production for today - argonaut gold inc. · pdf filecorporate presentation december 2016 |...

18
PRODUCTION FOR TODAY DEVELOPMENT FOR TOMORROW TSX:AR CORPORATE PRESENTATION December 2016

Upload: duongkhue

Post on 24-Feb-2018

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: PRODUCTION FOR TODAY - Argonaut Gold Inc. · PDF fileCORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD TSX:AR 3 CHECKING THE RIGHT INVESTMENT BOXES ü Strong board and management

PRODUCTION FOR TODAY DEVELOPMENT FOR TOMORROW

TSX:AR CORPORATE PRESENTATION December 2016

Page 2: PRODUCTION FOR TODAY - Argonaut Gold Inc. · PDF fileCORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD TSX:AR 3 CHECKING THE RIGHT INVESTMENT BOXES ü Strong board and management

2 TSX:AR CORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD

This presentation contains certain “forward-looking statements” and “forward-looking information” under applicable Canadian securities laws concerning the proposed transaction and the business, operations and financial performance and condition of Argonaut Gold Inc. (“Argonaut” or “Argonaut Gold”). Forward-looking statements and forward-looking information include, but are not limited to, statements with respect to estimated production and mine life of the various mineral projects of Argonaut; synergies and financial impact of completed acquisitions; the benefits of the development potential of the properties of Argonaut; the future price of gold, copper, and silver; the estimation of mineral reserves and resources; the realization of mineral reserve estimates; the timing and amount of estimated future production; costs of production; success of exploration activities; and currency exchange rate fluctuations. Except for statements of historical fact relating to Argonaut, certain information contained herein constitutes forward-looking statements. Forward-looking statements are frequently characterized by words such as “plan,” “expect,” “project,” “intend,” “believe,” “anticipate”, “estimate” and other similar words, or statements that certain events or conditions “may” or “will” occur. Forward-looking statements are based on the opinions and estimates of management at the date the statements are made, and are based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. Many of these assumptions are based on factors and events that are not within the control of Argonaut and there is no assurance they will prove to be correct. Factors that could cause actual results to vary materially from results anticipated by such forward-looking statements include risks of the mining industry, failure of plant, equipment or processes to operate as anticipated, changes in market conditions, variations in ore grade or recovery rates, risks relating to international operations, fluctuating metal prices and currency exchange rates, changes in project parameters, the possibility of project cost overruns or unanticipated costs and expenses and labour disputes. These factors are discussed in greater detail in Argonaut's most recent Annual Information Form and in the most recent Management Discussion and Analysis filed on SEDAR, which also provide additional general assumptions in connection with these statements. Argonaut cautions that the foregoing list of important factors is not exhaustive. Investors and others who base themselves on forward-looking statements should carefully consider the above factors as well as the uncertainties they represent and the risk they entail. Argonaut believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this press release should not be unduly relied upon. These statements speak only as of the date of this press release. Although Argonaut has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Argonaut undertakes no obligation to update forward-looking statements if circumstances or management’s estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking statements. Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking statements to the extent they involve estimates of the mineralization that will be encountered if the property is developed. Comparative market information is as of a date prior to the date of this document. References to dollars or “$” are to U.S. dollars unless specified otherwise.

FORWARD LOOKING INFORMATION

Page 3: PRODUCTION FOR TODAY - Argonaut Gold Inc. · PDF fileCORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD TSX:AR 3 CHECKING THE RIGHT INVESTMENT BOXES ü Strong board and management

3 TSX:AR CORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD

CHECKING THE RIGHT INVESTMENT BOXES

ü  Strongboardandmanagementü  Lowall-insustainingcostproducer1

ü  Leveragetogoldthroughdevelopmentassets

ü  Focusonhigh-return,shortpaybackprojectsintheAmericas

ü  Focusonsimpleprojectsü  Freecashflowgenera@on

ü  StrongbalancesheetOURGOAL:REDUCERISKINARISKYBUSINESSWHILEPRESERVINGLEVERAGETHROUGHDEVELOPMENT1Non-IFRSmeasuresdiscussedonpage17ofthispresenta:on.

