professional portfolio small

14
U n d e r g r a d u a t e & P r o f e s s i o n a l Portfolio Rakan W. Ayyoub

Upload: rakan-w-ayyoub-assoc-aia

Post on 10-May-2015

317 views

Category:

Technology


1 download

TRANSCRIPT

Page 1: Professional portfolio small

U n d e r g r a d u a t e & P r o f e s s i o n a l P o r t f o l i o

Rakan W. Ayyoub

Page 2: Professional portfolio small

Located in a very distinct district in The Jordanian Capital, Jabal Al Waibdeh “Mount Waibdeh” is one of the oldest inhibited areas in the history of Amman, the Coffee place was chosen to have a very deconstructionist and provocative look in order to make it stand out from the crowed of traditional J o r d a n i a n a r c h i t e c t u r e p r e s e n t i n t h e a r e a

The narrow voids linking between buildings are interlocking at different points, these points allow activity to transform and change so it is reflecting the motion of cars and pedestrians within that area.The buildings evolved over time in an arithmetic way in a series of 1 to 2 levels, the regulations changed to allow 3, or more.This growth in length is equal to the change in time, and the continuity and flawlessness of time induces us to think of 1 continuous structure such as a folded structure.When observing the area's skyline of the nearby buildings, each level of the surroundings, can be combined and compressed into a multilevel structure, thus creating a folded

sectional grid, jumping in and about 6 levels, each level represents a change in functionality.

Pro

jec

t C

on

ce

ptu

aliz

atio

n

Change in building height = change in time

1

2

34

5....

The section shows the sequential jump of levels from number 1 “ The entrance” to number 6 “ The gallery” Notice the ramp leading towards the reading areas which in turn shifts level to the inclined book shelves which is on the same level then shifts levels by ramps towards the terrace.Notice how the exhibition space is created by the void and the hanging artwork that can be seen from all around the building.

The Inclining Book Shelf

3Reading Area

2Entrance

1Transformation

5

Terrace 4

Gallery

6

Se

ctio

n A

-A

This plan shows the small entrance area, it was designed in this manner to allow for security measures, a ramp follows to take the users to another level hence a change of functionality towards an ordering counter and a setting area, the area views a gallery below from the void and a view towards the outside, the right part of the plan shows another setting area that leads to inclined book shelves.

1

2

3

4

5

6

7

8

9

1. 2. ,3. ,4. 5. ,6. Main Entrance Inclining Ramp Prep. Area Ordering Counter W.C Setting and , , Reading., Void Open To Below , Inclining Book Shelves , Setting and Reading7. 8. 9.

The ability to store more books on an inclined bended

slab is of vital importance to the projects economical survival, angular walls allow for easy leveling, thus a ramp was created that crosses one level of bookshelves right onto another level, and up towards another ramp that leads to the outside terraces.

Pla

n G

rou

nd

Flo

or

The Back elevation faces a northen area were there is no direct lightning, northen areas may reduce favorable ambient conditions. This is the elevation used for the book shelves, it is mainly used as a folded slab that holds most of the building together.

The Book place Cafe A t h i r d y e a r p r o j e c t

Section A-A

Instr

uc

tors

:

3rdyear

A t h i r d y e a r p r o j e c tThe Book place Cafe

F I G U R E 1 . B

Voids and the surrounding buildings.

F I G U R E 1 . A

D R.AL IALGH OU L

F I G U R E 1 . B

Hence a 6 leveled folded structure with 6 changes in activity

F I G U R E 1 . CF I G U R E 1 . C

Time Represents continuity , a folded structure

F I G U R E 1 . D

02

Page 3: Professional portfolio small

Pro

jec

t C

on

ce

ptu

aliz

atio

n

Instr

uc

tors

:

3rdyear

D R.AL IALGH OU L

Computer History Museum

Sec

tio

n A

-A

1. 2. ,3. ,4. Computer Time line Exhibition Entrance Entrance Visible , Storage Exhibition.

