production planning and control (ppc)
TRANSCRIPT
-
8/8/2019 Production Planning and control (PPC)
1/14
-
8/8/2019 Production Planning and control (PPC)
2/14
Determine grossrequirement offinish products
Determine netrequirement offinish product
Develop masterproductionschedule
Explode BoM to
find gross request
Determine netparts requirement
Sales orderforecast
Inventory inhand
Compparts
-
8/8/2019 Production Planning and control (PPC)
3/14
Adjustrequirement forscrap allowance
Schedule/release order
aggregate
All levelexplode
Issueplannedorder
Compare
plan order
Scrapallowance
yes
-
8/8/2019 Production Planning and control (PPC)
4/14
` Process Planning is a process of establishingthe shortest and the most economical paththat is to be followed from a point it is
received as a raw material in the shop flooruntil it is completed as finished product.
-
8/8/2019 Production Planning and control (PPC)
5/14
` The document which gives the processplanning is called as process sheet.
` Input to the process planning
1. Drawing2. Machine capacity chart
3. Available tooling
-
8/8/2019 Production Planning and control (PPC)
6/14
` Factors to be considered in process planning
1. Order quantity
2. Delivery component
3. Skill of manpower4. Other resources
-
8/8/2019 Production Planning and control (PPC)
7/14
1. Study the component drawing
2. Draw the list of machine
3. Prepare the list of operation
4. Fix up the sequence of operation5. Insert auxiliary operation
6. Write down route sheet
-
8/8/2019 Production Planning and control (PPC)
8/14
1. Continuous and mass production
2. Batch production
3. Job order production
-
8/8/2019 Production Planning and control (PPC)
9/14
` It concerns the physical release ofmanufacturing order and allocation of jobsto work men on different machine with
drawing material and tools for such a jobfrom stores and delivery in advance toshops
-
8/8/2019 Production Planning and control (PPC)
10/14
` Release of manufacturing order
` Stores issue
` Return the surplus material
` Tool issues` Shop and inter departmental transport
` Inspection
` Coordination with scheduler
-
8/8/2019 Production Planning and control (PPC)
11/14
` It is a process of checking actualperformance against production plan andreporting the deviation
` Number of factors that push schedule of themark are
1. delay in material receipt
2. Excessive absentism
3. Strikes
-
8/8/2019 Production Planning and control (PPC)
12/14
` Collecting information from manufacturingshop
A. Physical count
B. Daily production reportC. Job card
D. Detachable ticket
-
8/8/2019 Production Planning and control (PPC)
13/14
` Recording progress of work and comparisonof actual progress against plan
1. Progress card
2. Display board3. Network updating
-
8/8/2019 Production Planning and control (PPC)
14/14
` Expediting to rush up remaining operation
` Communicating anticipated delays to salesdepartment and customers