Page 4: PRODUCTION FOR TODAY - Argonaut Gold Inc. · PDF fileCORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD TSX:AR 3 CHECKING THE RIGHT INVESTMENT BOXES ü Strong board and management

4 TSX:AR CORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD

STRONG BOARD, MANAGEMENT & TECHNICAL

JamesE.Kofman,Chairman§  ViceChairman,CormarkSecuri:es§ WorkexperienceatUBSSecuri:es,Osler,Hoskin&Harcourt

PeterC.Dougherty§ WorkexperienceatMeridianGold,FMC

IanAtkinson§  DirectorofKinrossGoldandGlobexMining§ WorkexperienceatCenterra,Hecla,BaMleMountain,Hemlo,Noranda

ChristopherR.LaWanzi§  DirectorofTerangaGold,SpanishMountainGold§ WorkexperienceatMicon

PeterMordaunt§  DirectorofEthosGold§ WorkexperienceatS:ngrayCopper,CornerBaySilver

DalePeniuk§  DirectorofLundinMining,CapstoneMining§ WorkexperienceatKPMG

AudraB.Walsh§  CEOofMinasdeAguasTenidas,President&CEOofA2ZMining,DirectorofOrvanaMinerals

§ WorkexperienceatSierraMetals,Minera,Barrick,Newmont

ExperiencedBoardofDirectors

PeterC.Dougherty,President&CEO§ WorkexperienceatMeridanGold,FMC

WilliamZisch,COO§ WorkexperienceatMidwayGold,RoyalGold,Newmont,FMC

DavidA.Ponczoch,CFO§ WorkexperienceatTwinMetalsMinnesota,YamanaGoldThomasH.Burkhart,VicePresidentofExplora9on§ WorkexperienceatNewDimensions(Northair),PegasusGold

W.RobertRose,VicePresidentofTechnicalServices§  WorkexperienceatAndinaMinerals,Kappes,Cassiday&

AssociatesCur@sTurner,CorporateDevelopmentOfficer§  WorkexperienceatCynaco,YamanaGold,MeridianGoldDanielA.Symons,VicePresident,InvestorRela9ons§ WorkexperienceatRomarcoMinerals,RenmarkFinancial

StrongManagement&TechnicalTeam

Page 5: PRODUCTION FOR TODAY - Argonaut Gold Inc. · PDF fileCORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD TSX:AR 3 CHECKING THE RIGHT INVESTMENT BOXES ü Strong board and management

5 TSX:AR CORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD

COMBINING STRENTHS WITH EXPERTISE

• 2016 Guidance 115,000 to 120,000 GEOs1

• Low cost produc;on • Strong Cash Balance with

$50 million2 • AErac;ve Development

Projects to Provide Growth

Management 142 Years Combined Mining Experience

Shareholder Value

1GEO is gold equivalent ounces based on a conversion of silver to gold at a 65:1 ratio 2At September 30, 2016

Page 6: PRODUCTION FOR TODAY - Argonaut Gold Inc. · PDF fileCORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD TSX:AR 3 CHECKING THE RIGHT INVESTMENT BOXES ü Strong board and management

6 TSX:AR CORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD

CAPITAL SUMMARY

1 As at close on December 2, 2016 2 Includes 3.5M “in-the-money” stock options and 2.2M restricted shares outstanding at September 30, 2016 3 As at close on September 30, 2016

Exchange / Symbol TSX:AR

Share Price1 C$2.60

Shares Outstanding 158M

Fully Diluted Shares Outstanding2 164M

Market Capitalization1 C$411M

52 Week High / Low1 C$4.45 / C$0.78

Cash Balance3 C$67M (US$50M)

Page 7: PRODUCTION FOR TODAY - Argonaut Gold Inc. · PDF fileCORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD TSX:AR 3 CHECKING THE RIGHT INVESTMENT BOXES ü Strong board and management