1

2

3

1. 2. Computer Time Line Exhibit ion Computer ,Advertisement History Exhibition Visible Storage ,3. Exhibition

A

A

B B

1

1. Semiconductor Exhibition,

A t h i r d y e a r p r o j e c t

Located in one of Jordan’s most visited areas, Jabal Amman “Mount Amman” the area is a very rich cultural and urban space. The Computer History Museum was established as a non-profit organization in 1999 in the united states. The Museum is dedicated to the preservation and celebration of computing history. It is home to one of the largest international collections of computing artefacts in the world, encompassing computer hardware, ephemera, photographs, moving images, documents and software.

Computer History Museum A t h i r d y e a r p r o j e c t

Pro

jec

t C

on

ce

ptu

aliz

atio

n

To conceptualize the design; since the functional requirements of a museum are quite limited, it was easy to symbolize the conception to include chips each comprising an architectural program, thus being analogous to the machine language of a computer, with interconnecting paths forming an analogous circulation pattern, which introduces a sequential programming of the visitor as he passes through the so called units. The Sketches show the primary formation of the spaces in elevation form , it is clear how the auditorium space is buried underneath and the rest of the museum is composed of

interconnected spaces that overlap each other and are connected.

Exhibition Space - Program

Exhibition Space - Program

Exhibition Space - Program

Exhibition Space - Program

Exhibition Space - Program

Interconnection path

Interconnection path

The Formation of a logical schemata 1 C o n c e p t i n i t i a t i o nF I G U R E 2 . A 2 Labyr inth ine Movements

F I G U R E 2 . B

Exhibition Unit

Exhibition Unit

Exhibition Unit

3 Geometr ical Format ionsF I G U R E 2 . C 4O v e r a l l L a y e r i n g

F I G U R E 2 . D

Computer history Timeline ExhibitionF I G U R E 2 . E

S e m i - C o n d u c t o r E x h i b i t i o n F I G U R E 2 . F

03

Page 4: Professional portfolio small

Chosen in the city of Zarka, the functional requirements of the program were quite brutal and a lot of the concentration was on functional and structural accuracy and on healthcare conceptual design for eye centers in general.

Pro

jec

t C

on

ce

pt

A healing theater experience

The Book place Cafe A t h i r d y e a r p r o j e c t

Instr

uc

tors

:

4thyear

F I G U R E 3 . B

Curvilinear formation to facilitate way finding

F I G U R E 3 . A

D R.SAL IMALFAQIH

Functional layeringF I G U R E 3 . C

Facilitation of way finding

Healing Environment to be created here (Stage)

Healing and Positive Working experience

The Curvilinear Shape enables patients to be spectators

All Patients on east sideto emphasis circadian rhythms.

Central Warhouses

Engineering Workshops

Outpatient Clinics

Cataract Surgery Suite

Laundry Department

Cataract Radiology

Morgue

Inpatient BedroomsMain Visitor Circulation and void

Main Labs

Emergency Department

ICU

a f o u r t h y e a r p r o j e c tCataract�Surgery Center

Celebration of sight most of us do not go around touching buildings, yet without thinking about it we touch them all the time, celebration of eye sight is of vital importance in hospital design and construction, the idea of walking form darkness to light has been celebrated in all cultures, " All colors will agree in the dark ",

The Placebo Effect The site has no challenging views to promote the placebo pill effect, creation of this placebo pill effect using architectural + environmental challenging aspects may contribute to produce an architectural concept.

A Healing Theater

The project deals with many design aspects, focusing primarily on the subject of evidence based design EBD, the project included a variety of healthcare design ideas incorporated and integrated into this building to produce a fully functional, patient rewarding and visitor friendly experience.

In its essence the and the placebo pill effectinteraction between the body and

the mind was of major importance, hence th is evidence based healing environment.

This healing environment must reflect a positive working environment for the doctors also,

hence the creation of this experience based

economy overruns the service based economy.

This kind of economy (experienced based is now leading the market e.g branding), for that the creation of a memorable experience makes people place a higher value on it (this is known as scripting the experience), for an experience is basically the knowledge, occurrence and the feelings that takes place, and so making this project as a healing stage was the major concept.

