  • PROCESS PLANT DIVISION

    General Presentation

  • Capabilities

    Total Project Management with IT System

    Experience

    General Information

    Company Overview Company Location Vision & Philosophy Business Area Field of Service Our Clients Organization Overseas Distribution Manpower Resources Research and Development Quality Control & Assurance/HSE Major Reference for Process Plant Projects Project Document Control System Engineering Data Management 3D CAD System Procurement & Material Management System Schedule and Progress Control Construction Management System Pre-Commissioning & Commissioning Management System

    Contents

  • Company Overview

    Year Established

    1974 as an Engineering Arm of Hyundai Group

    President & CEO

    Dong Wook Kim

    Manpower Strength

    1,765 Staff (As of March 2009)

    Business Area

    Process Plant

    - Power & Energy Plant

    - New Industrial Plant

    Infrastructure & Environment

    Globalization

    Engaged mostly in overseas projects

    (about 75%)

  • Business Area

    2

  • Onshore Production & Gathering Offshore (Fixed Facilities &

    Floating Mobile Unit)

    Oil & Gas Processing

    Upstream

    PetrochemicalChemicalsFertilizer

    Downstream

    Refinery Aromatics LNG

    Midstream

    Field of Service

    FULL RANGE OF SERVICE

    EPC

    EP

    FEED

    PMC

    E

    EP,CM

    Feasibility Study

    Conceptual

    Engineering

    FEED

    PMC Services

    Total Project Management

    Construction Management

    Commissioning & Start-up

    Operation & Maintenance

    Basic & Detail

    Engineering

    Procurement

    Procurement Service

    Construction

    3

  • Our Clients (Overseas)

    OIL MAJOR COMPANY

    4

  • Our Clients (Overseas)

    STATE OWNED OIL & GAS COMPANY

    5

  • Our Clients (Domestic)

    6

  • Organization

    7

    Technology Innovation

    & Development Office

    Upstream Oil&GasLNG FacilitiesOil RefineryOil TerminalPetrochemicalFertilizer &Chemicals

    Ok-chul Kim

    Nam-wook Park

    Thermal Power PlantCombined Cycle Power PlantCogeneration Power PlantDiesel Power PlantGeothermal/Wind Power PlantHydro & Pumped Storage

    Power Pant

    Transmission, Substation &

    Distribution

    Nuclear Power PlantNew & Renewable EnergyPower System Studies

    Infra

    RoadStructureUrban PlanningArchitecture

    Environment

    Water Supply & SewerageWater PowerUnderground WaterEnvironmentNew Business Opportunities

    in the era of GDP $ 30,000,

    Strategic future

    Business to Create new

    contents

    Dong-kyu Paik

    technology development Quality managementProcess Management

    Analysis

    Wee-chul Kim

    Yoon-young Lee

    Planning Business Analysis Public Relation (PR)Industrial Environment DesignCreative Value for Clients

    Planning Office

    Dae-young Ji

    HR Planning, HRD, HSE

    Accounting, Budget Control

    Personnel, Employee Welfare,

    Domestic and Foreign-

    constriction management

    Won-keuk Lee

    OUTSOUR. & PROCUREMENT

    Jong-ho Lee

    Material ProcurementTransportation, L/CCustoms InspectionOutsourcing Partner (Vendor)

    Selection

    POWER & ENERGY PLANT

    PROCESS PLANT

    INFRA & ENVIRONMENT

    INDUSTRIAL PLANT

    BUSINESS & MARKETING

    GEN. ADMIN. & MGT.

    Sang-wook kim

    Domestic & International

    Marketing & Contract

    Marketing DevelopmentNational Risk ManagementIntegrated Marketing for

    new markets

  • Overseas Distribution

    Korea :

    HDO Clean Fuels Project

    Hyundai Oil Refinery Phase I & II

    Hyundai Petrochemical Complex I & II

    Incheon LNG Project

    Yongduk Wind Power Plant

    FGD Facility for Pyongtaek TPP

    Brazil :

    Porto Velho 340 MW CCPP

    China :

    Chishui Urea Plant

    Pingdingshan Urea Plant

    Shaanxi Urea Plant

    Libya :

    Attahaddy Gas Field Development (350 MMSCFD)

    Ras Lanuf Petrochemical Complex Phase II

    Misurata Thermal Power Plant

    Nigeria :

    Bonny Terminal Integrated Project

    India :

    HPCL Hydrogen Generation Plant

    GMR MADRAS DPP

    Mangalore Barge Mounted CCPP

    Iran :

    South Pars Phase 4 & 5 (2,000 MMSCFD)

    South Pars Phase 2 & 3 (2,000 MMSCFD)

    Kuwait :

    KNPC New Oil Pier Project

    Petroleum Hydrotreatin Catalyst Plant

    Qatar :

    QGPC NGL-4 Plant

    Philippines :

    Petron TCCU Revamp & Mixed Xylene

    NPC-1159 230KV Substation

    Indonesia :

    Suban I & II Gas Project

    Sumpal Gas Project

    Miwon CPP

    Malaysia :

    GPP Stage II & III, IV (each 500 MMSCFD)

    TAWAU DPP

    Thailand :

    NPK Fertilizer Complex

    Bangladesh :

    Kailashtilla LPG Plant

    Meghnaghat CCPP

    Pakistan:

    Pirkoh Gas Compression

    Project

    Saudi Arabia :

    Makkah Taif TPP

    Romania :

    Petrobrazi CPP

    UAE :

    UAE Rebar Mill

    Vietnam : Pha Lai II Thermal Power Plant

    Ba Ria add-on CCPP

    Greece :

    Crude & Vacuum Distillation

    Taiwan : Fomosa Lube Base Oil

    Yemen :

    Ras Issa Refinery Project

    Republic of Equatorial Guinea :

    The Potable Water Supply Project,

    Colombia:

    Colombia Diesel Unit(HDT)

    Overseas Projects

    (75%)

    Domestic Projects

    (25%)

    8

    Mexico:

    FEED of Sempra Baja LNG Terminal Project

  • Human Resources

    PERMANENT EMPLOYEES

    As of March, 2009

    186

    115

    714

    ADMINISTRATIVE

    1,552

    MARKETING

    & PROPOSAL

    Staff Location

    ----------------------------------

    Head Office 1,461

    Overseas 151

    Domestic Site 123

    Task Force Office 30

    ----------------------------------- Total 1,765

    Staff Experience

    -----------------------------------

    Over 20 Years (20%)

    10~20 Years (47%)

    0 ~10 Years (33%)

    ----------------------------------- Average Experience : 13 Years

    107

    106

    ENGINEER

    Overall Manpower Breakdown

    -------------------------------------

    Project Management 179

    Engineering (Subtotal) 1,041

    Process & Safety 126

    Civil & Arch 130

    Piping 155

    Mechanical 215

    Electrical 102

    C&I 105

    Infra & Environmental 176

    Nuclear 32

    Construction Management 148

    Procurement 46

    Technical Planning 11

    R&D / IT 39

    QA/QC & HSE 53

    Commissioning 35

    Marketing & Proposal 106

    Administrative 107

    -------------------------------------

    TOTAL 1,765

  • Korea Research Institute of Chemical Technology

    MTO

    Development of manufacture of light olefin from methanol and DME

    2006. 11 ~ 2009. 10

    Korea Electric Power Research Institute

    CO2 2nd Stage

    Scale up and Optimization Study on the CO2 recovery Process utilizing high performance absorbents of CO2