7 TSX:AR CORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD

EL CASTILLO MINE

MINE DETAILS §  120 kilometres from the capital of Durango

in state of Durango, Mexico §  Open pit / Heap leach mine

YTD OPERATIONAL HIGHLIGHTS AT SEPT 30/17

§  Production of 46,019 GEOs2

§  ~8.1 million tonnes of ore placed on the leach pads

§  ~2.8 million additional tonnes outside 2016 mine plan have been found and mined

GOLD RESERVES & RESOURCES (at December 31, 2015)1

Category

Tonnes(000s)

Au

Grade(g/t)

AuOunces(000s)

Proven&Probableat$1,000/oz

20,684

0.48

317

Measured&Indicatedat$1,300/oz

45,056

0.42

605

Inferredat$1,300/oz

7,847 0.28 71

1Pleaseseeresourcedisclosureonpage18forfulldetails2GEOisgoldequivalentouncescalculatedataconversionrateof55:1forsilvertogoldfor2015and65:1for2016

ElCas:llo

Page 8: PRODUCTION FOR TODAY - Argonaut Gold Inc. · PDF fileCORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD TSX:AR 3 CHECKING THE RIGHT INVESTMENT BOXES ü Strong board and management

8 TSX:AR CORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD

LA COLORADA MINE

MINE DETAILS §  45 kilometres from the capital of Hermosillo §  Open pit / Heap leach mine

YTD OPERATIONAL HIGHLIGHTS AT SEPT 30/17

§  Production of 41,694 GEOs2

§  Completed leach pad #5 and Northeast leach pad construction

§  ~3.7 million tonnes of mineralized material place on the leach pads

GOLD RESOURCES (at December 31, 2015)1

§  Indicated of 601k oz Au– (29M tonnes @ 0.64 g/t) §  Indicated of 8.5M oz Ag – (29M tonnes @ 9.0 g/t) §  Inferred of 15k oz Au – (506k tonnes @ 0.90 g/t) §  Inferred of 285k oz Ag – (506k tonnes @ 17.5 g/t)

1Pleaseseeresourcedisclosureonpage18forfulldetails2GEOisgoldequivalentouncescalculatedataconversionrateof55:1forsilvertogoldin2015and65:1in2016

Page 9: PRODUCTION FOR TODAY - Argonaut Gold Inc. · PDF fileCORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD TSX:AR 3 CHECKING THE RIGHT INVESTMENT BOXES ü Strong board and management

9 TSX:AR CORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD

SAN AGUSTIN PROJECT

PROJECT DETAILS1

§  10 kilometres from the El Castillo mine §  Low initial capital - $43M §  Low cash costs - $648/GEO §  After-tax IRR – 50% §  After-tax NPV at $1,200 Au and 5%

discount - $90M §  Average LOM annual production – 80k

GEOs §  Low risk project

§  Open pit / Heap leach

M&I Resources (at December 31, 2015)3

§  Indicated of 845K oz Au – (82M tonnes at 0.32 g/t) §  Indicated of 28.2M oz Ag – (82M tonnes at 10.7 g/t)

29

66

94 95 88

0

20

40

60

80

100

Year1 Year2 Year3 Year4 Year5

GEO2produc@onprofile–first5years

CATALYSTS

§  Targeting first gold production – Q3 2017 §  Ability to finance project with existing cash,

projected cash flow and revolving credit facility §  Excellent exploration potential 1Basedontheassump:onsandparametersassetforthinthePEANI43-101TechnicalReport

datedJune10,20162GEOisgoldequivalentouncescalculatedataconversionrateof80:1forsilvertogold3PleaseseeResourcedisclosureonpage18forfulldetails

Page 10: PRODUCTION FOR TODAY - Argonaut Gold Inc. · PDF fileCORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD TSX:AR 3 CHECKING THE RIGHT INVESTMENT BOXES ü Strong board and management

10 TSX:AR CORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD

SAN ANTONIO PROJECT

PROJECT DETAILS1

§  45 km from the port capital city of La Paz. §  Low initial capital - $84M §  Low cash costs - $553/oz Au §  After-tax NPV at $1,200 gold and a 8%

discount - $206M §  After-tax IRR of 66% §  1.9 year payback §  Low risk project once permitted