The diagram Shows the zoning of various departments within the building the main, ia central circulation space and void can be seen clearly here, surrounded by 2 main cores, that distribute circulation and functional flow from one place to another seamlessly, Cataract�Surgery Center

a f o u r t h y e a r p r o j e c t

04

Page 5: Professional portfolio small

20+10+X World Architecture Community Awards8th Cycle

AWARD S

Located in one of Jordan’s most visited areas, Jabal Amman “Mount Amman” the area is a very rich cultural and urban space. The Computer History Museum was established as a non-profit organization in 1999 in the united states. The Museum is dedicated to the preservation and celebration of computing history. It is home to one of the largest international collections of computing artefacts in the world, encompassing computer hardware, ephemera, photographs, moving images, documents and software.

Pro

jec

t C

on

ce

ptu

aliz

atio

n

G e o m e t r i c a l F o r m a t i o n s

Computer history Timeline ExhibitionF I G U R E 2 . E

S e m i - C o n d u c t o r E x h i b i t i o n F I G U R E 2 . F

A t h i r d y e a r p r o j e c t

The shmesani area is filled with voids between buildings, these voids can be used at a lower level in order to maintain some sort of visual continuity. When looking at the area’s surroundings a lot of features can be noticed:The external visual framing continuity EVFC aspect will impact the users, and clients ability to

interact with the outside, passers by and cars will be able to view the building from the outside, giving them a transparent and honest visual experience of what is going on inside the building.

The external visual framing continuity EVFC , will also insure a pleasant working environment

for the staff of the building, bringing in plenty of natural lightning.

The internal visual framing continuity IVFC , is a concept based on the honesty of the

interactions between the bank departments and other mixed used stories. For the purpose of delivering an efficient IVFC the building was first split into 2 main sections. Then in order to provide a more honest view instead of a building being composed of 1 floor slab, the floor slabs were to be shifted along the Z axis in order for the viewer to grasp a wider viewing frame of 2 stories instead of 1.

Viewing two stories at once enables a more confident way finding ability, plus that it enables the client or building users to experience more of the building, thus that they are exposed more to the nature of the banking departments, and more to other retail stores and so on. Split levels were used in order to make a diversity in building uses also, a change in function from one department to another may enhance the users’ psychological state of mind.

National Commercial Bank

The building is c o m p o s e d o f low e-g laz ing curtain walls, on a spider based mullion system, t h e s y s t e m i s suppor ted by the a luminum panels at the f r o n t o f t h e b u i l d i n g , t h e panels are in turn suppor ted by t h e m a s t s o n e a c h s i d e .

F I G U R E 6 . A

Interior Branding for the client’s waiting area

F I G U R E 4 . B

Interior Branding for the client’s waiting area.

F I G U R E 4 . C

IVFC

EVFC

Internal visual framing continuity

External visual framing continuity Building Transparency enhances honest client-dealer interaction and may promote a feeling of well being

Left Building plan

Right Building plan

middle area

IVFC

IVFC

Left Building section Right Building section Void

View

View

floor

floor

floor

floor

floor

View

Pro

jec

t C

on

ce

ptu

aliz

atio

n

1. 2. 3. 4. 5.Entrance Lobby, Coffee Place, W.C. , Credit Manager , Credit and Auditing Dept. Daily safe, Security Pass, Dealers’ Hall 6. 7. 8.

12

3

4

5

6

7

8

Shading Device

Spider

Horizontal Panel

Low e Curtain Wall

Vertical Bracing

Supporting Mast

The building is composed of low e-glazing curtain walls, on a spider based mullion system, the system is supported by the aluminum panels at the front of the building, the panels are in turn supported by the masts on each side, this specific design is to encourage a visual movement as cars and pedestrians move by.

A bank project was intended to teach students the ways in which mid-rise buildings are built and designed, the project is located in an area stacked with mid-rise buildings, and is a very vital commercial and business district in the Jordanian Capital.