    2006. 11 ~ 2009. 9

    Korea Institute of Energy Research

    GTL

    Development of manufacture of FT synthetic oil with natural gas

    2006. 8 2009. 7

    Research & Development on Process Technology

    Principal

    Subject

    Period

    KICTEP

    LNG

    Detailed Planning on LNG plant Area

    2007.10 2008. 2

    10

  • Quality Control & Assurance

    INSPECTION CONTROL MEASURING CONTROL TEST EQUIPMENT CONTROL QUALITY RECORDS CONTROL INTERNAL QUALITY AUDIT QUALITY POLICY CONTROL MANUAL QUALITY PROCEDURES WORK PLAN PROCEDURES INSPECTION AND TEST PLANS DESIGN&DOCUMENT CONTROL

    (DRN, 3D REVIEW)

    PROCUREMENT CONTROL

    (SPMAT)

    SPECIAL PROCESS CONTROL FIELD MATERIAL CONTROL CONSTRUCTION CONTROL COMMISSIONING &

    STARTUP CONTROL(FSI)

    PLAN

    PRACTICE & ACTION

    AUDIT & MONITORING

    QUALITY IMPROVEMENT

    COST REDUCTION

    CUSTOMER VALUE MAXIMIZATION

    11

  • PS - Online Review & Electronic Markup

    On-Line Design Review

    - Online DRN (Design Review Notice)

    - Verification by related Discipline

    Comment Method Change

    - Hard Copy (paper) => Electronic Markup

    Online Review

    Elect. Markup

    Quality Control & Assurance

    12

  • Quality Control & Assurance

    Q-Captains System

    Q-CAPTAINS

    Critical

    Area

    Critical Point Focused Quality Control System by Experienced Quality Engineer

    (Q-Captains) during Preparation and Execution of the Project

    QCaptains are responsible for identified

    critical areas taking care of;

    Mechanical Hauling & Access Plan (MH&AP) Safety in Design (SID) Constructability Consistency Check with P&ID Spec. Safety and HAZOP

    Critical

    Area

    Critical

    Area

    Critical

    Area

    Critical

    Area

    Critical

    Area

    13

  • Quality Control & Assurance

    Flawless Startup Initiative (FSI)

    - Lead the implementation of FSI in the respective Q Area

    - Monitor the execution of the potential flaws mitigating action

    Q-CAPTAINS - Ensure that FSI is considered in the relevant project activities

    RESPONSIBILITY - Own the Q Area registers and documents

    - Report regularly to management

    - Take corrective actions if targets for FSI Plan are not met

    - Identify and participate in Q Syndicate

    FSI Q-Captains System

    14

    FSI ORGANIZATION

    AWARENESS TRAINING

    FLAW-LIST & MITIGATION

    ACTION PLAN

    LESSONS LEARNED

    WORKSHOP

    PREPARE Q AREA

    WORK PLAN

    PREPARE Q AREA

    PROCEDURES

    PROGRESS MONITORING

    HEALTH CHECK

    (FSI READINESS)

    QUALITY SYSTEM

    for

    COMMSIONING & START UP

    99.9% of ALL TESTED FUNCTIONALITY

    is

    FIRST TIME RIGHT

  • Health, Safety, Environment

    15

    ISO 14001

    OHSAS 18001

    HSE

    Harmonizing between the Plant and Environment

    Maintaining a Safe Working Environment

    Integrated Implementation Plan

    Compliance with all HSE Legislation

    Achieving the Target Established

    Program for Self Motivation

    on HSE

    *

  • Integrated Project Management with IT System

    Internal Communication

    Procurement Management

    SPMAT (Intergraph), HiPCS, HPWCS

    Schedule & Progress Measurement

    PRIMAVERA

    HECOS (In-house )

    Project Document Control System(EDMS)

    ProjectSpace (EDMS)

    Engineering Management

    EDIS (In-house), 3D CAD

    Pre-Commissioning & Commissioning

    HPCM

    Construction Management

    WJCS

    HECs IT SOLUTION

    16

  • Data Consistency : Single Entry Data Input

    Total Project Management with IT System

    EDIS

    3D CAD

    (PDS/PDMS)

    LLM

    ISO DWG

    EDM

    Electrical

    IDM

    Instrument

    LDM

    SAM

    Line

    Equipment

    ELM

    HPCM

    HPMAC

    SPI

    SPPID

    ProjectSpace - Project Deliverables (P&ID, MDR etc)

    Tag No

    (Line, Equipment, Instrument Tag)

    Tagged Item w/System No.

    Process Data

    APTools

    Piping Design Data

    SPMAT

    Design Data

    Equipment ListList ListInstrument ListMotor List

    PR

    E&I

    Check ListInspection

    Sheets

    BOMMaterial CodeInstrument IndexHook-up DrawingLoop Diagram

    PI

    All

    PI

    SP Explorer

    (EDIS + SPPID + SPI + SPMAT + HPCM + 3D CAD + ProjectSpace)

    ELD

    17

    P&IDs

    2D Nav (P&ID & Documents Browsing)

  • Project Document Control System

    Project Document Control System (ProjectSpace/EDMS)

    Electronic Document Management System (EDMS) from DocumentumCustomizing of Documentum Software to PDCS in 1998ProjectSpace is web based project portal system to enhance performance of data management by achieving real time logging and distribution of various data to numerous participants (vendors and subcontractors) located at various working places.

    18

    *

  • Example of EDMS and Network Configuration

    Project Document Control System

    19

  • Engineering Data Management

    EDIS System Configuration

    3D CAD

    (PDS/PDMS)

    Engineering Data in Plant Life Cycle

    D

    A

    T

    A

    B

    A

    S

    E

    IDM

    Line

    Data

    Instrument

    Data

    Equipment

    Data

    Eqp. Tag

    Inst. Tag

    Project Common Data

    M

    O

    D

    U

    L

    E

    R

    E

    P

    O

    R

    T

    Setup

    Project

    Import

    Export

    ProjectSpace

    CAESAR II

    Line ListPackage ListEquipment ListLoading D/SNozzle List

    Instrument

    Process D/S

    LDM

    SAM

    Line Tag

    Legend

    existing

    future

    ELD

    2D Nav

    EDM

    LLM

    P&IDs

    File

    ISO DWG

    Load List Motor List

    Electrical

    Instrument

    Line

    Equipment

    ELM

    SPF

    EAM(CMMS)

    SP Materials

    HPMAC

    COMMERCIAL & IN-HOUSE

    SYSTEM INTERFACE

    SPI

    SPPID

    Qualified Document & Asset Database for Client

    20

    Why EDIS?

    HECs In-house Package to integrate, manage and share engineering data among disciplines

    Process & Piping : Line List, Stress Analysis Data Vendor Piping Specialty

    Mechanical : Equipment List

    Instrumentation : Instrument Index, Instrument Data Sheet, Vendor Instrument Data

    Electrical : Electrical Load List

    Civil & Construction : Equipment Loading Data

    *

  • 3D CAD System

    HECs 3D Modeling system has been introduced to improve efficiency of engineering, reduce construction error and assure operation satisfactory.All disciplines are assigned in the 3D Modeling system and over 90% of Engineering Works are designed and reviewed by 3D Modeling system.

