production scedule

7
Rose Newbury Task Expected date of completion Date of completion Comments Receive permission for song use This took a long time because I had to contact the band on facebook and they took a long time to get back to me with permission. Research and analyse other real media videos 22/11/10 29/11/10 This took a large amount of time because I had to research three videos that I thought would best fit with the genre of my song and analyse them. Create Storyboard 5/12/11 17/12/10 The storyboard took some time because I draw each of the scenes out by hand and at times changed the idea of the video. Liaison with actors and actresses 13/12/10 13/12/10 This task was finished on time because I could easily contact the actresses/actor s I wanted in my video. Arrange first filming session (book cameras) 13/12/10 13/12/10 This task was finished on time because it was easy to arrange the sessions and Production Schedule

Upload: roseannn19

Post on 25-May-2015

236 views

Category:

Business


4 download

TRANSCRIPT

Page 1: Production scedule

Rose Newbury

Task Expected date of completion

Date of completion Comments

Receive permission for song use

20/11/10 1/12/10 This took a long time because I had to

contact the band on facebook and they took a long time to get back to me with

permission.Research and

analyse other real media videos

22/11/10 29/11/10 This took a large amount of time

because I had to research three

videos that I thought would best fit with

the genre of my song and analyse them.

Create Storyboard 5/12/11 17/12/10 The storyboard took some time because I

draw each of the scenes out by hand

and at times changed the idea of

the video.Liaison with actors

and actresses13/12/10 13/12/10 This task was

finished on time because I could

easily contact the actresses/actors I

wanted in my video.Arrange first filming

session (book cameras)

13/12/10 13/12/10 This task was finished on time

because it was easy to arrange the

sessions and book equipment.

Organise props costumes.etc.

13/12/10 13/12/10 This task was finished on time

because the costumes were

discussed beforehand with the actors/actresses and organise the props I

only had to gain permission.

Arrange locations 13/12/10 13/12/10 This task was finished on time

because the locations were arranged in the

storyboard and just had to check that I

could use them.

Production Schedule

Page 2: Production scedule

Rose Newbury

First filming session 15/12/10 15/12/10 The first filming session was finished on the day it began

because I had planned before hand what I was going to

film and what I needed for this

session.Upload Footage 3/1/11 3/1/11 This task was

finished on the same day as started but it

did take a large amount of time to complete because the software kept

being unresponsive and therefore

crashing which meant I had to start the upload again.

Upload Song 3/1/11 4/1/11 This task wasn’t finished on the day I wanted to because the previous task took longer than expected which

meant that uploading the song had to be put back to the next

day.Edit existing footage 4/1/11 4/1/11 This task finished on

the time expected because I just had to

edit out all of the clips that I didn’t

need for the video.Plan next filming

session8/1/11 8/1/11 This task was

finished on time because all I had to do was to plan what footage I was going

to film next.Gain permission for use of filming space

(performance Scenes)

14/1/11 14/1/11 This task was finished on the time

expected because all I had to do was gain permission from the person authorised.

Notify Actors/Actresses

14/1/11 14/1/11 This task as finished on the same day as started because I

had a way of contacting all of the

Page 3: Production scedule

Rose Newbury

actors/actresses I wanted for this filming session.

Receive permission for props

(instruments)

14/1/11 14/1/11 This task was finished on the time expected because I

had to gain permission from the

same person I had to gain permission from for the filming space.

Second filming session

(performance element)

18/1/11 18/1/11 This filming session ended on the same

day as started because I had

planned what I need to film for the video

beforehand and there were no disruptions or

problems.Upload footage 19/1/11 20/1/11 This task wasn’t

finished on the time expected because there were problem as before with the software in that it kept freezing and

therefore disrupting to upload.

Edit 19/1/11 20/1/11 This task wasn’t finished in the time expected because the previous task took longer than expected which

mean that this task was postponed until

this date.Plan next filming

session22/1/11 22/1/11 This task was

finished in the time expected because

knew what I needed to film before hand

from my storyboard..Notify

Actors/Actresses22/1/11 22/1/11 This task again didn’t

take up lots of time because I could

easily contact the actress that I needed

or this session.Third Filming

Session25/1/11 25/1/11 This task was

finished in the time expected because

Page 4: Production scedule

Rose Newbury

this filming session was done with one actor at the location of my house which means that it was easy to film and didn’t take long.

Upload Footage 25/1/11 26/1/11 This task took longer than expected

because again the software wasn’t

working as it should have been.

Edit 26/1/11 27/1/11 This task was postponed to this

date because of the previous task taker

longer than expected but this task in the end didn’t take up

lots of time.Create Rough Cut 5/2/11 5/3/11 This task took longer

because I had a lot of footage to edit in order to create the

rough cut and I also had problems with the software being

slow.Create Questionnaire 16/3/11 16/3/11 This task didn’t take

up a lot of time because I knew what questions I wanted to

answer so it was easy to create

Receive Feedback 20/3/11 20/3/11 This task didn’t take up a large amount of

time because I received the

feedback after the video was watched by the audience I

chose.Re-shoots 3/4/11 3/4/11 There wasn’t much

that I had to re-shoot in order to perfect my

video so this task was finished on the

date expected.Finished Video 8/4/11 9/4/11 The video was

finished a day late due to software

problems.