05

Instr

uc

tors

:

4thD R.SAL IMALFAQIH

Page 6: Professional portfolio small

working on the aesthetic embodied response to architectural spaces, of both interiors and exteriors, and just the visual pleasures of the notsurface(glass geometric regularity), but the tactile, auditory and olfactory pleasures that the body responds to a whole, such as textured materials, hollowed acoustic spaces, coding smells to building areas etc and etc..

Instr

uc

tors

:

Incorporating the building with natural stone formations.

F I G U R E 4 . A

D R.SAL IMALFAQIHSha ana

v i s i o n a r y I N T E R V E N T I O N

There is more to a place than its physical dimensions

the understanding of place, sensibility, due respect to it’s

nature and the courage to design something new is probably

an approach to generate new meaningful places. Places

are complex systems and we are still very weak in

understanding and dealing with complex systems and thier

phenomena.

Traces that represent the search of the traveler towards a

place remind us that earth is not only a surface, but beneath

it and beneath our feet the earth continues downwards. We

feel the movement of the planet as we feel gravity .

“elements” – the project articulates on these motifs Architecture confronts tradition and can reformulate memory in a way that points to the future. The goal is to bring traditional aesthetic qualities in a entirely novel and previously unforeseen way that discloses the philosophy of time and place, and world existence.the building is not only an object to be viewed. It is formed merely by its relationship to everything that surrounds it both from a very physical and environmentally significant way. This relationship creates a spiritual connection both with its place and with the people who enter that realm.It's the movement within spaces which anticipates the form of the building. “ the sites energy creates a certain movement and rhythm” – 3 dimensional movement, underground. Sky direction and the movement horizontally.

Co

nc

ep

tua

l Ap

pro

ac

h

Middle Corridor Guest Room Guest Room Kitchen Services

Rooms are separated from the main old building by means of a high tech glass box, although the box is not completely open to the outside the above skylight can bring enough light at all times of day

Courtyards bring enough intimacy with nature, forming a reasonable spirit of place feeling.

The middle corridor is completely interactive with the natural features of the site, the platform which it constitutes allows interaction with the sand below.

Kitchen services are close to the restaurant areas and the rooms for optimum service.

Vill

ag

e In

terv

en

tion In the village area , as someone approaches its

entrance a minor plot with old destroyed houses was chooses in order to construct a traditional hotel, the hotel was designed in a manner to contradict the villages architectural element. The Juxtapositioning of the extremely high tech building materials and the very old stones, redefines the sites religious - and architectural elements and exposes them in a eccentric way, the allows the visitors that approach the site to start feeling and wondering about the place.

Sketching destroyed limestone village buildings.

F I G U R E 4 . B

Introducing an exhibition inside an old house.

F I G U R E 4 . C

D R.SAL IMALFAQIH 065th

year

Page 7: Professional portfolio small

Computer History Museum A t h i r d y e a r p r o j e c t

Computer history Timeline ExhibitionF I G U R E 2 . E

S e m i - C o n d u c t o r E x h i b i t i o n F I G U R E 2 . F

Instr

uc

tors

:

D R.SAL IMALFAQIH

Gro

un

d F

loo

r P

lan

1245

6

8

7

9

Sec

tion

A-A

1. Entrance 2. Foyer3. Library: Reading , Exploration4. Artificial lightning exhibition5. Penetration of Nature exhibition6. Contemporary Meets Past Gallery7. Amphitheater - the social reunion8. Restaurant 9. Transitional Tunnel10. Plaza - play with nature11. Audiovisuals exhibition

1. Entrance 2. Foyer3. Library: Reading , Exploration4. Artificial lightning exhibition5. Penetration of Nature exhibition6. Contemporary Meets Past Gallery7. Amphitheater - the social reunion8. Restaurant 9. Transitional Tunnel10. Plaza - play with nature11. Audiovisuals exhibition Fi

rst

Flo

or

Pla

n

1245611

7

3

3

Sec

tion

A-A

07D R.SAL IMALFAQIH

5thyear

Page 8: Professional portfolio small

Producing the fundamental Design, Final Design and tender documents for the $ 20 Billion, Shamia Expansion and Service Building for the Holly Masque in Mecca, ( Al Haram ) expansion project.