    3D Modeling System

    21

    System & Specifications

    Line List

    Material

    Spec.

    Plot Plan

    (ELP)

    P&ID

    Inst.

    Index

    Equip.

    List

    Loading

    Data

    SPMat

    RCM

    IDCM

    ISO Drawing

    Control Module

    MPM

    Modling

    Progress Module

    PSMT

    CRM

    Clash Review

    Module

    Plan Drawing

    Spool BOM

    Spool Drawing

    Purchase BOM

    Isometric Drawing

    LDM

    Line Data

    Management

    ELD

    Equipment

    Loading Data

    EDM

    Electrical Data

    Management

    ELM

    Equipment List

    Management

    IDM

    Instrument Data

    Management

    SAM

    Stress Analysis

    Management

    Catalog

    Design Review

    Structural

    Equipment

    Piping

    Hanger & Support

    HVAC

    Electrical

    Drawing & Report

    Space Management

    e-Draw /

    Plantwave

    Spool GEN

    Report Control

    Module

    Pipe Support

    Material Take-Off

    Equipment Detail

    Inline Instrument

    Manhole

    Pipe Support Module

    Penetration Hole

    U/G Module

    Joint Detail

    Engg

    Data

    EDIS

    3D

    In-House

    Program

  • 3D CAD System

    3D Modeling Review System in 3 Phase for Accessibility, Operability, Maintainability (AOM) Objective of each Phase

    Phase #1 (30%) -To verify the plot plan

    Phase #2 (60%) -To define the piping and cable layout to the required detail for starting the preparation

    of construction drawings

    Phase #3 (90%) -To assure that the model contains sufficient information for the production of final

    documents for fabrication and erection and for the final check of the material requirements.

    Facilitator & Q-Captains

    Facilitator is charge of overall management through the whole 3D Modeling Review Process.

    Q-Captains are responsible for the accuracy of 3D Model Review on the their assigned Area.

    3D Modeling Review System - Smart Plant Review

    22

    *

  • Procurement Management System

    Planning and scheduling Standardization Quantification Supplier management Inquiry process and

    purchasing

    Tracking Progress measurement Inventory and warehouse

    management

    Construction planning

    SPMAT Integrated Life Cycle Material and

    Supply Chain Management Solution

    Material libraries

    on project or

    Enterprise level

    Material Life Cycle

    Library

    (MLCL)

    Inventories,

    Forecasts &

    Issues

    Site Management

    (SM)

    Turn engineers

    into Procurement

    Knowledge

    Engineering &

    Procurement

    Integration

    (E&PI)

    Procurement

    Traffic Expediting

    & Inspection

    Material Supply Chain

    Management

    (MSCM)

    23

    *

  • Schedule & Progress Management System

    EDMS

    (Project Space)

    PRIMAVERA

    PMSA

    24

    Schedule Control

    Work Breakdown Structure

    Project Master Schedule

    Project Detail Schedule

    Schedule Analysis

    Resource Control

    Document Control

    Master Document Register

    Material Status Report

    Construction BOQ Sheet

    Progress Control

    Project S-Curve

    Progress Summary Progress

    Progress Calculation Sheet

    Behind Report

    Work Done (or To Be Done) Report

  • Check List

    Punch List

    Status Report

    Progress Report

    Welding Control

    Pressure Test Control

    NDE/PWHT Control

    Spool Control

    Short/Stock/Surplus

    Spool B/M

    PO/BM/DWG

    Tracking

    Project Space

    (EDMS)

    Schedule & Progress

    Construction Progress Control

    Pre-Commissioning & Commissioning

    Construction Management System

    PRIMAVERA

    Punch Control

    Procurement Control

    Real Time Performance

    HPCM

    WJCS

    SPMAT

    Work Breakdown Structure

    Project Master Schedule

    Project Detail Schedule

    Schedule Analysis

    Resource Control

    25

  • INPUT

    OUTPUT

    HPCM

    * HPCM (Hyundai Pre-commissioning & Commissioning Management System)

    Import/Export

    Export

    Project Start

    Ready for Construction

    Mechanical

    Completion

    Ready for

    Start-up

    Ready for

    Operation

    Engineering

    Pre-commissioning

    Commissioning

    Start-up

    Project Data

    Engineering Data

    (Equipment, Line,

    Cable, Instrument)

    Subsystem Data

    Geographical Data

    Scheduling Data

    Data Management

    Pre-Comm. & Comm.

    Job Generation

    Check List Generation

    Punch List Management

    Report Generation

    Progress Calculation

    Check List

    Punch List

    Status Report

    Progress Report

    Pre-comm. and Commissioning Management System

    26

  • Check/Test Sheets Data Reports Progress Chart

    Output Reports

    Pre-comm. and Commissioning Management System

    27

  • References for Major Process Plant Projects

    REFERENCE FOR MAJOR PROJECTS OF PROCESS PLANT

    OIL REFINERY PLANTPETROCHEMICAL PLANTCHEMICALSOIL & GAS PRODUCTION/PROCESSING LNG FACILITIESOFFSHORE FACILITIES

    As an EPC contractor or Engineering Contractor, we have executed over 400 process plant projects with a total installed value cost far exceeding $15 billion.

    28

    HYUNDAI

  • CLIENT

    NAFTEC Spa/ Algeria

    LOCATION
    Arzew, Algeria

    CONTRACT PERIOD
    2009. 01 ~ 2011. 11

    CAPACITY

    - Rehabilitation Project (Revamping)

    Atmospheric Distillation

    (60,000 BPSD 90,000 BPSD)

    - Adaptation Project (New)

    LNHT & ISOM

    (7,500 BPSD, RON=88, UOP)

    References for Major Process Plant Projects

    Oil Refinery Plant

    ARZEW Refinery Project

    29

    *

  • CLIENT
    Hyundai Oilbank Co., Ltd.

    Korea


    CAPACITY

    Heavy Oil Upgrading Plant

    ARDS : 66,000 BPDS

    - RFCC : 52,000 BPDS

    LOCATION
    Daesan , Korea


    CONTRACT PERIOD
    2008. 5 ~ 2011. 6

    HDO #2 HOU Project

    Oil Refinery Plant

    References for Major Process Plant Projects

    30

    Project Site

  • CLIENT
    Map Ta Phut Olefins Co., Ltd.

    Thailand


    CAPACITY

    Benzene : 193,000 MTPA

    Toluene : 101,000 MTPA

    Mixed Xylene : 139,000 MTPA

    LOCATION
    Rayong , Thailand


    CONTRACT PERIOD
    2008. 1 ~ 2010. 1

    Aromatics Recovery Unit Project

    Oil Refinery Plant

    References for Major Process Plant Projects

    31

  • CLIENT
    Pak Arab Refinery Ltd. (PARCO)

    Pakistan


    CAPACITY

    Diesel Hydro Desulfurizer Facilities

    DHDS Unit : 26,000 BPSD

    LOCATION
    Mahmood Kot, Pakistan


    CONTRACT PERIOD
    2008. 6~ 2010. 9

    MCR DHDS Project

    Oil Refinery Plant

    References for Major Process Plant Projects

    32

  • *

    CLIENT
    Kuwait National Lube Oil Company, Kuwait


    CAPACITY

    Hydroisomerisation (HIU) : 7,000 BPSD

    Hydrofinishing (HFU) : 6,500 BPSD

    Hydrogen Plant (HPU) : 4 package

    Amine Treating (ATU) : 2 TPD

    LOCATION
    Shuaiba, Kuwait


    CONTRACT PERIOD
    2007. 10 ~ 2011. 4

    Oil Refinery Plant

    Base Oil Plant Project

    References for Major Process Plant Projects

    33

    *

    61

  • *

    CLIENT
    SK ENERGY, KOREA


    CAPACITY
    Alkylation : 18,000 BPSD

    Sulfur : 620 TPD

    Spent Acid Recovery: 150 TPD

    Butamer : 13,000 BPSD

    LOCATION
    Ulsan, Korea


    CONTRACT PERIOD
    2006. 2 ~ 2008. 4


    Oil Refinery Plant

    SK NO. 2 FCC Project

    References for Major Process Plant Projects

    34

    *

    61

  • CLIENT

    Hyundai Oilbank Co., Ltd.