§  Open pit / Heap leach

M&I Resources (at December 31, 2015)2

§  Measured & Indicated of 1.7M oz Au – (65M tonnes at 0.83 g/t)

§  Inferred of 67k oz Au – (6M tonnes at 0.34 g/t)

CATALYSTS

§  Positive ruling from Federal lawsuit §  Communicating with all stakeholders to advance

permits 1Basedontheassump:onsandparametersassetforthinthePEANI43-101TechnicalReportdatedOctober10,2012.2PleaseseeResourcedisclosureonpage18forfulldetails

Page 11: PRODUCTION FOR TODAY - Argonaut Gold Inc. · PDF fileCORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD TSX:AR 3 CHECKING THE RIGHT INVESTMENT BOXES ü Strong board and management

11 TSX:AR CORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD

MAGINO PROJECT

PROJECT DETAILS1 §  Location – Ontario, Canada

§  Mine life – 10 years §  Cash cost - $582/oz Au §  After-tax NPV at $1,200 gold and a 5% discount

rate - $415M §  After-tax IRR – 23% §  Initial capital - $540M

Reserves & Resources (at December 31, 2015)2

§  Proven & Probable Reserves of 3.0M oz Au – 105M tonnes at 0.89 g/t

§  Indicated of 4.1M oz Au (inclusive of reserves) – 144M tonnes at 0.88 g/t

370317

423

179 163223

318382

289

157

0100200300400500

Year1

Year2

Year3

Year4

Year5

Year6

Year7

Year8

Year9

Year10

Goldproduc@onprofile–Lifeofmine

CATALYSTS §  Definition drilling, geotechnical drilling, Feasibility Study §  Permitting and First Nations agreements

1Basedontheassump:onsandparametersassetforthinthePre-FeasibilityNI43-101TechnicalReportdatedFebruary22,2016.2PleaseseeResourcedisclosureonpage18forfulldetails

US$M*Mine Fleet 70Pre-production Mining 40*ProcessPlant 180Infrastructure&Tailings 95TotalDirectCost 385 EPCM,Indirects,OwnersCosts 100Con:ngency 55TotalIni@alCapital 540

note:*Oftheabove,$176mmisquoted

Page 12: PRODUCTION FOR TODAY - Argonaut Gold Inc. · PDF fileCORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD TSX:AR 3 CHECKING THE RIGHT INVESTMENT BOXES ü Strong board and management

12 TSX:AR CORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD

At October 20, 2016

Street Consensus ($M)1

Development Assets PEA/PFS at $1,200 Au and 5% discount rate

($M)

Development Assets

PEA/PFS at $1,300 Au and 5% discount rate

($M)

El Castillo $43

La Colorada $81

San Agustin $119

San Antonio $70 $219 $265

Magino $88 $414 $551

Total $401 $633 $816

TREMENDOUS LEVERAGE THROUGH DEVELOPMENT ASSETS

1Sourcestreetresearch.StreetconsensusNPVsarebasedonanalystconsensuses:matesavailableatOctober20,2016.StreetconsensusincludesresearchfromBMOCapitalMarkets,CanaccordGenuity,CIBCWorldMarkets,DesjardinsSecuri:es,MackieResearchandSco:aCapital

Page 13: PRODUCTION FOR TODAY - Argonaut Gold Inc. · PDF fileCORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD TSX:AR 3 CHECKING THE RIGHT INVESTMENT BOXES ü Strong board and management

13 TSX:AR CORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD

P/NAV vs. PEERS at October 19, 2016

1.48x

1.28x

1.17x 1.15x

0.91x 0.87x

0.79x 0.78x 0.76x

0.60x

Klondex Richmont Guyana McEwen Beadell Argonaut Kirkland Lake Teranga Primero Perseus

Median: 0.91x

Source:FactSet,streetresearch1.ProformaNewmarketacquisi:on;assumesUS$20mmintransac:onsfeesistakenoutofMergeCoNAV.

