Rehearse critical jobs Review Response to Emergencies in Immersive
Environment Team Training is Essential Look to Gaming
“Imagination is more important than knowledge.”
Albert Einstein
![Page 108: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/108.jpg)
![Page 109: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/109.jpg)
![Page 110: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/110.jpg)
![Page 111: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/111.jpg)
(9X)
![Page 112: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/112.jpg)
IncidentViolation
Fatality
Hazard
Accident
LuckySafe
EffectiveEfficient
PrecisePerfect
Precision Operations are Inherently Safe!
![Page 113: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/113.jpg)
Situational Awareness Assertiveness Decisiveness Communication Leadership Adaptability / Flexibility Mission Analysis
![Page 114: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/114.jpg)
Technology Solution◦ Training cannot be an afterthought◦ “Entertrainment” – Next Generation Learning
Environment◦ Training frequency should be measured in days –
Not Years! Human Solution◦ Phenomenal Leadership at all levels◦ Arm yourself with knowledge◦ Adopt a Checklist Discipline Culture◦ Stop targeting safety as the goal!
![Page 115: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/115.jpg)
![Page 116: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/116.jpg)
CanceledIan McCurdie, Hytek A/S, UK
Lecture: Competence‐upgrading: Inspection and service of cranes and davits
![Page 117: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/117.jpg)
Speaker
Arnold Free, CMLabs / Vortex, Montreal, CALecture: Design and implementation of effective simulation‐based training
curriculum for offshore lift crew trainingBackground: He has earned his Ph.D. in Engineering from Cambridge University,
UK and draws on nearly 30 years of engineering and software experience in simulation, training and operations planning. He has helped organizations navigate how they use simulation technology to improve safety and better business practices
![Page 118: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/118.jpg)
The work is simulated. The skills are real.
![Page 119: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/119.jpg)
If you believe training is expensive.
Try ignorance!
![Page 120: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/120.jpg)
An evidence-based approach to simulation-driven lift planning and
learning.
A brief look at how simulation can transform processes in the offshore lift industry.
![Page 121: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/121.jpg)
How do we create effective learning organizations?
Look at the empirical evidence.
![Page 122: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/122.jpg)
Myth.
People learn through different training styles.
![Page 123: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/123.jpg)
Evidence.
There is no evidence that we learn through different styles (auditory,
visual, etc).
There is strong evidence we learn by doing.
![Page 124: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/124.jpg)
Myth.
We learn best through formal/structured programs.
![Page 125: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/125.jpg)
Evidence.
There is no evidence that we best learn through formal training
methods.
There is strong evidence that skills retention is better with informal
and repetitive learning.
![Page 126: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/126.jpg)
Myth.
Information = knowledge.
![Page 127: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/127.jpg)
Evidence.
Learning methods that provide information through presentations (with
instructor or via elearning) are less effective – telling is not learning.
There is strong evidence that learning effectiveness is much higher when
the student is actively engaged in problem solving.
![Page 128: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/128.jpg)
Myth.
Practice makes perfect.
![Page 129: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/129.jpg)
Evidence.
Practice is important when learning skills, but practice alone is not
what really matters and practicing incorrect behaviour can have a
very negative impact.
What makes the difference to effective learning is planning, doing
and corrective feedback.
![Page 130: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/130.jpg)
Simulation can help the Learning Organization
Delivering consistent training based on proven methods.
Involving complete processes, operations and teams.
Fostering inquiry, dialogue and review.
Building continuous awareness of, and interaction with the
environment through repetition.
![Page 131: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/131.jpg)
About Vortex Training Solutions
Vortex creates engaging virtual environments to enhance preparedness, performance and mission outcome for critical equipment operations.
![Page 132: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/132.jpg)
Vortex - simulation leadership in Europe
PNI Training - Norway BAE Systems - UK Lego - Denmark
Babcock - UK Subsea7 - UK John Deere - Finland
![Page 133: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/133.jpg)
Examples.