    Korea

    CAPACITY

    #1 Mogas Hydrotreating Unit : 20,000 BPSD

    #2 Hydrogen Manufacturing Unit : 45,000 Nm3/hr

    #3 Gas Oil Hydrotreating Unit : 25,000 BPSD

    LOCATION

    Daesan, Korea
    CONTRACT PERIOD
    2003. 12 ~ 2005. 10

    Oil Refinery Plant

    HDO CLEAN FUELS PROJECT

    References for Major Process Plant Projects

    35

  • Phase 1

    (Grass Root)

    Phase 2

    Capacity (BPSD) Licensor

    CDU #1100,000-

    VDU44,000-

    LPG Merox 2,000UOP

    Kerosene Merox 7,000UOP

    Naphtha Hydrotreater #16,000UOP

    Catalytic Reformer #1 4,000UOP

    Gas Oil Hydrotreater #1 16,000UOP

    Hydrocracker 22,000UOP

    Delayed Coker19,000F/W

    Hydrogen Generation (MMSCFD)54KTI

    Sulfur Recovery (MT/D) 180JGC

    Capacity (BPSD) Licensor

    CDU #2200,000-

    Gas Oil Hydrotreater #132,000EXXON

    Kerosene / Gas Oil-

    Hydrotreater 24,000EXXON

    Kerosene Hydrotreater 24,000EXXON

    Naphtha Hydrotreater #2 20,000UOP

    Platformer #2 20,000UOP

    Sulfur Recovery (MT/D) 180JGC

    HYUNDAI OIL REFINERY PROJECT

    CLIENT

    Hyundai Oilbank Co., Ltd.

    Korea

    LOCATION
    Daesan, Korea

    CONTRACT PERIOD
    Phase 1(Grass Root) 1986 ~ 1988

    Phase 2 1994 ~ 1996

    Oil Refinery Plant

    References for Major Process Plant Projects

    36

  • Oil Refinery Plant

    CLIENT
    Formosa Petrochemical Co.

    CAPACITY
    Base Oil : 10,000 BPSD

    #2 VDU : 57,000 BPSD

    LHDC : 25,000 BPSD

    MSDW : 14,000 BPSD

    WOU : 10,000 BPSD

    LOCATION
    Taiwan


    CONTRACT PERIOD
    2005. 2 ~ 2007. 6

    Lube Base Oil Project

    References for Major Process Plant Projects

    37

  • CLIENT
    HELLENIC ASPROPYRGOS

    REFINERY S.A.


    CAPACITY
    Atmospheric :54,000 BPSD

    Vacuum :15,000 BPSD

    LOCATION
    Attica, Greece


    CONTRACT PERIOD
    1997. 7 ~ 2001. 12

    CRUDE & VACUUM DISTILLATION

    UNIT

    Oil Refinery Plant

    References for Major Process Plant Projects

    38

  • CLIENT
    Hyundai Oilbank Co., Ltd.

    Korea


    CAPACITY
    Paraxylene : 300,000 MTPA

    Benzene : 108,000 MTPA

    LOCATION
    Daesan, Korea
    CONTRACT PERIOD
    1996 ~ 1997

    HYUNDAI OIL AROMATICS PROJECT

    Oil Refinery Plant

    References for Major Process Plant Projects

    39

  • *

    CLIENT
    Petro Vietnam, Vietnam


    CAPACITY

    Polypropylene : 150,000 MTPA

    LOCATION
    Dung Quat, Vietnam


    CONTRACT PERIOD
    2008. 1 ~ 2010. 4

    Petrochemical Plant

    Dung Quat PP Project

    References for Major Process Plant Projects

    40

    Site

    Hanoi

    Site

    Hochi minh

    Refinery

    *

    61

  • *

    CLIENT
    Arabian Amines Company


    CAPACITY

    Ethyleneamine : 27,200 MTPA

    LOCATION
    Al-Jubail, Saudi Arabia


    CONTRACT PERIOD
    2007. 12 ~ 2010. 1

    Petrochemical Plant

    AAC Ethyleneamines Project

    References for Major Process Plant Projects

    41

    *

    61

  • CLIENT
    Daesan MMA Corporation, Korea


    CAPACITY
    MMA (Methyl Methacrylate) : 90,000 MTPA

    - MMA Purification Unit

    LOCATION
    Daesan, Korea


    CONTRACT PERIOD
    2007. 5 ~ 2009. 2

    MMA Project

    References for Major Process Plant Projects

    Petrochemical Plant

    42

    *

    61

  • CLIENT
    Daesan MMA Corporation, Korea


    CAPACITY
    PMMA (Poly Methyl Methacrylate) : 40,000 MTPA

    - Polymerization Unit

    - Extrusion Unit

    - Monomer Recovery Unit

    - Pelletizing & Packing Unit

    - Utility & Offsite Facilities

    LOCATION
    Yeosu, Korea


    CONTRACT PERIOD
    2007. 4 ~ 2008. 6

    PMMA Project

    References for Major Process Plant Projects

    Petrochemical Plant

    43

    *

    61

  • Phase I

    Phase II

    Capacity (MTPA)Licensor

    - Ethylene 350,000MW Kellogg

    - Butadiene 57,000Nippon Zeon

    - SM100,000Raytheon (Badger)

    - LDPE (Tubular)100,000 BASF

    - LLDPE 60,000 Stamicarbon

    - HDPE100,000 Phillips

    - PP170,000 Himont

    - EO/EG 100,000 Scientific Design

    - RPG Hydrotreating430,000 IFP

    - Benzene Recovery140,000HRI

    Capacity (MTPA)Licensor

    - Ethylene 450,000MW Kellogg

    - Butadiene104,000Nippon Zeon

    - MTBE 100,000 CD-Tech

    - SM 200,000 Raytheon (Badger)

    - EO/EG 200,000 Scientific Design

    - EVA/LDPE (Autoclave) 85,000 Exxon

    - HDPE/LLDPE130,000 UCC

    - PP160,000 Technipol

    - VCM 50,000 Mitsui Toatsu

    - PVC 150,000 Geon

    - Benzene Recovery 190,000 IFP

    - SBR 82,000 Goodyear

    CLIENT

    Hyundai Petrochemical Co., Ltd.

    LOCATION
    Daesan, Korea

    CONTRACT PERIOD
    Phase I 1988 ~ 1991

    Phase II 1995 ~ 1998

    Petrochemical Plant

    HYUNDAI PETROCHEMICAL

    COMPLEX I & II

    References for Major Process Plant Projects

    44

  • CLIENT

    Ras Lanuf Oil & Gas Processing Co.