(1)

Page 14: PRODUCTION FOR TODAY - Argonaut Gold Inc. · PDF fileCORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD TSX:AR 3 CHECKING THE RIGHT INVESTMENT BOXES ü Strong board and management

14 TSX:AR CORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD

Market Perception è Creating Value

§  El Castillo Perception of limited mine life.

§  Magino High capex requirements prevent the Company from building in this market.

§  San Antonio Failure to obtain permits in a timely manner.

§  Low grade nature of deposits.

ü  Advance San Agustin.

ü  De-risk and evaluate funding

alternatives, including partnerships.

ü Working top down, bottom up

approach. Legal and social licenses.

ü  Educate investors on similar cash flow and costs compared to to higher grade mine operations.

HOW TO ADDRESS MARKET PERCEPTIONS

Page 15: PRODUCTION FOR TODAY - Argonaut Gold Inc. · PDF fileCORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD TSX:AR 3 CHECKING THE RIGHT INVESTMENT BOXES ü Strong board and management

15 TSX:AR CORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD

Current Assets ($M) – at September 30, 2016

Cash $ 50

VAT and Income Tax Prepayments

14

Inventory Value (48k oz @ $1,250)

60

Total $124

SUMMARY OF INVESTMENT CASE

§  Strong balance sheet with flexibility •  $50 million in cash, $1 million debt

(equipment leases) at Sept. 30, 2016 •  $30 million undrawn corporate revolver

§  Defensive gold stock •  Long track record of adding cash to the

balance sheet through operations §  Highly leveraged to upside in gold

•  Development assets provide tremendous leverage

§  Proven, low cost operator •  Low cost per tonne of ore processed

§  Trading at a discount to peers •  P/NAV basis

Page 16: PRODUCTION FOR TODAY - Argonaut Gold Inc. · PDF fileCORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD TSX:AR 3 CHECKING THE RIGHT INVESTMENT BOXES ü Strong board and management

Dan Symons Vice President, Investor Relations Argonaut Gold Inc. First Canadian Place 100 King St. West, Suite 5700 Toronto, ON M5X 1C7 T: 416-915-3107 Email: [email protected]

CORORATE PRESENTATION JULY 2016 | ARGONAUT GOLD

WWW.ARGONAUTGOLD.COM

TSX:AR ADDITIONAL INFORMATION

Page 17: PRODUCTION FOR TODAY - Argonaut Gold Inc. · PDF fileCORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD TSX:AR 3 CHECKING THE RIGHT INVESTMENT BOXES ü Strong board and management

