production schedule

3

Click here to load reader

Upload: luciapuricelli

Post on 10-Jul-2015

159 views

Category:

Business


0 download

TRANSCRIPT

Page 1: Production schedule

Production Schedule

Date Task28/10/10

02/11/10

4/11/10

15/11/10

16/11/10

18/11/10

19/11/10

20/11/10

21/11/10

22/11/10

24/11/10

25/11/10

26/11/10

28/11/10

29/11/10

First day of filming. I filmed some of the narrative at my friend’s house will be the location of the narrative part of my video. I managed to get most of this part done apart from when my character leaves the house because it was raining.

I filmed the first performance part of my music video. This was a brighter day so took the opportunity to film in the outside location. I only managed to get some of the performance done because I wanted to capture lots of different shots so ended up doing the same lyric numerous times.

I started editing my video on this day. I took all the footage I had collected so far and cut out the parts I won’t be using.

I filmed the rest of the narrative at the house location in this day because this was one of the only days since my last filming session in which it was sunny enough to film any outside parts of my video. I finished this part of the narrative and only have one small part left to do.

Edited more of my music video.

I filmed all of the performance behind the white backdrop on this day. I took a long time to do this because I wanted to get these shots all in one go since it took a lot of effort and time to set the backdrop up.

Edited more of my music video.

I started my digi-pak. I started the front cover by cutting out the image of a guitar and placing them where I wanted them. I also added the artists name and the title of the song.

I continued work on my digi-pak by adding in the text inside the guitar.

Edited more of my music video.

I finished the front cover of my digi-pak and moved onto the back cover, I added the image of the artist and added the tracks that will on the album.

Edited more of my music video.

Started work on my poster. I started by cutting out the shape of the guitar and filling it with words like I had done on my digi-pak. I finished the back cover of my digi-pak by adding the words around the edge and by change the style of the image, I made it black and white instead of in colour.

Edited more of my video. Continued work on my poster, I finished off adding all the words inside the guitar and added the artists name and release date.

Started work on the CD panel of my digi-pak. I started adding the artists name all over the page.

Page 2: Production schedule

2/12/10

5/12/10

7/12/10

12/12/10

14/12/10

8/01/11

14/01/11

17/01/11

18/01/11

23/01/11

26/01/11

29/01/11

5/02/11

07/02/11

13/02/11

15/02/11

16/02/11

18/02/11

22/02/11

26/02/11

04/03/11

This was a sunny day so decided to film some more of the performance part of my video. I didn’t get much done but managed to collect some more shots which I could use in end part of my song where the line repeats itself over and over again.

I finished off the CD panel of my digi-pak.

Edited more of my video.

I finished my poster on this day. I added the artist’s website and record label and quotes from a magazine.

Edited more of my video.

I continued work on my digi-pak. I started on one of the inside covers by taking a still from my video and placing it on the panel. I then wrote words on scrape pieces of paper and took pictures on them. I will later put these on the computer and cut them out to place on my digi-pak.

Edited more of my music video.

Edited more of my music video.

Edited more of my music video.

Filmed the last bit of performance since it was a sunny day and everyone I needed was free. This took a while but I managed to get all the performance completed.

Edited more of my music video.

Edited more of my music video.

Filmed more of the narrative part of my video.

Edited more of my music video.

Finished one of the inside covers of my digi-pak. I uploaded pictures that I had taken before and placed them on the panel I wanted. I only have two panels left to do.

Edited more of my music video.

Edited more of my music video.

Finished my digi-pak. I put one still from my video along two panels and finished the spines.

Edited more of my music video.

Edited more of my music video.

Finished filming the narrative part of my video and also edited more of my music

Page 3: Production schedule

07/03/11

12/03/11

14/03/11

18/03/11

video.

Edited more of my music video and finished a rough cut.

Re-filmed some parts of my video to improve the shots.

Edited my music video.

Finished all production.