Instr

uc

tors

:

Walkways under terrace areas, comprising ablutions

F I G U R E 5 . A

D R.SAL IMALFAQIH

Detailed design and tender documents for an extension to the Makah Holy Haram to accommodate additional 800,000 worshipers, comprising a new building of 4 praying levels with a capacity of 300,000 worshipers, connected at its ground, first and roof floors to the First Saudi Extension of Makah Haram, and includes a basement level for electro-mechanical services; state-of-the-art technology in natural and artificial climate and lighting controls; security, crowd management, and sound distribution and control systems; structural health monitoring sensors; cleaning equipment; interactive signage; and high end interior finishing works. The project provides internal courtyards covered with 12 operable skylights, 6 fixed ones, 4 fixed domes of 18 m diameter each, and one 36 m diameter sliding dome above the 24 m wide/26 m high ceremonial spine connecting the north and south piazzas through a 59 m wide main gate at the north end flanked by 2 new minarets (135 m high each) on its left and right sides and a 30 m wide gate at the south end. The project also comprises 194,000 m² external praying piazzas accommodating 314,000 worshipers with 2,500 toilet cubicles and 850 ablution points beneath them; a service building of 6 overlapped radial steps accommodating 11,000 toilets, 5,370 ablution points, 2 helipads, service and solid waste management facilities, authorities' offices and a 110,000 m² praying area at its roof level for 165,000 worshipers; several bridges (total of 42,750 m²) linking the new building to the service building and to the existing Holy Haram; a service road below the external piazzas and dedicated service culverts carrying all infrastructure utility networks; and a temporary steel bridge for access of trucks during construction.

Pro

jec

t D

esc

riptio

n

Wo

rk R

esp

on

sab

ilitie

s

Participated in the conceptual design and provided full technical support throughout the entire project. Applied diverse knowledge of Islamic architectural principles and practices in a broad array of assignments and related fields. Was responsible for the production and oversight of construction documents that conform to Saudi standards and client

standards, including drawings and specifications. Participated in coordination works with other Dar departments and other consultants Was responsible for working directly with the project designer and client (Saudi Government Representative) to realize the

project vision. Development of detailed solutions to exclusive conditions. Served as a resource and provided technical guidance to less experienced architects.

Construction site of Shamia expansion

F I G U R E 5 . B

p r o f e s s i o n a l E x p e r i e n c e 2 0 1 1Al-Haram�Expansion

Terrace areas with prayer lines directed perpendicularly towards Kabba

F I G U R E 5 . C l e f t

Transition Area between Shamia Building and service area.

FIGURE 5.D middle

Bird’s eye view zone 15

F IGURE 5 .E r ight

P. D

ire

cto

r:

08MR.JO SE PHH AJJAR

Page 9: Professional portfolio small

Conceptual design, Design Development, and Tender Documents for Abraj Kudai Towers Complex, Mecca, Saudi Arabia, a 12 mega skyscrapers complex joined by a podium.

Computer history Timeline ExhibitionF I G U R E 2 . E

S e m i - C o n d u c t o r E x h i b i t i o n F I G U R E 2 . F

Abraj Kudai

Locating a sophisticated multi-functional development in such a prestigious site in the vicinity of the Holy Haram, imposed certain character and determinants. Due to its huge unparalleled size, height, distinguished location and exposure, the building forces itself as a landmark that should relate to both the Saudi Locality as well as the Islamic Universality of its expected users, over and above to illustrate its modern multi-functional identity.

The project is a “Residential, Commercial Complex”

at Manafia area, in Makkah Central Zone, 2.2Km. south of the Holy “Haram” and 1.7 Km through tunnel .