Simulation assists in many areasEngineering – understanding machine performance, operations behaviour, ergonomicsOperations planning – lift planning, equipment coordination, access studyMission preparation – process documentation, mission rehearsal, mission briefingTraining – skills development, certification and testing, crew resource management
![Page 134: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/134.jpg)
To be effective
Require common tools and processes that support the sharing of assets – engineering builds a simulation that can be loaded into a simulator for training Scalable technology – from web to desktop to immersiveFidelity is critical – risk of negative training, poor prediction of outcomes
![Page 135: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/135.jpg)
Use Case: Lift planning
Experimentation, understanding the environment, planning safe lifts, communicating procedures
![Page 136: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/136.jpg)
Use Case: Equipment systems awareness
Machine systems are complex, many configurations, understanding hydraulic and electrical systems
![Page 137: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/137.jpg)
Use Case: Lift crew team-training
Built around OMHEC training guidelines.Teamwork can not be taught in a classroom
Job planning and toolbox talkFull mission, team‐based training solutions for the operator, signalman and riggerTandem lifts with two cranesIntegrated inspection trainingAfter action team review
![Page 138: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/138.jpg)
Use Case: Project life-cycle training
Continuous training through‐out the life of the projectTesting lift plans in advance
![Page 139: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/139.jpg)
Use Case: Augmented reality
Combine the real and the virtual for task support
![Page 140: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/140.jpg)
Use Case: Integrated task training
Crane configuration and load management system training
![Page 141: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/141.jpg)
Use Case: Inspection and situational awareness
Machine or site walk around, load and lifting gear inspection
![Page 142: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/142.jpg)
Is simulation-based training effective?
The evidence is very clearRecent study in several industries – simulation‐based training was found to be effective and recommended for on‐going or expanded use in all casesRecent Vortex survey of operators and instructors (about 300 individuals surveyed) who had used simulators
87% of instructors stated that simulation based training was very effective at skills development 75% of operators stated they would find it extremely useful to practice in a simulator before performing a lift or learning new procedures
![Page 143: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/143.jpg)
Essential Elements of Effectiveness
Delivering consistent training throughout project teams and lifecycle – engineering,
planning, operations.
Involving complete processes, operations and teams.
Fostering inquiry, dialogue and review.
Building continuous awareness of, and interaction with the environment through
repetition.
![Page 144: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/144.jpg)
Thanks.
![Page 145: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/145.jpg)
The work is simulated. The skills are real.
![Page 146: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/146.jpg)
Speaker
Svein Anders Eriksson, Discipline leader,
Petroleum Safety Authority, NO
![Page 147: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/147.jpg)
PTIL/PSA
Closing/ ajourn
Svein Anders Eriksson Discipline leader
Logistics and Emergency Preparedness, PSA Norway
12th – 14th April 2011
The 16th North SeaOffshore Cranes and Lifting Conference
![Page 148: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/148.jpg)
PTIL/PSA
What have we covered during theconference?
• Regulatory focus areas• Improvements and new technology• Heavy lifting• Maintenance and inspection• Wire ropes• Human factors and training
![Page 149: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/149.jpg)
PTIL/PSA
Have we managed to…..
• Share best practice and experience with colleagues in the industry?
• Create new relations and renew old?• Provide for increased safety awareness?
• Here are my hopes:
![Page 150: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/150.jpg)
PTIL/PSA28/04/2011
4
Today’s and tomorrow’s challenge
We will not see colleagues being crushed between containers
![Page 151: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/151.jpg)
PTIL/PSA28/04/2011
5
Today’s and tomorrow’s challenge
We will not see people being snatched by tag lines
![Page 152: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/152.jpg)
PTIL/PSA28/04/2011
6
We will not see boom failures or technical breakdowns, which can seriously hurt people and do damage to property
Today’s and tomorrow’s challenge
![Page 153: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/153.jpg)
PTIL/PSA
Today’s and tomorrow’s challenge
We will not see people getting squeezed between containers during lifting operations
![Page 154: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/154.jpg)
PTIL/PSA
Today’s and tomorrow’s challenge
We will not see damage to personnel an property due to use of unsafe drilling hoisting tools
![Page 155: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/155.jpg)
PTIL/PSA
If you want to improve safety in safety critical operations …..
![Page 156: Proceedings Thursday 14th April](https://reader030.vdocument.in/reader030/viewer/2022020208/568bd56b1a28ab203498618e/html5/thumbnails/156.jpg)
PTIL/PSA
Welcome to the next offshore cranes and lifting conference
Venue and dates:• Aberdeen• 24th – 26th April 2012