    CAPACITY
    HDPE : 80,000 MTPA (UCC UNIPOL Process)

    LLDPE : 80,000 MTPA (UCC UNIPOL Process)

    LOCATION
    Ras Lanuf, Libya


    CONTRACT PERIOD
    1991 ~ 1998

    RAS LANUF PETROCHEMICAL COMPLEX

    Petrochemical Plant

    References for Major Process Plant Projects

    45

  • *

    Chemicals

    S-2 Project

    References for Major Process Plant Projects

    CLIENT
    Kumgang Korea Chemical Co., Ltd.
    (KCC), Korea


    CAPACITY
    Methyl Chloro Silane Monomer : 50,000 MTPA

    - Distillation, Hydrolysis, Polymer,

    - HTV, Gum, Polymer Storage (2nd)

    LOCATION
    Daesan, Korea


    CONTRACT PERIOD
    2005. 8 ~ 2007. 10

    46

    *

    61

  • *

    Chemicals

    CLIENT
    Kumgang Korea Chemical Co., Ltd.
    (KCC), Korea


    CAPACITY
    Methyl Chloro Silane Monomer
    : 25,000 MTPA

    LOCATION

    Jeonju, Korea


    CONTRACT PERIOD
    2001 ~ 2004

    KCC SILICON PROJECT

    References for Major Process Plant Projects

    47

    *

    61

  • *

    CLIENT
    SAUDI ARAMCO


    CAPACITY
    1) FEED Gas Inlet Facilities

    2) Gas Treatment Facilities

    (600 MMSCFCD x 3 Trains)

    - Acid Gas Removal Unit

    - Acid Gas Enrichment Unit

    - TEG Gas Drying Unit

    - Propane Refrigeration Unit

    3) Offsite

    LOCATION
    Karan Gas Field, Saudi Arabia


    CONTRACT PERIOD
    2009. 3 ~ 2012. 1

    Oil & Gas Production/Processing

    KARAN Gas Facilities Project

    References for Major Process Plant Projects

    48

    *

    61

  • *

    CLIENT
    QATAR SHELL GTL LIMITED


    CAPACITY
    LPU Package Product: 140,000 BPSD

    Naphtha: 17,800 BPSD

    Gas Oil: 32,684 BPSD

    Base Oil: 16,616 BPSD

    LOCATION
    Ras Laffan, Qatar


    CONTRACT PERIOD
    2006. 7 ~ 2010. 9

    Oil & Gas Production/Processing

    Pearl GTL C5 Project

    References for Major Process Plant Projects

    48

    *

    61

  • *

    CLIENT
    Saudi Aramco


    CAPACITY
    Sour associated Gas : 563 MMSCFD

    Hydrocarbon Condensate : 18.8 MBD

    315 MMSCFD of associated Gas

    70 MBPCD of C3+ NGL Production

    LOCATION
    Khurais, Saudi Arabia


    CONTRACT PERIOD
    2006. 9 ~ 2009. 5


    Oil & Gas Production/Processing

    Khurais Project

    References for Major Process Plant Projects

    49

    *

    61

  • CLIENT

    Agip Iran BV

    CAPACITY
    500 MMSCFD x 4 Trains

    LOCATION
    Assaluyeh, Iran

    CONTRACT PERIOD
    2002. 3 ~ 2005. 2

    SOUTH PARS GAS FIELD

    DEVELOPMENT PHASES 4&5

    Oil & Gas Production/Processing

    References for Major Process Plant Projects

    50

  • CLIENT

    Total Fina Elf NIOC

    CAPACITY
    500 MMSCFD x 4 Trains

    LOCATION
    Assaluyeh, Iran
    CONTRACT PERIOD
    1999. 3 ~ 2003. 3

    SOUTH PARS GAS FIELD

    DEVELOPMENT PHASES 2 & 3

    Oil & Gas Production/Processing

    References for Major Process Plant Projects

    51

  • Oil & Gas Production/Processing

    References for Major Process Plant Projects

    CLIENT

    PETRONAS GAS SDN. BHD., Malaysia

    CAPACITY

    Sales Gas : 250 MMSCFD x 3

    LOCATION
    Kerteh, Terengganu State, Malaysia
    CONTRACT PERIOD
    1990 ~ 1994

    GAS PROCESSING PLANT

    2 & 3, 4 (GPP-2/3,4)

    52

  • CLIENT

    Qatar Petroleum Corporation

    CAPACITY
    NGL : 10,200 TPD

    Ethane : 3,150 TPD

    Propane : 3,000 TPD

    Butane : 2,100 TPD

    LOCATION
    Dukhan & Mesaieed, Qatar
    CONTRACT PERIOD
    1999. 8 ~ 2003. 6

    NGL-4 PROJECT

    Oil & Gas Production/Processing

    References for Major Process Plant Projects

    53

  • CLIENT

    Sirte Oil Company

    CAPACITY
    Gas Treatment : 350 MMSCFD

    Condensate : 31,000 BPD

    LOCATION
    Attahaddy, Libya
    CONTRACT PERIOD
    1999. 9 ~ 2004. 2

    CLIENT

    Saudi ARAMCO

    CAPACITY
    Gas Processing Facilities : 1,600 MMSCFD

    LOCATION
    Hawiya, Saudi Arabia
    CONTRACT PERIOD
    1998. 8 ~ 2002. 4

    ATTAHADDY GAS FIELD

    DEVELOPMENT PROJECT

    Hawiyah Inlet and

    Auxiliary Facilities

    Oil & Gas Production/Processing

    References for Major Process Plant Projects

    54

  • NEW OIL PIER AND ASSOCIATED

    TOP SIDE FACILITIES

    CLIENT

    Kuwait National Petroleum Company

    CAPACITY
    Trestle 2,960m, Berth 4 units,

    Loading Arm 36 units

    LOCATION
    Mina Al-Ahmadi, Kuwait
    CONTRACT PERIOD
    2001. 3 ~ 2004. 4

    Oil & Gas Production/Processing

    References for Major Process Plant Projects

    CLIENT

    Shell Petroleum Development Company

    CAPACITY
    Oil Treatment : 1,510,000 BPD

    LOCATION
    Bonny, Nigeria
    CONTRACT PERIOD
    2002. 3 ~ 2006. 2

    BONNY TERMINAL INTEGRATED PROJECT

    55

  • References for Major Process Plant Projects

    CLIENT
    Tokyo Gas Engineering Co., Ltd.

    Japan


    CAPACITY

    Terminal and Trunk Line

    Phase I : 3,370 KTPA

    LOCATION
    Zhuhai, China


    CONTRACT PERIOD
    2007. 10 ~ 2008. 6

    LNG Facilities

    Zhuhai LNG Terminal FEED Services

    56

  • CLIENT

    Korea Gas Corporation

    CAPACITY

    Berth Facilities : 75,000 Ton

    LNG Storage Tank : 100,000 K x 3 Units

    LNG Vaporization & Sendout Facilities

    LOCATION
    Inchon, Korea

    CONTRACT PERIOD
    1991. 5 ~ 1996. 12

    INCHON LNG RECEIVING TERMINAL

    INCHON LNG RECEIVING TERMINAL(1st Extension)

    CLIENT

    Korea Gas Corporation

    CAPACITY

    LNG 7.5 x 10^6 MTPA

    Send-Out : 3,060 Ton/Hr

    STORAGE TANK
    - Above-ground : 10 Units
    - In-ground : 8 Units

    LOCATION
    Inchon, Korea

    CONTRACT PERIOD
    1991 ~ 1998

    LNG Facilities

    References for Major Process Plant Projects

    57

  • DONGHAE-1 NATURAL GAS PRODUCTION FACILITIES

    CLIENT

    Korea National Oil Corp., Korea

    CAPACITY
    4 Legged Jacket with 8 Skirt Piles

    4 Legged 4 Level Deck

    Gas : 50 MMSCFD

    Condensate : 15 BBL/MMSCFD

    LOCATION
    Korea

    CONTRACT PERIOD
    2001. 3 ~ 2003. 11

    CLIENT

    UNOCAL Makassar Ltd.