The total site area is approx. 60,000 m², Ajyad road from the east, Kudai & Birka tunnels from the west and Prince Meteb land from north the site is accessible from two main roads from east & west as well as a private road from north, surrounded by private buildings and properties from the East .However, many advantages were carefully considered and used to achieve the best solution and the maximum benefit of the allocated site as listed hereafter:

The site outstanding location and being nearby the Holy “Haram” with a direct access to Haram piazza for both pedestrian and vehicular circulation. The complete separation between pedestrian routes and vehicular circulation due to the presence of the Kudai station , Rail way (APM) and Kudai & Birka tunnels.

Pro

jec

t D

esc

riptio

n

Wo

rk R

esp

on

sab

ilitie

s Basic configuration of massing, and site layout, production of sun and wind studies Major contributions to the design of elevation openings, including arches, gates, windows and other various design elements

including cornices, corbeling design. The design of such elements required deep analysis of Mecca's architecture and a vast study of various Islamic architectural elements.

Leading the 3D BIM modeling of the various design components using Sketchup with a team including 6 architects. Contributing to the 2D detailing of all design components to produce references for the assembly of major true length design

elevations and sections. Leading 3D BIM assembly and design of each tower using Sketchup by creating assemblies of components , the design process

thrived to produce a highly detailed 3D model of the 12 towers to produce finalized 2D parallel CAD elevations under the supervision of a Senior Architect.

Production of High Quality Design Renders using 3D studio max, and V-Ray Participated in Final Design and Tender Documents Producing Detailed building enclosure drawings, sectional details, material treatments using Revit Architecture Software. Reconstructing a detailed Revit based 3D BIM model, the process required redrawing of floor plans, sections, producing room

schedules, and other drawings according to the List of Deliverables.

Main Building Entrance Gate

F I G U R E 6 . A

Tower 6, with artificial light to simulate natural sunlight.

F I G U R E 6 . B

Excavation works in site area under construction.

F I G U R E 6 . C

p r o f e s s i o n a l E x p e r i e n c e

Site plan showing a flower dome arrangement.

FIGURE 6.D r ight

Void areas between towers.

FIGURE 6.E middle

ElevationF IGURE 6 .F r ight

P. D

ire

cto

r:

MR.JO SE PHH AJJAR 09

Page 10: Professional portfolio small

Schematic and Conceptual Design for Le - Meridian Hotel Extension in Amman Jordan, this included proposals for various options with schematic plans, elevations,3d models and rendered images.

Instr

uc

tors

:

D R.SAL IMALFAQIH

The concept was developed as a direct relationship between the site analysis results and the client's needs. The project emerged as a transparent building allowing for the maximum use of daylight and the stunning views of the site. The exterior façades represent a dynamic transition between the surrounding buildings to a building that suites its location as a high-tech landmark for the 21st century.Influenced by the Fiberglass reinforced concrete cladding style of the 1960s Iskan's commercial building, the bands of GRC sequentially open up in dynamic steps to reveal more daylight and views. This corresponds to the clients' needs of more ample daylight and views that were not present in the nearby Meridian and the Iskan building. The location of the GRC used in the building is located in the northern elevation of the building that is by nature lacking in natural daylight and is facing the old buildings, facades thus blocking any views. These GRC steps open up slowly towards the north, thus providing necessary shading during summer daylight when the sun is almost perpendicular to the building and is strongest in the northeastern and northwestern parts of the sky during the morning and evening. The GRC panels lose their influence towards the south elevation to allow for natural daylight to enter during winter times when the sun is lowest in the sky and tends to be present more in the south. The southern elevation is however treated with high tech shading devices that can block the sun completely in the summer when needed.

Pro

jec

t C

on

ce

ptu

al A

pp

roa

ch

Wo

rk R

esp

on

sab

ilitie

s

Lead Direct meetings with the clients to determine project needs and objectives. Lead the entire concept design with a team of interns. Was responsible for coordinating and monitoring Revit modeling between interns, junior architects and other Dar engineering

trades. Lead coordination meetings with other trades. Produced high quality renderings and presentation graphics for the proposal. Lead the production of the design presentation proposal package for the client. Participated in meetings and project presentation to the client.