17 TSX:AR CORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD

Notes and disclosures

ArgonautGoldisaCanadiangoldcompanyengagedinexplora:on,minedevelopmentandproduc:onac:vi:es.Itsprimaryassetsaretheproduc:onstageElCas:lloMineinDurango,MexicoandtheLaColoradaMineinSonora,Mexico,theadvancedexplora:onstageSanAntonioprojectinBajaCaliforniaSur,Mexico,theadvancedexplora:onstageMaginoprojectinOntario,CanadaandtheSanAgus:nprojectinDurango,Mexico.TheCompanyalsohasseveralexplora:onstageprojects,allofwhicharelocatedinNorthAmerica.Forfurtherinforma:onontheCompany'sproper:espleaseseethereportsaslistedbelowontheCompany'swebsiteoronwww.sedar.com.QUALIFIEDPERSONTechnicalinforma:onincludedinthisreleasewassupervisedandapprovedbyThomasBurkhart,ArgonautGold'sVicePresidentofExplora:on,andaQualifiedPersonunderNa:onalInstrument(“NI”)43-101.NATIONALINSTRUMENT43-101–STANDARDSOFDISCLOSUREFORMINERALPROJECTS(“NI43-101”)ThomasBurkhart,ArgonautGold’sVice-PresidentofExplora:onandaQualifiedPersonunderNI43-101,hasreadandapprovedthescien:ficandtechnicalinforma:oninthispresenta:onasitrelatestoArgonaut.Thispresenta:oncontainsinforma:onregardingmineralresourcesthatarenotmineralreservesanddonothavedemonstratedeconomicviability.Thepreliminaryeconomicassessmentsreferencedhereinarepreliminary,andmayincludeinferredmineralresourcesthataretoospecula:vegeologicallytohavetheeconomicconsidera:onsappliedtothemthatwouldenablethemtobecategorizedasmineralreserves.Thereisnocertaintythatthepreliminaryeconomicassessmentswillberealized.CAUTIONARYNOTETOU.S.INVESTORSCONCERNINGESTIMATESOFMEASURED,INDICATEDANDINFERREDRESOURCESThispresenta:onusestheterms“Measured”,“Indicated”and“Inferred”ResourcesasdefinedinaccordancewithNa:onalInstrument43-101–StandardsofDisclosureforMineralProjects.UnitedStatesreadersareadvisedthatwhilesuchtermsarerecognizedandrequiredbyCanadiansecuri:eslaws,theUnitedStatesSecuri:esandExchangeCommissiondoesnotrecognizethem.UnderUnitedStatesstandards,mineraliza:onmaynotbeclassifiedasa“reserve”unlessthedetermina:onhasbeenmadethatthemineraliza:oncouldbeeconomicallyandlegallyproducedorextractedatthe:methereservecalcula:onismade.UnitedStatesreadersarecau:onednottoassumethatalloranypartofthemineraldepositsinthesecategorieswilleverbeconvertedintoreserves.Inaddi:on,“InferredResources”haveagreatamountofuncertaintyastotheirexistence,andastotheireconomicandlegalfeasibility.ItcannotbeassumedthatalloranypartofanInferredResourcewilleverbeupgradedtoahighercategory.UnitedStatesreadersarealsocau:onednottoassumethatalloranypartofanInferredResourceexists,oriseconomicallyorlegallymineable.NON-IFRSMEASURESTheCompanyhasincludedcertainnon-IFRSmeasuresincluding“Cashcostpergoldouncesold”,“All-insustainingcostpergoldouncesold”,“Fullyloadedcostpergoldouncesold”,“Adjustednetearnings(loss)”and“Adjustedearnings(loss)pershare”inthispresenta:ontosupplementitsfinancialstatementswhicharepresentedinaccordancewithInterna:onalFinancialRepor:ngStandards(“IFRS”).Cashcostpergoldouncesoldisequaltoproduc:oncostslesssilversalesdividedbygoldouncessold.All-insustainingcostpergoldouncesoldisequaltoproduc:oncostslesssilversalesplusgeneralandadministra:veexpenses,explora:onexpenses,accre:onofreclama:onprovisionandsustainingcapitalexpendituresdividedbygoldouncessold.Fullyloadedcostpergoldouncesoldisequaltoproduc:oncostsplusexpendituresonmineralproper:es,plantandequipment,generalandadministra:veexpenses(excludingshare-basedcompensa:on),repaymentofdebt,interestpaid,incometaxespaidandexplora:onexpensesdividedbygoldouncessold.Adjustedearningsisequaltonetlosslessthenon-cashimpairmentwritedownofinventories,netoftax,andtheforeignexchangeeffectsoftheweakeningMexicanpesoonthecalcula:onofdeferredtaxes.Adjustedearnings(loss)pershareisequaltoadjustednetearnings(loss)dividedbybasicweightedaveragenumberofcommonsharesoutstanding.TheCompanybelievesthatthesemeasuresprovideinvestorswithanimprovedabilitytoevaluatetheperformanceoftheCompany.Non-IFRSmeasuresdonothaveanystandardizedmeaningprescribedunderIFRS.Thereforetheymaynotbecomparabletosimilarmeasuresemployedbyothercompanies.Thedataisintendedtoprovideaddi:onalinforma:onandshouldnotbeconsideredinisola:onorasasubs:tuteformeasuresofperformancepreparedinaccordancewithIFRS.