    CAPACITY
    TLP (Tension Leg Platform)

    FPU (Floating Production Unit)

    60,000 bbl/Oil & 150 MMSCFD Gas Processing

    LOCATION
    Indonesia

    CONTRACT PERIOD
    2001 ~ 2003

    WEST SENO FIELD DEVELOPMENT PROJECT

    Offshore Facilities

    References for Major Process Plant Projects

    58

  • CLIENT

    ONGC, India

    CAPACITY
    Gas : 30 MMSCFD

    LOCATION
    India
    CONTRACT PERIOD
    1997 ~ 1999

    BCP-A & BCP-B BOOSTER COMPRESSOR

    PLATFORM PROJECT

    ONGC NEELAM PROCESS COMPLEX PROJECT

    CLIENT

    ONGC, India

    CAPACITY
    Process Platform :

    Oil : 128,460 BPSD Gas : 2.56 MMSCFD

    Water Injection Platform :

    229 BWPD Well Platform

    LOCATION
    India
    CONTRACT PERIOD
    1992 ~ 1994

    Offshore Facilities

    References for Major Process Plant Projects

    59

  • References for Major Process Plant Projects

    Oil Refinery Plant

    60

    Nation

    Project

    Plant Description

    Period

    Algeria

    Arzew Refinery Project

    - Rehabilitation Project (Revamping)

    Atmospheric Distillation

    (60,000 BPSD 90,000 BPSD)

    - Adaptation Project (New)

    LNHT & ISOM

    (7,500 BPSD, RON=88, UOP)

    2009. 01 ~ 2011. 11

    Korea

    SK HCC Project

    VDU : 70,000 BPSD

    HCK : 40,000 BPSD

    VB : 40,000 BPSD

    H2 : 85MMSCFD

    SRP : 300TPSD

    2008. 10 ~ 2011. 2

    Korea

    HDO#2 HOU Project

    (FEED & LLI Procurement)

    ARDS : 66,000 BPSD (CLG)

    RFCC : 52,000 BPSD (UOP)

    GHT : 40,000 BPSD (SHELL)

    LMX : 25,400 BPSD (UOP)

    ALK : 16,000 BPSD (DuPont)

    KMX : 15,000 BPSD (UOP)

    SHU : 12,500 BPSD (UOP)

    PRU : 10,000 BPSD (UOP)

    BTU : 8,100 BPSD (UOP)

    SRU : 500 TPSD (CB&I)

    SAR : 150 TPSD (MECS)

    HMU : 110 MMSCFD (HTAS)

    2008. 5 ~ 2011. 6

    *

  • References for Major Process Plant Projects

    Oil Refinery Plant

    61

    Nation

    Project

    Plant Description

    Period

    Pakistan

    MCR DHDS Project

    DHDS : 26,000 BPSD

    2008. 6 ~ 2010. 9

    Thailand

    Aromatics Recovery Project

    Benzene : 193,000 MTPA

    Toluene : 101,000 MTPA

    Mixed Xylene : 139,000 MTPA

    2008. 1 ~ 2010. 1

    Kuwait

    Base Oil Plant Project

    Hydroisomerisation (HIU)

    :7,000 BPSD

    Hydrofinishing (HFU)

    :6,500 BPSD

    Hydrogen Plant (HPU)

    :4 package

    Amine Treating (ATU)

    :2 TPD

    2007. 10 ~ 2011. 4

    Indonesia

    PERTAMINA DUMAI Revamping

    Project

    (Process Design Package)

    CDU Revamping

    (100,000 BPSD to 200,000 BPSD)

    VDU : 50,000 BPSD

    PSA : 12,000 Nm3/h

    2008. 3 ~ 2008. 8

    *

  • Reference List for Major Process Plant Projects

    Nation

    Project

    Plant Description

    Period

    Oil Refinery Plant

    62

    Korea

    Clean Fuels Project

    1 Mogas Hydrotreating Unit

    : 20,000BPSD

    2 Hydrogen Manufacturing Unit

    :45,000 Nm3/hr

    3 Gas Oil Hydrotreating Unit

    :25,000 BPSD

    2003. 12 ~ 2005. 10

    Korea

    Hydrogen Plant Project

    Hydrogen : 29,000 MTPA

    2002. 7 ~ 2004. 7

    Korea

    SK No.2 FCC Project

    Alkylation (Stratco) : 18,000 BPSD

    Sulfur (TPA) : 620 TPSD

    2006. 2 ~ 2008. 4

    Taiwan

    Lube Base Oil Project

    Base Oil : 10,000 BPSD

    #2 VDU : 57,000 BPSD

    LHDC : 25,000 BPSD

    MSDW : 14,000 BPSD

    WOU : 10,000 BPSD

    2005. 2 ~ 2007. 6

    Kuwait

    Crude Export Facility Project

    Crude Oil Production : 3MMBOPD

    Increase Oil Export Potential

    : 2MMBOPD

    2005. 10 ~ 2008. 9

  • Korea

    Hyundai Oil Refinery Project

    (Phase1 & Phase 2)

    Phase 1 CDU : 100,000 BPSD

    VDU : 44,000BPSD

    Phase 2 CDU : 200,000 BPSD

    Phase 1 : 1986 ~ 1988

    Phase 2 : 1994 ~ 1996

    Oil Refinery Plant

    Korea

    Hyundai Aromatics

    Complex Project

    Paraxylene : 300,000 MTPA

    Benzene : 108,000 MTPA

    1996 ~ 1997

    Philippines

    Petron TCCU Revamp &

    Mixed Xylene Unit

    TCCU Revamping: 3,000 BPSD

    (12,000 BPSD to 15,000 BPSD)

    Mixed Xylene : 7,200 BPSD (UOP)

    1998.11 ~ 2000. 2

    Reference List for Major Process Plant Projects

    India

    HPCL Hydrogen

    Generation Unit

    Hydrogen : 14,500 MTPA

    (Haldor Topsoe)

    1998. 1 ~ 2000.12

    Greece

    Crude & Vacuum

    Distillation Unit

    VDU : 15,000 BPSD

    ADU : 44,000 BPSD

    1997. 7 ~ 2001.12

    63

    Nation

    Project

    Plant Description

    Period

  • Vietnam

    Dung Quat PP Project

    Polypropylene : 150,000 MTPA

    2008. 1 ~ 2010. 4

    Saudi Arabia

    AAC Ethyleneamines Project

    Ethyleneamine : 27,200 MTPA

    2007. 12 ~ 2010. 1

    Reference List for Major Process Plant Projects

    Petrochemical Plant

    Korea

    MMA Project

    MMA (Methyl Methacrylate)