The glass in the building was designed to be of transparent LOW e glazing with low reflectance, this reduces glare to the surrounding Shmesani residential area and maintains a beautiful exterior connectivity from inside to outside providing a more welcoming experience. The building uses floor landscaping in various areas, unlike the landscaping treatment in the ISKAN commercial building that represented a fungi problem in the flooring treatment. The landscaping in this building is based upon HYDROPONICS where soil is not present and the rate of growth of greenery is multiplied. The trees represent shading, increase the real estate value of the building and allow for noise reduction and cancellation from the surrounding highway streets. The mixture of glass, greenery and WOODPLASTIC composites in the elevations allows for a theme rarely present in the country and is suitable to be represented as a new Icon as the Iskan commercial building was in the past.

Le Meridian Expansion p r o f e s s i o n a l E x p e r i e n c e

View from the Abdali complex towards the Iskan area.

F I G U R E 7 . A

Back Elevation of the tower and part of the surrounding complex

F I G U R E 7 . A

P. M

an

ag

er:

10MR.KH AL I LFAK H ORY

Page 11: Professional portfolio small

Computer history Timeline ExhibitionF I G U R E 2 . E

S e m i - C o n d u c t o r E x h i b i t i o n F I G U R E 2 . F

Yet another multi-functional development in the vicinity of the Holy Haram, the development includes various functional units in a mini scale urban complex of total site area of 117665 m2.

The project included 3 main entrances including a service entrance. The functions were comprised of a Mega-mall of total area: 50826 m2, various types of residential villas with total area of: 19234 m2, a multipurpose hall total area of: 15945 m2 , a health club with total area of: 7566 m2, employee housing areas with total area of: 7200 m2, exhibition hall with total area of: 11330 m2, a small mosque with total area of 480 m2 and a twin tower hotel with a built up area of 83150 m2, yielding a total built up area of 287850 m2.

The project was designed on a crescent geometry basis in the site plan, and the architectural language spoke of Makkah local architecture rather than the typical islamic architectural elements located near the holly haram.

Pro

jec

t D

esc

riptio

n

Wo

rk R

esp

on

sab

ilitie

s

Basic configuration of massing, and site layout, production of sun and wind studies Major contributions to the design of building enclosure. Leading the 3D modeling of the various design components using Sketchup with a team including 6 architects. Contributing to the 2D detailing of all design components to produce references for the assembly of major true length design

elevations and sections. Production of High Quality Design Renders using 3D studio max, and V-Ray

Mega mall F I G U R E 8 . A

Private Villa AreasF I G U R E 8 . B

p r o f e s s i o n a l E x p e r i e n c e Makah Hotel & Complex

Mega Mall entrance

F I G U R E 8 . D

Multipurpose hall Elevation.

F I G U R E 8 . E

Typical floor plan showing various spaces.

Modified Pointed arch, a variation from the original

F I G U R E 8 . C

Conceptual design, of the Mecca Hotel and Commercial Complex, a twin tower hotel, joined by a podium, situated within a commercial complex containing a health club, a club house, r e s i d e n t i a l v i l l a s , a m e g a m a l l a n d v a r i o u s e x h i b i t i o n h a l l s .

P. D

ire

cto

r:

MR.SAR IJED EON 11

Page 12: Professional portfolio small

Building Information Modeling (BIM) and architectural design, including coordination with other engineering disciplines, and preparation of specifications and other technical design documents, for Al Madina C onv ent i on C ente r , A l M a d i na A l M una w a , S a ud i A ra b i a ,

Instr

uc

tors

:

D R.SAL IMALFAQIH

Detailed design and supervision of construction for a 4-storey convention center (including a basement level) on a site area of 91,000 m². The project consists of a main convention theater for 2,500 persons, 2 large exhibition halls, 3 multi-purpose halls, meeting rooms, business center, economic and media center, service and landscaped areas. Parking spaces for 2,100 cars are provided at both the basement and ground levels. Total built-up area: 40,405 m².