Page 18: PRODUCTION FOR TODAY - Argonaut Gold Inc. · PDF fileCORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD TSX:AR 3 CHECKING THE RIGHT INVESTMENT BOXES ü Strong board and management

18 TSX:AR CORPORATE PRESENTATION DECEMBER 2016 | ARGONAUT GOLD

Mineral Resource notes and disclosures AllMineralResourceshavebeenes:matedinaccordancewithCanadianIns:tuteofMining(“CIM”)Standards.MineralResourcesarenotknownwiththesamedegreeofcertaintyasMineralReservesanddonothavedemonstratedeconomicviability.Inaddi:on,thequan:tyandgradeofreportedinferredmineralresourcesshownaboveareuncertaininnatureandthereisinsufficientexplora:ontodefinetheseinferredmineralresourcesasanindicatedormeasuredmineralresourceanditisuncertainiffurtherexplora:onwillresultinupgradingthemtoanindicatedormeasuredmineralresourcecategory.Numbersmaynotaddupduetorounding.TheReservesforElCas:llosetoutintheabovetablewereupdatedinternally,arevalidasofDecember2015andreviewedbyQualifiedPersonMikeLechnerandArgonaut’sCOORichardRhoades.Thereserveupdateusedagoldpriceof$1,000.Cut-offgrades,dependingonrockandoretype,variedfrom0.15g/tforoxideto0.54g/tforsilicifiedsulphide.TheMineralResourceforElCas:llointheabovetablewereupdatedinternally,arevalidasofDecember2015andreviewedbyQualifiedPersonMikeLechnerandArgonaut’sCOORichardRhoades.Theresourceupdateusedagoldpriceof$1,300.Cut-offgrades,dependingonrockandoretype,variedfrom0.101g/tforoxideto0.415g/tforsilicifiedsulphide.TheMineralConeResourcesusedforLaColoradaintheabovetablewereupdatedinternally,arevalidasofDecember,2015andreviewedbyQualifiedPersonMikeLechnerandArgonaut’sCOORichardRhoades.TheConeResourceupdateusedagoldpriceof$1,300andasilverpriceof$18.Thegoldequivalentcutoffgradevarieddependingondepositandrangedfrom0.083to0.154g/t.ThePitDesignResourcesusedforLaColoradaintheabovetablewereupdatedinternally,arevalidasofDecember,2015andreviewedbyQualifiedPersonMikeLechnerandArgonaut’sCOORichardRhoades.ThePitDesignResourceupdateusedagoldpriceof$1,000andasilverpriceof$14.Thegoldequivalentcutoffgradevarieddependingondepositandrangedfrom0.110to0.201g/t.TheMineralResourcesfortheSanAntonioProjectsetoutinthetableaboveweretakenfromtheSanAntonioTechnicalReport,datedOctober10,2012(effec:vedateofSeptember1,2012).Thegoldresourcewases:matedatagoldpriceof$1,500usingacutoffgradeof0.11g/tAuforoxideandtransi:onand0.15g/tAuforsulphide.TheseamountshavebeenreviewedandconfirmedbyThomasBurkhart,whoisaqualifiedpersonunderNI43-101.TheMineralResourcesfortheMaginoGoldProjectsetoutinthetableaboveweretakenfromtheMaginoPre-FeasibilityStudyTechnicalReport,datedFebruary22,2016(effec:vedateofJanuary18,2016).Theresourcewases:matedatagoldpriceof$1,200.TheProbableReservestudyusedagoldcutoffof0.35g/twhiletheIndicateResourcestudyu:lizedacutoffof0.25g/tgold.TheseamountshavebeenreviewedandconfirmedbyThomasBurkhart,whoisaqualifiedpersonunderNI43-101.TheMineralResourcesfortheSanAgus:nGold-SilverProjectsetoutinthetableaboveweretakenfromtheSanAgus:nOxideResourceEs:mate,datedOctober3,2014(effec:vedateofJuly8,2014).Theresourcewases:matedusingagoldpriceof$1,300andsilverpriceof$20.Agoldequivalentcutoffof0.18g/twasusedfortabula:ngMineralResources.TheseamountshavebeenreviewedandconfirmedbyThomasBurkhart,whoisaqualifiedpersonunderNI43-101.