    : 90,000 MTPA

    -MMA Purification Unit

    2007. 5 ~ 2009. 2

    Korea

    PMMA Project

    PMMA (Poly MethylMethacrylate)

    : 40,000 MTPA

    - Polymerization Unit

    - Extrusion Unit

    2007. 4 ~ 2008. 6

    64

    Vietnam

    PV TEX PET Project

    Polyester 500 Ton/Day

    (Staple Fiber 400 T/D, Filament 100 T/D)

    2009. 7 ~ 2011. 7

    Nation

    Project

    Plant Description

    Period

  • Petrochemical Plant

    Reference List for Major Process Plant Projects

    Indonesia

    UAB#3 Plant

    Linear & Branched Alkyl Benzene

    : 60,000 MTPA

    (UOP HF Alkylation Process )

    1996. 9 ~ 1998. 4

    Korea

    Lotte Offsite Expansion Project

    Naphtha Tank : 25,000 M3 x 2

    Benzene Tank : 10,000 M3 x 1

    2005. 10 ~ 2006. 11

    Korea

    D-7 Project

    SM Cap. Upgrade: 70,000 MTPA

    (100,000 MTPA -> 170,000 MTPA)

    2004. 1 ~ 2005. 12

    65

    Iran

    Ethylene Plant of 11th Olefin Project

    Ethylene Plant: 1,200 MTPA

    Low Temp. Storage Tank: 10,000 ton

    2006. 1 ~ 2009. 12

    Nation

    Project

    Plant Description

    Period

  • Petrochemical Plant

    Reference List for Major Process Plant Projects

    Korea

    Yukong-Arco POSM Complex

    Propylene Oxide : 100,000 MTA
    Styrene Monomer: 225,000 MTA

    1988. 6 ~ 1990. 6

    66

    Korea

    Hyundai Petrochemical

    Complex I & II

    Phase I

    Ethylene 350,000 MTPA

    SM 100,000 MTPA LDPE 100,000 MTPA

    -LLDPE 60,000 MTPA

    HDPE 100,000 MTPA PP 170,000 MTPA

    Phase II

    Ethylene 450,000 MTPA

    SM 200,000 MTPA

    -HDPE/LLDPE 130,000 MTPA

    PVC 150,000 MTPA Benzene Recovery 190,000 MTPA

    - PP 160,000 MTPA

    Phase I

    : 1988 ~ 1991

    Phase II

    : 1995 ~ 1998

    Nation

    Project

    Plant Description

    Period

    Libya

    Ras Lanuf Petrochemical Complex

    HDPE : 80,000 MTPA

    LLDPE : 80,000 MTPA

    1991 ~ 1998

  • Korea

    H Project

    Ethylene Glycol Monobutyl Ether (BG) :54 MTPD

    Diethylene Glycol MonobutylEther(BDG):14 MTPD

    2004. 5 ~ 2005. 6

    Korea

    S-2 Project

    Methyl Chloro Silane Monomer :

    50,000 MTPA

    2005. 8 ~ 2007. 10

    Chemicals

    Reference List for Major Process Plant Projects

    Korea

    KCC Silicon Project

    Methyl Chloro Silane Monomer
    : 25,000 MTPA

    2001 ~ 2004

    67

    Nation

    Project

    Plant Description

    Period

    Korea

    P-2 Project

    Polysilicon: 3,000 MTPA

    2008. 2 ~ 2010. 5

    Vietnam

    PVTEX PET Project

    Polyester: 500 TPD

    - Polycondensation Unit (Process Unit)

    - Staple Fiber Unit

    - Filament Unit

    - UT/OS Unit

    2009. 5 ~ 2011. 5

  • China

    Chishui Urea Plant

    Urea : 500 MTPD

    1993. 6 ~ 1996. 6

    Chemicals

    China

    China Shaanxi Urea Plant

    Urea : 400 MTPD

    1995. 6 ~ 2000. 6

    Reference List for Major Process Plant Projects

    China

    China Pingdingshan

    Urea Plant

    Urea : 400 MTPD

    1996. 1 ~ 2000. 6

    68

    Nation

    Project

    Plant Description

    Period

  • Reference List for Major Process Plant Projects

    Oil & Gas Production/Processing

    69

    Qatar

    Pearl GTL C5 Project

    LPU Package Product: 140,000 BPSD

    Naphtha : 17,800 BPSD

    Gas Oil : 32,684 BPSD

    Base Oil : 16,616 BPSD

    2006. 7 ~ 2010. 9

    Saudi Arabia

    Khurais Gas Processing Facilities

    Sour associated Gas : 563 MMSCFD

    Hydrocarbon Condensate : 18.8 MBD

    315 MMSCFD of associated Gas

    70 MBPCD of C3+ NGL Production

    2006. 9 ~ 2009. 5

    Kuwait

    DOW-PIC Olefin Project

    Berth 31,32 Upgrade

    New Berth 34,35 and Topside Installation,

    Construct 4 Buildings

    2006. 4 ~ 2008. 3

    Nation

    Project

    Plant Description

    Period

    Saudi Arabia

    KARAN Gas Facilities Project

    1) FEED Gas Inlet Facilities

    2) Gas Treatment Facilities

    (600 MMSCFCD x 3 Trains)

    - Acid Gas Removal Unit

    - Acid Gas Enrichment Unit

    - TEG Gas Drying Unit

    - Propane Refrigeration Unit

    3) Offsite

    2009. 3 ~ 2012. 1

  • Kuwait

    KNPC BERTH # 5&6 Expansion Project

    Berth: 20,000 to 120,000 DWT x 2
    - Marine Loading Arm : 12 Sets
    - Metering System : 12 Sets
    - Automatic Gangway : 2 Sets
    - Quick Release Hook : 24 Sets

    2005. 9 ~ 2007. 6

    Kuwait

    Kuwait Facility Upgrade Project

    LP Separator, TV/HP Gas compressor,

    Hydro-Cyclone, Desalter Package,

    Chemical

    2005. 5 ~ 2007. 6

    Indonesia

    Suban II Gas Project

    Well Site Facilities & Gathering Station Trunk Line (26/43.5km)

    Revamping Work at existing Grissik Central Gas Plant

    2004. 9 ~ 2006. 8

    Nigeria

    Bonny Terminal Integrated Project

    Oil Treatment : 1,510,000 BPSD

    2002. 3 ~ 2006. 2

    Reference List for Major Process Plant Projects

    Oil & Gas Production/Processing

    70

    Kuwait

    New Ethane Recovery Plant Project

    Ethane Recovery : Ethane 96% (Recovery from 1,140 MMSCFD Gas)

    2005. 6 ~ 2007. 11

    Nigeria

    EGP-3 Project

    Gas Processing Facility : 395 MMSCFD

    (285 MMSCFD -> 680 MMSCFD)