Upon Request of the Saudi government the design language was reminiscent of that used in Makah, it is evident how governmental buildings use this architectural language to represent themselfs. A new introduction of roof screens and Kufi font writing on were introduced to the language, the Kufi font is illuminated with LED light during night time.

The design passed through a long proposal phase before getting into the final image, many sub-consultants participated in the design process including interior designers and acoustic design for the convention halls.

This project was the first project to be completely designed using building information modeling in Dar Group. everything was modeled using Autodesk Revit.

Pro

jec

t C

on

ce

ptu

al A

pp

roa

ch

Wo

rk R

esp

on

sab

ilitie

s Participated in design conception, and design development for the entire project Detailed configuration of massing, and site layout, production of sun and wind studies Managing a team of junior architects and playing a major role in the planning of site layout, site planning and parking. Leading Revit BIM modeling of the project site using eagle point site works. Leading the team for BIM detailing of all design components. Direct and continuous coordination with other engineering trades to realize project accuracy and to produce a warning free Revit

BIM model. Leading the production of the tender package for construction purposes.

Madina Convention Center p r o f e s s i o n a l E x p e r i e n c e

Entrance hall showing escalators and elevators

F I G U R E 9 . A

BIM Revit model showing Architectural and structural elements

F I G U R E 9 . C

Conference Hall with acoustical treatments and Dome area

F I G U R E 9 . B

P. D

ire

cto

r:

12MR.JO SE PHH AJJAR

Page 13: Professional portfolio small

Computer history Timeline ExhibitionF I G U R E 2 . E

S e m i - C o n d u c t o r E x h i b i t i o n F I G U R E 2 . F

Urban design proposal of a complex of 135 residential and commercial towers to allow room for pilgrims in Makah during pilgrimage season. The design included the design of 9 tower types with variations, with various podium designs to incorporate streets and parking, and other vital facilitates, podium floor areas where between 2000 to 3000 m², tower floor areas ranged from 1000 m² to 3000 m² with 15 to 25 floors per tower, giving a total built up area of around 5.3 million m².

The urban design took the views towards the Kabah in consideration, this how many towers were massed for maximum exposure towards the Haram.

The client this time was more open minded to use a modernized Islamic architecture but with a hint of Maka’s Local architecture.

The Building openings and plans followed a 3.8 m by 3.8 grid, this grid was reflected on everything from tower proportions, floor heights, windows, columns and other typical units.

Islamic patterned screens and abstract Islamic arabesque were used to promote the modern architectural feel of the project. The wooden Mashrabiah theme of Makah and the local yellow stone in Mount Khandama natural formations were strong elements in the definition of the theme.

Pro

jec

t D

esc

riptio

n

Wo

rk R

esp

on

sab

ilitie

s

Coordination with the Urban Planning department to realize project objectives Configuration of massing, and site layout, production of sun and wind studies Deep study, research and analysis of Mecca's historical architecture and a vast study of various Islamic architectural elements,

to combine with modern green sustainable techniques to produce a LEED complying city. Leading the 3D modeling of the various design components using Sketchup. Contributing to the detailed planning and configuration of all tower layouts and podiums. Production of High Quality Design Renders using Lumion and Photoshop

Main spine area with water features, ground LED lights and sprinkler cooled environment.

F I G U R E 1 0 . A

Approaching zone 1, podium spanning a 70 m high cliff.

F I G U R E 1 0 . B

Voids and the surrounding buildings.

F I G U R E 1 0 . C - D

Khandama

Voids and the surrounding buildings.

F I G U R E 1 . A

Entire Project site plan showing the Haram service building below

FIGURE 10.D Left

L shaped tower showing podium below and spine area.

FIGURE 10.E Lef t

The design included site analysis, study works, planning, and producing various skin treatments for hotel and residential towers to be used as the bases for the urban planners to build upon.

P. D

ire

cto

r:

MR.JO SE PHH AJJAR 13

Page 14: Professional portfolio small

www.rakan-ayyoub.com

Rakan Ayyoubp r o d u c t i o n s