    Slug Catcher, Dehydration, NGL Extraction, LPG Fractionation

    2005. 6 ~ 2007. 12

    Nation

    Project

    Plant Description

    Period

  • Reference List for Major Process Plant Projects

    Oil & Gas Production/Processing

    71

    Nation

    Project

    Plant Description

    Period

    Indonesia

    Suban Gas Project

    Gas Processing : 2 x 150 MMSCFD

    Well Site Facilities & Gathering Station

    2001. 3 ~ 2003. 4

    Kuwait

    KOC Pipeline Facilities

    Pipeline from Kuwait North to CMM Area in KOC : 48 Inch x 121 KM

    2002. 10 ~ 2004. 6

    Kuwait

    VSM Driven Crude Transit Pumps at 11 GCs

    10 Pumps : 160,000 BOPD

    1 Pump : 120,000 BOPD

    Control System Modification

    2003. 1 ~ 2004. 7

    Kuwait

    New Oil Pier & Associated Topside Facilities at MAA Refinery

    New MAA Pier

    (Trestle 2,962m, Berth 4 Units, Loading Arm 36 Units)

    2001. 3 ~ 2004. 4

    Iran

    South Pars Field Development Phase 4&5

    Gas Processing Facilities :

    500 MMSCFD x 4 Trains

    2002. 3 ~ 2005. 2

  • Oil & Gas Production/Processing

    Reference List for Major Process Plant Projects

    72

    Nation

    Project

    Plant Description

    Period

    Qatar

    NGL-4 Project

    NGL : 10,200 TPD

    Ethane : 3,150 TPD

    Propane : 3,000 TPD

    Butane : 2,100 TPD

    1999. 8 ~ 2003. 6

    Libya

    Attahaddy Gas Development Project

    Gas Treatment : 350 MMSCFD

    Condensate : 31,000 BPD

    1999. 9 ~ 2004. 2

    Iran

    South Pars Field Development Phase 2&3

    Gas Processing Facilities :

    500 MMSCFD x 4 Trains

    1999. 3 ~ 2003. 3

    Indonesia

    Sumpal Gas Project

    Well Site Surface Piping, Flowlines Trunklines (16 / 4.5Km, 28 / 9 Km)

    Grissik Central Gas Plant Expansion

    2001. 3 ~ 2002. 12

  • Oil & Gas Production/Processing

    Reference List for Major Process Plant Projects

    73

    Nation

    Project

    Plant Description

    Period

    Malaysia

    Gas Process Plant 2&3,4

    Sales Gas : 250 MMSCFD x 3

    1990 ~ 1994

    Saudi Arabia

    Hawiyah Inlet and Auxiliary Facilities

    Gas Processing : 1,600 MMSCFD

    1998. 8 ~ 2002. 4

    Pakistan

    Pirkoh Gas Field Development Project

    Gas Compression Plan: 250 MMSCFD

    1997 ~ 1999

  • Korea

    Inchon LNG Receiving Terminal (2nd Extension)

    Berth Facilities : 75,000 Ton
    LNG Ship Jetty & Trestle
    Above LNG Storage Tank :

    100,000kl x 4 Units
    In-ground LNG Tank :
    140,000kl x 2 units
    In-ground LNG Tank :
    200,000kl x 8 units
    LNG Vaporization & Send-out Facility : 2,730 ton/h

    1995. 12 ~ 2009. 11

    China

    Zhuhai LNG Terminal FEED

    Services

    Terminal and Trunk line

    Phase I : 3370 KTPA

    2007. 10 ~ 2008. 6

    LNG Facilities

    Korea

    Kwang Yang LNG Terminal Extension Project

    LNG Tank: 8 Unit

    Send-Out: 2,020 T/H

    2004. 9 ~ 2005. 6

    Mexico

    Sempra Baja LNG Terminal Project

    Receiving Terminal : 220,000m3 LNG Tankers

    (Unloading Arms : 3 Sets)

    2001. 3 ~ 2003. 8

    Reference List for Major Process Plant Projects

    74

    Nation

    Project

    Plant Description

    Period

  • Reference List for Major Process Plant Projects

    LNG Facilities

    75

    Korea

    In-chon LNG

    Receiving Terminal

    Berth Facilities : 75,000 Ton

    LNG Storage Tank : 100,000 K x 3

    1991. 5 ~ 1996.12

    Korea

    In-chon LNG

    Receiving Terminal

    (1st Extension)

    LNG : 7.5 x 10^6 MTPA,

    Send-Out : 3,060 Ton/Hr,

    STORAGE TANK
    Above-ground : 10 Units
    In-ground : 8 Units

    1991 ~ 1998

    Nation

    Project

    Plant Description

    Period

  • Offshore Facilities

    Reference List for Major Process Plant Projects

    Korea

    Donghae-1 Natural Gas Production Facilities

    4 Legged Jacket with8 Skirt Piles

    4 Legged 4 Level Deck

    Gas: 50 MMSCFD

    Condensate: 15 BBL/MMSCFD

    2001. 3 ~ 2003. 11

    Korea

    Tokdo Observation

    Offshore Platform Project

    Main Deck for Accommodation and Laboratory, Cellar Deck for Generator

    4 Legged Jacket (Dia 32 inch)

    1998.11 ~ 1999. 5

    Indonesia

    West Seno Field Development

    Project

    TLP(Tension Leg Platform)

    FPU(Floating Production Unit)

    Oil : 60,000 bbl/oil Gas :150 MMSCFD

    2001. 9 ~ 2003. 4

    India

    BCP-A & BCP-B Booster Compressor

    Platform Project

    Gas : 30 MMSCFD

    1997 ~ 1999

    India

    ONGC Neelam Process Complex Project

    Process Platform :

    Oil : 128,460 BPSD Gas : 2.56 MMSCFD

    Water Injection Platform : 229 BWPD

    Well Platform

    1992 ~ 1994

    76

    Nation

    Project

    Plant Description

    Period

  • Thank you

    PROCESS PLANT

    PROCESS PLANT

    Upstream Oil & Gas

    LNG Facilities

    Oil Refinery

    Petrochemical

    Fertilizer & Chemicals

    Offshore Facilities

    INDUSTRIAL PLANT

    INDUSTRIAL PLANT

    Cement Plant

    Steel Mills & Metal Plant

    Material Handling

    Automation System

    AS/RS & Logistic System

    Food Processing Plant

    Auto Mobile Plant

    POWER & ENERGY

    PLANT

    POWER & ENERGY

    PLANT

    Power Generation

    Power Transmission

    Substation & Distribution

    Power System Analysis

    INFRA &

    ENVIRONMENT

    INFRA &

    ENVIRONMENT

    Road, Subway, Bridge

    Geotechnical Eng.

    Building & Structure

    Dam & Hydropower

    Water Supply

    Sewage Treatment

    Industrial Wastewater

    Treatment

    Harbor & Coastal Eng.

    PROCESS PLANT

    PROCESS PLANT

    Upstream Oil & Gas

    LNG Facilities

    Oil Refinery

    Petrochemical

    Fertilizer & Chemicals

    Offshore Facilities

    INDUSTRIAL PLANT

    INDUSTRIAL PLANT

    Cement Plant

    Steel Mills & Metal Plant

    Material Handling

    Automation System

    AS/RS & Logistic System

    Food Processing Plant

    Auto Mobile Plant

    POWER & ENERGY

    PLANT

    POWER & ENERGY

    PLANT

    Power Generation

    Power Transmission

    Substation & Distribution

    Power System Analysis

    INFRA &

    ENVIRONMENT

    INFRA &

    ENVIRONMENT

    Road, Subway, Bridge

    Geotechnical Eng.

    Building & Structure

    Dam & Hydropower

    Water Supply

    Sewage Treatment

    Industrial Wastewater

    Treatment

    Harbor & Coastal Eng.